www.huawei.com
Huawei SingleDAS Solution Overview
Author : Fengfuan 00179441
Version:V02(20130325)
Multi-Band/Multi-Network/Multi-Vendor/Multi-Operator
In-building Solution
Content
•
IBS Requirements In MBB Era
• Huawei SingleDAS Solution
• Cases
~70% mobile traffic occurred in indoor
~70% mobile traffic occurred in indoor
Source: NTT DoCoMo
Indoor Coverage Transfer from “Nice to Have” to “Must Have”
80% complaints come from indoor
80% complaints come from indoor
Drop Call Weak Signal Poor Call Quality Low Download Speed
Indoor coverage is vital for business success
Source: Softbank Outdoor 30.30% Indoor 69.70% Customers complaint Voice Services Data Services Outdoor 10% Indoor 90%
TCO Pressure Drives Operators Sharing DAS
Multi-operator and multi-system sharing is the
effect way to improve the resource utilization
Multi-operator and multi-system sharing is the
effect way to improve the resource utilization
System share is the main trend of large scenes
System share is the main trend of large scenes
Burj Dubai
ET&du share Stadium of Brazil world cup Vivo/OI/TIM/Claro/Nextel
Beijing airport T3 China Unicom& China Telecom
Spain subway
Telefonica/VDF/Orange
Train station of Shenzhen
CMCC/Unicom/Telecom Venice hotel of Macao5 operators sharing
• In order to reduce the investment, many operator choose DAS share in large scenes
• Some scenarios don’t have enough installation space, operators much share the DAS system
Subway/tunnel Airport
Europe, the site rental cost is 57.99% of TCO
OPEX 73% CAPEX 27% Site rental 57.99% Power consumption 12% Maintenance 2% BSC software upgrade 0.6% Transmission 0.01% BTS Equipment 23% I&C 2.3% De-installation 0.3% Fiber 0.6% Transportation 0.2% BSC 1%
Content
•
IBS Requirements In MBB Era
•Huawei SingleDAS Solution
SingleDAS: New Generation IBS Solution for Multi-Band/Network/Vendor/Operator
UMTS NodeB LTE eNodeB Operator A Slave DCU1 GSM BTS UMTS NodeB LTE eNodeB Operator B Master DCU GSM BTS UMTS NodeB LTE eNodeB Operator C Slave DCU2 GSM BTS DRH DRH Camouflage Camouflage Stadium Subway/Tunnel Skyscraper Airport • Full-digital, full-band,multi-operator/ system/vendor
• No dedicated equipment rooms to reduce CAPEX
• Unified RAN & DAS management to reduce OPEX
The Optimal IBS Sharing Solution
M2000
IP network
Optical fiber
Huawei SingleDAS Portfolio
DCU+DRH
:
:
:
:
DCU: Distributed ControlUnit,
Master Unit
DRH: Distributed Remote Head , Remote Unit
POI(Point Of Interface)
:
:
:
:
High performance multi-network sharing unit
SingleDAS
Platform TX RX Operator A Operator B GSM UMTS LTE GSM UMTS LTE Tunnel Leaked cable DRH DRH Optical fiber POI DCU RF Signal RFU/RRU Antenna Coupler Equipment roomSingleDAS Highlights
• Smooth expansion new band • Software for cell splitting • 2T2R for MIMO
• Smooth re-farming
Smooth Expansion & Evolution
Excellent Performance
• Advance platform
• Low power consumption • Low noise floor
• High reliability
Flexible Deployment
• Different site sharing • Electronic-adjustable POI
• Easy installation & maintenance
Unified Management
• Unified RAN and DAS O&M • Remote interference precise
DBS3900 IBS: Advanced Digital Platform Ensure Product High Performance
• Frequency band: DD800/900/1800/2100/2600MHz(Now),
700/850/1900/AWS(Planning)
• Supports 6 bands/sectors
• Electronic-adjustable POI: Each RFC supports 4 operators and
input power remote configuration
• DCU 1:3 star networking
• Support 72DRHs Master DCU
DPC
12 digital port to DRHs or Slave DCURFC:
RF interface to BTS (6~+16dBm)DCU Specification
DCU Specification
RFC : Radio Frequency Card
DPC : Digital Processing Card
DRH Specification
DRH Specification
Dual band
Single-band Triple band
……
Up tosix band
• Output power:40W /20W
• Power Consumption: 660WVs traditional 1600W (Triple band@40W output)
• Noise Figure:3 dB Vs traditional 5dB
• MTBF>>100,000h >> Vs traditional 50000h
• 2T2R for LTE MIMO
• Natural cooling
Slave DCU1 Slave DCU2 Slave DCU3
…
1 2 6
cascade to 6 DRH
Excellent Performance Flexible deployment Smooth expansion & evolution Unified management
DC-48V power supply
Power Supply
Power Module
POI3401: Full-band/High Performance Sharing Unit
Modularized Design, Easy Evolution
Modularized Design, Easy Evolution
•
Frequency: 800/900/1800/2100/2600MHz
•
Full bandwidth :
30M@800MHz/ 35M@900MHz/
75M@1800MHz/60M@2100MHz/ 70M@2600Mhz
•
High performance ensure network quality:
PIM>-160dBc, Isolation(inter-band)>30dB,
Isolation(out-band)>80dB
•
Each band support
4 operators sharing
Green Site Saves Power Consumption by 54%
Power consumption save by 54%
1600W
660W
Reduce
54%
Power consumption
Traditional Repeater DBS3900 IBS (Triple band @40W)
Test@10dB PAR
Traditional FFPA DPD+Doherty
DPD+A DHT
12%
25%
30%
DAS3401 Advanced linearity technology ensure PA high efficiency
DAS3401: Dielectric duplexer
Traditional repeater: Metal duplexer
New duplexer with less insertion loss
Traditional repeater:Multi-chip DAS3401: Single chip
High integrated design with low power consumption
Multi DRHs Uplink Noise Floor Is Not Superimposed to Ensure Network Quality
Excellent Performance Flexible deployment Smooth expansion & evolution Unified management
Carrier 1 RU1
Carrier 1
……
RU2Carrier 1 RU6
Slot 0 Slot 4 Slot 7
Uplink noise floor
Uplink noise floor
Uplink noise floor
Slot 0 Slot 4 Slot 7
Noise floor superposition
Total uplink noise floor
Traditional Solution
DBS3900 IBS Solution
Carrier 1 DRH1
Carrier 1
……
DRH2Carrier 1 DRH6
Slot 0 Slot 4 Slot 7
Uplink noise floor
Uplink noise floor
Uplink noise floor
Slot 0 Slot 4 Slot 7
Nonoise floor superposition
Total uplink noise floor
•Signal pre-demodulation, close the no user slot channel to ensure nonoise floor superposition
High Reliability Ensure Network High Performance
Salt spray test
ROHS test
High/low temperature test Rain test Vibration test
Packaging drop test
PIM test Power capacity test
MTBF
High Performance
Network
Sharing the high quality
DNA of Huawei RRU
Strict quality control
processes
Full series of simulation
environment test
Incoming control QC
100% initial test
Inventory sampling test 100% retest
Different Site Sharing Minimize CAPEX
Busy carrier Idle carrier No dedicated site reduce the high rental cost of new site
DRH BTS BTS BTS site B site A site C Slave DCU1 Slave DCU2 Master DCU Reuse outdoor macro site
Excellent Performance Flexible deployment Smooth expansion & evolution Unified management
New site BTS B BTS C BTS A MU RU MU
•
High CAPEX for new site
•
Long construction period
Traditional Solution
Electronic-adjustable POI Make Installation & Configuration Easier
•
RFC
embedded electronic-adjustable POI:
No need external combiner & attenuator
Input power remote configuration by M2000, no need to work on site
Combiner RU RU RU RU •Installation is difficult
•On-site configure input power with spectrum analyzer
Traditional Solution
DBS3900 IBS Solution
RF cable DRH DRH DRH DRH DCU M2000 Coupler Operator A Operator B Operator C Operator D RFU/RRU Load/POI Coupler Operator A Operator B Operator C Operator D Load/POI Attenuator MU RFU/RRU
Configuration
complexity
Excellent Performance Flexible deployment Smooth expansion & evolution Unified management
Modularized Open Architecture Easy Installation & Maintenance
Fast Installation
Easy Maintenance
900 2100 2100
5
minutes for triple band DRH installation 900900Each band can be installed one by one
Separated OM for each band
Software Cell Splitting for Capacity Expansion
U2100 Sector1 F2 G900 TRx1 F1 MU RU RU RU RU U2100 Sector2 F2 G900 TRx1 F1 U2100 Sector1 F2 DRH DRH DRH DRH • Add a new MU• Optical fiber redeployment for cell assignment
• Add a new RFC
•Cell assignment by M2000
•Footprint is limited
•High CAPEX for new MU
Traditional Solution
DBS3900 IBS Solution
MU1
Reduce equipment & engineering investment
U2100 Sector2
F2
New RFC
DCU
DCU DRH GSM900 LTE1800 RFC DRH DRH DRH DRH
Base station Base station
900Mhz 1800Mhz
Modularized Open Architecture Easy Expansion New Band
Step 1:Insert a new RFC & new cell
in DCU .
Step 2: Add a new DRH
Step 3:Software configuration by M2000
Expansion new band don’t need to replace the equipment
RFC 900
RFC 1800
2T2R for MIMO Reduce 50% Quantity of Equipments & Transmission
eNodeB TRX2 TRX1 Optical fiber RF cable TRX2 TRX1 AntennaDBS3900 IBS Solution
•DCU: 1 •Optical fiber :1 •DRH :1Traditional Solution
•MU: 2 •Optical fiber: 2 •RU: 2 eNodeB TRX2 TRX1 Optical fiber RF cable Antenna MU1 MU2 RU2 RU1 RFC2 RFC1Excellent Performance Flexible deployment Smooth expansion & evolution Unified management
0 50000 100000 150000 20M 2T2R&1T1R DL THP 2T2R 1T1R
Near point Middle point Far point
Smooth Evolution for Re-farming Without Hardware Expansion
Assume scenario :GSM1800 re-farming to LTE
Step1:Add LTE source
Step2: Customized output power of different system via M2000
Satisfy diversified coverage requirement for multi-system without hardware expansion
1800MHz LTE OR 1800MHz GSM LTE 1800MHz GSM
One OSS Saves Hardware Investment
DAS REMS
•
One OSS
:
One OSS server
saves 50% hardware with less
footprint and power
consumption
“2”
“ 1”
”
”
”
•
Separate Network
•
Two OSS
Traditional Solution
SingleDAS Solution
DRH M2000 DRH DRH DRH DRH DRH DCU Co-OM Link HW BTS/ DBS RAN BTS/ DBS RU RU RU MU RAN OSS RAN DAS DAS RAN RAN
Unified Management Improves O&M Efficiency
Domain Alarm Name NE Relative BTS RAN Output low power RRU1 /
DAS Output low power DRH1 RRU1
Unified Management By M2000
Unified Management By M2000
One
surveillance view(alarm/device
panel ……),
improves O&M efficiency
One
maintenance experience &
One
configuration,
reduce maintenance skill
requirement
M2000
DAS RAN
Fast Remote Precise Interference Location Saves OPEX
RTWP abnormal BTS MU RU RU RU RU Abnormal RU RTWP abnormal DCU M2000 OM Link BTS DRH DRH DRH DRH DRH Abnormal DRH DRH level RTWP remote detect by M2000• Fast remote troubleshooting • Low OPEX
Traditional Solution
DBS3900 IBS Solution
• Work on site, low OM efficiency • High OPEX for troubleshooting
RTWP d B m -120 -80 -100 1900 1920 1940 1960 1980 Frequency MHz RTWP: -83.5dBm
DRH supports Spectrum scanning
Excellent Performance Flexible deployment Smooth expansion & evolution Unified management
• Found uplink noise interference from DRH
• Found intermodulation interference from passive DAS
Content
•
IBS Requirements In MBB Era
• Huawei SingleDAS Solution
Backgroud
Crystal Hall , the biggest theater in Azerbaijan, Total seats are 25000 . There are many VIP mobile customers.
• Azercell mobile market share: 60%, 3G subscriber rate:90%, but have no coverage in Crystal Hall • High complaint rate
SingleDAS Help Azercell Enhance Brand in Crystal Hall
Crystal Hall
Challenge
• Equipment footprint is limited ,difficult to deploy E// Marco BTS equipment
• 1800MHz LTE evolution demand, but it is too hard to get the authorization to rebuild system.
SingleDAS Help Azercell Enhance Brand in Crystal Hall
Benefit
• One set of equipment support multi-system ,fast deployment
• High output power(40W per band) make less equipment, easy deployment
• One deployment support capacity flexible scheduling and LTE evolution ,reduce CAPEX
• Excellent coverage (RSCP>–95dBm : 100%, Ec/Io>–7dB : 99%), reduce subscriber rate RF cable DCU Coupler GSM900 DCS1800 UMTS2100 E// RFU Load Equipment room • 7 DCU+ 15 tri-band DRH • 14 sectors access 900MHz:::: 14sector,,,4 carrier/sector, 1800MHz:::: 14sector,,,4 carrier/sector, 2100MHz:::: 14sector,,,3 carrier/sector,
SingleDAS solution
France
France
France
France SFR: POI3401 Replaced Traditional POI In Paris Subway
SFR: POI3401 Replaced Traditional POI In Paris Subway
SFR: POI3401 Replaced Traditional POI In Paris Subway
SFR: POI3401 Replaced Traditional POI In Paris Subway
Background
SFR deployed UMTS and LTE over all RATP transport network in Paris, and shared with BYG/LotB/Orange. The network is composed of 295
stations and 319 radio sites.
Challenges
•
5 bands and 4 operators sharing, Inter-modulation
rejection is the biggest challenge
•
Tradition solution do not support evolution from 2G
to UMTS and LTE
•
Installation space is narrow, traditional solution is
hard to update new band
Huawei Value
•
Low PIM(-160dBc) and high isolation(in-band:
30dB; out-band:80dB) reduced interference,
protect investment
•
Modularized design, new module is added on
the top to update LTE, no need redundant space
•
Idler wheel design makes installation easy and
fast, improves efficiency
•
One system support 5 bands and 4 operators
BTS POI DAS DD800 900 1800 2100 2600
OP1 OP2 OP3 OP1 OP2 OP3 OP4 OP1 OP2 OP3 OP4 OP1 OP2 OP3 OP4 OP1 OP2 OP3 OP4
Idler wheel
Easy for installation DD800
2600
900/ 1800/ 2100
Smooth expansion to LTE
France
France
France
Summary
1. Huawei innovative SingleDAS fully meet multi-band, multi-network,
multi-vendor ,multi-operator requirements.
2. Advanced digital platform ensure network high performance
3. Flexible deployment for multi-operator IBS sharing, reduce
deployment cost.
4. Easy expansion and smooth evolution, reduce network cost.
5. Unified optimization and management for DAS/RAN, guarantee
Thank you
www.huawei.com
Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.