• No results found

Project Cost Reporting for PPM

N/A
N/A
Protected

Academic year: 2021

Share "Project Cost Reporting for PPM"

Copied!
20
0
0

Loading.... (view fulltext now)

Full text

(1)

Project Cost Reporting for PPM

(2)

Project Cost Reporting for PPM

The Consulting Solution “Project Cost Reporting” supports project-centric

and cross-project evaluations in PPM, all based on accounting-integration

and/or object links.

(3)

Project Cost Reporting for PPM

Our Service

An implementation-ready Solution

Implementation of the Solution

Documentation of the Solution

6 Months of Bugfixing

(4)

Project Cost Reporting for PPM

basic Idea & Functionality

With the project cost reporting, you can analyse project-centric budgets, planned

costs or actual costs. The analysis can be defined based on various criteria such

as:

fiscal year

fiscal period

accounting object (WBS element or network activity)

value type

cost element

CO version

After the report criteria have been set, the user is able to apply individual filter (e.g.

special periods or cost elements). In addition to that, the customer and the

individual user can define KPI that are calculated based on the retrieved cost data.

The KPIs can be defined by a build-in formula editor. Once a report has been

(5)

Project Cost Reporting for cProjects

Aggregation to PS accounting object level

n : 1

(6)

Project Cost Reporting for cProjects

Cost reporting entry screen

(7)

Project Cost Reporting for cProjects

Select your project(s) & define collections

1

add and remove

projects easily

multiple projects

at the same time

integrated search

help to find the

right project

every user can

save project

collections

individually

(8)

Project Cost Reporting for cProjects

Define your data source

2

define reporting

dimension freely

via drag & drop

set individual filter

for each

remaining criteria

3

choose between

different versions,

value types or

currencies, if it is

not defined as

column criteria

4

(9)

Project Cost Reporting for cProjects

Define your data source

3

Manual period

selection

Quick selections

available

(10)

Project Cost Reporting for cProjects

Save your selections for easy access

2

default selections

for every user

customizable

 user independent

every user can

save and remove

selections

individually

 user dependent

3

4

(11)

Project Cost Reporting for cProjects

Define your output

show and hide

columns

define your own

KPIs via the

integrated

formula editor

use variables to

be flexible in your

calculation

default KPI for

each user

save your own

formulas for easy

access

select KPIs

(12)

Project Cost Reporting for cProjects

Get knowledge about your project(s)

6

criteria data

according to your

individual column

selection

your project data

broken down to

single WBS

elements

analyze your

self-defined KPIs

(13)

Project Cost Reporting for cProjects

Export your data into different formats

aggregate your

data (e.g. based

on hierarchy

levels)

export your

project data to

MS Excel or

Adobe PDF

(14)

Project Cost Reporting for cProjects

Examples I

Actual costs per

year, based on

(15)

Project Cost Reporting for cProjects

Examples II

Actual costs per

year, based on

WBS hierarchy

WBS elements on

the last 3 periods

(planned costs)

(16)

Project Cost Reporting for cProjects

Examples III

Value type per

year

(17)

Project Cost Reporting

Project-Specific and Cross-Project Reporting

The Consulting Solution “Project Cost Reporting” supports project-centric and cross-project

evaluations in PPM, all based on accounting-integration or object links.

 You seek to analyse project-centric budgets, budget costs or actual costs

 You want to evaluate cost-based operating numbers

 You strive to generate your own KPI and

 Precise overview of project costs and KPIs

 Flexibility to freely combine various calculations within a single solution

 Seamless integration into the PPM 5.0 user interface

 Fast and detailed calculation of account assignment objects

 The Service provides the following evaluations and representations

 PSP-elements according to value-type, cost type, business year, period or CO version

 Evaluation dimensions are freely combinable

 Filter on various criteria can be combined

 Calculation of operating figures, deviation and definable key indicators  Display of different currencies and CO versions

 Implementation in approx. 3 weeks

Business Challenges

Key Features

Business Benefits

Availability, Technical Details

 Available for SAP PPM 5.0, cProjects 4.5

 Delivery via transport

 Distributed ERP systems are supported

 Complete documentation of all development objects and functionalities

Pricing, Links

 Price: 12,000 Euro*

 SAP Note: 1811695

 SAP Service No.: 50109202, Enhancement Svcs for PPM

 Contact: Tobias Gläser

Related Services

 Integrated Cost Planning

 Earned Value Management and Progress Measurement

(18)

Contact Information

Tobias Gläser

SAP Deutschland AG & Co. KG

Hasso-Plattner-Ring 7 69190 Walldorf, Germany M +49 160 908 23181

[email protected]

SAP Portfolio and Project Management Consulting

(19)

© 2013 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. National product specifications may vary.

These materials are provided by SAP AG and its affiliated companies ("SAP Group") for informational purposes only, without representation or warranty of any kind, and SAP Group shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP Group products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty.

SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and other countries.

(20)

© 2013 SAP AG. Alle Rechte vorbehalten.

Weitergabe und Vervielfältigung dieser Publikation oder von Teilen daraus sind, zu welchem Zweck und in welcher Form auch immer, ohne die ausdrückliche schriftliche Genehmigung durch SAP AG nicht gestattet. In dieser Publikation enthaltene Informationen können ohne vorherige Ankündigung geändert werden.

Einige der von der SAP AG und ihren Distributoren vermarkteten Softwareprodukte enthalten proprietäre Softwarekomponenten anderer Softwareanbieter.

Produkte können länderspezifische Unterschiede aufweisen.

Die vorliegenden Unterlagen werden von der SAP AG und ihren Konzernunternehmen („SAP-Konzern“) bereitgestellt und dienen ausschließlich zu Informationszwecken. Der SAP-Konzern übernimmt keinerlei Haftung oder Gewährleistung für Fehler oder Unvollständigkeiten in dieser Publikation. Der SAP-Konzern steht lediglich für Produkte und Dienstleistungen nach der Maßgabe ein, die in der Vereinbarung über die jeweiligen Produkte und Dienstleistungen ausdrücklich geregelt ist. Keine der hierin enthaltenen Informationen ist als zusätzliche Garantie zu interpretieren.

SAP und andere in diesem Dokument erwähnte Produkte und Dienstleistungen von SAP sowie die dazugehörigen Logos sind Marken oder eingetragene Marken der SAP AG in Deutschland und verschiedenen anderen Ländern weltweit. Weitere Hinweise und Informationen zum Markenrecht finden Sie unter http://www.sap.com/corporate-en/legal/copyright/index.epx#trademark.

References

Related documents

TURN IN RENTAL TRAILERS FASTER NOTICE IDLE TRAILERS AND TAKE ACTION RENT FEWER TRAILERS PROTECT YOUR CARGO FROM THEFT MANAGE TRAILER COMPLIANCE AND DATA SHARING FROM

In this paper we analyse the use, co-creation of and learning in two public spaces in dif- ferent towns in Slovenia: in the Tabor community, located in one of the neighbourhoods

PFRS 5, paragraph 23, provides that the impairment loss for a disposal group classified as held for sale shall reduce the carrying amount of the noncurrent assets only.. Thus,

The second axis represents the content provider revenue model (U2), where the content provider can either choose to charge end-users for the content or use the

The question of whether electronic bill of lading is capable of replicating the major functions of the paper bill of lading remains a topic of controversy in respect of the

Go America Auto Insurance Company, Indianapolis, Indiana: High Security Lock Systems and Transponders...

DESAIN KEKUATAN DINDING STRUKTURAL.. SISTEM DINDING