Choosing your

perfect builder

Sentinel Homes are experts in their field and understand the pitfalls of buying a section and building a home. Sentinel Homes will assist you in identifying and eliminating potential problems that will cost you money, time and emotional energy.

Many of these building issues are caused by promises of cheaper prices and so-called “extras”, or simply a lack of knowledge of the building process that becomes expensive later on.

We have compiled a list to help you make informed decisions when it comes to your homebuild – better still, we invite you to meet with our award-winning team to discuss building processes and any difficulties that may arise.

We’ve identified eight key areas to be aware of before homebuilding: 1. Your section

2. Design

3. Specification 4. Builder credibility 5. Confidence 6. Compliance 7. Handover 8. Doing it yourself

(2)

What’s the slope of the section?

Sections that are not flat may need extra retaining work or more expensive foundations.

Do you have a Geotechnical report (a ‘Geotech’ report) on the soil quality of your site?

The site may require expensive foundations to stabilise the build.

Will the site require specific additional engineering?

Due to its slope, geotech, report, being in a high wind zone, proximity to the coast, earthquake proneness, thermal activity

Are there restricted legal covenants associated with the site?

This may limit what can be built.

Are the sites boundaries restricting its shape (called daylight angles)?

Will your home meet Council planning requirements, such as:

Backyard sizes, Turning bays, Service courts, Boundary setbacks, Site coverage.

Will you require resource consent from the Council?

Is the section prone to any flooding or is it on a 100-year flood plane?

This may require a change in design or location of your dream home.

Do you need an engineered, storm-water disposal system? Do you have a sewer connection on site?

If not, you may require a bio-tank, waste-water management system.

Is there a water meter on site?

Some councils will charge up to $10,000 for water meters and water tanks or, if building close to a forest, additional water tanks may be required.

How far from the site is the phone and internet connection?

The further away it is, the higher the cost to run a line to the house.

Your section

(3)

Does the site’s street have gas?

Where is the location of power in regard to the building site? How accessible is the site for building materials to

be delivered?

Will you require a new driveway and how much will it cost? Are there any protected trees which are illegal to cut down? Are there trees you want to keep which may create a

drip-line over the building site?

Is the direction of your home facing north to capture the sun? Can you locate all the boundary pegs?

Does the Purchase Agreement of your section have a “cooling off” (‘due diligence’ or finance) clause?

(Note: a “Solicitor Approval” clause does not necessarily give you grounds to stop the Sale and Purchase Agreement).

Is your land title, “Limited as to Parcels” or “Limited as to Title”?

The council will not process requests to undertake building works in these instances.

Have you carried out a LIM report?

Do you understand the LIM and does it impact on the build and its costs?

Do you have a pre-approved loan from the bank?

If so, the bank needs to approve the section and build design to ensure you retain your finances.

Your section

(4)

Design

How your section and home fit together

Will your builder:

Meet you on site and explain all the pitfalls of the section you are hoping to purchase or have purchased?

Provide a full, comprehensive design service that allows your home to fit both the section and district plan requirements? Know the right people who can advise you of potential

design issues regarding the shape of your section?

Work with you to transform your ideas into a plan that is functional, practical and has your seal of approval? Give you a huge range of choices through access to a

many product ranges?

Ensure your title is clear? (all development levies cleared with none outstanding; reserve contributions paid, etc.)

Know what covenants and restrictions have been placed on your site which may prevent your plans being realised?

Ensure that your home meets all council standards?

Quote square metre rates that are genuine and explain how they are calculated?

Include only reliable, good-quality materials in your plan specification?

(5)

When you receive quotes from a builder, you need to make sure you know what you’re getting. You should receive a schedule called a specification (‘spec’ for short) that outlines exactly what is being used to build your home. Another thing to be aware of is something called Provisional Cost Sums (PC Sums). Builders use PC Sums to estimate the price of an item when they are not sure of its exact cost. In some cases, builders will use PC Sums to lower the overall price of a building contract, causing homebuilders to break their budget due to higher actual costs.

Specification checklist:

Does your quote come with a complete, comprehensive specification?

Has your builder thoroughly explained what’s included in the spec, what’s not included and why?

Are the standard, foundation design costs included in the spec (some builders treat this as an extra)?

Have provisions been made for a geotech report, if required? Do you have water, telephone, gas and power available at the

site and, if not, is it included in the spec?

Has the builder allowed for a water meter if your section does not have one?

If the builder contract/quote has included PC Sums, do you understand what these include?

Has the builder allowed for full drainage? (some builders only include a low PC Sum)

Specification

(6)

Does your quote or contract include a full kitchen (some build-ers only allow for a minimal PC sum that does not

provide a kitchen to your standards)?

Do you have underground services that cross your site and has a design provision been allowed to accommodate these? Does your quote allow for correct wind, earthquake and/or

corrosion-zone protection?

Building codes require extra engineering, bracing and product specification in these cases.

Will your builder:

Provide a handover programme?

Include a maintenance programme in the build contract or quote?

Honour any ongoing building responsibilities after finishing your home?

Specification

(7)

Builder credibility

What makes a good builder

Is your builder:

Trade certified and affiliated with a recognised industry body, like the Registered MasterBuilders Federation?

Able to provide an independent, ten-year warranty? Consistently winning awards within the trade?

Using the standardised fixed price Master Builders contract agreement?

Can your builder:

Show you some of the homes they’ve previously built and provide written and verbal testimonials from past clients? Show you projects they are currently working on/have just

finished where you can check the quality of workmanship? Demonstrate they have the right skills, knowledge, ability and

(8)

Confidence

Managing all the details of a homebuild

Does your builder:

Have any past, failed businesses?

Work with quantity surveyors and construction managers that are experienced in overseeing and working with tradesman, sub-trades and the council?

Have connections to reputable building consultants:

Manage a team that understands the construction process and will communicate with you regularly?

Have professional systems and procedures? Have the support of a large governing body?

Keep up-to-date with New Zealand legislative changes, such as the building act, and its implications?

Talk in plain language and explain building jargon?

Give you confidence that they can complete your building contract without running into financial difficulty?

Geotech engineers Structural engineers Fire engineers

Surveyors - house set out Surveyors - topographical Town planners

Valuers Lenders

Financial planners Interior designers Landscape designers

(9)

Compliance

Ticking all the boxes

Industry Compliance can be a minefield and if not handled correctly will lead to major delays and budget overruns. Sentinel Homes has all the bases covered and can guarantee no surprises. Their keys to managing compliance issues are:

1. Partnering with reputable advisors in insurance, guarantees, health and safety, legal firms and accounting bodies.

2. Having systems for tracking and taking care of documentation.

Does your builder provide:

The internal controls necessary to meet requirements imposed by government bodies and industry regulators? A guarantee, such as a masterbuilders premium

10 year guarantee? Public liability insurance?

A professional health and safety system that will keep all tradesman and sub-trades safe on-site?

Ccc code compliance certificate?

This process is time-consuming and will delay your move-in date as you may not get insurance until your house complies.

(10)

Doing it yourself

Advice on labour-only and kitset homes

When considering labour-only or kitset homes it’s important to know the po-tential risks, liabilities and financial implications involved. Being the head con-tractor is a full-time job. When learning something new, it’s normal to make mistakes; however, these will ultimately cost you time and money.

Risk

You are responsible for managing the entire building project, from engaging tradesman and professional services to managing builder performance, qual-ity, workmanship and compliance with building code standards.

Liability

You are accountable for meeting building code and council standards. The dwelling you build must perform to building code standards for ten years, even if you sell the home. You are also accountable for:

The health and safety of all staff

and contractors. Any damage caused to neighbouring properties Insurance public, statutory, contract works.

Financial

Building contracts for labour-only/kitset homes will not include geotechnical or drainage costs or any professional services. It becomes your obligation to understand the schedule of:

Quantities Sub-trades Tradesman

Compliance rates/quotes/quantities/ PC sums (you are responsible for all budgeting aspects of the build).

Time

You are the head contractor when building labour-only or kitset homes, a vastly time-consuming role. Some aspects of your role include:

Sourcing reputable trades, sub-trades, manufacturers and products.

Creating a building timeline and managing its timeframes – any missed deadlines will cost you money.

Obtaining at least three quotes to make comparisons.

Learning building jargon. Becoming knowledgeable in compliance issues.

References

Related documents

 Goal- Education of both clinical and academic staff on how to incorporate the QSEN competencies into their respective practice arenas... The best

In this passage, Posner recognizes that the use of communication in this instance is not merely a facilitating practice, nor is it the subject of a

As concerns have been expressed that some landlords might try to interfere in the leaseholders’ right to exercise the RTM, the landlord will not be entitled to be a

For the reasons stated above and in our initial comments, an affirmative obligation to file closed captioning certifications and/or contact information would unnecessarily burden

Having studied the background triggers and optimized the SNRfrac threshold using both background and simu- lated signals, the final step in the analysis is to apply the search

The treatment can effectively lower the pollution from the ballast water.The results indicate that solution of high •OH concentration significantly improves the quality of

Assuming the total number of dollars all individuals hold is determined by the government, the only way individ- uals taken collectively have of adjusting to a

As in childhood, the association between abuse/neglect in adolescence and young adult ADHD extended to other forms of vic- timization: participants who reported being