The installation and servicing of offshore wind farms of offshore wind farms

Kaj Lindvig, CSO, A2SEA A/S 16th September 2010p

(2)

A2SEA

Started 1

st

July 2000

100% dedicated offshore wind

100% dedicated offshore wind

4 (5) vessels, 230 employees, 85 mio Euro turnover

SEA ENERGY 2002

SEA JACK

85 mio Euro turnover

2007

Owned 100% by Dong Energy

Si Wi d 49% i 2011

2002 2007

Siemens Windpower 49% owner in 2011

Installed 700 turbines, 300 foundations

SEA POWER SEA WORKER

2002 20082008

(3)

Presentation Structure

Foundations

2002 – 2012 Market

Foundation installation

Turbines

Turbines

Turbine installation

Cables

Cable Laying

Other offshore activities

The challenge

Round Up

(4)

Installed Capacity / MW per Country

25

Installed MW per country by the end of 2010 Year Installed

Cap.

MW acc.

No. of

Turbines

485

25

2002 222 112

2004 476 263

3800

128

1423

2006 849 359

2008 1404 554

3800

1231 408

128

2010 3500 1235

2012 7500 2330

1231

UK Denmark Netherlands Sweden Germany Belgium Ireland

(5)

Offshore Wind 2002-2012

Frederikshavn

Blyth Offshore Barrow Offshore

S

Utgrunden Yttre Stengrund Robin Rigg

Ormonde Walney

G t M

Anholt

Burbo Bank Lillgrund

Nysted Horns Rev 1

North Hoyle Arklow Bank

Samsø Ormonde

Rhyl Flats Gwynt y Mor

Lynn Inner Dowsing Lincs

Horns Rev 2

Rødsand 2 Baltic I Sprogø

Alpha Ventus

Gr. Gabbard Prinses Amalia Egmond an Zee Lincs y

Scroby Sands Bard Offshore I

Norder Gründe Nordsee Ost

Kentish Flats

Egmond an Zee Gunfleet Sands

Thanet Blight Bank Thornton Bank

(6)

Typical Offshore Installation

Hardware: Software:

Foundations 15% Installation Foundations 5%

Foundations 15% Installation Foundations 5%

Turbines 45% Installation Turbines 5%

Cables 15% Installation Cables 4%

Transformer Station 2% Trafic Control/HSE/Project Management 4%

Scour protection etc. 5%

(7)

Presentation Structure

2002 – 2012 Market

Foundations

Foundation installation

Turbines

Turbines

Turbine installation

Cables

Cable Laying

Other offshore activities

The challenge

Round Up

(8)

Off h F d ti

Offshore Foundations

(9)

Installation of Gravity Foundations

Nysted Lillgrund

Thornton Bank R d d II Rødsand II Sprogø

Approx. 225 installed end of 2010

Photo: www.JanWinther.com

(10)

Installation of Monopile Foundations

Foundations

Horns Rev I &II Kentish Flats

Burbo Bank Barrow Kentish Flats

Scroby Sands

Prinses Amalia (Q7)

Barrow Robin Rigg

Lynn Inner Dowsing

Egmond an Zee Rhyl Flats

Gunfleet Sands Th t

Thanet Arklow

North Hoyley

Greater Gabbard Blight Bank

Baltic 1 Walney 1

(11)

Jackets, Tripod, Tripile

Bard

(12)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation

Turbines

Turbine installation

Cables

Cable Laying y g

Other offshore activities

The challenge

The challenge

Round Up

(13)

Installation and equipment

(14)

Installation and equipment HLV Svanen

Installation and equipment

(15)

Installation and equipment

(16)

Installation and equipment

(17)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation

Turbine installation

Turbines

Cables

Cable Laying

Cable Laying

Other offshore activities Th h ll

The challenge

Round Up

(18)

Turbines

Siemens 2.3M Units Weight

1a Hub 32.3

1b Blades 9.2

1a + 1b Hub + Blades 60

2 Nacelle 82

3 Tower (approx ) 130

3 Tower (approx.) 130

(1+2+3) Total Assembly 246

Siemens 3.6M Units Weight

1a Hub 42.4

1b Blades 17 2

1b Blades 17.2

1a + 1b Hub + Blades 95

2 Nacelle 125

3 T ( ) 180

3 Tower (approx.) 180

(1+2+3) Total Assembly 400

(19)

Turbines

Vestas V90, 3MW Units Weight

1a Hub 40

1b Blades 9+

1b Blades 9+

1a + 1b Hub + Blades 67+

2 Nacelle 70

3 T ( ) 110

3 Tower (approx.) 110

(1+2+3) Total Assembly 247+

Vestas V112, 3MW Units Weight

1a Hub 45

1b Blades 11

1b Blades 11

1a + 1b Hub + Blades 78

2 Nacelle 80+

3 T ( ) 130

3 Tower (approx.) 130

(1+2+3) Total Assembly 288+

(20)

Turbines

Multibrid 5M Units Weight

1a Hub 62

1b Blades 49 5

1b Blades 49.5

1a + 1b Hub + Blades 111.5

2 Nacelle 233

3 T ( ) 200

3 Tower (approx.) 200

(1+2+3) Total Assembly 544

Repower 6M Units Weight

1a Hub 84

1b Blades 72

1b Blades 72

1a + 1b Hub + Blades 156

2 Nacelle 316

3 T 285

3 Tower 285

(1+2+3) Total Assembly 757

(21)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation T bi

Turbines

Turbine installation

Cables

Cable Laying y g

Other offshore activities

The challenge

The challenge

Round Up

(22)

Turbine Installations

(23)

Turbine Installation

Vestas

2.0MW/3.0MW

Siemens 2.3MW

(24)

Turbine Installation

Repower 5.0 MW Full Rotor Installation

Photo: With courtesy by Jan Oelker

Siemens 3.6 MW Single Blade Installation

Photo: Project Burbo

(25)

Feeding Offshore

(26)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation T bi

Turbines

Turbine installation

Cable Laying

Cables

Other offshore activities

The challenge The challenge

Round Up

(27)

Offshore Turbines/Foundations

Interay cables

Transformer Station

Shore Cable (Transport) Shore Cable (Transport) Shore Line

Transformer Station

Onshore Onshore Cable

Transformer Station Distribution of Power

(28)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation T bi

Turbines

Turbine installation

Cables

Cable laying

Other offshore activities

The challenge

Round Up

(29)
(30)

Cable laying

(31)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation T bi

Turbines

Turbine installation

Cables

Cable laying

Other offshore activities

The challenge

Round Up

(32)

Service - Lifetime

(33)

Service

(34)

Crew vessels

M/V Thj lf

M/V Thjalfe Catemaran

Service vessels

(35)

Other vessels will be required as well…

 Cable laying vessels

 Personnel transfer vessels

 Tugs T

 Hotel ships

Totally 52 different vessels involved in Horns Rev II.

Totally up to 30 different vessels on the site at a

time.

(36)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation T bi

Turbines

Turbine installation

Cables

Cable laying

Other offshore activities

The challenge

Round Up

(37)

Future Selection of Harbour

Decide the

logistic flow for;

F d ti

Foundation installation

Turbine installation

Turbine installation

Cable Installation Cost / Time

Cost / Time

Contingency

Storage

Risk (delivery /

Risk (delivery /

handling / damage)

(38)
(39)

Port Logistics

(40)

Turbines

6,0 MW Turbine (Siemens/Vestas)

Rotor diameter : 126 m;;

Hub Height : 90 m;

Total Weight at hub height (nacelle + blades) : 250-350 tons;

Weight of tower : 500 tons;

Weight of tower : 500 tons;

8,5 MW Turbine

Rotor diameter : 160 m;

Rotor diameter : 160 m;

Hub Height : 110 m;

Total Weight at hub height (nacelle + blades) : 800 tons;

W i ht f t 1000 t

Weight of tower : 1000 tons;

10 MW turbine (Clipper)

Rotor diameter : 150 meter

Hub height: 100 meter

(41)

T bi

Turbines

• 3 – 5 – 6 MW

• Vestas

• Siemens Siemens

• RePower

• Multibrid

• Gamesa

• BARD

• Alstrom

• Alstrom

• Nordex

• 2-4 Chinese exporters

(42)

A d f d ti l d diff t

And foundations even larger and different …

Photo Jos Beurskens

Photo Jos Beurskens Photo Jos Beurskens

(43)

Floating Vessel Types

 DP vessels from O&G sector for piling operations

 Floating heavy lift cranes & shear leg cranes

leg cranes

(44)

N V l New Vessels

(from Oil & Gas)

Master Marine SeaJacks

(45)

T i l d i f l

Typical design of new vessels

(46)

F d i t i t ll ti From design to installation

• Conceptual design 1 year

• Basic design ½ year

• Detailed Design

• Class Approval etc. 2-2½ year

C i

• Construction

• Test Test ? ?

1st vessel ready in 3-4 years.

• Start 2011-2012 Usage

2015-2016

2015 2016

(47)

By 2015-2016?

Deaper waters in Germany

• Round 2½ in UK

• Start Round 3 in UK

New Markets need the same

• US market

• US market

• Canada

• China

(48)

Presentation Structure

2002 – 2012 Market

Foundations Foundations

Foundation installation T bi

Turbines

Turbine installation

Cables

Cable laying

Other offshore activities

The challenge g

Round Up

(49)

Offshore wind - hardware

Grid / Cables / Transformers

Distribution of 50 GW offshore wind in 2030

Cable production

Technology

Foundations

Steel

Production facilities

New designs

Materials

Materials

Turbines

Production

Development

Onshore - offshore

(50)

Offshore wind - software

Harbours

Germany

UK UK

Others

Vessels

I t ll ti

Installation

Service

Other vessels

Manpower / Know-how

NAREC, Newcastle UK

Bremen / Oldenburg Germany Bremen / Oldenburg, Germany

Esbjerg, Denmark

The Netherlands

From oil and gas From oil and gas

From shipping

Technical / engineering

(51)

References

Related documents

Workshop presented at the 2003 Utah State University Family and Consumer Science Extension Agents Annual Conference, February 20, 2003, Kayesville, UT.. The Impact of Business

Intensive inpatient treatment for adults and youth – Outpatient treatment - Youth Recovery House-Relapse specific group - Gender specific elders groups – Pregnant Post Partum group

After the war, sales of whisky increased virtually every year until 1980, but for the next few years, sales dropped dramatically, leaving a whisky surplus and, inevitably, this led

We estimated the ratio of the vaccine­preventable disease incidence (VPDI) for IPD to the VPDI for clinically­defined pneumonia from surveillance data in Kilifi, Kenya,

Statistical results of a simple main effects test contrasting stage survival of Metacarcinus magister larvae given experimental diet treatments (unfed vs. algal-fed) at

Caterpillar offers, as standard, on its mining technology products GPS receivers, both low and high, that have the capability to utilise both the GLONASS satellite

The following list describes many data-mining techniques in use today. Each of these techniques exists in several variations and can be applied to one or more

15 To date, this is the first systematic review of the evidence about the effects of novel psychoactive substances on the mental and physical health of people with severe