• No results found

Bechtel Project Opportunity List

N/A
N/A
Protected

Academic year: 2022

Share "Bechtel Project Opportunity List"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

(1)

Bechtel Project Opportunity List

Energy

DRIFTWOOD LNG

Date Opened:

Location:

Scope:

November 10, 2017

UNITED STATES, LA E

Closing Date:

26132

US PERMANENT OFFICES Office:

Job Number: Client: DRIFTWOOD LNG LLC

DRIFTWOOD LNG Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact Bridger Elliott [email protected] Subcontracts

Not listed. Contact project.

Subcontracts Contact Bridger Elliott [email protected]

(2)

Energy

PENNSYLVANIA CHEMICALS PROJECT

Date Opened:

Location:

Scope:

July 31, 2013

UNITED STATES, PA EPC

Closing Date:

25873

US PERMANENT OFFICES Office:

Job Number: Client: SHELL CHEMICAL APPALACHIA, LLC

PENNSYLVANIA CHEMICALS PROJECT

An ethane cracker with an approximate annual average capacity of 3.3 billion pounds of ethylene; three polyethylene units; and power and steam generation, storage, logistics, cooling water, water treatment, emergency flare, buildings and warehouses.

Description:

PROGRAMS Procurement

Materials and Construction Equipment to support Construction.

Update company registration in Bechtel's Supplier and Contractor Portal and complete additional requests prior to consideration. Contact

[email protected] to complete a Project-specific prequalification.

Procurement Contact Sidney Crews +1 878 439 3093 [email protected] Subcontracts

Support for construction, general services & mechanical & electrical Update company registration in Bechtel's Supplier and Contractor Portal and complete additional requests prior to consideration. Contact

[email protected] to complete a Project-specific prequalification.

PLUTO LNG OFFSHORE

Date Opened:

Location:

Scope:

July 01, 2019

AUSTRALIA EPCM

Closing Date:

26232

US PERMANENT OFFICES Office:

Job Number: Client: WOODSIDE BURRUP PTY LTD

PLUTO LNG OFFSHORE Description:

PROGRAMS Procurement

Refer to the ICN Gateway for opportunities.

Procurement Contact Luke Walker +1 713 235 2325 [email protected] Subcontracts

Not listed. Contact project.

(3)

Energy

SUEZ PETRO REFINERY EARLY WORKS

Date Opened:

Location:

Scope:

May 01, 2020

EGYPT E

Closing Date:

26371

EGYPT - PROJECTS Office:

Job Number: Client: RED SEA NATIONAL REFINING & PE

SUEZ PETRO REFINERY EARLY WORKS SUEZ PETRO REFINERY FEED Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact James Hart

[email protected] Subcontracts

Not listed. Contact project.

(4)

Infrastructure

RIYADH METRO PROJECT

Date Opened:

Location:

Scope:

July 29, 2013

SAUDI ARABIA EPC

Closing Date:

25872 AL KHOBAR Office:

Job Number: Client: ARRIYADH DEVELOPMENT AUTHORITY

RIYADH METRO PROJECT Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact Charly Stiban +966 011 510 5634 [email protected] Subcontracts

Not listed. Contact project.

Subcontracts Contact Zeyad Hakam [email protected]

SOUTH FIELD ENERGY PROJECT

Date Opened:

Location:

Scope:

July 01, 2016

UNITED STATES, OH EPC

Closing Date:

26173

US PERMANENT OFFICES Office:

Job Number: Client: SOUTH FIELD ENERGY LLC

SOUTH FIELD ENERGY PROJECT Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact Shonda Terrell 330-843-1437 [email protected] Subcontracts

Not listed. Contact project.

Subcontracts Contact Terry Stamps +1 903 267 9623 [email protected]

(5)

Mining & Metals

LOS PELAMBRES PIC FS

Date Opened:

Location:

Scope:

March 28, 2016

CHILE E

Closing Date: September 30, 2019 26093

SANTIAGO Office:

Job Number: Client: ANTOFAGASTA MINERALS SA

LOS PELAMBRES PIC FS

LOS PELAMBRES PIC FS - The Project contemplates to reinforce the ore production capacity, without exceeding the maximum ambientally approved capacity of 210.000 tons per day.

Description:

PROGRAMS Procurement Electrical Room Pre-cast Spools Electrical Bulk

Procurement Contact Juan Carlos Palacios Hernandez +56 2 2925 4660

[email protected] Subcontracts

Not listed. Contact project.

OLYMPIC DAM SCM21

Date Opened:

Location:

Scope:

October 07, 2019

AUSTRALIA EPCM

Closing Date:

26283 BRISBANE Office:

Job Number: Client: BHP BILLITON GROUP

OLYMPIC DAM SCM21 Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact William Thomson +61 07 31836708 [email protected] Subcontracts

Not listed. Contact project.

Subcontracts Contact William Thomson +61 07 31836708 [email protected]

(6)

Mining & Metals

Quebrada Blanca Fase 2

Date Opened:

Location:

Scope:

July 01, 2012

CHILE EPCM

Closing Date:

25800 SANTIAGO Office:

Job Number: Client: COMPANIA MINERA TECK QUEBRADA

Quebrada Blanca Fase 2

The Quebrada Blanca copper deposit is located at an elevation of approximately 4,300 meters above sea level in the Cordillera de Los Andes area of Chile’s Region I, which is approximately 165 km southeast of Iquique and close to the Bolivian border.

Description:

PROGRAMS Procurement Precast Concrete Rebar

Structural Steel Spools

Corrugated Steel tunnel Large Diameter Corrugate Pipe

Fences & Gates CCTV system

Lightning Protection System MV Cables

Fiber Optic Cable And Accesories Electrical Bulk

Flow Instrument

Procurement Contact Fanny Lorena Flores Fuentes +56 2 2370 3563

[email protected] Subcontracts

Not listed. Contact project.

YANACOCHA SULFIDES STAGE 3- ONSHORE

Date Opened:

Location:

Scope:

June 17, 2019

PERU S

Closing Date:

26280

PERU PROJECTS Office:

Job Number: Client: MINERA YANACOCHA S.R.L.

YANACOCHA SULFIDES STAGE 3- ONSHORE Description:

PROGRAMS Procurement Not listed.

Subcontracts

(7)

Nuclear, Security & Environmnt BLUE GRASS CHEM DEMIL

Date Opened:

Location:

Scope:

June 13, 2003

UNITED STATES, KY EPC

Closing Date:

24915

GOVERNMENT PROJECT 24915 Office:

Job Number: Client: US ARMY

BLUE GRASS CHEM DEMIL Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact Arch Mcalister 859-625-6272 [email protected] Subcontracts

Not listed. Contact project.

Subcontracts Contact Arch Mcalister 859-625-6272 [email protected]

GBSD

Date Opened:

Location:

Scope:

June 20, 2020

UNITED STATES, UT EPC

Closing Date:

26305

US PERMANENT OFFICES Office:

Job Number: Client: NORTHROP GRUMMAN

GBSD

Ground Based Strategic Deterrent Description:

PROGRAMS Procurement

Infrastructure and Network systems equipment and materials

Register at http://supplierregistration.becpsn.com/

Procurement Contact Elizabeth Lovko [email protected] Subcontracts

Construction Services

Register at http://supplierregistration.becpsn.com/

Subcontracts Contact Elizabeth Lovko [email protected]

(8)

Nuclear, Security & Environmnt MOBILE LAUNCHER 2

Date Opened:

Location:

Scope:

April 21, 2019

UNITED STATES, FL EPCM

Closing Date:

26046

US PERMANENT OFFICES Office:

Job Number: Client: NASA - NAT'L AERONAUTICS & SPA

MOBILE LAUNCHER 2 Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact Lisa Tribuce 703-429-6261 [email protected] Subcontracts

Not listed. Contact project.

Subcontracts Contact Lisa Tribuce 703-429-6261 [email protected]

NATRIUM DEMONSTRATION

Date Opened:

Location:

Scope:

November 16, 2020

UNITED STATES, WA E

Closing Date:

26396

US PERMANENT OFFICES Office:

Job Number: Client: TerraPower

NATRIUM DEMONSTRATION NATRIUM DEMONSTRATION

Natrium will be the first commercial reactor ever in the state of Wyoming and one of the first advanced reactors to operate in the United States

Description:

PROGRAMS Procurement

Currently looking for manufacturers and fabricators for complex or long lead items to provide early expressions of interest.

Procurement Contact Troy Tuttle

[email protected] Subcontracts

Currently looking for early site work contractors and taking interest for future construction

Subcontracts Contact Troy Tuttle

[email protected]

(9)

Nuclear, Security & Environmnt POLAND AP1000 FEED A

Date Opened:

Location:

Scope:

June 30, 2021

POLAND S

Closing Date:

26424

US PERMANENT OFFICES Office:

Job Number: Client: WESTINGHOUSE ELECTRIC COMPANY

POLAND AP1000 FEED A POLAND AP1000 FEED A

This project is supporting the initial study and feasibility for brining Nuclear Power to Poland. Interested suppliers should contact the Procurement Manager

Description:

PROGRAMS Procurement

Early market data is appreciated regarding critical or long-lead items

Procurement Contact Fiona Stigter 713 235 3115 [email protected] Subcontracts

Market Survey Data is requested for early works or major subcontract items

Subcontracts Contact Fiona Stigter 713 235 3115 [email protected]

PUEBLO CHEM DEMIL PROJECT

Date Opened:

Location:

Scope:

October 01, 2002

UNITED STATES, CO EPC

Closing Date:

24852

US PERMANENT OFFICES Office:

Job Number: Client: US ARMY

PUEBLO CHEM DEMIL PROJECT

The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) Project will design, build, operate and close a plant, which will use water neutralization and biotreatment to destroy projectiles and mortars containing 2,600 tons of mustard agent.

Description:

PROGRAMS Procurement

Equipment and Supplies for Construction and Fabricated Equipment Register on the Supplier Portal, forward interest via Project Website:

https://www.peoacwa.army.mil/job-and-business-opportunities/

Procurement Contact Daniel Harlin +1 719 5530683 [email protected] Subcontracts

(10)

Nuclear, Security & Environmnt WTP

Date Opened:

Location:

Scope:

December 11, 2000

UNITED STATES, WA EPC

Closing Date:

24590

US PERMANENT OFFICES Office:

Job Number: Client: US DEPARTMENT OF ENERGY

WTP

Hanford Waste Treatment and Immobilization Plant Description:

PROGRAMS Procurement

Not listed. Contact project.

Procurement Contact Kathleen Valencia 509-371-5998 [email protected] Subcontracts

Not listed. Contact project.

References

Related documents

Table 4.2: Comparison of hydroformylation results for et,ph-P4 and me,ph-P4 catalyst systems. Further reproduction prohibited without permission... Initial attempts

Las Hermanas, an organization of lay and religious Hispanic women, wanted women ordained, but they and other progressive Hispanic Catholic organizations like Padres Associated

Have a qualified service person or plumbing engineer, knowledgeable about the latest technologies in temperature actuated mixing valves, automatic compensating type mixing

Under the assumptions of this analysis, the expected level of safety for unmitigated UAV operations in the airspace follow similar trends in the vicinity of jet routes and

•  Finding the right balance between performance /scalability and security is a well-known challenge •  Robust but computationally expensive security.. mechanisms are difficult

I am forensic anthropologist for the province of Quebec through the Laboratoire de Sciences Judiciaires et de Médecine Légale, in Montreal, and for the state of North Carolina

1) Explore, via a literature review, the concept of and associated steps, involved in analytical pavement design. 2) To evaluate different factors affecting the

have focused upon general deterrence 19 to such a great extent 20 that enforcement can (and this article argues it does) lose the perception of proportionality with the