Build Back Smarter:
House performance
improvements at the time of
earthquake repairs
Project aims
To show that home performance
improvements can and should be included in the ‘standard’ repair of earthquake-damaged Canterbury homes.
To find out how to include home performance improvements with earthquake damage
repairs without slowing down the rebuild process.
Why Canterbury?
100,000+ homes damaged in the earthquakes 15,000 with major (>$100,000) repair by
insurers
Compares with 3300 renovations/pa normally Most homes will have been inefficient,
under-insulated and poorly performing
The extensive repair and rebuilding create the opportunity to include upgrades which will
improve a home’s performance
Most houses have major renovations on a 30 year cycle –once in a generation opportunity
Damage to be repaired Retrofit opportunity
Roof damage Ceiling insulation –low cavity roof spaces and skillion roofs
Heat transfer systems in low cavity roof spaces Ceiling damage Removal of downlights
Efficient lighting
Externally vented bathroom / kitchen ventilation Heat transfer systems
Cladding damage Wall insulation combined with building paper Wall lining damage Wall insulation
Floor or foundation damage Under-floor insulation Ground vapour barrier Twisted or raked window
frames
Double glazing/high performance glass Improved thermal frames
Reduce window area on south side
Chimney damage Replace older fires with efficient clean heating option Hot water cylinder damage Replace with solar, heat pump or wetback water heating
Cylinder wraps and seismic restraint Upgrade and lag piping
Plumbing damage Water efficient fittings Rainwater tanks
The houses
12 case study homes identified – 6 repaired during three year duration of project, 3
rebuilds, 3 still under repair
Detached dwellings – pre 1990
Substantial damage – enabling thermal envelope improvements
IAG and Southern Response (AMI) Insurer
Repairs started in Port Hills – only recently on the flatter areas
House Household Typology Location Insurer/ PMO
Huntsbury 1 Family: couple and two children
1950s Mass Housing+ 1980s addition
Port Hills Arrow/ Southern Response
Huntsbury 2 Retired couple 1950s Mass Housing+ 1980s addition
Port Hills IAG/ Hawkins Woolston 1 Couple and
disabled son, major health issues
1950s Mass Housing On the flat IAG/ Hawkins
Cashmere 1 Couple Villa + 2000s extension
Port Hills Arrow/ Southern Response
Mt Pleasant 1 Couple Villa + 2000s extension]
Port Hills IAG/ Hawkins Spreydon 1 Couple 1930s bungalow
[Lath and plaster linings]
© Beacon Pathway Inc
House Household Typology Location Insurer/ PMO
St Martins 1 Single
retired 1970s concrete floor, low pitch roof
On the flat Arrow/ Southern Response
Redcliffs 1 Rental. 1960s mass housing with more recent additions
Port Hills Hawkins/ IAG Somerfield 1 Couple with
2 kids Transitional bungalow[Lath and plaster linings]
On the flat Arrow/ Southern Response
Halswell 1 Couple 1960s mass housing On the flat Hawkins/ IAG Papanui 1 Extended
family 1950s mass housing On the flat Hawkins/ IAG New Brighton 1 Couple 1950s art deco On the flat Hawkins/ IAG
The process
Houses identified by PMO, Beacon check, homeowner agree
Whole house assessment, upgrade plan developed, agreed with homeowners, PMO Upgrades undertaken at time of repair –
project funded + homeowner funded
Upgrades implemented by insurer’s builder/ subcontractors – except for insulation
Evaluation
Documentation during repair
Post completion structured interviews: Homeowner
Building
Project manager
Homestar comparison
Halswell 1
Earthquake Repairs ($150,000) BBS Upgrades ($20,000) Homeowner Improvements ($20,000) Foundations repaired& floor relevelled Underfloor insulation & vapourbarrier Double glazed windows in aluminium frames
Driveway, paths,
patio, drainage Upgraded double glazing to thermally broken low e Ceiling & wall linings
replaced
Wall insulation
Internal doors refitted
Solar hot water & pipe lagging
Liquefaction removed External ducting of rangehood
Brick cladding
replaced & building wrap installed
Bathroom extract fan – externally vented
Mt Pleasant 1
Earthquake Repairs
($260,000) BBS Upgrades ($12,000) Homeowner Improvements ($35,000)
Foundations Underfloor insulation –
insufficient access for vapour barrier
Replaced gas heater with wood burner
Roof replacement Ceiling insulation incl. skillion Double glazing with uPVC frames
Ceiling & wall linings replaced
Wall insulation Awnings over western windows
Internal doors refitted
Heat transfer system Low flow tapware & plumbing fittings Full interior
redecoration
Downlights replaced – LED/IC rated
Bathroom extract fan – externally vented
Somerfield 1
Spreydon 1
Key findings
Retrofits easily incorporated with repairs – but Beacon project manager a critical component of success
Retrofit work was minor vs repairs – sometimes poor workmanship – ventilation & plumbing
particularly, insulation damage
All houses moved from 2 to 5 star rating
Homeowners found high value from retrofits and performance improvements
Full insulation seen as a “no brainer” by all Strong willingness from PMOS & Insurers for
Process learnings
Repair process has been very very very slow… Delays have been caused by a range of
institutional constraints such as:
apportioning costs from multiple events between insurers and EQR;
attributing cause of building damage to land or earthquake (again EQR vs insurers);
delays for geotech testing and foundation design
issues of rebuilding/ repair of residential areas on a flood plain.
Scope of repairs
Repairs are generally scoped by assessors
using non-intrusive methods (i.e. don’t go into the ceiling or subfloor)
EQC vs insurance company repairs – often not clear
Repair vs rebuild
Changing scope of repairs in design phase – particularly where foundation damage
Wiring issues – and extent of
under-maintenance and deterioration since the earthquakes
Ease of scale up
Whole house assessment & independent project facilitator seen as key components for success Homeowners funded many additional
improvements – but performance-related funding seen as critical
High prices by PMO builders/subcontractors & low care means different delivery model needed
Insulation & windows worked well with certified installers
Materials & product costs also a barrier
Scale up?
Wide agreement in the need for funding for a “Build Back Smarter Service” but no funding agreements able to be reached
A “once in a generation