• No results found

Ezz API 510 All Mcq Exam

N/A
N/A
Protected

Academic year: 2021

Share "Ezz API 510 All Mcq Exam"

Copied!
126
0
0

Loading.... (view fulltext now)

Full text

(1)

6

6

Tips

Tips

to

to

Study

Study

for

for

API

API

510

510

Closed

Closed

Book

Book

Questions

Questions

Study

Study

the

the

16

16

Topics

Topics

in

in

Part

Part

4

4

of

of

the

the

Study

Study

Module

Module

Tip

Tip

#

#

1:

1:

Closed

Closed

Book

Book

exam

exam

questions

questions

total

total

100

100

on

on

a

a

real

real

exam.

exam.

Over

Over

fifty

fifty

(50)

(50)

or

or

even

even

more

more

(maybe

(maybe

even

even

60+)

60+)

may

may

be

be

from

from

API

API

510

510

code.

code.

Tip

Tip

#

#

2:

2:

Always

Always

copy

copy

module

module

examples

examples

&

&

highlights

highlights

to

to

your

your

API

API

510

510

code

code

book

book

as

this

is

allowed

as

as

long

long

as

as

there

there

are

are

no

no

loose

loose

pages

pages.

These

examples

are

very

important

reminders

(for

the

open

book)

that

help

you

remember

key

words

and

points

regarding

the

code!

This

is

called

“WORD

ASSOCIATION”

and

is

a

critical

part

of

memory!

Tip

Tip

#

#

3:

3:

Memorize

Memorize

key

key

words

words

in

in

the

the

study

study

guide

guide

in

in

Part

Part

4

4

(16

(16

Topics)

Topics)

and

these

may

be

highlighted,

underlined

or

bold

bold

letters!

letters!

Tip

Tip

#

#

4:

4:

Associate

Associate

key

key

words

words

with

with

a

a

general

general

section

section

or

or

subsection

subsection

(Organization&

Certification

reqmts,

Insp

Intervals,

etc)

or

a

code

requirement

Know

Know

YOUR

YOUR

Chapters

Chapters

VERY

VERY

WELL

WELL

(1

(1

thru

thru

8)

8)

Tip

Tip

#

#

5:

5:

Always

Always

use

use

the

the

study

study

guide

guide

Part

Part

4

4

(16

(16

Topics)

Topics)

with

with

the

the

Practice

Practice

Exam

Exam

questions

questions

and

make

sure

that

whenever

you

miss

a

question,

you

check

references

&

review

code

sections

again

and

again

until

you

understand

them

clearly!

Retake

all

Practice

exams

(daily

if

preparing

for

an

API

510

exam)

until

you

score

above

95%+

(better

is

to

practice

until

you

score

100%

&

have

full

memory

of

questions

and

concepts)!

Tip

Tip

#

#

6:

6:

Real

Real

API

API

Exams

Exams

NEVER

NEVER

use

use

the

the

following

following

type

type

of

of

answers:

answers:

All

All

of

of

the

the

above

above

….

….

You

You

will

will

NEVER

NEVER

see

see

this

this

on

on

a

a

real

real

API

API

exam

exam

Both

Both

A

A

&

&

B

B

…………

…………

You

You

will

will

NEVER

NEVER

see

see

this

this

on

on

a

a

real

real

API

API

exam

exam

None

None

of

of

the

the

above

above

Sometimes,

Sometimes,

you

you

may

may

see

see

this,

this,

but

but

not

not

often!

often!

IF

IF

you

you

see

see

None

None

of

of

these

these

or

or

None

None

of

of

the

the

above

above

Watch

Watch

out!!!Reason:It

out!!!Reason:It

is

is

likely

likely

a

a

correct

correct

answer

answer

to

to

a

a

“very

“very

easy”

easy”

question!

question!

API

(2)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Sections

(Sections

1

1

&

&

2)

2)

1.

1.AAnonnon‐codecodevesselvesselisisoneoneis:is:

A)Notfabricatedtoarecognizedconstructioncode&meetingnoknownrecognizedstandards B)Notconstructed&approvedas jurisdictionalspecialbasedon jurisdictionacceptancerules C)Fabricatedtoarecognizedconstructioncodebuthaslostitsnameplateorstamping D)Notconstructedinaccordancewithanapplicableconstructioncode

Answer

Answer==AA……Reference:Reference:APIAPI510,510,Para.Para.1.1.1.b1.1.1.b NonNon‐CodeCodevesselvessel==self self explanatoryexplanatoryansweranswer 2.

2.AAnonnon‐standardstandardvesselvesselisisoneoneis:is:

A)Notconstructedinaccordancewithanapplicableconstructioncode

B)Fabricatedtoarecognizedconstructioncodebuthaslostitsnameplateorstamping C)Notfabricatedtorecognizedconstructioncodesandmeetingnoknownrecognizedstandard D)Notconstructedandapprovedas jurisdictionalspecialbasedon jurisdictionacceptancerules Answer

Answer==BB……Reference:Reference:APIAPI510,510,Para.Para.1.1.1.d1.1.1.d NonNon‐StandardStandardvesselvessel==missingmissingaanameplatenameplate 3.

3.APIAPI510510isisrestrictedrestrictedtotoowner/usersowner/usersthatthatemployemployororhavehaveaccessaccessto:to: A)AnauthorizedInspAgency,anInspectorandExaminers

B)AnauthorizedInspAgencyandanEngineeringOrganization

C)AnauthorizedInspAgency,EngineeringOrganizationandaRepairOrganization D)AnauthorizedInspAgency,Inspector,Examiners,Engineer,andaRepairOrganization Answer

Answer==DD……Reference:Reference:510,510,Par.Par.1.1.21.1.2 AnsAns==CC AllAll55entitiesentitiesarearerequiredrequired 4.

4.WhichWhichAPIAPI510510AppendixAppendixlistslistsqualificationqualificationandandcertificationcertificationrequirementsrequirementsforforInspectors?Inspectors?

A)AppendixA B)AppendixB

C)AppendixC D)AppendixD

Answer

Answer==BB……Reference:Reference:510,510,Par.Par.1.1.11.1.1&&AppendixAppendixBB 5.

5.WhichWhichstatementstatementisistruetrueregardingregardingconflictsconflictsbetweenbetweenAPIAPI510510andand jurisdictionalregulations? jurisdictionalregulations? A)Evenif 510coderulesarelessstringent,510coderuleswillalwaysapply

B)Both510and jurisdictionrulesmustalwaysbemetandconflictsresolved C)If 510coderulesaremorestringent,thenthe510coderuleswillalwaysapply D)Owner/Usermayelecttofolloweitherof therulesaslongasitisdocumented Answer

Answer==CC……Reference:Reference:510,510,Par.Par.1.1.3.1.1.3.…… Also,remember this***Star Question…Wecan never break any jurisdictionrulesby following API 510 code… API 510 doesnot allow this!!!

(3)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Sections

(Sections

1

1

&

&

2)

2)

6.

6.WhichWhichAppendixAppendixininAPIAPI510510listsliststhethetypestypesof of vesselsvesselsthatthatMAYMAYbebeexcludedexcludedfromfromthethecode?code?

A)AppendixA B)AppendixB

C)AppendixC D)AppendixD

Answer

Answer==AA……Reference:Reference:510,510,Par.Par.1.2.21.2.2 7.

7.WhichWhichof of thesearetheseareNOTNOTtotobebeexcludedexcludedfromfromspecificspecificrequirementsrequirementsof of APIAPI510510code?code? A)Classesof containerslistedforexemptionfromthescopeof ASMESectionVIII,Div.1&2 B)Thosewithinternal/externaloperatingpressuresnotexceeding15psiregardlessof size C)Cargoorvolumetanksontrucks,ships,andbargescoveredby jurisdictionalregulations D)Thosecontainingwaterwithdesignpressure/tempabove300psi&above210°F(99°C) Answer

Answer==DD……Ref:Ref:510,510,Para.Para.1.2.21.2.2&&App.App.A,A,itemitema.1,a.1,b.1,b.1,b.6,b.6,b.8…b.8…OPEN ORCLOSEDBOOK 8.

8.WhichWhichof of thesetheseareareexcludedexcludedfromfromthethespecificspecificrequirementsrequirementsof of thetheAPIAPI510510code?code? A)Pressurevesselsonmovablestructuresnotcoveredbyother jurisdictionalregulations B)Allclassesof containersnotexemptedbythescopeof ASMESect.VIII,Div1

C)Pressurevesselsdesignedforaninternalpressurelessthan15psig D)PressurevesselswithdesignsexceedingNPS6(insidediameter) Answer

Answer==CC……Reference:Reference:510,510,AppendixAppendixA,A,SectionsSectionsAA&&BB……OPEN ORCLOSEDBOOK 9.

9.PressurePressureVesselsVesselsexcludedexcludedfromfromthetheAPIAPI510510codecoderulesrulesmaymayincludeincludeallallof of thethefollowingfollowingthatthat are

arelocatedlocatedononmovablemovablestructuresstructuresandandcoveredcoveredbyby jurisdictional jurisdictionalregulationsregulationsEXCEPTEXCEPTfor:for: A)Cargoorvolumetanksfortrucks,ships,andbarges

B)Pressurevesselsinstalledforrailwaysorthosethatuserailcars C)Airreceiversassociatedwithbrakingsystemsof mobileequipment D)Pressurevesselsinstalledinocean‐goingships,barges,andfloatingcraft Answer

Answer==BB……Ref:Ref:510,510,AppendixAppendixA,A,SectSectAA …NO…NOMENTIONMENTIONOFOFRAILWAYS/RAILCARSRAILWAYS/RAILCARSININCODECODE 10.

10.VesselsVesselscontainingcontainingwaterwaterunderunderpressurepressureareareexcludedexcludedfromfrom510510codecoderulesrulesifdesignifdesign pressure

pressure&&temperaturetemperaturedoesdoesnotnotexceed:exceed: A)250psiand212°F(100°C)

B)300psiand210°F(99°C) C)350psiand212°F(100°C) D)400psiand210°F(99°C) Answer

(4)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

1

1

&

&

2)

2)

11.

11.WhichWhichof of thesethesearecoveredarecovered(not(notexcluded)excluded)bybyspecificspecificrequirementsrequirementsof of APIAPI510510code?code? A)MaximumVolumeof 5ft³(0.141m³)withamaximumdesignpressureof 250psi(1723KPa) B)MaximumVolumeof 3ft³(0.08m³)withamaximumdesignpressureof 350psi(2410KPa) C)MaximumVolumeof 2.5ft³(.07m³)withamaximumdesignpressure1000psi(6892KPa) D)MaximumVolumeof 1.5ft³(.042m³)withamaximumdesignpressure600psi(4137KPa) Ans

Ans==CC……Ref:Ref:510,510,App.App.A,A,Subsect.*Subsect.*readsreadsdd……510510TypoTypo……CCexceedsexceedslimitslimits OPENOPENBOOKBOOK 12.

12.APIAPI510510recognizesrecognizesfitnessfitness‐forfor‐serviceserviceconceptsconceptsfor:for: A)Evaluatingin‐servicedamageusingAPI579rules B)Evaluatingin‐servicedamageusingAPI580rules C)Evaluatingin‐servicedamageusingAPI510rulesonly

D)EvaluatinganydamagefoundduringanyinspectionusingAPI510rulesonly Answer

Answer==AA……Reference:Reference:510,510,Para.Para.1.31.3 13.

13.APIAPI510510recognizesrecognizesriskrisk‐basedbased‐inspectioninspectionconceptsconceptsfor:for: A)Evaluatingin‐servicedamageusingAPI579rules B)Evaluatingin‐servicedamageusingAPI580rules C)Evaluatingin‐servicedamageusingAPI510rulesonly D)Noneof thesearecorrect

Answer

Answer==BB……Reference:Reference:510,510,Para.Para.1.31.3 APIAPI580580isisusedusedtotodeterminedetermineinspectioninspectionintervals!intervals! 14.

14.WhatWhatAPIAPIPublicationPublicationcoverscoverswelding&welding&hothottaptapproceduresproceduresforinforin‐serviceservicepressurepressurevessels?vessels?

A)API572 B)API510

C)API582 D)API2201

Answer

Answer==DD……Reference:Reference:510,510,SectionSection22 15.

15.WhatWhatdocumentsdocumentscovercoverNDENDEexaminerexaminerqualificationqualificationandandcertificationcertificationrespectively?respectively? A)CP‐189StandardandASNTPracticeSNT‐TC‐1A

B)CP‐189StandardandASMESectionVCoderules C)ASNTPracticeSNT‐TC‐1AandASMEVCoderules D)ASNTPracticeSNT‐TC‐1AandASMESectionVCoderules Answer

(5)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

16.

16.WhichWhichof of thesetheseshouldshouldbebeconsideredconsideredananalterationalterationtotoaapressurepressurevesselvesselperperAPIAPI510?510? A)Additionof asize8NPSreinforcednozzleinavesselhavingnozzlessized2NPS,3NPS&6NPS B)Additionof severalnewLWN‐typenozzlessize2NPSand3NPSnotrequiringreinforcement C)Replacementof anexistingsize18NPSreinforcedmanwaynozzle

D)Noneof theaboveshouldbeconsideredanalteration Answer

Answer==AA……Reference:Reference:APIAPI510,510,SectionSection3.23.2(Definition(Definitionof of Alteration)Alteration) 17.

17.WhichWhichof of thesetheseshouldshouldbebeconsideredconsideredananalterationalterationtotoaapressurepressurevesselvesselperperAPIAPI510?510? A)Replacementof aportionof aseverelycorrodedshellusingaflushinsertpatch B)Replacementof asize16NPSnozzleduetosevereinternalcorrosion

C)Addingareinforced24NPSmanwaynozzlewhen3suchnozzlesalreadyexistonavessel D)Noneof theseshouldbeconsideredanalteration

Answer

Answer==DD……Reference:Reference:APIAPI510,510,SectionSection3.23.2(Definition(Definitionof of ananAlteration)Alteration) 18.

18.WhichWhichof of thesetheseshouldshouldbebeconsideredconsideredananalterationalterationtotoaapressurepressurevesselvesselperperAPIAPI510?510? A)Replacementof a2:1Ellipsoidalheadduetoseverecorrosion

B)Replacementof corrodedHemisphericalheadswithtwonew2:1EllipsoidalHeads C)Replacementof reinforcedsize16NPSnozzleneck&flangeduetosevereinternalcorrosion D)Additionof anotherreinforcedsize18NPSmanwaynozzlewhen1alreadyexistsonavessel Answer

Answer==BB……Reference:Reference:APIAPI510,510,SectionSection3.23.2(Definition(Definitionof of ananAlteration)Alteration) 19.

19.WhichWhichof of thesetheseshouldshouldbebeconsideredconsideredananalterationalterationtotoaapressurepressurevesselvesselperperAPIAPI510?510? A)Additionof smallborenozzlesorweldedcouplingsnotrequiringreinforcement B)Anycomparableorduplicatereplacementduetoseverecorrosionorotherreasons C)Additionof anyreinforcednozzlegreaterthanthesizeof existingreinforcednozzles D)Addingareinforcednozzle(12NPSorgreater)equaltoasizeof existingreinforcednozzles Answer

Answer==CC……Reference:Reference:APIAPI510,510,SectionSection3.23.2(Definition(Definitionof of ananAlteration)Alteration) 20.

20.WhichWhichof of thesetheseshouldshouldNOTNOTbebeconsideredconsideredananalterationalterationtotoaapressurepressurevesselvesselperperAPIAPI510?510? A)Replacementof acorrodedsump(20NPSSchedule40)withanewsump(20NPSSch.80) B)Additionof areinforcednozzlelessthanorequaltothesizeof existingreinforcednozzles C)Replacementof acorrodedhemihead(E=0.85,RT2)withanewhemihead(E=1.00,RT1) D)Additionof 2newreinforcednozzlesinashellwithnoshellnozzles&2smallerheadnozzles Answer

(6)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

21.

21.AAphysicalphysicalchangechangeininanyanycomponentcomponentwithwithdesigndesignimplicationsimplicationsaffectingaffectingpressurepressure‐ containing

containingcapabilitycapabilityof of aapressurepressurevesselvesselisiscalledcalleda(n):a(n):

A)Rerating B)Redesign

C)Repair D)Alteration

Answer

Answer==DD……Reference:Reference:APIAPI510,510,SectionSection3.23.2(Definition(Definitionof of ananAlteration)Alteration) 22.

22.TheThecode,code,codecodesection,section,ororotherotherrecognizedrecognizedandandgenerallygenerallyacceptedacceptedengineeringengineeringstandardstandard or

orpracticepracticetotowhichwhichthethepressurepressurevesselvesselwaswasbuiltbuiltororwhichwhichisisdeemeddeemedbybythetheowner/userowner/useroror the

theengineerengineertotobebemostmostappropriateappropriateforforthethesituationsituationisiscalledcalledthe:the: A)Designcode B)Inspectioncode

C)Constructioncode D)Applicableconstructioncode Answer

Answer=D=D ……Reference:Reference:APIAPI510,510,SectionSection3.33.3(Definition(Definitionof of applicableapplicableconstructionconstructioncode)code) 23.

23.TheThecodecodeororstandardstandardforforwhichwhichaavesselvesselwaswassrcinallysrcinally builtbuilttoistoiscalledcalledthe:the: A)Designcode B)Inspectioncode

C)Constructioncode D)Applicableconstructioncode Answer

Answer==CC……Reference:Reference:APIAPI510,510,SectionSection3.103.10(Definition(Definitionof of constructionconstructioncode)code) 24.

24.AAshortenedshortenedtitletitleforforAPIAPI510510isis……OrOr……APIAPI510510isiscalledcalledthe:the: A)Designcode B)Inspectioncode

C)Constructioncode D)Applicableconstructioncode Answer

Answer==BB……Reference:Reference:APIAPI510,510,SectionSection3.313.31(Definition(Definitionof of InspectionInspectioncode)code) 25.

25.WhichWhichoneoneof of thesetheseisisNOTNOTconsideredconsideredananAuthorizedAuthorizedinspectioninspectionagencyagencyperperAPIAPI510?510? A)Inspectionorganizationof the jurisdictionoutsideof thatinwhichthepressurevesselisused B)AnInsurancecompany’sinspectionorganizationthatislicensed&writesinsuranceforaPV C)Inspectionorganizationof anowner/userof pressurevesselswhomaintainsaninspection organizationforhisequipmentonlyandnotforvesselsintendedforsaleorresale

D)Independentorganizationundercontractandunderthedirectionof anowner/userthatis recognizedbythe jurisdictioninwhichthepressurevesselisused.

Answer

(7)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

26.

26.WhichWhichoneoneof of thesetheseisisNOTNOTconsideredconsideredananAuthorizedAuthorizedinspectioninspectionagencyagencyperperAPIAPI510?510? A)Inspectionorganizationof the jurisdictionoutsideof thatinwhichthepressurevesselisused B)AnInsurancecompany’sinspectionorganizationthatislicensed&writesinsuranceforaPV C)Inspectionorganizationof anowner/userof pressurevesselswhomaintainsaninspection organizationforhisequipmentonlyandnotforvesselsintendedforsaleorresale

D)Independentorganizationundercontractandunderthedirectionof anowner/userthatis recognizedbythe jurisdictioninwhichthepressurevesselisused.

Answer

Answer==AA……Reference:Reference:APIAPI510,510,SectionSection3.63.6(Definition(Definitionof of AuthorizedAuthorizedInspectionInspectionAgency)Agency) 27.

27.WhichWhichoneoneof of thesetheseisisNOTNOTconsideredconsideredananAuthorizedAuthorizedinspectioninspectionagencyagencyperperAPIAPI510?510? A)Inspectionorganizationof the jurisdictioninwhichthepressurevesselisused

B)AnInsurancecompany’sinspectionorganizationthatislicensed&writesinsuranceforaPV C)Inspectionorganizationof anowner/userof pressurevesselswhomaintainsaninspection organizationforhisequipmentandalsoforthesaleorresaleof pressurevessels

D)Independentorganizationundercontractandunderthedirectionandcontrolsof an owner/userthatisrecognizedbythe jurisdictioninwhichthepressurevesselisused. Answer

Answer==CC……Reference:Reference:APIAPI510,510,SectionSection3.63.6(Definition(Definitionof of AuthorizedAuthorizedInspectionInspectionAgency)Agency) 28.

28.AnAnemployeeemployeeof of ananauthorizedauthorizedinspectioninspectionagencyagencywhowhoisisqualifiedqualifiedandandcertifiedcertifiedtotoperformperform inspections

inspectionsunderunderthetheAPIAPI510510isiscalledcalleda(n):a(n):

A)QAInspector B)QCInspector

C)Examiner D)Noneof these

Answer

Answer==DD……Ref:Ref:APIAPI510,510,SectionSection3.73.7(Definition(Definitionof of AuthorizedAuthorizedPressurePressureVesselVesselInspector)Inspector) 29.

29.WheneverWheneverthethetermterminspectorinspectorisisusedusedininAPIAPI510,510,ititrefersreferstotoa(n):a(n): A)QAInspector B)QCInspector

C)Examiner D)Noneof these

Answer

Answer==DD……Ref:Ref:APIAPI510,510,SectionSection3.73.7(Definition(Definitionof of AuthorizedAuthorizedPressurePressureVesselVesselInspector)Inspector) EXAM

EXAMTIP:TIP:WhenWhenyouyouseeseeaa“None“Noneof of thetheAbove”Above”answeranswer It’sIt’smostmostlikelylikelyaacorrectcorrectansweranswer Correct

Correctansweranswerwaswas“too“tooeasy”easy”……sosotheytheyusedused“None“Noneof of these”these”……EXPECTEXPECTAAFEWFEWLIKELIKETHIS!THIS! 30.

30.AAshortenedshortenedtitletitleusedusedininAPIAPI510510forforAuthorizedAuthorizedPressurePressureVesselVesselInspectorInspectoris:is: A)QAInspector B)Inspector

C)Examiner D)VesselInspector

Answer

(8)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

31.

31.PersonPersonwhowhoassistsassistsananinspectorinspectorbybyperformingperformingspecificspecificNDENDEononpressurepressurevesselsvesselsbutbutdoesdoes not

notevaluateevaluateexamexamresultsresultsperperAPIAPI510510unlessunlesstrainedtrainedandandauthorizedauthorizedtotododososobybyowner/user:owner/user: A)QAInspector B)QCInspector

C)Examiner D)AWSCWIInspector

Answer

Answer==CC……Ref:Ref:APIAPI510,510,SectionSection3.203.20(Definition(Definitionof of Examiner)Examiner) 32.

32.DesignatedDesignatedareasareasononpressurepressurevesselsvesselswherewhereperiodicperiodicexamsexamsareareconductedconductedarearecalled:called: A)Examinationpoints B)Thicknessmeasurementpoints

C)Inspectionpoints D)Noneof thesearecorrect Answer

Answer==DD……Ref:Ref:APIAPI510,510,SectionSection3.93.9(Definition(Definitionof of ConditionConditionMonitoringMonitoringLocationsLocationsororCMLs)CMLs) Correct

Correctansweranswerwaswas“too“tooeasy”easy”……IIusedused“None“Noneof of these”these”hopinghopingtototricktrickyou!you!DidDidititwork?work? 33.

33.CMLsCMLsareareananabbreviationabbreviation(for(forwhatwhatterm)term)andandwerewerepreviouslypreviouslyreferredreferredtoto(as(aswhatwhatterm)term) in

inpastpastAPIAPI510510codecodeeditions?editions?

A)CorrosionmonitoringlocationspreviouslywereThicknessMonitoringLocations(TMLs) B)ConditionmonitoringlocationspreviouslywereThicknessMonitoringLocations(TMLs) C)CorrosionmeasurementlocationspreviouslywereThicknessMeasurementLocations(TMLs) D)ConditionmeasurementlocationspreviouslywereThicknessMeasurementLocations(TMLs) Answer

Answer==BB……Ref:Ref:APIAPI510,510,SectionSection3.93.9(Definition(Definitionof of ConditionConditionMonitoringMonitoringLocationsLocationsororCMLs)CMLs) 34.

34.AnyAnyweldingweldingtechniquetechniqueusedusedtotoobtainobtaincontrolledcontrolledgraingrainrefinementrefinementandandtemperingtemperingof of thethe underlying

underlyingheatheataffectedaffectedzonezone(HAZ)(HAZ)ininthethebasebasemetalmetalisiscalled:called: A)Controlled‐depositionwelding B)Temper‐beadwelding C)Half ‐beadwelding D)Noneof theseiscorrect Answer

Answer==AA……Ref:Ref:APIAPI510,510,SectionSection3.113.11(Definition(Definitionof of ControlledControlled‐DepositionDepositionWelding)Welding) 35.

35.InInthethehalf half ‐beadbeadweldingweldingtechnique,technique,thethetermterm“half “half ‐bead”bead”refersreferstotothethefactfactthat:that: A)Theweldshallbedepositedwithstringerbeadsandishalf thewidthof anormalweldbead B)Allweldedlayersmustbegrounddownafterbeingdeposited(removalof half of alllayers) C)Thethicknessof thefirstweldlayerdepositedmustbereducedbyone‐half bygrinding D)Thethicknessof thefinalweldlayerdepositedmustbereducedbyone‐half bygrinding Answer

Answer==CC……Ref:Ref:APIAPI510,510,SectionSection3.113.11(Definition(Definitionof of ControlledControlled‐DepositionDepositionWelding)Welding) Note:

Note:TemperTemper‐beadbeadtechniquetechniquerefersreferstoto“tempering“temperingof of thethelayerlayerbelowbelowthethecurrentcurrentbeadbeadbeingbeing deposited”

(9)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

36.

36.AAmethodologymethodologywherebywherebyflawsflawsandandconditionsconditionscontainedcontainedwithinwithinananequipmentequipmentitemitemareare assessed

assessedininorderordertotodeterminedeterminethetheintegrityintegrityof of thetheequipmentequipmentforforcontinuedcontinuedserviceserviceisiscalled:called: A)Risk‐basedInspectionAssessment

B)Fitness‐for‐serviceevaluation C)Nondestructiveexamination D)In‐ServiceInspectionassessment Answer

Answer==BB……Ref:Ref:APIAPI510,510,SectionSection3.223.22(Definition(Definitionof of FitnessFitness‐forfor‐serviceserviceevaluation)evaluation) 37.

37.AApointpointininthetherepairrepairororalterationalterationprocessprocessbeyondbeyondwhichwhichworkworkmaymaynotnotproceedproceeduntiluntilthethe required

requiredinspectioninspectionororNDENDEhashasbeenbeenperformedperformedandanddocumenteddocumentedisiscalledcalleda(n):a(n): A)HoldPoint

B)WitnessPoint C)InspectionPoint D)ExaminationPoint Answer

Answer==AA……Ref:Ref:APIAPI510,510,SectionSection3.243.24(Definition(Definitionof of HoldHoldPoint)Point) 38.

38.AAresponseresponseororevidenceevidenceresultingresultingfromfromthetheapplicationapplicationof of aaNondestructiveNondestructiveexamexamisiscalled:called: A)Defect

B)Imperfection C)Discontinuity D)Indication Answer

Answer==DD……Ref:Ref:APIAPI510,510,SectionSection3.263.26(Definition(Definitionof of Indication)Indication) 39.

39.AnAnimperfectionimperfectionwhosewhosetypetypeororsizesizeexceedsexceedsthetheapplicableapplicableacceptanceacceptancecriteriacriteriaisiscalled:called:

A)Discontinuity B)Flaw

C)Defect D)Indication

Answer

Answer==C…C…Ref:Ref:APIAPI510,510,SectionSection3.153.15(Definition(Definitionof of Defect)Defect) 40.

40.AAFlawFlawororotherotherdiscontinuitydiscontinuitynotednotedduringduringinspectioninspectionthatthatmaymayorormaymaynotnotexceedexceedthethe applicable

applicableacceptancecriteriaacceptancecriteriaisiscalled:called:

A)Defect B)Imperfection

C)Indication D)Noneof these

Answer

(10)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

41.

41.AAstrategystrategydefiningdefininghowhowandandwhenwhenaapressurepressurevesselvesselororpressurepressure‐relievingrelievingdevicedevicewillwillbebe repaired,

repaired,inspected,inspected,and/orand/ormaintainedmaintainedisiscalledcalleda(n):a(n): A)RepairPlan

B)InspectionPlan C)QualityPlan

D)QAInspection/RepairMgmtSystem Answer

Answer==BB……Ref:Ref:APIAPI510,510,SectionSection3.323.32(Definition(Definitionof of InspectionInspectionPlan)Plan) 42.

42.WorkWorkneededneededtotorestorerestoreaavesselvesseltotoaaconditionconditionsuitablesuitableforforsafesafeoperationoperationatat designconditions

designconditionsisiscalledcalleda(n):a(n):

A)Alteration B)Rerating

C)Repair D)Derating

Answer

Answer==CC……Ref:Ref:APIAPI510,510,SectionSection3.533.53(Definition(Definitionof of Repair)Repair) 43.

43.If If anyanyoftheoftherestorativerestorativeworkworktotoaapressurepressurevesselvesselresultsresultsininaachangechangetotothethedesigndesign temperature,

temperature,MDMT,MDMT,ororMAWP,MAWP,thetheworkworkshallshallbebeconsideredconsidereda(n):a(n):

A)Alteration B)Rerating

C)Repair D)Derating

Answer

Answer==AA……Ref:Ref:APIAPI510,510,SectionSection3.533.53(Definition(Definitionof of Repair)Repair) 44.

44. AAchange,change,eithereitherananincreaseincreaseororaadecrease,decrease,inineithereitherdesigndesigntemperaturetemperaturerating,rating,MDMTMDMToror MAWP

MAWPratingratingof of aavesselvesselisiscalledcalleda(n):a(n):

A)Alteration B)Rerating

C)Modification D)Derating

Answer

Answer==BB……Ref:Ref:APIAPI510,510,SectionSection3.563.56(Definition(Definitionof of Rerating)Rerating) 45.

45.WhenWhenaavesselvesselisisnearingnearingitsitsminimumminimumallowedallowedthickness,thickness,aapermissiblepermissiblewaywaytotoprovideprovideforfor additional

additionalcorrosioncorrosionallowanceallowancewithoutwithoutusingusingaarepairrepairorganizationorganizationisisto:to: A)Performanalterationonthevesselandchangethesrcinal designconditions B)Rerateavesselabovethesrcinal designconditions

C)Repairavesseltorestorethesrcinal designconditions D)Derateavesselbelowsrcinal designconditions Answer

(11)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

46.

46.ThisThistypetypeof of pressurepressureisisbasedbaseduponuponcalculationscalculationsusingusingthetheminimumminimum(or(oraverageaveragepitted)pitted) thickness

thicknessforforallallcriticalcriticalvesselvesselelementselementsandandisisexclusiveexclusiveof of thethecorrosioncorrosionallowanceallowanceandandmaymay be

beadjustedadjustedforforstaticstaticheadheadpressurepressureandandotherotherloadsloadssuchsuchasaswindwindandandearthquakes:earthquakes:

A)MAWP B)DesignPressure

C)MAOP D)MDMT

Answer

Answer==AA……Ref:Ref:APIAPI510,510,SectionSection3.373.37(Definition(Definitionof of MAWP)MAWP) 47.

47.AArepairrepairorganizationorganizationmaymaybebeanyanyoneoneof of thethefollowingfollowingEXCEPT:EXCEPT: A)Holderof avalidASMECertificateof Authorization(U‐stamp) B)Holderof avalidASMECertificateof Authorization(R‐stamp) C)Owner/Userof pressurevesselswhorepairshisownequipment D)Anindividualororganizationthatisauthorizedbythelegal jurisdiction Ans

Ans==BB……Ref:Ref:APIAPI510,510,SectSect3.543.54(Definition(Definitionof of RepairRepairOrg)Org) NationalNationalBoardBoardissuesissuesRR‐StampStamp 48.

48.AArepairrepairorganizationorganizationmaymaybebeanyanyoneoneof of thethefollowingfollowingEXCEPT:EXCEPT: A)Holderof avalidASMEU‐stamporNationalBoardR‐Stamp B)Owner/Userof pressurevesselswhorepairshisownequipment C)Anindividualororganizationthatisauthorizedbythelegal jurisdiction

D)AcontractorwhosequalificationsareacceptabletotheAuthorizedPressureVesselInspector Ans

Ans==DD……Ref:Ref:APIAPI510,510,SectSect3.543.54(Definition(Definitionof of RepairRepairOrg)Org) acceptableacceptabletotothetheOwner/UserOwner/User 49.

49.AArepairrepairorganizationorganizationmaymaybebeanyanyoneoneof of thethefollowingfollowingEXCEPT:EXCEPT: A)Holderof avalidASMEU‐stamporNationalBoardR‐Stamp B)Owner/Userof pressurevesselswhorepairshisownequipment C)Anindividualororganizationthatoperateswithinalegal jurisdiction D)AcontractorwhosequalificationsareacceptabletotheOwner/User Ans

Ans==CC……Ref:Ref:APIAPI510,510,SectSect3.543.54(Definition(Definitionof of RepairRepairOrg)Org) authorizedauthorizedbybylegallegal jurisdiction jurisdiction 50.

50.WhichWhichof of thethefollowingfollowingisisaarepairrepairorganizationorganizationaccordingaccordingtotoAPIAPI510?510? A)Holderof avalidNationalBoardU‐stamporASMER‐Stamp

B)Owner/Userof pressurevesselswhodoesnotrepairhisownequipment C)Anindividualororganizationthatoperateswithinalegal jurisdiction D)AcontractorwhosequalificationsareacceptabletotheOwner/User Answer

(12)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

51.

51.RequiredRequiredthicknessthicknessisisdefineddefinedbybyAPIAPI510510asasthetheminimumminimumthicknessthicknessforforeacheachelementelementof of aa pressure

pressurevesselvesselbasedbasedononthetheappropriateappropriatedesigndesigncodecodecalculationscalculationsandandcodecodeallowableallowablestressstress that

thatconsidersconsidersallallof of thethefollowingfollowingfactorsfactorsEXCEPT:EXCEPT:

A)Pressure B)Mechanicalloadings

C)Structuralloadings D)CorrosionAllowance Answer

Answer==DD……Ref:Ref:APIAPI510,510,SectSect3.553.55(Definition(Definitionof of RequiredRequiredThickness)Thickness) 52.

52.AlternativeAlternativetotocodecodecalculations,calculations,requiredrequiredthicknessthicknesscancanbebereassessedreassessedusing:using: A)StructuralDesignMinimumThickness

B)FitnessforserviceanalysisperAPI579 C)Therearenoalternativestocodecalcs D)Risk‐basedInspectionassessmentsperAPI580 Answer

Answer==BB……Ref:Ref:APIAPI510,510,SectSect3.553.55(Definition(Definitionof of RequiredRequiredThickness)Thickness) 53.

53.TypeTypeof of assessmentassessment&&managementmanagementprocessprocessthatthatisisfocusedfocusedononinspectioninspectionplanningplanningforforlossloss of

of containmentcontainmentof of pressurizedpressurizedequipmentequipmentininprocessprocessfacilitiesfacilitiesdueduetotomaterialmaterialdeteriorationdeteriorationis:is: A)InspectionPlan B)Fitness‐for‐Service

C)Risk‐basedInspection D)QualityAssurance Answer

Answer==CC……Ref:Ref:APIAPI510,510,SectSect3.573.57(Definition(Definitionof of RiskRisk‐BasedBasedInspection)Inspection) 54.

54.RegardingRegardingRBI,RBI,risksrisksarearemanagedmanagedprimarilyprimarilythroughthroughInspectionInspectionininorderordertotoinfluence:influence: A)Theprobabilityof failure

B)Theconsequenceof failure C)Theprofitabilityof theservice D)Thelengthof inspectionintervals Answer

Answer==AA……Ref:Ref:APIAPI510,510,SectSect3.573.57(Definition(Definitionof of RiskRisk‐BasedBasedInspection)Inspection) 55.

55.ReductionReductioninintoughnesstoughnessdueduetotoaametallurgicalmetallurgicalchangechangecancanoccuroccurininsomesomelowlowalloyalloysteelssteels as

asaaresultresultof of longlongtermtermexposureexposureatat650ºF650ºF – –1100ºF1100ºF(345ºC(345ºC – –595ºC)595ºC)temptemprangerangeisiscalled:called: A)Creep

B)BrittleFracture C)TemperEmbrittlement

D)HighTemperatureHydrogenAttack(HTHA) Answer

(13)

API

API

510

510

Code

Code

Closed

Closed

Book

Book

Exam

Exam

Questions

Questions

(Section

(Section

3)

3)

56.

56.TemperTemperEmbrittlementEmbrittlementaffectsaffectswhichwhichlowlowalloysalloysandandoccursoccursininwhatwhattemperaturetemperaturerange?range? A)TEaffects1.25Cr‐0.5Moalloysteelsinthe650ºF –1100ºF(345ºC –595ºC)temprange B)TEaffects2.25Cr‐1.0Moalloysteelsinthe650ºF –1100ºF(345ºC –595ºC)temprange C)TEaffects1.25Cr‐0.5Moalloysteelsinthe750ºF –1100ºF(400ºC –595ºC)temprange D)TEaffects2.25Cr‐1.0Moalloysteelsinthe750ºF –1100ºF(400ºC –595ºC)temprange Answer

Answer==BB……Ref:Ref:APIAPI510,510,SectSect3.593.59(Definition(Definitionof of TemperTemperEmbrittlement)Embrittlement) 57.

57.TheThe“transition“transitiontemperature”temperature”asasdefineddefinedbybyAPIAPI510510isisthe:the: A)Temperatureatwhichamaterial’smodulusof elasticitychanges

B)Temperatureatwhichamaterialfracturemodechangesfromductiletobrittle C)Temperatureatwhichamaterialundergoeschemicalandmetallurgicalchanges D)Noneof theseiscorrect

Answer

Answer==BB……Ref:Ref:APIAPI510,510,SectSect3.603.60(Definition(Definitionof of TransitionTransitionTemperature)Temperature)

API

API

BODY

BODY

OF

OF

KNOWLEDGE

KNOWLEDGE

PART

PART

2

2

(SPECIAL

(SPECIAL

QUESTION)

QUESTION)

58.

58.ForForP1,P1,P3,P3,P4,P4,andandP5P5materialsmaterials(for(forpurposepurposeof of APIAPI510510examination)examination)thethelowerlowertransitiontransition temperature

temperatureandandthetheupperuppertransformationtransformationtemperaturetemperaturewillwillbebe(respectively):(respectively): A)1200°F&1500°F B)1250°Fand1500°F C)1300°Fand1600°F D)1330°F&1600°F Answer

Answer==DD……Ref:Ref:APIAPI510,510,SectSect22(References)(References) SeeSeethetheAPIAPI510510BODYBODYOFOFKNOWLEDGEKNOWLEDGE

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

1

1

Topic

Topic1:1:OrganizationOrganization&&CertificationCertificationRequirementsRequirements 59.

59.WhichWhichof of thesethesedoesdoesNOTNOTqualifyqualifyaapersonpersonforforananAPIAPI510510certification?certification?

A)BSEng.degreewith2yearstotalPVexperience(1yearinPVInspectionperAPI510)

B)ASEng.degreewith2yearstotalPVexperience(1yearinPVInspectionperAPI510)

C)HSgraduatewith2yearstotalPVexperience(1yearinPVInspectionperAPI510)

D)AnyPersonwith5yearstotalPVexperience(1yearinPVInspectionperAPI510)

Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.B.2.1.cB.2.1.c ThreeThreeyearsyearstotaltotalPVPVexperienceexperienceisisrequiredrequired

60.

60.AllAllof of thesethesedescribedescribeexperienceexperiencethatthatmaymayqualifyqualifyoneonetotobebeananAPIAPI510510InspectorInspectorEXCEPT?EXCEPT?

A)Bothperformance&supervisionof InspectionactivitiesperAPI510 B)Experienceindesignof PVs&supervisionof InspectionactivitiesperAPI510 C)Experienceinoperationof PVs&performanceof InspectionactivitiesperAPI510 D)ExperienceinConstruction&Repairof PressureVesselsinaccordancewithAPI510 Answer

(14)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

1

1

61.

61.WhichWhichof of thesetheseisisNOTNOTananauthorizedauthorizedinspectioninspectionagencyaccordingagencyaccordingtotoAPIAPI510?510?

A)Inspectionorganizationof a jurisdictionwherethepressurevesselisused

B)Inspectionorganizationof aninsurancecompanythatinsurespressurevessels

C)OwnerorUserwhomaintainsaninspectionorganizationforhisownequipment

D)Independentcontractorhiredbyanowneroruserthatisnotrecognizedbya jurisdiction

Answer

Answer==DD……Reference:Reference:APIAPI510,510,Para.Para.3.6.d3.6.d MustMustbebe“recognized”“recognized”bybyaa jurisdiction jurisdiction 62.

62.WhichWhichof of thesetheseisisananauthorizedauthorizedinspectioninspectionagencyaccordingagencyaccordingtotoAPIAPI510?510?

A)Insurancecompanyinspectionorganizationthatdidnotinsureagivenpressurevessel B)Independentoutsidecontractorhiredbyowneroruserbutnotrecognizedbya jurisdiction C)Owneroruserwhomaintainsaninsporgforhisequiponly(notforvesselsforsaleorresale) D)Inspectionorganizationof a jurisdictionoutsidea jurisdictionwhereapressurevesselisused Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.3.6.c3.6.c HisHisequipmentequipmentonlyonly……notnotintendedintendedforforsalesaleororresaleresale 63.

63.WhichWhichof of thesetheseisisNOTNOTaarepairrepairorganizationorganizationaccordingaccordingtotoAPIAPI510?510? A)Anindividualororganizationthatisnotauthorizedbythelegal jurisdiction B)Anowneroruserof pressurevesselswhomakesrepairsonhisownequipment C)Contractorwhosequalificationsareacceptabletothepressure‐vesselowneroruser

D)Holderof validUSTAMP(ASMEcertificateof authorization)and/oravalidRSTAMP(NationalBoard)

Ans

Ans==AA……Ref:Ref:APIAPI510,510,Para.Para.3.54.a/b/c/d3.54.a/b/c/d MustMustbebe“authorized”“authorized”bybythethelegallegal jurisdiction jurisdiction 64.

64. WhoWhoisisresponsibleresponsibletotoexecuteexecutethetheinspectioninspectionplanplanincludingincludingthetheestablishedestablishedschedule?schedule? A)AuthorizedInspectionAgency B)Owner/UserOrganization

C)AuthorizedPressureVesselInspector D)RepairOrganization Ans

Ans==BB……Ref:Ref:APIAPI510,510,Para.Para.4.14.1 Owner/UserOwner/Userresponsibilitiesresponsibilities 65.

65.WhoWhoshallshallexerciseexerciseoveralloverallcontrolcontrolof of activitiesactivitiesrelatingrelatingtotoinin‐serviceserviceinspection,inspection,repair,repair, alteration

alteration&&reratingreratingof of pressurepressurevesselsvesselsandandpressurepressurerelievingrelievingdevices?devices? A)AuthorizedInspectionAgency B)Owner/UserOrganization C)RepairOrganization D)API510AuthorizedInspector Answer

(15)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

1

1

66.

66.WhoWhoisisresponsibleresponsibleforfordeveloping,developing,documenting,documenting,implementing,implementing,executing,executing,andandassessingassessing pressure

pressurevessel/pressurevessel/pressure‐relievingrelievingdevicedeviceinspectioninspectionsystemssystems&&inspection/repairinspection/repairproceduresprocedures that

thatmeetmeetAPIAPI510510inspectioninspectioncodecoderequirements?requirements?

A)Owner/UserOrganization B)AuthorizedInspectionAgency C)AuthorizedPressureVesselInspector D)Noneof thesearecorrect Answer

Answer==AA……Ref:Ref:APIAPI510,510,Para.Para.4.2.14.2.1 Owner/UserOwner/Userresponsibilitiesresponsibilities 67.

67.AllAllrepairsrepairsandandalterationsalterationsshallshallbebeperformedperformedbybya(n):a(n): A)Owner/UserapprovedContractorholdingavalidASMER‐Stamp B)Owner/UserapprovedContractorholdingavalidASMEU‐Stamp C)RepairOrganization(Canbeowner/userrepairinghisownequip) D)Owner/UserapprovedMaintenanceGroupdoingrepairs Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.4.2.34.2.3 RepairRepairOrganizationOrganizationresponsibilitiesresponsibilities 68.

68.Owner/userOwner/userqualityqualityassuranceassuranceinsp/repairinsp/repairmanagementmanagementsystemsystemcontainscontainsallallthesetheseEXCEPT:EXCEPT: A)Organizationandreportingstructureforinspectionpersonnel

B)Documentingof inspectionandqualityassuranceprocedures C)Documentingandreportinginspectionandtestresults D)Developinganddocumentingrepairplans

Answer

Answer==DD……Ref:Ref:APIAPI510,510,Para.Para.4.2.1.a/b/c/d4.2.1.a/b/c/d Owner/UserOwner/UserOrganizationOrganizationresponsibilitiesresponsibilities The

Thecorrectcorrectansweranswerisis……DevelopingDeveloping&&documentingdocumentingINSPECTIONINSPECTIONPLANS…PLANS…NotNotrepairrepairplansplans 69.

69.WhoWhoisisresponsibleresponsibletotoowner/userowner/userforforactivitiesactivitiesinvolvinginvolvingdesign,design,analysis,analysis,ororevaluationevaluationof of pressure

pressurevesselsvesselsandandpressurepressure‐relievingrelievingdevicesdevicescoveredcoveredbybythetheAPIAPI510510code?code?

A)AuthorizedInspectionAgency B)AuthorizedPressureVesselInspector C)CorrosionSpecialist D)Noneof thesearecorrect

Answer

Answer==DD……Ref:Ref:APIAPI510,510,Para.Para.4.2.24.2.2 ENGINEERENGINEERRESPONSIBILITIESRESPONSIBILITIES TrickyTrickyansweranswer==D!!!D!!! 70.

70.WhoWhoisisresponsibleresponsibletotothetheowner/userowner/usertotoassureassurethatthatthetheinspection,inspection,NDE,NDE,andandpressurepressure testing

testingactivitiesactivitiesmeetmeetAPIAPI510510requirements?requirements?

A)AuthorizedInspectionAgency B)AuthorizedPressureVesselInspector

C)Examiner D)RepairOrganization

Answer

(16)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

1

1

71.

71.ToTomaintain/repairmaintain/repairvesselsvesselsororpressurepressure‐relievingrelievingdevices,devices,thetherepairrepairorganizationorganizationisis responsible

responsibletotothetheowner/userowner/userandandshallshallprovideprovideallallof of thethefollowingfollowingitemsitemsEXCEPT:EXCEPT: A)Materials B)QualityAssurance

C)Equipment D)Workmanship

Answer

Answer==BB……Ref:Ref:APIAPI510,510,Par.Par.4.2.34.2.3 RepairRepairOrganizationOrganizationprovidesprovidesQualityQualityControl,Control,notnotQAQA 72.

72.InspectorsInspectorsmaymaybebeassistedassistedininperformingperforminginspectionsinspectionsbybyOTHEROTHERPROPERLYPROPERLYTRAINEDTRAINEDANDAND QUALIFIED

QUALIFIEDINDIVIDUALScalled:INDIVIDUALScalled:

A)CertifiedweldinginspectorsandNDEtechnicians B)OperatingPersonnelandNDEtechnicians C)ExaminersandOperatingpersonnel D)Examiners

Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.4.2.44.2.4&&4.2.64.2.6 InspectorInspectorresponsibilitiesresponsibilities 73.

73.AllAllNDENDEresultsresultsmustmustbebeevaluatedevaluatedandandacceptedacceptedbybythe:the:

A)CertifiedweldinginspectorsandNDEtechniciansdoingtheexaminations B)NDEtechniciansdoingtheworkinassistancetotheinspector

C)Examinersdoingtheworkinassistancetotheinspector D)Noneof theseiscorrect

Answer

Answer==DD……Ref:Ref:APIAPI510,510,Par.Par.4.2.44.2.4 InspectorInspectorresponsibilitiesresponsibilities DidDidyouyoumissmissititagain?again? 74.

74.RegardingRegardingexaminerexaminerresponsibilities,responsibilities,whichwhichof of thethefollowingfollowingisisnotnotaatruetruestatement?statement? A)Hemustbeprovencompetentbyowner/users&mustholdcertsinallNDEproceduresused B)Hedoesnotneed510certificationanddoesnotneedtobeanemployeeof theowner/user C)HeneedstobetrainedandcompetentintheNDEproceduresbeingused

D)HeshallperformtheNDEinaccordancewith jobrequirements Answer

Answer==AA……Ref:Ref:APIAPI510,510,Para.Para.4.2.5.1/24.2.5.1/2 ExaminerExaminerresponsibilitiesresponsibilities MAYMAYNOTNOTMUSTMUST 75.

75.WhoWhoshallshallmaintainmaintaincertificationcertificationrecordsrecordsof of examinersexaminersemployed,employed,includingincludingdatesdatesandand results

resultsofpersonnelofpersonnelqualificationsqualifications(that(thatshallshallbebemademadeavailableavailabletotothetheinspector)?inspector)? A)Owner/user B)Examiner’semployer

C)AuthorizedInspectionAgency D)AuthorizedPressureVesselInspector Ans

(17)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

76.

76.PerPerAPIAPI510,510,aastrategystrategydefiningdefininghowhowandandwhenwhenaapressurepressurevesselvesselororpressurepressure‐relievingrelieving device

devicewillwillbebeinspected,inspected,repaired,repaired,and/orand/ormaintainedmaintainedisiscalleda(n):calleda(n):

A)In‐serviceInspectionPlan B)On‐StreamInspectionPlan

C)QualityPlan D)InspectionPlan

Ans

Ans==DD……Ref:Ref:APIAPI510,510,Par.Par.3.323.32 InspectionInspectionPlanPlandefinitiondefinition 77.

77.TheTheinspectioninspectionplanplanshouldshouldbebedevelopeddevelopedbybythe:the:

A)AuthorizedInspectionagency B)InspectororEngineer

C)Owner/User D)Engineer

Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.1.1.15.1.1.1 DevelopmentDevelopmentof of ananInspectionInspectionPlanPlan 78.

78.WhoWhoshallshallbebeconsultedconsultedwhenwhenneededneededtotoclarifyclarifypotentialpotentialdamagedamagemechanismsmechanismsandand specific

specificdamagedamagelocationslocationswhenwhendevelopingdevelopingananInspectionInspectionPlan?Plan? A)CorrosionSpecialist B)InspectororEngineer C)Inspectoronly D)Engineeronly Answer

Answer==AA……Ref:Ref:APIAPI510,510,Para.Para.5.1.1.15.1.1.1 DevelopmentDevelopmentof of ananInspectionInspectionPlanPlan 79.

79.CorrosionCorrosionspecialistspecialistshallshallbebeconsultedconsultedwhenwhendevelopingdevelopingthetheinspectioninspectionplanplanforforvesselsvessels that

thatoperateoperateatatelevatedelevatedtemperaturestemperaturesabove:above:

A)650°F(345°C) B)700°F(371°C)

C)750°F(400°C) D)800°F(427°C)

Ans

Ans==CC……Ref:Ref:APIAPI510,510,Para.Para.5.1.1.15.1.1.1 DevelopmentDevelopmentof of ananInspectionInspectionPlanPlan 80.

80.RegardingRegardinginspectioninspectionplanplandevelopment/evaluationdevelopment/evaluationof of damagedamagemechanismsmechanismsusingusingNDE,NDE, examinations

examinationsmustmustbebescheduledscheduledatatintervalsintervalsthatthatconsiderconsiderALLALLOFOFTHESEFACTORSTHESEFACTORSEXCEPT:EXCEPT: A)Thetypeof damageandtherateof damageprogression

B)Thetoleranceof theequipmenttothetypeof damage C)Probabilityof theNDEmethodtoidentifythedamage D)MaximumintervalsasdefinedintheInspectionPlan Answer

Answer==DD……Ref:Ref:APIAPI510,510,Para.Para.5.1.1.25.1.1.2 DevelopmentDevelopmentof of ananInspectionInspectionPlanPlan……MaximumMaximum intervals

(18)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

81.

81.Inspection plansshall containinspectiontasksand schedulerequired toMONITOR DAMAGE MECHANISMS& ASSURE EQUIPMENT’SMECHANICALINTEGRITY .Inspection.Inspectionplansplans should

shouldcovercoverallallof of thethefollowingfollowingdetailsdetailsEXCEPT:EXCEPT:

A)Describeanyrequiredrepairsandincludetherepairplanindetail

B)Describenecessarypressuretests,typeof tests,testpressures,andduration

C)Definetype(s)of inspectionneeded&identifynextinspectiondateforeachinspectiontype D)Describeinsp&NDEtechnique&extent&locationof insp&NDEincludingcleaningneeded Answer

Answer==AA……Ref:Ref:APIAPI510,510,Para.Para.5.1.25.1.2 MINIMUMMINIMUMCONTENTSCONTENTSOFOFANANINSPECTIONINSPECTIONPLANPLAN 82.

82.WhatWhattypestypesof of inspectioninspectionplansplansarearebasedbasedononindustryindustrystandardsstandardsandandpracticespracticesandmayandmaybebe used

usedunderunderAPIAPI510510rules:rules:

A)Similarserviceinspectionplans B)Genericinspectionplans C)StandardIndustryPractices D)Risk‐basedinspectionplans Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.1.25.1.2 MinimumMinimumContentsContentsof of ananInspectionInspectionPlanPlan 83.

83.InspectionInspectionplansplansmaymayorormaymaynotnotexistexistininaasinglesingledocument,document,butbutthethecontentscontentsof of thetheplanplan should

shouldbebereadilyreadilyaccessibleaccessiblefrom:from:

A)InspectionRecords B)Inspectiondatasystems C)AuthorizedInspectionAgencyfiles D)Progressiverecords Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.1.25.1.2 MinimumMinimumContentsContentsof of ananInspectionInspectionPlanPlan 84.

84.InspectionInspectionplansplansmaymayalsoalsocontaincontain“other“otheradditionaladditionaldetails”details”totoassistassistininunderstandingunderstandingthethe rationale

rationaleforforthetheplanplanandandininexecutingexecutingthetheplanplanthatthatmaymayinclude:include: A)Definingthelocationof thedamage

B)Defininganyspecialaccessrequirements C)Definingrepairdetailsregardingthedamage

D)Describingthetypesof damageanticipatedorexperiencedintheequipment Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.5.1.35.1.3 AdditionalAdditionalContentsContentsof of ananInspectionInspectionPlanPlan 85.

85.AnAninspectioninspectionplanplanshallshallbebeestablishedestablishedfor:for: A)Allpressurevesselsforagivenowner/user

B)Allpressurevesselswithinthescopeof API510code

C)Allpressurevesselsandpressure‐relievingdevicesforagivenowner/user

D)Allpressurevesselsandpressure‐relievingdeviceswithinthescopeof API510code Answer

(19)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

86.

86.RBIRBIcancanbebeusedusedtotodetermine:determine: A)Inspectionmethodsandtechniques

B)Inspectionintervalsandfutureinspectionplans C)Inspectionintervalsandthetypeof futureinspections

D)Inspectionintervalsandtypeandextentof futureinspectionsandexaminations Answer

Answer==DD……Reference:Reference:APIAPI510,510,Para.Para.5.25.2 RiskRisk‐basedbasedInspectionInspection 87.

87.RBIRBIassessmentsassessmentsdeterminedetermineriskriskby:by:

A)Combiningtheprobabilityandtheconsequenceof equipmentfailure

B)Assessingthelikelihoodof failureandthecostassociatedwithequipmentfailure

C)Assessingthelikelihoodof failureanddocumentingtherisksassociatedwithagivenprocess D)Noneof thesearecorrect

Answer

Answer==AA……Reference:Reference:APIAPI510,510,Para.Para.5.25.2 RiskRisk‐basedbasedInspectionInspection 88.

88.WhenWhenowner/userowner/userconductsconductsananRBIRBIassessment,assessment,ititmustmustincludeincludeaasystematicsystematicevaluationevaluationof:of: A)Theprobabilityandconsequenceof failureinaccordancewithAPI579

B)Theprobabilityandconsequenceof failureinaccordancewithAPI580 C)Theconsequenceof failureinaccordancewithAPI579andAPI580 D)Theconsequenceof failureinaccordancewithAPI580andAPI581 Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.25.2 RiskRisk‐basedbasedInspectionInspection 89.

89.InInRBI,RBI,importantimportantstepsstepsininassessingassessingthetheprobabilityprobabilityof of aapressurepressurevesselvesselfailurefailureinclude:include: A)Identifyingandevaluatingeffectivenessof pastequipmentinspectionmethods&techniques B)Assessingthoseexistingdamagemechanisms(DMs)thataremostlikelytoaffectequipment C)Identifying/evaluatingpotentialDMs/currentequipconditions/pastinspectioneffectiveness D)AssessingallpossibleDMslikelytoaffectcurrentequipmentusingexistinginsptechniques Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.5.25.2 RiskRisk‐basedbasedInspectionInspection 90.

90.InInRBI,RBI,importantimportantstepsstepsininassessingassessingthetheconsequenceconsequenceof of aapressurepressurevesselvesselfailurefailureincludeinclude identifying

identifyingandandevaluatingevaluatingallallof of thesetheseEXCEPT:EXCEPT:

A)Thenatureof theprocessfluid(s) B)Potentialinjuriesthatcouldoccur C)Environmental/equipmentdamage D)Potentialdamagemechanisms Answer

(20)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

91.

91.ForForRBI,RBI,thetheprobabilityprobabilityassessmentassessmentmustmustbebebasedbasedon:on: A)Allformsof damagethatispossiblewithinaprocessunit B)Allformsof damagethathasbeendocumentedbyInspection

C)Allformsof damagethatcouldreasonablybeexpectedtoaffectavesselinagivenservice D)Noneof theseiscorrect

Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.5.2.15.2.1 ProbabilityProbabilityAssessmentAssessment(related(relatedtotoRBI)RBI) 92.

92.TheTheconsequenceconsequenceof of aareleasereleaseisisdependentdependentononthe:the:

A)Associatedhealtheffects,environmentalandequipmentdamageandequipmentdowntime B)Typeandamountof processfluidcontainedintheequipment

C)Potentialincidentsthatmayoccurasaresultof fluidrelease D)Sizeandthetypeof apotentialrelease

Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.2.25.2.2 ConsequenceConsequenceAssessmentAssessment(related(relatedtotoRBI)RBI) 93.

93.AfterAfterananRBIRBIassessmentassessmentisisconducted,conducted,thetheresultsresultscancanbebeusedusedtotoestablishestablishthe:the: A)Vesselinspectionplan

B)MostappropriateinspectionandNDEmethods,tools,andtechniques C)Extentof NDEandtheintervalforinternal,external,andon‐streaminspections

D)Needforpressuretestingafterdamagehasoccurredorafterrepairs/alterationsaredone Answer

Answer==AA……Ref:Ref:APIAPI510,510,Para.Para.5.2.35.2.3 DocumentationDocumentation(related(relatedtotoRBI)RBI) 94.

94.AfterAfterananRBIRBIassessmentassessmentisisconducted,conducted,thetheresultsresultscancanbebeusedusedtotoestablishestablishtheVESSELtheVESSEL INSPECTION

INSPECTIONPLANandPLANandbetterbetterdefinedefineallallof of thesetheseitemsitemsEXCEPT:EXCEPT:

A)ThemostappropriateinspectionandNDEmethods,tools,andtechniques

B)Theextentof NDE(percentageof vesseltoexamine)andtheapplicableinspectioninterval C)Theneedforpressuretestingafterdamagehasoccurredorafterrepair/alterationsaredone D)Theprevention&mitigationstepstoeliminateprobability&consequencesof avesselfailure Answer

Answer==DD……Ref:Ref:APIAPI510,510,Para.Para.5.2.35.2.3 DocumentationDocumentation(related(relatedtotoRBI)RBI)ReduceReduceprobabilityprobability 95.

95.WhenWhenRBIRBIassessmentsassessmentsareareusedusedtotosetsetvesselvesselinspectioninspectionintervals,intervals,assessmentsassessmentsshallshallbe:be: A)Documentedonetimeandshallremainonfileforthelifeof thevessel

B)Updatedonlywhenthevesselinspectionintervalwillbechanged C)Updatedafteranyavesselundergoesanyprocesschange D)Updatedaftereachvesselinspection

Answer

(21)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

96.

96.SafetySafetyprecautionsprecautionsareareimportantimportantininpressurepressurevesselvesselinspectioninspectionandandmaintenancemaintenanceactivitiesactivities and

andregulationsregulationsgoverngovernmanymanyaspectsaspectsof of vesselvesselentryentryandandmustmustbebefollowed.followed.InInaddition,addition,the:the: A)Safetyrequirementsof OSHAregardingconfinedspacerulesapplytoAPI510inspections B)Owner/user’ssafetyproceduresmustbereviewedandfollowedinallcases

C)VesselInspectionPlanmustdetailanyconfinedspaceentryrequirements D)Noneof thesearecorrect

Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.35.3 PreparationPreparationforforInspectionInspection 97.

97.PersonalPersonalprotectiveprotectiveequipmentequipmentshallshallbebewornwornwhenwhenrequiredrequiredforforallallthesethesereasonsreasonsEXCEPT:EXCEPT: A)Regulations(Jurisdictional&others) B)Owner/userrequirements

C)AuthorizedInspectionAgencyrules D)Repairorganizationrequirements Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.5.35.3 PreparationPreparationforforInspectionInspection(Equipment)(Equipment) 98.

98.WhichWhichof of thesethesestatementsstatementsarearenotnottruetrueregardingregardingprecautionsprecautionstotobebetakentakenbeforebefore beginning

beginninganyanyvesselvesselinspectioninspection&&maintenancemaintenanceactivitiesactivities(NDE,(NDE,pressurepressuretest,test,repair,repair,etc)?etc)? A)Obtainpermissiontoworkintheareafromoperatingpersonnelresponsibleforavessel B)Whenindividualsareinsideavessel,allpersonsworkingaroundavesselshouldbeinformed C)Individualsworkinginsidevesselsshouldbeinformedwhenworkisgoingonoutsideavessel D)Permissionshouldbeobtainedfromtheowner/userSafetyDepartment

Answer

Answer==DD……Ref:Ref:APIAPI510,510,Para.Para.5.35.3 PreparationPreparationforforInspectionInspection(Communication)(Communication) 99.

99.AllAllof of thethefollowingfollowingstatementsstatementsarearetruetrueregardingregardingprecautionsprecautionstotobebetakentakenpriorpriortoto entering

enteringaavesselvesselEXCEPT:EXCEPT:

A)Vesselshallbeisolatedfromallsourcesof liquids,gases,vapors,radiationandelectricity B)Vesselshallbedrained,purged,cleaned,ventilated,andthengastestedbeforeitisentered C)Procedurestoensurecontinuoussafeventilationandprecautionstoensuresafeegressand emergencyevacuationof personnelfromthevesselshouldbeclear

D)Documentationof safetyprecautionsisrequiredpriortoanyvesselentry.Beforeenteringa vessel,individualsmustobtainpermissionfromtheresponsibleoperatingpersonnel

Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.35.3 PreparationPreparationforforInspInsp(Vessel(VesselEntry)Entry)……ShouldShouldnotnotshallshall 100.

100.BeforeBeforeperformingperforminganyanyof of thetherequiredrequiredAPIAPI510510inspections,inspections,inspectorsinspectorsshallshallfamiliarizefamiliarize themselves

themselveswithwiththethevessel’svessel’spriorpriorhistoryhistoryandandshouldshouldreview:review:

A)Priorinspectionresults/repairs,currentinspectionplan,andsimilarserviceinspectionresults B)Priorinspectionandrepairresults,priorinspectionplans&similarserviceinspectionresults C)Priorinspectionandrepairresults,andpriorinspectionplansonly

D)Priorinspectionandrepairresultsonly Answer

(22)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

101.

101.PressurePressurevesselsvesselsarearesusceptiblesusceptibletotovariousvarioustypestypesof of damagedamagemechanismsmechanismsthatthatincludeincludeallall of

of thesetheseEXCEPT:EXCEPT:

A)Isolatedandlocalizedmetallossandblistering B)Surfaceconnectedcrackingandsubsurfacecracking C)Metallurgicalchangesandmaterialpropertychanges D)Dimensionalchangesandmicrofissuring/microvoidformation Answer

Answer==AA……Ref:Ref:APIAPI510,510,Par.Par.5.4.15.4.1 TypesTypesof of DamageDamage GeneralGeneralandandlocalizedlocalizedmetalmetallossloss 102.

102.TheThepresencepresenceororpotentialpotentialof of damagedamageininaavesselvesselisisdependentdependentuponuponitsitsmaterialmaterialof of construction,

construction,qualityqualityof of construction,construction,operatingoperatingconditionsconditionsand:and: A)Locationintheplant B)Designcharacteristics C)Qualityof Corrosionprotection D)Plant’sgeographicallocation Answer

Answer==BB……Reference:Reference:APIAPI510,510,Para.Para.5.4.25.4.2 DamageDamageMechanismMechanismInspectionInspection 103.

103.DetailedDetailedinformationinformationininAPIAPI571571aboutaboutcommoncommondamagedamagemechanismsmechanisms(DMs)(DMs)includes:includes: A)ThemostimportantDMs,suchasCUI&generalandlocalizedmetalloss

B)Criticalfactors,affectedequipment,andappearanceormorphologyforeachDM C)Criticalfactors,appearanceandtypicalinspection&monitoringtechniquesforeachDM D)Criticalfactors,appearance,preventionandmitigation,andaffectedequipmentforeachDM Answer

Answer==CC……Reference:Reference:APIAPI510,510,Para.Para.5.4.35.4.3 DamageDamageMechanismMechanismInspectionInspection 104.

104.GeneralGeneraltypestypesof of inspectionrecognizedinspectionrecognizedbybyAPIAPI510510are:are: A)Internal,On‐stream,andExternalinspections

B)Internal,On‐stream,External,andThicknessinspections C)Internal,On‐stream,External,Thickness,andCUIinspections D)Internal,On‐stream,External,Thickness,CUI,andRoutineinspections Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.5.4.35.4.3 GeneralGeneraltypestypesof of InspectionInspection ThereThereareareRoutineRoutine inspections,

inspections,butbutthetheroutineroutineinspectioninspectionisisnotnotconsideredconsideredoneoneof of 55generalgeneraltypestypesof of inspection!inspection! 105.

105.ImperfectionsImperfectionsidentifiedidentifiedduringduringinspectionsinspectionsandandexaminationsexaminationsshouldshouldbe:be: A)EvaluatedperAPI510Section6rules

B)EvaluatedperAPI510Section7rules

C)Characterized,sized,andevaluatedperAPI510Section6rules D)Characterized,sized,andevaluatedperAPI510Section7rules Answer

(23)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

106.

106.TheTheinternalinternalinspectioninspectionshallshallbebeperformedperformedby:by:

A)Aninspectorinaccordancewiththedetailedproceduresof theAuthorizedInspagency B)Anexamineracceptabletotheinspectorinaccordancewithqualitymanual

C)Aninspectorinaccordancewiththeowner/userqualitymanual D)Aninspectorinaccordancewiththeinspectionplan

Answer

Answer==DD……Ref:Ref:APIAPI510,510,Para.Para.5.5.2.15.5.2.1 InternalInternalInspectionInspection 107.

107.AAprimaryprimarygoalgoalof of thetheinternalinternalinspectioninspectionisisto:to: A)Determinetheserviceabilityof theentirevessel

B)Determinethemaximumallowedinspectionintervalforthevessel C)Finddamagethatcannotbefoundbyregularmonitoringof externalCMLs D)Noneof theseiscorrectperAPI510

Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.5.5.2.15.5.2.1 InternalInternalInspectionInspection 108.

108.ForForequipmentequipmentnotnotdesigneddesignedforforentryentrybybypersonnel,personnel,whatwhatmustmustbebedonedoneperperAPIAPI510?510? A)OnlyOn‐Streaminspectionsmustalwaysbedonewhenavesselisinaccessible

B)Acombinationof On‐StreamandExternalinspectionsandUTthicknessmustbeemployed C)Abesteffortinternalinspmaybedonebyremovingpipespools(viewthroughthenozzle) D)InspectionportsshallbeopenedforIDsurfaceexamsallowingremotevisualinsptechniques Answer

Answer==DD……Ref:Ref:APIAPI510,510,Para.Para.5.5.2.15.5.2.1 InternalInternalInspectionInspection 109.

109.WhenWhenvesselsvesselsareareequippedequippedwithwithremovableremovableinternals,internals,internalsinternalsmaymayneedneedremovalremovalto:to: A)Assurenounusualconditionorcorrosiononinaccessiblepartsof removableinternalsexist B)Allowinspectionof pressureboundarysurfacestoanextentdeemednecessarybyInspector C)Allowinspectionof vesselinternalcomponentstoanextentdeemednecessarybyInspector D)Assurethattheremovableinternalsareinserviceableconditionandfitforcontinuedservice Answer

Answer==BB……Ref:Ref:APIAPI510,510,Para.Para.5.5.2.25.5.2.2 InternalInternalInspectionInspectionof of VesselVesselInternalsInternals 110.

110.VesselVesselinternalsinternalsneedneednotnotbeberemovedremovedcompletelycompletelyasaslonglongasasreasonablereasonableassuranceassuranceexistsexists that

thatdamagedamageatatvesselvesselareasareascoveredcoveredbybythetheinternalsinternalsis:is:

A)Occurringtoanextentthatisnotgreaterthanthatfoundinmoreaccessiblevesselareas B)Occurringtoanextentthatisnotlesserthanthatfoundinmoreaccessiblevesselareas C)OccurringtoanextentthatisconsiderednegligibleorinsignificantbytheInspector D)Noneof theseiscorrect

Answer

(24)

API

API

510

510

Code

Code

(16

(16

Closed

Closed

Book

Book

Topics)

Topics)

Topic

Topic

#

#

2

2

111.

111.WhoWhoshouldshoulddeterminedeterminewhenwhenititisisnecessarynecessarytotoremoveremovedepositsdepositsororliningsliningstotoperformperform adequate

adequateinternalinternalinspections?inspections?

A)Inspectorinconsultationwithcorrosionspecialist B)EngineerandCorrosionSpecialist

C)CoatingspecialistandInspector D)CorrosionSpecialist

Answer

Answer==AA……Reference:Reference:APIAPI510,510,Para.Para.5.5.2.35.5.2.3 InternalInternalInspectionInspectionof of DepositsDepositsandandLiningsLinings 112.

112.If If internalinternalliningsliningsareareiningoodgoodconditionconditionandandtherethereisisnonoreasonreasontotosuspectsuspectthatthatdamagedamageisis occurring

occurringbehindbehindthem,them,whatwhatdoesdoesAPIAPI510510state?state?

A)Performspotexamsforreasonableassurancenodamageexists B)Itnotnecessarytoremoveliningsduringtheinternalinspection

C)Extent&examinationpercentagebeneathliningsmustbeasstatedintheInspectionPlan D)Itislefttothediscretionof theAuthorizedPressureVesselinspector&CorrosionSpecialist Answer

Answer==BB……Reference:Reference:APIAPI510,510,Para.Para.5.5.2.35.5.2.3 InternalInternalInspectionInspectionof of DepositsDepositsandandLiningsLinings 113.

113.If If thetheliningliningappearsappearsdamaged,damaged,bulgedbulgedororcracked,cracked,ititmaymaybebeadvisableadvisabletototaketakeallallof of thethe following

followingactionsactions(EXCEPT):(EXCEPT):

A)Completelyremovedamaged,bulged&crackedliningsforinspectionof vesselbeneath B)Removesmallportionsof linings&investigateliningcondition(ConsultCorrosionSpecialist) C)Removesmallportionsof linings&investigatevesselsurfacesbelow(ConsultCorr.Specialist) D)PerformexternalNDEtechniquestoexploreforvesseldamagebeneaththeseinternallinings Answer

Answer==AA……Reference:Reference:APIAPI510,510,Para.Para.5.5.2.35.5.2.3 InternalInternalInspectionInspectionof of DepositsDepositsandandLiningsLinings 114.

114.AllAllonon‐streamstreaminspectionsinspectionsshouldshouldbebeconductedconductedby:by:

A)AnInspectoronly B)AninspectorapprovedExaminer C)Eitheraninspectororexaminer D)Atrainedexaminer

Answer

Answer==CC……Ref:Ref:APIAPI510,510,Para.Para.5.5.3.15.5.3.1 OnOn‐StreamStreamInspectionInspection 115.

115.AllAllonon‐streamstreaminspectioninspectionworkworkperformedperformedbybyananexaminerexaminershallshallbe:be:

A)Authorizedandapprovedbyowner/userwhomayrequireadditionalqualificationtests B)AuthorizedandapprovedbytheAuthorizedInspectionAgency

C)AuthorizedandapprovedbytheEngineer D)AuthorizedandapprovedbyInspector Answer

References

Related documents

 Testing Protocols for Cost-Effective Care: Pathologists provide a “value add” in coordinated care systems such as by developing protocols for laboratory ordering, resulting

NS6: Feasibility study of future needs for wireless technology S6.0.2 SE May 07 M Goodarzi Feasibility study with recommendation to identify the future needs of wireless

– Better control of information intellectual assets – Better internal information discovery.. – Better

We found that, overall, the Australian system has shifted away from a broader CBNRM policy and program (funding) agenda with a focus on devolution and the achievement of

The Utah Supreme Court, in John Wyatt’s case, may have already significantly helped unwed putative fathers from outside of Utah by ruling that the federal Parental

Firstly, more inclusive and participatory polit- ical parties and parliaments (Dewan Perwakilan Rakyat) have become the main locus of political power and state institutions—in

This study evaluated the effects of treatment initiation on substance use, school attendance, employment, and involvement in criminal activity at 12 months post-admission for

SQL> ALTER DATABASE COMMIT TO SWITCHOVER TO PHYSICAL STANDBY; Database altered. Step 3 Shut down and restart the former