PP Interview question : PP Interview question :

sap pp interview questions

sap pp interview questions

http://www.sap-img.com/sap-pp.htm http://www.sap-img.com/sap-pp.htm http://www.coolinterview.com/type.asp?iType=258 http://www.coolinterview.com/type.asp?iType=258 http://www.allinterview.com/Interview-Questions/PP.html http://www.allinterview.com/Interview-Questions/PP.html http://www.saptechies.com/category/sap-interview-questions/sap-pp-interview-questions/ http://www.saptechies.com/category/sap-interview-questions/sap-pp-interview-questions/ http://sap.ittoolbox.com/groups/career/sap-career/sap-pp-interview-questions-587439 http://sap.ittoolbox.com/groups/career/sap-career/sap-pp-interview-questions-587439 http://ebooks.ebookmall.com/title/sap-mm-2F-pp-interview-questions-answers-and-explanations-sap-production-planning-certification-stewart-ebooks.htm sap-production-planning-certification-stewart-ebooks.htm http://www.big4guy.com/index.php/2006/03/20/sap_pp_interview_questions_what_is_a_pro http://www.big4guy.com/index.php/2006/03/20/sap_pp_interview_questions_what_is_a_pro http://www.sap-img.com/production/interview-questions-and-answer-on-sap-pp.htm http://www.sap-img.com/production/interview-questions-and-answer-on-sap-pp.htm

In SAP which is the highest organizational level? In SAP which is the highest organizational level? A Annss:: TThheehhiigghheesstt organizational organizational level in SAP is level in SAP is Client. Client. 2

2 In Level code 0001/0002 etc can the MRP be carried out for one particular level?In Level code 0001/0002 etc can the MRP be carried out for one particular level? Ans:

Ans: Yes, in level code 0Yes, in level code 0001/0001/0002 MRP ca002 MRP can be carried out for one parn be carried out for one particular leticular level.vel. 3

3 For SAP PP module what are the cutover activities followed?For SAP PP module what are the cutover activities followed? Ans:

Ans: The followiThe following are some of the cut over activitieng are some of the cut over activities that are to be s that are to be followfollowed for PP Discreteed for PP Discrete Manufacturing: Production Planning/ Master Data: In PP only master data shall be migrated Manufacturing: Production Planning/ Master Data: In PP only master data shall be migrated to SAP; there is no master data in the first stage. The elements that are related to PP in the to SAP; there is no master data in the first stage. The elements that are related to PP in the master data are Bill of Materials, Routing and Work Centers.

master data are Bill of Materials, Routing and Work Centers.

Transaction Data: As per the cut off date, ideally there should not be any work in process, all Transaction Data: As per the cut off date, ideally there should not be any work in process, all the open production orders should be closed and semi finished goods would be dismantled the open production orders should be closed and semi finished goods would be dismantled and should be added to Raw materials. This strategy should be followed for all production and should be added to Raw materials. This strategy should be followed for all production order where lead time to complete the production order is not large.

order where lead time to complete the production order is not large.

Since, the production orders are for longer duration and it is not possible to dismantle the Since, the production orders are for longer duration and it is not possible to dismantle the  product

 product and add it and add it to inventto inventory, folory, following clowing can be the san be the stratetrategy to miggy to migrate the drate the data to SAata to SAP ItP It create a material master for the work in process and set the standard price as the cost incurred create a material master for the work in process and set the standard price as the cost incurred for that product (Work in process), create a bill of material, which will be used only for this for that product (Work in process), create a bill of material, which will be used only for this  product

 production ordeion order includr including this ing this matermaterial and otial and other mateher materials srials still to btill to be consume consumed. It cred. It createseates Routing for rest of the production process. Bring the work in process material into inventory Routing for rest of the production process. Bring the work in process material into inventory as of the cut off date. It creates the production orders in SAP for the Work in process and as of the cut off date. It creates the production orders in SAP for the Work in process and issue materials to production order.

issue materials to production order. 4

4 Which is the highest organizational level for Material Master Record PP Data?Which is the highest organizational level for Material Master Record PP Data? Ans:

Ans: The highesThe highest Organizatt Organizational level for Mional level for Material Material Master Recaster Record PP Data is Plantord PP Data is Plant.. 5

5 What would be the result to plan after it has been converted into production order?What would be the result to plan after it has been converted into production order? Ans:

Ans: When the Planned ordeWhen the Planned order is converted to Productr is converted to Production order the planned ordeion order the planned order are offset byr are offset by  product

(2)

6 What are the requirements for PIR, Sales Order, and Customer Requirement are reduced after they are produced?

Ans: After the Delivery is made to the Particular Order in case of strategy 11, the PIR are consumed after the GR for Production Order are the requirements which are reduced automatically.

7 What is the difference between F1 Help and F4 Help?

Ans: F1 Help is used for field help and whereas F4 is used for possible entries.

8 Is it possible to attach a drawing for a material to BOM and what is the process?

Ans: Yes, it’s possible to attach a drawing for a material to BOM and coming to the process create a document using Transaction Code CV01N Create Document and attach the drawing in that document. Then the system will automatically generate a document number and then assign this document in the BOM with item category D.

9 Is it possible to assign one material to more than one operation in a routing?

Ans: No, one material from a BOM cannot be assigned to different operations, but it can be done  by defining the material for so many times as required in the BOM.

10 Where is the Variant Configuration typically used?

Ans: The Variant Configuration is typically used at Make-to-Stock Environment. What is the procedure to

insert an inspection

checkpoint at the end of an operation?

Ans: The procedure to insert an inspection is by defining it in the process sample, assign inspection type 03 in the Material Master then create MIC and assign them in the Routings. Then the system automatically generates the Inspection Lots.

12 What is used to generate reports in SAP for a list of material requirements from LTP? Ans: To generate the reports for the list of material required for LTP is by using MS70 and then

use MCEC.

13 What is the parameter used to specify the teardown time in one operation?

Ans: The teardown time in one operation can be defined by one of the Standard Parameter. 14 How to get planned orders scheduled for scheduling planned order for capacity

leveling?

Ans: The planned orders scheduled for scheduling planned order while running MRP, by selecting 2 in the scheduling box this will bring planned orders into CM01 and CM02.

15 When both labor, Machine categories exist how does process time is calculated in WC? Ans: When both labor, Machine categories exist scheduling is done based on the Capacity

Category it is defined at Work center.

(3)

Ans: General data that contains in basic data screen are Material Number, Material Description and Base Unit of Measure.

17 How to navigate for creating object dependencies in a BOM for configurable materials? Ans: Navigation for creating object dependencies in a BOM is for configurable materials is Go to

Extras>Object Dependency>Assign.

18 Explain me why work scheduling view is required for semi finished and finished products?

Ans: Work Schedule view is required for semi finished and finished products because all the details are mentioned in MRP views and they are also available for production for scheduler  and production scheduler profile in this view, if not maintained conversion of planned order  to production will not be possible.

19 Which transaction code is used for creating material master? Ans: MM01 is the transaction code for creating material master.

20 What is the procedure when a program is

run for capacity planning Transaction code CM01 and where the plan orders are not included in the pegged requirements, even checked the profile and the check box for order and plan order are all activated? Ans: When the planned orders have been created

without capacity requirement indicator in MRP “2” lead time scheduling, in such case they would be converted to process orders they will have impact on the resource. If the  planned orders, re-run the MRP or change in

every planned order, going to the menu and edit the Scheduling. Another possibility is to do with routing/work centers used and

whether it is actually calculates consumption of capacity of the category at the work center   being displayed in CM 01, it may consume a

capacity pool or it may not consume the category. What is Batch? Ans: The  partial quantity of  material managed separately from

(4)

other  quantity of same material in stock is called Batch. 22 How to delete a group of products that are

created in Screen MC84 and group of  products?

Ans: The product group is created as a material master record with material type PROD and this record is deleted in SARA and the members deleted in the product group and then archive the product group in transaction SARA. Object MM_MATNR.

23 Which component in BOM is allocated to operation?

Ans: Routing is the component in BOM which is allocated to operation.

24 What is the procedure for MPS in Back  ground online when it was run for a plant either ways?

Ans: MPS in Back ground online was run for a  plant in either ways it would run MPS for a

single material/plant, if it does not work it need to run a planning file and a consistency check first, transaction OMDO and MDRE respectively it require to set up two jobs to do it but it is straight forward, once it was done this set up the back ground job MPS to run and do it in NEUPL first time round and then change to NETCH after that.

25 In which unit the stock keeping is done in a company?

Ans: The Stock keeping in a company is done at Base unit of measure.

When will the order fully settlement? Wipro

1 211 If the scenario is''Party is

supplying some material we have to do the some processing operation on it, how it cab be handled in SAP" IBM 0 174 what is

(5)

std info set? where it is used? 0 151

What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling? 0 155

• How are basic order dates

determined? 0 124 how to create

report in sap pp Wipro 0 250

Integration of PP with MM , Integration of PP with SD . TCS 0 206 What is mean by

Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management. 0 249

Can i create Production order without bom and routing ? lakshman Wipro 3 1599

Checkdigit example PCS 0 229 Hi,

Can any one tell me what we will do after the marking and releasing of standard price in product costing. Sravan Wipro 1 649

Hi, I have run the standard cost estimate for one product. Can any one tell me the

planning steps for 100 products. Sravan Wipro 2 1217 What is the difference

between stock transfer order and stock transport order ? Deloitte 1 2110

What is the difference between time ticket and time event confirmation and when they are used ? Deloitte 0 434 What does a

PP Consultant do in his/her real time?

26 What is the output of MPS run?

Ans: MPS is run to plan the materials which are of  'A' type in the abc analysis (80% dollar value) that have to be planned before. MPS is also a type of MRP only in which components just  below the materials on which MPS run is

taken place, are planned.

27 Where BOM does always created? Ans: BOM is always created at Single Level. 28 List some components of BOM?

Ans: Components of BOM are List of Components, Quantity of Components and Unit of Measure

(6)

of Components. 29

How does SAP know that an operation has components as indicated by the component allocation indicator?

Ans: Component allocation is done by routing maintenance or BOM maintenance for the assembly. This is master data maintenance. As soon as a PO is created, the master data is read into the PO.

30 In which table the planning values are maintained in MC93 transaction?

Ans: The planning values that are maintained by using transaction code MC95 to display the entries and the table are S076.

==============

Interview Questions and Anwsers on SAP PP

1. If you have released Prdn order today and it had gone to shop floor. Next day it was found that there is shortage of material. What will you?

2. How you define Standard Cost and Variable cost in PP? 3. Where can you find Read PP Master in SAP(PP)?

4. What are all the settings done for configuring integration of PP with FICO?

1. Do availability check. You will get missing parts list. Procure those missing parts. Then confirm the production order. One more thing you can do, change customize setting so that user cannot release if parts are missing during order release.

2. Standard cost is the cost which is fixed for a period, variable cost is varying with period. As for  example cost of semi finished, finished materials are fixed & cost of raw materials are varied.

3. You will find in master data tab page of production header data overview, CO02 - Read PP Master Data. Also from Functions menu you will get Read PP Master Data. This means that you want the system to re-update the production order with the latest BOM structure.

(7)

4. Assigning of Cost center to work center. Assigning Activity type to work center, Standard Cost estimate, Costing Run, Order settlement, Product costing. *-- Chandan Majumdar

---1. Can MRP be carried out for one particular level of a bom ( Level code : 0001/0002 etc). Yes it can be done by running for specific materials (Single Material Single Level)

2 How Requiements( PIR,Sles Order, Customer Requirement) are reduced after they are produced?

Reqmts are reduced automatically after Delivery is made to the Particular Order  (In case of Strategy 11, the PIRs are consumed after the GR for Production Order) 3. Can't one material be assigned to more than one operation in a routing?

One material from a BOM CANNOT be assigned to different Operations.

It can be done by defining the material for so many times as required in the BOM 4. How to insert an inspection checkpoint at the end of an operation?

If in process sample is to be defined, assign inspection type 03 in the Material Master. Then create MICs and assign them in the Routings.

System automatically generates the Inspection Lots

5. Where we have to specify the teardown time in one operation? Teardown time can be defined as one of the Standard Parameters...

6. How the process time is calculated in a WC when both labour, Machine categories exist? Scheduling is done based on the Capacity Category we define in the Workcenter 

7. How to create opbject dependencies in a BOM FOR A CONFIGURABLE MATERIAL? Go to Extras -> Object Dependency -> Assign

For this U need to create Characteristics and Class (of Class Type 300) earlier 

8. Can any body explain me why work scheduling view is required for semi finished and finished products?

(Because we'll mention all details in MRP views)

A) We need to maintain working scheduling view in order to make that finished or semi finished goods available for 

 production as we assign production scheduler and production scheduler profile in this view, if  not maintained

conversion of planned order to production will not be possible.

. Is it possible to attach a drawing for a material to BOM and what is the process?

Ans: Yes, it’s possible to attach a drawing for a material to BOM and coming to the process create a document using Transaction Code CV01N Create Document and attach the drawing in that

(8)

document. Then the system will automatically generate a document number and then assign this document in the BOM with item category D.

2. For SAP PP module what are the cut over activities followed?

Ans: The following are some of the cut over activities that are to be followed for PP Discrete Manufacturing: Production Planning/ Master Data: In PP only master data shall be migrated to SAP; there is no master data in the first stage. The elements that are related to PP in the master  data are Bill of Materials, Routing and Work Centers.

Transaction Data: As per the cut off date, ideally there should not be any work in process, all the open production orders should be closed and semi finished goods would be dismantled and should  be added to Raw materials. This strategy should be followed for all production order where lead

time to complete the production order is not large.

Since, the production orders are for longer duration and it is not possible to dismantle the product and add it to inventory, following can be the strategy to migrate the data to SAP It create a material master for the work in process and set the standard price as the cost incurred for that product (Work in process), create a bill of material, which will be used only for this production order  including this material and other materials still to be consumed. It creates Routing for rest of the  production process. Bring the work in process material into inventory as of the cut off date. It

creates the production orders in SAP for the Work in process and issue materials to production order.

3. What is the procedure to insert an inspection checkpoint at the end of an operation?

Ans: The procedure to insert an inspection is by defining it in the process sample, assign inspection type 03 in the Material Master then create MIC and assign them in the Routings. Then the system automatically generates the Inspection Lots.

4. Explain me why work scheduling view is required for semi finished and finished products? Ans: Work Schedule view is required for semi finished and finished products because all the details are mentioned in MRP views and they are also available for production for scheduler and  production scheduler profile in this view, if not maintained conversion of planned order to  production will not be possible.

5. What is Batch?

Ans: The partial quantity of material managed separately from other quantity of same material in stock is called Batch.

6. How to delete a group of products that are created in Screen MC84 and group of  products?

(9)

Ans: The product group is created as a material master record with material type PROD and this record is deleted in SARA and the members deleted in the product group and then archive the  product group in transaction SARA. Object MM_MATNR.

7. What is the procedure for MPS in Back ground online when it was run for a plant either ways?

Ans: MPS in Back ground online was run for a plant in either ways it would run MPS for a single material/plant, if it does not work it need to run a planning file and a consistency check first, transaction OMDO and MDRE respectively it require to set up two jobs to do it but it is straight forward, once it was done this set up the back ground job MPS to run and do it in NEUPL first time round and then change to NETCH after that.

8. What is the output of MPS run?

Ans: MPS is run to plan the materials which are of ‘A’ type in the abc analysis (80% dollar value) that have to be planned before. MPS is also a type of MRP only in which components just below the materials on which MPS run is taken place, are planned.

9. List some components of BOM?

Ans: Components of BOM are List of Components, Quantity of Components and Unit of Measure of Components.

10. How does SAP know that an operation has components as indicated by the component allocation indicator?

Ans: Component allocation is done by routing maintenance or BOM maintenance for the assembly. This is master data maintenance. As soon as a PO is created, the master data is read into the PO.

Re: When will the order fully settlement? Answer # 1

we have to conform order and goods receipt.Later activate

the TECHO (technically completed). settlement means the

order account must be 0 that time only we can close the

order.

==================================================================== Re: what is pp cycle? Answer

# 4

1:Material Master - MM01

2: BOM creation - CS01

(10)

4: Route creation -CA01

5: PIR Generation -MD61

6: MRP Run - for Total Planning - MD01

for Single-Item, Multi-Level - MD02

7: Evaluation through MRP list and Stock requirement list

-MRP List -MD05,

Stock Requirements List - MD04

8: Conversion of Planned order to Production order - With

a

planned order -CO40

With material - CO01

9: Order management - Change >With material CO02

10: Confirmations- For order CO15

For Operation -For time ticket -CO11N

11: Goods issue - MB1A--261Movement type

12: Goods receipt - For Order MB31

13: TECO or Close Order- from Prod. Order Header menu.

14:Ko88 Order settlement

15:kkbc_ord costing report

this is the pp cycle

====================

sap pp interview questions

http://www.sap-img.com/sap-pp.htm http://www.coolinterview.com/type.asp?iType=258 http://www.allinterview.com/Interview-Questions/PP.html http://www.saptechies.com/category/sap-interview-questions/sap-pp-interview-questions/ http://sap.ittoolbox.com/groups/career/sap-career/sap-pp-interview-questions-587439 http://ebooks.ebookmall.com/title/sap-mm-2F-pp-interview-questions-answers-and-explanations-sap-production-planning-certification-stewart-ebooks.htm http://www.big4guy.com/index.php/2006/03/20/sap_pp_interview_questions_what_is_a_pro http://www.sap-img.com/production/interview-questions-and-answer-on-sap-pp.htm

References

Related documents

were by right the emperors whom Christ and St Peter had commanded that all Christians should obey. The exalted nature of the emperor’s position was reflected in his

‘Delivering Change in the Higher Education Sector’, Higher Education Leadership Conference, Dublin.. This Presentation is brought to you for free and open access by the Centre

For this simple game, we show via a potential function argument that in a variety of settings the multiplicative updates algorithm impressively fails to find the unique

This  document  is  the  2015  edition  of  the  Tax  Guide  issued  by  the  European 

Similarly, inequality solutions are required to determine the monotonicity and concavity of functions by the use of derivative (Sandor 1997).. E-mail address:

* This paper is presented to the 2nd KRIS-Brookings Joint Conference on "Security and Diplomatic Cooperation between ROK and US for the Unification of the

The others (e.g. Playing Videos, adding the shutdown button) are not crucial to the camera project but can be done if you’re also interested in exploring these capabilities.

The parameters observed intensity blast disease, the growth parameters (plant height, number of tillers, leaf chlorophyll content) and yield components (number of productive