Item No. CREW SIZE Hourly Production Production Rate Per 10 hrs.

SM

FW FORMWORK

FW01 Formwork to footings 2 CARPENTERS, 1 HELPER 1.2 12

FW02 Formwork to isolated footings 2 CARPENTERS, 1 HELPER 1.6 16

FW03 Formwork to rafts 2 CARPENTERS, 1 HELPER 1.4 14

FW04 Formwork to rafts D>0.75m 2 CARPENTERS, 1 HELPER 1.8 18

FW05 Formwork to tie beams 2 CARPENTERS, 1 HELPER 1 10

FW06 Formwork to high level tie beams D>0.45M 2 CARPENTERS, 1 HELPER 1.2 12

FW07 Formwork to Neck Columns 2 CARPENTERS, 1 HELPER 4

FW08 Formwork to U/G Water tank 2 CARPENTERS, 1 HELPER 6

FW09 Formwork to basement retaining walls 2 CARPENTERS, 1 HELPER 9

FW10 Formwork to columns (small size) 2 CARPENTERS, 1 HELPER 7

FW11 Formwork to Columns (large size) 2 CARPENTERS, 1 HELPER 9

FW12 Formwork to D/S beam internal (shallow) 2 CARPENTERS, 1 HELPER 6

FW13 Formwork to D/S beam external (Deep) 2 CARPENTERS, 1 HELPER 7

FW14 Formwork to D/S beam external (Shallow) 2 CARPENTERS, 1 HELPER 4

FW15 Formwork to D/S beam external (Deep) 2 CARPENTERS, 1 HELPER 6

FW16 Formwork to lift walls single core 2 CARPENTERS, 1 HELPER 6

FW17 Formwork to lift walls multi core 2 CARPENTERS, 1 HELPER 8

FW18 Formwork to slab decking (10ft) hourdi 2 CARPENTERS, 1 HELPER 1.6 16

FW19 Formwork to slab decking (>10ft) hourdi D/S beams 2 CARPENTERS, 1 HELPER 1.2 12

FW20 Formwork to slab decking (>10ft) hourdi 2 CARPENTERS, 1 HELPER 1.2 12

FW21 Formwork to slab decking (>10ft) hourdi 2 CARPENTERS, 1 HELPER 1 10

FW22 Formwork to staircase (non spiral) 2 CARPENTERS, 1 HELPER 4

FW23 Formwork to balcony parapets 2 CARPENTERS, 1 HELPER 6

FW24 Formwork to roof parapets 2 CARPENTERS, 1 HELPER 8

D = DEPTH

Page 1 of 7

U. GR. = UNDERGROUND

D/S = DECK - SLAB

> = GREATER THAN

< = LESS THAN

PRODUCTIVITY RATES FOR ALL PROJECT WORKS:

(Rev 0, May 2000)

(2)
(3)

Item No. CREW SIZE Hourly Production Production Rate Per 10 hrs.

FW 25 shutter Manufacture for pile caps 1 CARPENTER + 1 HELPER 2.00 20

FW 26 shutter Fix for pile caps I CARPENTER + 1 HELPER 1.50 30

FW 27 Deshutter footings/pile caps 1 HELPER 6.00 60

FW 28 Shutter make column necks 1 CARPENTER + 1 HELPER 1.50 15

FW 29 Shutter fix column necks 1 CARPENTER + 1 HELPER 1.20 12

FW 30 Deshutter Column necks 1 HELPER 4.80 48

FW 31 Shutter make tie beams 1 CARPENTER + 1 HELPER 1.20 12

FW 32 shutter fix tie beams 1 CARPENTER + 1 HELPER 1.00 10

FW 33 Column shutter making 1 CARPENTER + 1 HELPER 1.20 12

FW 34 Column shutter fixing 1 CARPENTER + 1 HELPER 1.00 10

FW 35 Column deshuttering 1 HELPER 4.00 40

FW 36 Walls shutter making 1 CARPENTER + 1 HELPER 1.50 15

FW 37 Walls shutter fixing 1 CARPENTER + 1 HELPER 0.80 80

FW 38 De shutter Tie beam shutter 1 HELPER 4.00 40

FW 39 Wall formwork deshuttering 1 HELPER 3.20 32

FW 40 Staircase formwork making 1 CARPENTER + 1 HELPER 0.80 8

FW 41 staircase formwork fixing 1 CARPENTER + 1 HELPER 0,8 8

FW 42 Staircase formwork deshuttering 1 HELPER 1,6 16

FW 43 Drop beams formwork making 1 CARPENTER + 1 HELPER 1.00 10

FW 44 Drop beams formwork fixing 1 CARPENTER + 1 HELPER 0.80 8

FW 45 Drop beams formwork stipping 1 HELPER 3.20 32

FW 46 suspended slab formwork fixing 1 CARPENTER + 1 HELPER 1.20 12

FW 47 suspended slab formwork deshutter 1 HELPER 5.00 50

FW 48 Formwork fixing for sunshades 1 CARPENTER + 1 HELPER 0.70 7

FW 49 Parapet formwork making 1 CARPENTER + 1 HELPER 1.20 12

FW 50 Parapets formwork fixing 1 CARPENTER + 1 HELPER 1.00 10

FW 51 Parapets formwork stripping 1 HELPER 4.00 40

FW 53 Fixing of lintle formwork 1 CARPENTER + 1 HELPER 0.50 5

FW 54 Deshutter lintle formwork 1 HELPER 2.00 20

FW 55 Deck formwork fixing 1 CARPENTER + 1 HELPER 1.50 15

FW 56 Deck Formwork deshuttering 1 HELPER 6.00 60

FW 57 Pipe scaffolding erection for slab 1 SCAFFOLDER 0.85 85

FW 58 inverted beam shutter fixing 1 CARPENTER + 1 HELPER 1.00 10

FW 59 De-Shuttering Manholes, square - circular (Timber) 1 CARPENTER + 1 HELPER 4m2 40m2

FW 60 Manhole Shutter erection - square or circular(Timber) 1 CARPENTER + 1 HELPER 1,5 m2

15m2

FW 61 Metal Shutter for Manholes 1 CARPENTER + 1 HELPER 1m2 10m2

FW 62 Metal Shutter for Precast Beams 2 CARPENTERS + 2 HELPERS 3M2 30M2

FW 63 Metal Shutter for Pile caps 2 CARPENTERS + 2 HELPERS 3M2 27M2

FW 64 Metal Shutters for Pile cap Beams 2 CARPENTERS + 2 HELPERS 3M2 30M2

(Rev 0, May 2000)

(4)

Item No. CREW SIZE Hourly Production Production Rate Per 10 hrs.

Per Unit

M MASONARY WORKS

MBW 01 Hollow Blockwork (100, 150 & 200 mm) 1 MASON, 1 HELPER 12 Nos 120 NR

MBW 02 Hollow Blockwork (large panels) 1 MASON, 1 HELPER 14 Nos. 140 NR

MBW 03 Solid blockwork 1 MASON, 1 HELPER 9,5 95 NR

MBW 04 Solid Blockwork as Raft forms 1 MASON, 1 HELPER 11 110 NR

MPL PLASTERWORK 1.2

MPL 01 Plaster (internal), walls final coat 1 MASON, 1 HELPER 1.6 16 SM

MPL 02 Plaster (internal), walls rush coat 2 HELPER 1.4 150 SM

MPL 03 Plaster (internal), walls mesh 1 HELPER 1.8 100 SM

MPL 04 Plaster (internal), walls hacking 1 HELPER 1 100 SM

MPL 05 Plaster (internal), walls guide point 1 MASON, 1 HELPER 1.2 100 SM

MPL 06 Plaster (internal), walls corner beads 1 MASON, 1 HELPER 10 SM 100 SM

MPL 07 Plaster (external), walls with grooves 1 MASON, 1 HELPER 10 SM 10 SM

MPL 08 Plaster (external), walls without grooves 1 MASON, 1 HELPER 1,2 12 SM

MPL 09 Plaster (external), walls rush coat 2 HELPER 15 SM 150 SM

MPL 10 Plaster (external), walls mesh 1 HELPER 10 SM 100 SM

MPL 11 Plaster (external), walls hacking 1 HELPER 10 SM 100 SM

MPL 12 Plaster (external), walls guide points 1 MASON, 1 HELPER 10 SM 100 SM

MPL 13 Plaster (external), walls corner beads 1 MASON, 1 HELPER 10 SM 100 SM

MPL 14 Plastering of Arches/Mullians 1 MASON, 1 HELPER 0.8 80

MPL 15 Floor screed 50mm thick 1 MASON, 1 HELPER 2 20

MPL 16 Roof screed 100 mm thick 1 MASON, 1 HELPER 1.5 15

MPL 17 Mosiac floor Tiles fixing 1 MASON, 1 HELPER 1.6 1.5

MPL 18 Floor Screed 25mm thick 1 Mason + 1 Helper 0,6 6

MCR CERAMIC WORKS

MCR 01 Ceramic tiles to walls by mortar 1 MASON, 1 HELPER 1.2 8 SM

MCR 02 Ceramic tiles to walls, mortar to corridors 1 MASON, 1 HELPER 1 9 SM

MCR 03 Ceramic tiles to walls, cut pieces 1 MASON 2 20 SM

MCR 04 Ceramic tiles to walls grouting 1 HELPER 5 50 SM

MCR 05 Ceramic tiles to walls, by glue 1 MASON, 1 HELPER 1,2 12 SM

MCR 06 Ceramic tiles to walls, corridors, by glue 1 MASON, 1 HELPER 1,3 13 SM

MCR 07 Ceramic tiles to walls, by glue, cut pieces 1 MASON 2 20 SM

MCR 08 Ceramic tiles to walls, by glue, grouting 1HELPER 5 50 SM

MCR 09 Ceramic tiles to floors 1 MASON, 1 HELPER 1 10 SM

MCR 10 Ceramic tiles to floors in halls 1 MASON, 1 HELPER 1,2 12 SM

MCR 11 Ceramic tiles to floors, cut pieces 1 MASON 2 20 SM

MCR 12 Ceramic tiles to floors, grouting 1 HELPER 5 50 SM

MCR 13 Marble flooring 1 MASON + 1 HELPER 0.60 60

PRODUCTIVITY RATES FOR ALL PROJECT WORKS:

(Rev 0, May 2000)

(5)

Item No. CREW SIZE Hourly Production Production Rate Per 10 hrs.

Per Unit

MCR 11 Ceramic tiles to floors, cut pieces 1 MASON 2 20 SM

MCR 12 Ceramic tiles to floors, grouting 1 HELPER 5 50 SM

MCR 13 Marble flooring 1 MASON + 1 HELPER 0.60 60

(Rev 0, May 2000)

(6)
(7)

Item No. CREW SIZE Hourly Production Production Rate Per 10 hrs. Per Unit MCR CERAMIC WORKS

MCR 13 Ceramic skirting by glue 1 MASON, 1 HELPER 2,5 M 25 METRE

MCR 14 Ceramic skirting by glue to halls, corridors 1 MASON, 1 HELPER 3 M 30 METRE

MTW TILING WORKS

MTW 01 Mosiac / Terrazo tiles to roofs 1 MASON, 1 HELPER 1,6 16 SM

MTW 02 Mosiac / Terrazo tiles to floors 1 MASON, 1 HELPER 1,4 14 SM

MTW 03 Mosiac skirting to halls 1 MASON, 1 HELPER 2,5 25 METRE

MTW 04 Mosiac skirting flush / recessed 1 MASON, 1 HELPER 1,4 14 METRE

MTW 05 Grouting / sealing to roof / floor tiles 1 HELPER 2,5 25 METRE

MKP KERBING / BLOCK PAVING WORKS

MKP00 P.C.C. Curve kerb base (to curves) 1 MASON, 1 HELPER 2,5 25 METRE

MKP01 PCC to kerb base (Straight line) 1 MASON, 1 HELPER 3,0 30 METRE

MKP02 Haunching to kerb base (Dumpes) 1 MASON, 1 HELPER 4 40 METRE

MKP03 kerbstonse (Without PCC) 1 MASON, 1 HELPER 1,5 15 METRE

MKP04 Interlock paving on pre prepared sub - base 1 MASON, 1 HELPER 2 SM

MKP05 Screed works including preparation 1 MASON, 1 HELPER 1,5 15 SM

MKP06 Haunching ot Kerb Base (Mixing Truck) 1 MASON, 1 HELPER 10 M 100M

DRW MANHOLE/ DRAINAGE CONSTRUCTION

DRW 01 Excavation for drains / manholes 1 HELPER 5 CM

DRW 02 Backfill to drains / manholes 1 HELPER 10 CM

DRW 03 Blockwork to manholes 1 MASON, 1 HELPER 2 NOS

DRW 04 Plaster to manholes 1 MASON, 1 HELPER 2 NOS

DRW 05 Benching to manholes 1 MASON, 1 HELPER 4 NOS

DRW 06 Fix covers to manholes 1 MASON, 1 HELPER 2 NOS

DRW 07 Fix gulley traps 1 MASON, 1 HELPER 1 NO

DRW 08 Laying of P.V.C. sleeves 4" - 12" 4 HELPER 24M 240M

MLW MISCELLANEOUS LABOUR WORKS

MLW01 Bitumen paint to concrete blockwork surfaces 1 HELPER 4 40 SM

MLW02 Bitumin painting Bases / piles 1 HELPER 7.00 70

MLW03 Hacking of concrete surfaces 1 HELPER 5 50 SM

MLW04 fixing of flexcell sheets 1 HELPER 6 SM

MLW05 pile cutting/dressing 1 HELPER 1 NO

MLW06 pile cutting/dressing (small diameter) 1 HELPER 2 NOS

MLW07 Vertical sealant (12 mm) 1 HELPER 2,5 25 METRE

MLW08 Horizontal sealant (12 mm) 1 HELPER 5 50 EMTRE

MLW09 Roof preparation for lw concrete 1 MASON, 1 HELPER 5 50 SM

MLW10 Angle fillet fixing 1 MASON, 1 HELPER 4 40 EMTE

MLW11 Hourdi block shifting and fixing to slab 2 HELPER 20 200 NOS

MLW12 Polythene sheet fixing 1 HELPER 3m 30

MLW13 Shaping of Soil Blinding 1 MASON + 1 HELPER 1 M 10M

MLW14 Protection Board installation 1 CARPENTER + 1 HELPER 8M2 80M2

MCW MISCELLANEOUS CARPENTARY WORKS

MCW 01 A/C subframe manufacture / fixing 1 CARPENTER 5 NOS

MCW 02 Door subframe manufacture / fixing 1 CARPENTER 4 NOS

MCW 03 Water bar fixing 1 CARPENTER 2 M 20 METRE

PRODUCTIVITY RATES FOR ALL PROJECT WORKS:

(Rev 0, May 2000)

(8)

Item No. CREW SIZE Hourly Production Production Rate Per 10 hrs.

Per Unit

CPW CONCRETE PLACEMENT WORKS

CPW01 Concrete to pile caps by pump 6 MASONS, 18 HELPERS, 1 CARPENTER 180 CM

Standard rate 1 man 1 hr. 10m3

CPW02 Concrete to PCC blinding (100 mm thick) 1 MASON, 10 HELPERS 27 CM

CPW03 Concrete to slabs/beams, by pump 6 MASONS, 18 HELPERS, 1 CARPENTER 180 CM

CPW04 Concrete to slabs / beams by crane 1 MASON, 6 HELPERS, 0.5 OPERATOR 8,10 27 CM

CPW05 Concrete to walls / columns, by pump 4 MASONS, 16 HELPERS, 2 CARPENTERS 1.2 81 CM

CPW06 Concrete by site mix 1 MASON, 12 HELPERS , 0.5 CARPENTER 1.6 9 CM

CPW07 Concrete Columns 8 HELPERS 1.40 10

CPW08 Concrete suspended slab (pump) 3 MASONS + 6 HELPERS 1.80 150

CPW09 Concrete parapets/staircases 8 HELPERS 1.00 7

CPW10 Blinding concrete 50 mm (readymix) 1 MASON + 4 HELPER 8,0 80

CPW11 Blinding concrete 50 mm (sitemix) 1 MASON + 8 HELPER 1.00 10

CPW12 Concrete footings & pile caps 1 MASON + 4 HELPER 12.00 120

CPW13 Concrete tiebeams, ground beams 1 MASON + 5 HELPER 6.00 60

CPW14 Concrete column necks 8 HELPER 1.50 15

CPW15 Concrete Ground slab 3 MASONS + 6 HELPER 1,5 15

CPW16 Concrete to precast slabs, beams 2 MASONS + 1 HELPER 3m3 30 M3

GLW GENERAL LABOUR WORKS

GLW01 Unloading reinforcement ((Flat Bed Truck) 4 HELPERS 2 Nos

GLW02 Loading reinforcement to slab (With Crane) 4 HELPERS (Flat Bed Truck loads) 40 Nos. 2 Nos

GLW03 Loading blockwork to site (with Wheel Burrow) 1 HELPER 400 Nos.

GLW04 Loading mortar to site location

GLW05 Mixing mortar for distribution 0, 3 L mixer 4 HELPER 6M3

GLW06 Site mixing of ready mix for distribution Hand mix 3M3

GLW07 Loading ready mix to site location NTRA NON TARGET RELATED ACTIVITES

NTRA01 Stacking of formwork 2 HELPERS

NTRA02 Curing of Substructure works 2 HELPERS

NTRA03 Curing of beams / slabs Hessiant Water 2 HELPERS

NTRA04 Curing of columns (Hessiant Water) 1 MASON + 2 HELPERS 1.6 (L.M) 36 M

NTRA05 Builders work make good chases 1.2 (L.M)

NTRA06 Site cleaning 1 HELPER 25 250 M2

NTRA07 Repairs to finished works 1

Page 5 of 7

PRODUCTIVITY RATES FOR ALL PROJECT WORKS:

(Rev 0, May 2000)

(9)

Item No. CREW SIZE

NTRA08 Maintenance of site services 2 HELPERS

NTRA09 Operators for mixers 2/MIXER

NTRA10 Operators for compaction equipment 1 UNIT

NTRA11 Office boy ARABTEC 1 / CONSULTANT 1

NTRA12 Watchman 2 MIN

NTRA13 Storekeeper 1/SHIFT

NON MEASURABLE

PRODUCTIVITY RATES FOR ALL PROJECT WORKS:

(Rev 0, May 2000)

(10)

Item No. CREW SIZE Hourly Production Rate

RF REINFORCEMENT

RF 01 Fix Rebar to footings & tie beams 1 STEEL FIXER 25

RF 02 Fix Rebar to walls, columns, beams, solid slabs 1 STEEL FIXER 20

RF 03 Fix rebar to ribs of hourdi slab 1 STEEL FIXER 18

RF 04 Fix rebar to mesh reinforcement 1 STEEL FIXER 15

RF 05 Fix rebar to hidden beams 1 STEEL FIXER 20

RF 01 Fix Rebar to footings & tie beams 1 STEEL FIXER 78

RF 02 Fix Rebar to walls, columns, beams, solid slabs 1 STEEL FIXER 38

RF 03 Fix rebar to ribs of hourdi slab 1 STEEL FIXER 35

RF 04 Fix rebar to mesh reinforcement 1 STEEL FIXER 15

RF 05 Fix rebar to hidden beams 1 STEEL FIXER

RFC 01 Steel cutting and bending 18.25 mm 1 STEEL FIXER 50.00

RFC 02 Steel cutting and bending 8 - 16 mm 1 STEEL FIXER 40.00

EXCAVATION

EX 1 Manual Excavation 1 HELPER

EX 2 Backfill + levelling 1HELPER

EX 3 Shaping of sloped earth for blinding for bases including compaction 1 MASON + 2 HELPER

PRODUCTIVITY RATES FOR ALL PROJECT WORKS:

(Rev 0, May 2000)

(11)

Productivity Rates for Tilling

Size. (Cms) Location Area Manpower Production Rate Remarks

(Sqm. Per day)

30 X 30 Floor Kitchen 1 Mason, 1 Helper

14

Residential Area by Sub-Contractor

30 X 30 Floor with pattern Corridor 1 Helper, 2 Masons 10 Residential Area by Sub-Contractor

40 X 40 Floor Bed room 1 Mason, 1 Helper 22-25 Residential Area by Sub-Contractor

20 X 20 Floor Store (small area) 1 Mason, 1 Helper 10 Residential Area by Sub-Contractor

30 X 60 Floor Bathroom 2 Mason, 1 Helper 6 Residential Area by Sub-Contractor

30 X 30 Floor + Wall Bathroom 2 Mason, 1 Helper 5

10 X 10 Wall Kitchen 1 Mason, 1 Helper 8-9 Residential Area by Sub-Contractor

30 X 60 Wall Corridor 1 Mason, 1 Helper 14-15 Residential Area by Sub-Contractor

30 X 30 Wall Bathroom 2 Mason, 1 Helper 7 Residential Area by Sub-Contractor

Residential Area by Sub-Contractor Notes:

1. 1 Day = 10 hrs. 2. Gang Size:

1 Mason + 1 Helper for Kitchen and Bedroom.

(Rev 0, May 2000)

References

Related documents

The government co ll ect s revenue f rom taxes on capital and labour income and value-added taxes on fina l demand , production taxes on intermediate inputs, and...

 Transportation  activities  include  personnel  and   freight  movements  and  mobile  plant  activities..  Intertwined  with  these  BMPs  are  enforceable

6 the distribution of possible food security outcomes for pastoralist regions based on this combination of rainfall and forecast is noticeably different for forecasts of

In view of the present satisfactory level of computerisation in commercial bank branches, it is proposed that, ‘‘payment of interest on savings bank accounts by scheduled

- Habitat for Humanity International – Provided computer support for the direct mail, telemarketing, major donor, matching gift, and special event fundraising programs -

No.3 IP Fixed Mobile All-IP based FMC Single Platform Box Module Site or Central Office One Cabinet One Site 9KW 3×3KW Smart modularized power management 2KW

  ParEEoning    Manager spreads namespace across Owners by assigning leases    Consistency   

• Our goal is to make Pittsburgh Public Schools First Choice by offering a portfolio of quality school options that promote high student achievement in the most equitable and