Training - Quality Manual

(2)

Key Contacts... Error! Bookmark not defined.

Authorities ...2

Introduction to Babcock International Group...3

Meeting the ISO 9001:2008 Standard ...4

1.0 Scope...4

2.0 Normative reference...4

3.0 Terms and definitions...4

4.0 Quality management system...4

4.1 General requirements ...4 4.2 Documentation requirements ...4 4.2.1 General ...4 4.2.2 Quality manual ...5 4.2.3 Control of documents...5 4.2.4 Control of records ...6 5.0 Management responsibility...6 5.1 Management commitment...6 5.2 Customer focus...6 5.3 Quality policy...6 5.4 Planning...7 5.4.1 Quality objectives...7

5.4.2 Quality management system planning ...7

5.5 Responsibility, authority and communication...7

5.5.1 Responsibility and authority ...7

5.5.2 Management representative ...7 5.5.3 Internal communication ...8 5.6 Management review...8 5.6.1 General ...8 5.6.2 Review input ...8 5.6.3 Review output ...9 6.0 Resource management...9

6.1/6.2 Provision of Resources/Human Resources ...9

6.3 Infrastructure...9

6.4 Work environment...9

7.0 Service realisation...10

7.1 Planning of service realisation...10

7.2 Customer related processes ...10

7.2.1 Determination of requirements related to the service ...10

7.2.2 Review of requirements related to the service...10

7.2.3 Customer communication ...10

7.3 Design and development ...10

7.4 Purchasing...10

7.4.1 Purchasing process ...10

7.4.2 Purchasing information ...10

7.4.3 Verification of purchased product...10

7.5 Production and service provision ...11

7.5.1 Control of production and service provision...11

7.5.2 Validation of processes for production and service provision ...11

7.5.3 Identification and traceability...11

7.5.4 Customer property ...11

7.5.5 Preservation of product ...12

7.6 Control of monitoring and measuring equipment...12

8.0 Measurement, analysis and improvement ...12

8.1 General ...12

8.2 Monitoring and measurement...12

8.2.1 Customer Satisfaction ...12

8.2.2 Internal Audit...12

8.2.3 Measurement and monitoring of processes ...12

8.2.4 Measurement and monitoring of service ...12

8.3 Control of non-conforming product ...12

8.4 Analysis of data...13 8.5 Improvement ...13 8.5.1 Continual improvement ...13 8.5.2 Corrective action ...13 8.5.3 Preventive action ...13 APPENDICES ...13

A. Training - Organisation Chart ...14

B. Training - Quality Manual Policy...15

(3)

Reviewed by

Mobile Number Service (yrs) Length of Alex Khan Managing Director – Education & Training 07879 412694 11

Barbara Brown Central Services Director 07887 757551 26

Dianne Travis Operations Service Sector Director 07788 133680 14

Paul Rowlett Operations Technical Training Director 07753 900287 2

Theresa Vincent National Quality Manager and Quality Management

Review Representative 07788 133684 17

Christine Potts Quality Standards and Procedures Coordinator 02476 305 748 6

Authorities

Signed:

Alexander Khan (Managing Director)

Revision history: First issued: September 2003

Reviewed and Revised: October 2008

Reviewed: June 2009

(4)

Introduction to Babcock International Group

For over a century, Babcock has been a name synonymous with ultra-reliable engineering excellence.

Today, Babcock International Group plc is the UK’s leading engineering support services

organisations with recorded revenue of £1.9bn in 2010. Babcock delivers critical asset support to many sectors, including transport, energy, defence, telecommunications and education. Our services are underpinned by three core capabilities:

• Managing Assets and Infrastructure

• Delivering Projects and Programmes

• Integrating Engineering Expertise

We take great pride in the considerable depth and breadth of our people’s expertise. Our 27,000 skilled staff design, build, manage, operate and maintain assets that are vital to the delivery of many key public services, both in the UK and overseas. Our market-leading reputation is based on one key fact: Babcock is a partner which can be trusted to deliver™.

Babcock, through the acquisition of VT Group, is now the largest private sector provider of vocational training in the UK. Babcock and its predecessors have been delivering essential training, support and assessment across a wide range of industries for more than 40 years. We currently manage the training of over 22,000 learners across the UK, working in partnership with over 6,000 employers in a variety of sectors.

Babcock access Government funded training to support employers and learners. We offer a broad range of qualifications, including apprenticeships, advanced apprenticeships, NVQs, Skills for Life, technical certificates and bespoke courses.

Babcock works in partnership with employers, awarding bodies and government agencies to create bespoke and blended solutions to meet their individual requirements. Through this approach we have achieved quality accreditations from standards bodies in both the private and public sector. As a large international organisation, Babcock is able to draw upon its broader capabilities and customer base. This includes the ability to establish dedicated and specialised training schools, raising finance where required and drawing upon the company’s training, information and

communications technology, systems and project management specialists to create best-in-class learning environments.

(5)

Meeting the ISO 9001:2008 Standard

1.0 Scope

Supplier of work-based learning and assessment services to the Hospitality and Catering, Care, Active Leisure and Learning, Automotive, Retail, Customer Service, Business and Administration, Management and Engineering sectors.

2.0 Normative

reference

This document and its related procedures and work instructions have been prepared in accordance with the requirements of ISO 9001: 2008.

3.0 Terms and definitions

The terms and definitions used within ISO 9001: 2008 – Quality Management Systems – Fundamentals and Vocabulary will apply.

4.0 Quality management system

4.1 General

requirements

The system consists of a five tier format:- Policies

Quality Management Manual and Quality Procedures

Operating Procedures

Supporting documentation and work instructions

Monitoring, Analysis and Control of the above (refer to Appendix C)

It is designed to identify and manage processes necessary for the Quality Management System and determine the sequence and interaction of the processes. Additionally to determine the criteria and methods used to ensure effective operation and control of the processes and to measure, monitor and analyse the processes and implement actions necessary to achieve planned results and continuing improvement. To also ensure that adequate information is available to achieve the above requirements of the Standards.

4.2 Documentation

requirements

4.2.1 General

The Quality Management System Manual together with documented Policies, Quality and Operating Procedures, controlled documentation and work instructions have been prepared that fully address the requirements of the Standards and the operational needs of the Training division of Babcock International Group.

(6)

4.2.2 Quality manual

The Quality Manual has been developed to satisfy the requirements of the Standard in respect of the company scope of registration as follows:-

Supplier of work-based learning and assessment services to the Hospitality and Catering, Care, Active Leisure, Automotive, Retail, Customer Service, Business and Administration, Management and Engineering sectors.

In order to ensure adequate control and dissemination of information, appropriate procedures, controlled documentation and work instructions have been prepared and are in place and can be accessed easily via the company intranet.

The Quality System is a five tiered format consisting of: Policies

Quality Management Manual and Quality Procedures – address the policy and process requirements of the standard

Operating Procedures – business processes which support the achievement of the standard

Supporting documentation and work instructions (where appropriate) and Quality System records – which support the procedures and provide objective evidence of the processes involved

Monitoring, analysis and control of the above

All of the above are controlled documents as defined in section 4.2.3. of the manual and the related procedure.

Exclusions are Design and Calibration.

4.2.3 Control of documents

All documents that relate to the Quality Management System are formally reviewed and controlled by the company designated Authorising Managers as described in the Quality Procedure, QP1 – Document Control.

Master Documents and amendments

o The Quality Management Manual, Policies, Quality and Operating Procedures and controlled documents and associated work instructions are held on the company intranet and available to all staff

(7)

o Documentation amendments are recorded by means of date and version number update on the master list of controlled documents and at the footer of all controlled documents

Data Control

Information relating to the day to day business of Babcock is maintained on the company intranet systems and secure servers, and the integrity of the information is assured through adherence to the back-up procedures.

4.2.4 Control of records

Records are maintained to evidence the effectiveness and development of the system. The Quality Procedure QP2 – Control of Records, identifies the records to be maintained and for what period.

5.0 Management

responsibility

5.1 Management

commitment

This Quality Management System evidences the high degree of commitment of the senior management of Babcock to satisfy, and where possible exceed, the following elements of the Standard.

5.2 Customer focus

The senior management of Babcock aim to ensure that the needs and expectations are determined and translated into the delivery of the requirement. Additionally to ensure that the requirements are fulfilled with the aim of achieving customer confidence and satisfaction, including where legal or regulatory requirements are necessary.

5.3 Quality policy

The primary objective of Babcock is to provide a service that consistently meets or exceeds customer requirements. To achieve this objective we have a Quality Management System based upon the requirements of ISO 9001 and giving due consideration to the requirements of Health and Safety at Work.

It is the Company Policy to ensure that all employees are fully informed of the requirements of the Quality Management System, which is achieved by provision of the Quality Manual at induction and its continuous accessibility on the company intranet.

The National Quality Manager takes the responsibility of Quality Management Representative and as such ensures this Policy is continually monitored and evaluated for its applicability and

effectiveness. This is achieved through internal auditing and quarterly Quality Management Reviews, to establish opportunities for improvement and to ensure implementation. This Policy shall be reviewed annually at Senior level. Validation of the System is achieved through continual monitoring of operational performance and trends.

(8)

The Managing Director, of Education and Training, has overall responsibility for implementation and compliance of Quality and Operating procedures throughout the Training division.

Our Quality Policy, Quality Management Manual and Quality and applicable Operating Procedures are communicated to all members of staff as part of the induction process, and are accessible at all times via the company intranet.

5.4 Planning

5.4.1 Quality objectives

Measurable objectives (eg contractual targets, learner progress and achievement) that are

consistent with the requirement of the Quality Policy, and to ensure that continuous improvement, have been established and documented at all appropriate levels of the company.

5.4.2 Quality management system planning

Senior management have ensured that the processes and resources required to achieve the defined quality objectives have been identified, planned and are under on-going review for their continued effectiveness and improvement. The System ensures that change is conducted in a controlled manner with the minimum of disruption either internally or externally and maintaining the integrity of the Quality Management System.

5.5 Responsibility,

authority and communication

5.5.1 Responsibility and authority

The outline organisation structure and functional responsibilities are shown in Appendix A.

Note that this chart, whilst indicating the broad hierarchical structure and structural relationships and responsibilities, does not refer to, or imply, the relative importance of positions.

The functional responsibility of an individual or a department is defined within the text of each Operating Procedure and/or work instruction – the specific responsibilities of the Management Representative are outlined below.

5.5.2 Management representative

The National Quality Manager holds overall responsibility of Quality Management Representative, though senior managers within the company have been assigned responsibility as ‘Authorising’ managers to embrace responsibilities that include:-

o Ensuring that the processes of the Quality Management System are established, implemented and maintained

o Reporting to the senior management team on the performance of the Quality Management System, including needs for improvement

(9)

o Controlling, updating and making available the Quality Manual and Quality Procedures o Controlling, updating and issuing the Operating Procedures, controlled documents and

work instructions

o Ensuring that there is a system of verification and audits independent of the person or authority carrying out the functions

o To analyse the quality problems identified either during the course of their work or resulting from internal or external audits, and ensuring corrective actions are taken.

o To ensure that the requirements of ISO9001 are always met

5.5.3 Internal communication

Appropriate management and staff are involved in the management review process and/or copied with all relevant documentation and reports. All appropriate documentation relating to Quality-based activities of the organisation will be disseminated via the company intranet and advised through newsletter and/or e-mail.

Additional to formal management reviews, management team meetings, regional and team meetings are held throughout the company on a regular basis. Staff roadshows are also held nationally to impart company strategy and news – these are scheduled as appropriate.

All staff are aware of the objectives set in terms of performance and efficiency via communication through the company intranet, newsletter, specific briefings from time to time and from regular appraisals at which individual performance targets are set.

5.6 Management

review

5.6.1 General

The Quality System, Quality Procedures, Operating Procedures, controlled documentation and work instructions are continually reviewed for their effectiveness, with areas for improvement identified and amendments made as required. There are procedures to ensure the system is subject to formal audits.

5.6.2 Review input

Management level Quality Management Reviews are held minimum quarterly. These meetings are minuted to include input from the Quality Management Representative who represents all Training stakeholders’ feedback, internal and externally sourced.

Management team and local team meetings are held monthly and minuted. Within the standard agenda for these meetings the following areas will be reviewed:

o Team Performance incl Audit results – internal and external

o Customer complaints

o Corrective/Preventative action

o Health & Safety

o Equality, Diversity, Welfare and Safeguarding

(10)

o Future training requirements

o Customer feedback

o Effectiveness of the Quality System and Procedures

o Good Practice/Success Stores

o Any other business

5.6.3 Review output

Changes made to the system, due to feedback received from Training stakeholders, regarding any element to improve the Quality Management System, is fed back to the teams via team meetings, email or news bulletins, as appropriate, with documentation updated and communicated as required.

6.0 Resource

management

6.1/6.2 Provision of Resources/Human Resources

The provision of resources to achieve the Quality System objectives that address customer satisfaction and continuous improvement is the responsibility of the Managing Director. Such provisions will take into account the correct assignment of personnel, having regard to their

competence based upon education, skills, training and experience and the continuing evaluation of their effectiveness and/or needs.

Senior management undertakes to define, provide and maintain facilities needed to achieve the service required. Such elements will include:-

o Work area and necessary fundamental facilities o Equipment appropriate to the needs

o Such supporting services as may be required to achieve the above

The above also takes into account human and physical factors, including Health and Safety and environmental implications as per the company policy statements.

6.3 Infrastructure

The provision and maintenance of the infrastructure needed to achieve conformity to the service requirements include buildings, workspace and associated utilities, hardware and software equipment and support services such as stable communication and information systems.

6.4 Work

environment

Suitable work environments are determined and managed to achieve conformity to service requirements.

(11)

7.0 Service

realisation

7.1

Planning of service realisation

Procedures have been formulated and implemented that ensure that the Quality objectives can be achieved.

Records are maintained to provide objective evidence of conformance of the service. Principal amongst these comprise the documentation held on learner files and the evaluation documentation retained in accordance with the relevant Operating Procedure.

7.2

Customer related processes

7.2.1 Determination of requirements related to the service 7.2.2 Review of requirements related to the service 7.2.3 Customer communication

The customer related processes, including the sub headings above, are addressed below and referred to in Operating Procedures and detailed in the Quality Assurance Framework (Appendix C)

o The customer requirements and expectations are clearly understood and any areas of ambiguity are resolved by continual contact prior to, during and at the conclusion of training within each learner organisation

o A formal review is undertaken in respect of each customer requirement, at a minimum on a quarterly basis and feedback is evaluated

o Any failures in respect of achieving customer satisfaction will be recorded and actioned, with full communication maintained with the customer. This is primarily achieved through the medium of learner reviews and/or customer concern reports where appropriate.

7.3

Design and development

This element of the Standard is Excluded. The company is not involved in the design and development phases of products or services as outlined in the standard.

7.4 Purchasing

7.4.1 Purchasing process 7.4.2 Purchasing information

7.4.3 Verification of purchased product

(12)

When purchasing materials and services of a quality critical nature, the company attaches importance to evaluating and selecting suppliers. Relationships between the suppliers and

Babcock are of great importance as the quality of products or service needs to be consistent in the range selected.

Procedures have been established, as detailed in the relevant Policy and Operating Procedure, which ensures that:

o Where practical, resource materials are obtained from the company approved supplier as per the Procurement Policy

o Purchasing documents clearly describe ordered items

o Purchasing documents are reviewed and approved prior to release

o Supplier performance is reviewed by the signing off of supplier invoices by the line managers who are aware of their performance

o Sub contracting of training and support services is arranged in accordance with the relevant Operating procedure

o Performance of external training consultants is measured in accordance the Sub-contract procedure

7.5

Production and service provision

7.5.1 Control of production and service provision

Procedures, documents and work instructions are in place to ensure that all aspects of service and delivery are carried out in a controlled manner, conducive to maintaining the quality of service and ensuring achievement of customer expectations and satisfaction.

7.5.2 Validation of processes for production and service provision

This is achieved through the independent verification and evaluation as defined in the appropriate Operating Procedure.

7.5.3 Identification and traceability

Training files, employer files and all associated documentation are held on the appropriate system in a controlled manner and in accordance with the retention timescales identified in the Quality Procedure QP2 – Control of Records.

7.5.4 Customer property

Care of customer property is essential to good customer relations and all our training staff are aware of the need to abide by the requirements of the workplaces they visit, including the use of appropriate protective clothing where appropriate.

(13)

7.5.5 Preservation of product

Procedures are in place to ensure that training files and associated documentation is maintained both in hard copy form and where appropriate in electronic format on the company intranet.

7.6

Control of monitoring and measuring equipment

This element of the Standard is Excluded. The company is not involved in the control of monitoring and measuring devices as detailed in the standard.

8.0 Measurement, analysis and improvement

8.1 General

Refer to Quality Assurance Framework, Appendix C.

8.2

Monitoring and measurement

8.2.1 Customer Satisfaction

Procedures exist to monitor the level of customer satisfaction by means of learner and employer questionnaires and client contact feedback.

8.2.2 Internal Audit

An effective programme of Quality System audits has been established and is maintained. Trained auditors, independent of the function being audited, conduct audits and results of audits and resultant corrective actions are evaluated at the Management Team Meetings. Specific attention will be paid to the conformance of the Quality Management System with the Standard.

8.2.3 Measurement and monitoring of processes

Compliance with the requirements of the Quality and Operating Procedures is monitored through internal audits and evaluations as detailed in the relevant Operating procedures.

8.2.4 Measurement and monitoring of service

Procedures are in place to ensure that training progression is consistent with the requirements of the individual training pathways.

8.3

Control of non-conforming product

Continuous learner reviews, questionnaires and evaluations, as well as customer and supplier concern reports, identify failures in service performance and delivery. Procurement and Human Resource Operating Procedures are in place to deal with instances where delivery of the required level of service is not being maintained.

(14)

8.4

Analysis of data

The performance of the company is analysed both internally and externally to monitor customer service and business performance. The results are used to establish trend development with a view to establishing procedures for preventive/corrective action and continuous improvement. External analysis is carried out by Government Bodies by way of performance and financial audits. Learners and employers are contacted and the quality of the service they have received

determined.

8.5 Improvement

8.5.1 Continual improvement

Planning and development is discussed at management team meetings and at regional/team meetings. This ensures that any development has the resources to allow managed introduction and implementation of the service.

8.5.2 Corrective action

The requirement for formal corrective action to be taken may arise from several sources such as: o Internal or external audits

o Internal Verification processes

o Complaints from customers – learners or employers o Failure of service

o Results of surveys and other evaluations

Procedures are in place to ensure the recording and investigation of cause of such incidents and the implementation of necessary corrective improvement. All such information is reviewed at Management Review Meetings and analysed with a view to satisfying the company requirement for continuous improvement.

8.5.3 Preventive action

Procedures are in place to ensure staff have a comprehensive induction along with continuous monitoring of their capabilities and performance. Internal and external audits are conducted to ensure compliance across all aspects of the business performance and service delivery.

APPENDICES

Appendix A Training Organisation Chart

Appendix B Training Quality Policy Statement

(15)

A. Training - Organisation Chart

Await release of Organisation Chart

(16)
(17)

References

Related documents

This option is built into the base unit, so it must be purchased at the same time along with the base unit, or at a later time by returning the base unit to a qualified

Guarantee an upgrade to renewable energy for change requires urgent action on biodiversity in power, technological reference later operation of renewable energy investment of

QMS is specified in a Quality Manual document featuring a three-tier structure, which consists of Quality Processes (including Quality Policies), Quality Procedures and

The organisation shall have a documented Quality Management System (Manual, Procedures, Records) that is in accordance with the requirements of the standard chosen

Our services provide help and assistance in developing your Quality Management System documentation (Quality manual, procedures and processes) to meet the changing needs of

RA corporate level (900 Manual) procedures are controlled by 900-10-01 Quality, Environment, Safety, Security and Product Safety Policies & Procedures Management Each RA

sent the revised copy if the document is a controlled document. If changes to a document will have a significant impact on the nature or quality of product or service, the customer

Fig.9 Schematic drawing of rig for elevated pressure combustion testing.. Fig.10 NOx emissions characteristics for elevated pressure combustion.. Fig.11 Direct photos of