East Of Unayzah JOB ORDER NO DWG CONT SHT
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
CERTIFIED
NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING
DESIGN CALCULATION OF
CONTROL & SWITCHGEAR BUILDING.
D.Banerjee DATE: 08.05.07 ENG'G. DEPT. CHECKED KSN 08.05.07 OPRG. DEPT D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN BY APPVD AJ EC AJ EC AJ EC SHEET NO. C H K 'D D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL
ىطسولا ةقطنملا عرف
NEW 132/13.8 KV SUBSTATION # 8829
C Saudi Arabia 31060103001 CE - 050357A. Design Criteria
A.1 Design Codes and References A.2 Material Specifications A.3 Soil Parameters
A.4 Load Combinations and Load Factors B. Load Calculations
B.1 Dead and Live Loads B.2 Wind Load
B.3 Seismic Load B.4 Soil Pressure B.5 Surcharge Load B.6 Crane Load C. Analysis and Design
C.1 Parapet
C.2 Stair and Landing
C.3 Stair case roof slab for stair mkd # 1 & 4 C.4 Basement Wall
C.5 Basement Mat Fdn
C.6 Isolated Footing & Combined footing C.7 Punching shear check for isolated footing C.8 GIS Floor slab.
C.9 Switchgear Floor slab. C.10 Crane beam C.11 Crane Bracket N O . A B C C.12 Roof Beams C.13 Grade Beams
C.14 Beams at Intermmediate Level
BY: C.15 Columns
C.16 STAAD Beam member no.which govern the design as per beam mkd. In dwg. D. Attachments
BY:- D.1 Sketch Sheet for STAAD File : 8829.std ) DATE:- & framing sketches of the building ( SK # 1 to 22 )
D.2 Hollow Core Roof Slab specification
BY D.3 Standard HS20 - 44 Truck loading (1 sheet). DATE:- D.4 Loading detail of GIS equipment on the floor
D.5 Loading detail of switchgear equipment on the floor BY:- D.6 Crane manufacturer's drawing & load data.
DATE:- D.7 Shear reinforcement calculation of basement beam ( mkd. BB* in dwg.)
E STAAD Analysis and Design
BY:- E.1 Input/Output ( Control & Switchgear Building.. STAAD File : 8829.std)
DATE:-INDEX PLANT REV NO.
2 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C TABLE OF CONTENTS SHEET NO. DRAWING NO. DRAWING TITLE CE-050622 C70 B NEW 132/13.8 KV SUBSTATION # 8829
A. DESIGN CRITERIA
A.1 Design Codes and References :
1 ACI 318 --- Building Code Requirements for Structural Concrete 2 ACI 315 --- For Reinforcement Details
3 UBC 1997 --- Uniform Building Code (for Wind and Seismic Loads ) 4 SEC - CRB Engineering Standards
5 AISC -- American Institute of Steel Construction (9th edition -1989) 6 Foundation Analysis and Design by Joseph E. Bowles 3rd Edition 7 PTS - 05CN129 --- Project Technical Specifications
8 CE - 050621 Civil Design Philosophy
A.2 Material Specifications :
fc' = comp. strength of concrete = 30.0 MPa
fy = yield strength of rebars (Grade 60) = 420 MPa
Fy = yield strength of steel (ASTM A36) = 250 MPa
wc = weight of normal reinforced concrete = 24 kN/m3
N
O
.
A B C
A.3 Soil Parameters : (As per soil investigation report) BY:
Φ = angle of internal friction = 28 deg. ws = unit weight of soil, dry = 19 kN/m3
BY:-DATE:- qa = net soil bearing capacity = 200 kPa
(for spread, mat and isolated fdn)
BY Ks = modulus of subgrade reaction = kN/m3
DATE:- Ka = coeff. of active soil pressure = 0.33
Ko = coeff. of soil pressure at rest = 0.50
BY:- c = soil cohesion (sand) = 0
DATE:- Note:
There was no Water table at 6m. below existing ground surface.
BY:-
DATE:-INDEX PLANT REV NO.
3 of
87
East Of Unayzah JOB ORDER NO DWG CONT SHT
30000 APPVD ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL 1 6 /J u n /0 7 AJ EC AJ EC D A TE 8 /M a y /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D.Banerjee T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C H K 'D D E S C R IP TIO N ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC OPRG. DEPT ENG'G. DEPT. 30.04.07 CHECKED KSN 30.04.07 DATE:
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
CERTIFIED C Saudi Arabia 31060103001 CE - 050357 SHEET NO. NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622
A.4 Load Combinations and Load Factors (as per ACI 318 - 95)
a. Service Load Combinations
Note: E as per UBC is a factored load (see UBC Sec. 1627) 1.0 S = D + L + C 2.0 S = D + L + C + H + S 3.0 S = D + 1.0 * (L + C + W + H + S) 4.0 S = D + W 5.0 S = D + 1.0 * (L + C + E / 1.4 + H + S) 6.0 S = D + E / 1.4
b. Ultimate Load Combinations 1.0 U = 1.4D + 1.7L + 1.7C 2.0 U = 1.4D + 1.7L +1.7C + 1.7H + 1.7S 3.0 U = 0.75* (1.4D + 1.7L + 1.7W + 1.7H + 1.7S) = 1.05D + 1.3L + 1.3W + 1.3H + 1.3S 4.0 U = 0.9D + 1.3W + 1.3H + 1.3S 5.0 U = 0.75* (1.4D + 1.7L +1.7C + 1.87E / 1.4 + 1.7H + 1.7S) N O . A B C = 1.05D + 1.3L +1.3C + E + 1.3H + 1.3S 6.0 U = 0.9D + 1.43E/1.4 = 0.9D + 1.02E BY: 7.0 U = 0.9D + 1.3W
BY:- where D = dead load
DATE:- L = roof live load
W = wind load
BY E = earthquake load
DATE:- H = earth pressure and/or hydrostatic pressure S = surcharge load
BY:- C = crane load
DATE:- BY:-
DATE:-INDEX PLANT REV NO.
4 of 87 T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL C H K 'D D A TE 3 0 /Ap r/ 0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 BY AJ EC AJ EC AJ EC CHECKED KSN 30.04.07 OPRG. DEPT REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CERTIFIED ENG'G. DEPT.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND CE-050622 C
B. LOAD CALCULATIONS
B.1 DEAD and LIVE LOAD : ( LC 9 & LC 10 )
B.1.1 Calculation of All Roof Loads and Explanation of STAAD Input data. Roof Dead Loads :
The roof consists of Hollow Core slab supported on longitudinal roof beam. This longitudinal roof beams are supported on column.
So the load is acting on these longitudinal beams.
Self weight of these hollow core slab are given below which is taken from manufacturars catalogue.
Roof Dead Load over GIS Room :
We select HCS 300 from manufacturers catalouge for GIS roof based upon the superimposed load acting on slab.
superimposed load = 4.22 kpa span = 12 m ( See Attachment # 1 )
Self weight of the hollow core slab ( Jointed ) = 3.55 kpa SUPERIMPOSED LOAD
Avg. 200 mm thk Foam Concrete ( 35 pcf = 565 kg/m3) = 1.13 kpa Waterproofing memb/separ'n sheet = 0.005kpa 100 mm insulation ( 350 n/m3 ) = 0.035kpa 50 mm thk screed ( 2200 kg/m3 ) = 1.10 kpa
N
O
.
A B C Protection layer 2 mm @ 300g/sqm = 0.003 kpa
Utility
Air condition duct = 0.20 kpa
BY: Ceiling = 0.25 kpa
Live load = 1.50 kpa
Total Superimposed load = 4.22 kpa
BY:-
DATE:-S/W +Superimposed load without Live load = 3.55+4.22-1.5 = 6.27 kpa
BY udl acting on the longitudinal beam = 6.27*12/2 = 38 kN/m
DATE:- ( Beam along grid D & L )
BY:-
DATE:- BY:-
DATE:-INDEX PLANT REV NO.
5 of
87
East Of Unayzah JOB ORDER NO DWG CONT SHT
T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R.
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 APPVD D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL C H K 'D D A TE 3 0 /Ap r/ 0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 BY AJ EC AJ EC AJ EC CHECKED KSN 30.04.07 OPRG. DEPT REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CERTIFIED ENG'G. DEPT.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED CE-050622 C
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING
Roof Live Load
Live load intencity = = 1.5 kPa
udl acting on the longitudinal beam = 1.50*12/2 = 9 kN/m ( Beam along grid D & L )
Superimposed dead loads on Roof: 1 Parapet wall :
Assume thickNess = 150 mm Dead load of parapet wall = 3.6 kPa
Parapet height = 1.0 m
udl = 3.6 kN/m
Roof Dead Load over Switchgear Room :
We select HCS 200 from manufacturers catalouge for Switchgear roof based upon the superimposed load acting on slab.
superimposed load = 7.72 kpa span = 7 m ( See Attachment # 1 )
Self weight of the hollow core slab ( Jointed ) = 2.6 kpa SUPERIMPOSED LOAD
N
O
.
A B C Avg. 200 mm thk Foam Concrete ( 35 pcf = 565 kg/m3) = 1.13 kpa
Waterproofing memb/separ'n sheet = 0.005 kpa 100 mm insulation ( 350 n/m3 ) = 0.035 kpa
BY: 50 mm thk screed ( 2200 kg/m3 ) = 1.10 kpa
Protection layer 2 mm @ 300g/sqm = 0.003 kpa Utility
BY:- Air condition duct = 0.20 kpa
DATE:- Ceiling = 0.25 kpa
Air Veltration machine With Pads = 3.50 kpa
BY Live load = 1.50 kpa
DATE:- Total Superimposed load = 7.723 kpa
BY:-DATE:- S/W +Superimposed load without Live load = 2.60+7.723-1.5 = 8.82 kpa udl acting on the longitudinal beam = 8.82*7/2 = 31 kN/m BY:- ( Beam along grid P & L )
DATE:-INDEX PLANT REV NO.
6 of 87 T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL C H K 'D D A TE 3 0 /Ap r/ 0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 BY AJ EC AJ EC AJ EC CHECKED KSN 30.04.07 OPRG. DEPT REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND CE-050622 C
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING ENG'G. DEPT.
Roof Live Load
Live load intencity = = 1.5 kPa
udl acting on the longitudinal beam = 1.50*7/2 = 5.25 kN/m ( Beam along grid P & L )
Superimposed dead loads on Roof: 1 Parapet wall :
Assume thickNess = 150 mm Dead load of parapet wall = 3.6 kPa
Parapet height = 1.0 m
udl = 3.6 kN/m
Roof Dead Load over Control Room :
We select HCS 380 from manufacturers catalouge based upon the superimposed load acting on slab.
superimposed load = 7.72 kpa span = 12 m ( See Attachment # 1 )
Self weight of the hollow core slab ( Jointed ) = 4.55 kpa
N
O
.
A B C SUPERIMPOSED LOAD
Avg. 200 mm thk Foam Concrete ( 35 pcf = 565 kg/m3) = 1.13 kpa Waterproofing memb/separ'n sheet = 0.005 kpa
BY: 100 mm insulation ( 350 n/m3 ) = 0.035 kpa
50 mm thk screed ( 2200 kg/m3 ) = 1.10 kpa Protection layer 2 mm @ 300g/sqm = 0.003 kpa
BY:- Utility
DATE:- Air condition duct = 0.20 kpa
Ceiling = 0.25 kpa
BY Air Veltration machine With Pads = 3.50 kpa
DATE:- Live load = 1.50 kpa
Total Superimposed load = 7.723 kpa
BY:-
DATE:- BY:-
DATE:-INDEX PLANT REV NO.
7 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED KSN 30.04.07 OPRG. DEPT ENG'G. DEPT. REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CHECKED BY AJ EC AJ EC AJ EC D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 C H K 'D D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL APPVD T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357
S/W +Superimposed load without Live load = 4.55 + 7.723 -1.5 = 10.77 kpa udl acting on the longitudinal beam = 10.77*12/2 = 65 kN/m ( Beam along grid D & L )
Roof Live Load
Live load intencity = = 1.5 kPa
udl acting on the longitudinal beam = 1.50*12/2 = 9 kN/m ( Beam along grid D & L )
Superimposed dead loads on Roof: 1 Parapet wall :
Assume thickNess = 150 mm Dead load of parapet wall = 3.6 kPa
Parapet height = 1.0 m
udl = 3.6 kN/m
2 DL 300 thk insulation wall = 7.20 kPa
wall height = 2.5 m
udl = 18 kN/m
Roof Dead Load over Battery & telecom Room :
We select HCS 300 from manufacturers catalouge based upon the superimposed load acting on slab.
N
O
.
A B C superimposed load = 7.72 kpa span = 9 m ( See Attachment # 1 )
Self weight of the hollow core slab ( Jointed ) = 3.55 kpa
BY: SUPERIMPOSED LOAD
Avg. 200 mm thk Foam Concrete ( 35 pcf = 565 kg/m3) = 1.13 kpa Waterproofing memb/separ'n sheet = 0.005 kpa
BY:- 100 mm insulation ( 350 n/m3 ) = 0.035 kpa
DATE:- 50 mm thk screed ( 2200 kg/m3 ) = 1.10 kpa
Protection layer 2 mm @ 300g/sqm = 0.003 kpa
BY Utility
DATE:- Air condition duct = 0.20 kpa
Ceiling = 0.25 kpa
BY:- Air Veltration machine With Pads = 3.50 kpa
DATE:- Live load = 1.50 kpa
Total Superimposed load = 7.723 kpa
BY:-
DATE:-INDEX PLANT REV NO.
8 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C SHEET NO.
S/W +Superimposed load without Live load = 3.55 + 7.723 -1.5 = 9.77 kpa udl acting on the longitudinal beam = 9.77*9/2 = 44 kN/m ( Beam along grid A & C )
udl acting on the longitudinal beam = 9.77*3/2 = 15 kN/m ( Beam Along grid C & D )
Roof Live Load
Live load intencity = 1.5 kPa
udl acting on the longitudinal beam = 1.5*9/2 = 6.75 kN/m ( Beam along grid A & C )
udl acting on the longitudinal beam = 1.50*3/2 = 2.25 kN/m ( Beam Along grid C & D )
Roof struct Dead Load ( Transformer Bay.) Assumed 1.5mm GALV. SHEET
Weight of steel structure = 0.85 kpa Weight of steel sheets = 0.15 kpa
Dead load = 1.00 kpa
Roof Live Load
Live load intencity = 1.5 kPa
N O . A B C Parapet wall : Assume thickNess = 150 mm BY: Dead load of parapet wall = 3.6 kPa
Parapet height = 1.0 m
udl = 3.6 kN/m
BY:-
DATE:-External & internal wall load
BY The wall thickness is 200mm & 300mm
DATE:- we apply the wall load to the respective beams as UDL depending to the wall height & thickness in load case 9.
BY:- The wall loads calculation are given in STAAD input file.
DATE:- BY:-
DATE:-INDEX PLANT REV NO.
9 of
87
East Of Unayzah JOB ORDER NO DWG CONT SHT
T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 APPVD D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL C H K 'D D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 BY AJ EC AJ EC AJ EC CHECKED KSN 30.04.07 OPRG. DEPT REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CERTIFIED ENG'G. DEPT.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING Saudi Arabia
B.1.2 Calculation of All Ground Floor Loads and Explanation of STAAD Input data. GIS ROOM
Ground Floor (Basement top) Dead Load One-way slabs :
Long span, L = 33 m.
Short span, S = 4.35 m.
B = L / S = 7.586
Minimum slab thickNes = = 181 m See ACI 09.5.3.3
Use thickNess of slab = 200 mm
GIS Floor slab given as a plate member in the main structural model. Ground Floor (Basement top) Live Load
GIS equipment manufacturer: HYOSOUNG Corp. (See attachment D # 4 ; For loading detail & opening in the slab to check the middle column location)
Reference drawings: 07L-A03-01 Rev .0 Layout of 132 kV GiS
The loads are taken from this manufactures drawing.
N
O
.
A B C The loads are applied as point load at bay center as per the following sketch given below.
BY: BY:- DATE:-BY DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
10 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C SHEET NO.
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING
24
N O . A B C BY: BY:- DATE:-BY DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
11 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC APPVD C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 SHEET NO.
13.8 KV SWITCHGEAR ROOM DEAD LOAD One-way slabs : Long span, L = 33 m. Short span, S = 3.40 m. B = L / S = 9.706
Minimum slab thickNes = See ACI 09.5.3.3
= 142 m
Use thickNess of slab = 200 mm
Switchgear Floor slab given as a plate member in the main structural model.
LIVE LOAD - 13.8 KV SWITCHGEAR ROOM - A & B Switchgear Manufacturer: ABB
Reference dwg No: N103857-BMA (See attachment D # 5 ; For loading No. of panels = 32 detail & opening in the slab to check
the middle column location) Panel dimensions (H x D x W, m): 2.950 x 1.400 x9.36
Design contact area for all panel = 1.4 x 9.36 = 13.10 m2
Total weight = 11250 kg = 112.5 kn
Live load in Switchgear area = 112.50 ÷ = 8.59 kpa
N
O
.
A B C increase load by 5% due to variation in actual equipment weight ( instillation Cas only )
Design live load in switchgear = 9.01 kpa Distributed load for Slabs Say = 9.5 kpa
BY: LIVE LOAD - 13.8 KV SWITCHGEAR ROOM - C
Switchgear Manufacturer: ABB
Reference dwg No: N103857-BMA See attachment # 5
BY:- No. of panels = 32
DATE:- Panel dimensions (H x D x W, m): 2.950 x 1.400 x9.36
Design contact area for all panel = 1.4 x 8.21
BY = 11.49 m2
DATE:- Total weight = 10000 kg = 100.0 kn
Live load in Switchgear area = 100.00 ÷
BY:- = 8.70 kpa
DATE:- increase load by 5% due to variation in actual equipment weight ( instillation Cas only )
Design live load in switchgear = 9.14 kpa Distributed load for Slabs
BY:- Say = 9.5 kpa
DATE:-INDEX PLANT REV NO.
12 of
87 11.49
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C 13.10 SHEET NO.
24
l
B.2
WIND LOAD
(As per UBC 1997)Basic wind speed = 101 mph = 162 kmph (As per SEC Std.)
qs = Wind stagnation pressure(Table-16F) = 26.0 psf = 1.24 kPa
Exposure C SEC std
Height above ave. level of adjoining ground = 13.80 m = 45.3 ft Ce = Combined height, exposure and gust factor coeff.(Table-16G) = 1.35
Cq = Pressure coefficient for primary frames (Table-16H)
Windward coeff. = 0.8
Leeward coeff. = 0.5
Iw = Importance factor (Table-16K) =
Pw = Design windward pressure = Ce * Cq * qs * Iw = 1.546 kPa
= Design leeward pressure = Ce * Cq * qs * Iw = 0.97 kPa
WIND LOAD CALCULATION
(As per ASCE 7-95)
N
O
.
A B C Calculation of wind load as per ASCE 7-95 qz = 0.613 Kz Kzt V
2
I N/m2
BY: Kz = Velocity pressure coefficient as per table 6.3 = 1 (Exposure category C ; Max. ht = 13.8m)
Kzt = 1
BY:- I = Importance factor = 1.15 for category III from table 6.2
DATE:- qz = Velocity pressure
V = Basic wind speed = 162 kmph = 45 m/sec
BY qz = 1542 N/m2 = 1.5417 kpa
DATE:- As per table 6-1 for low rise buildings
pw = Design wind pressure = qz( GCpf - GCpi) BY:- GCpf = External force coeff as per fig. 6.4 (as shown below) DATE:- GCpi = Inernal force coeff as per table 6.4 (as shown below)
Case -I : With GCpi = +0.8 BY:- Case -II : With GCpi = -0.3
DATE:-INDEX PLANT REV NO.
13 of
87
East Of Unayzah JOB ORDER NO DWG CONT SHT
T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 1.15 APPVD D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL C H K 'D D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 BY AJ EC AJ EC AJ EC CHECKED KSN 30.04.07 OPRG. DEPT REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CERTIFIED ENG'G. DEPT.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING Saudi Arabia
+0.4 -0.29 +0.4 -0.29
+ +
+0.8 +0.8 -0.3 -0.3
= = As per UBC
-0.4 -1.09 0.7 0.01 1.546 -0.83
Windward press = -0.62 kpa Windward press = 1.079 kpa W/ward press = 1.546 Leeward press = -1.68 kpa Leeward press = 0.015 kpa L/ward press = -0.83 Resultant pressure on frame = Resultant pressure on frame = Resultant press on fr =
1.06 kpa 1.064 kpa kpa
Hence calculation as per UBC is on conservative side.
N O . A B C BY: BY:- DATE:-BY DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
14 of
87 B
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DRAWING TITLE OPRG. DEPT ENG'G. DEPT. C70
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING CERTIFIED D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC NEW 132/13.8 KV SUBSTATION # 8829 C H K 'D D E S C R IP TIO N T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C
DRAWING NO. SHEET NO.
CE-050622 GCpi Case II GCpf Case I GCpf GCpi 2.38
Pw = Design windward pressure = Ce * Cq * qs * Iw = 1.546 kPa
= Design leeward pressure = Ce * Cq * qs * Iw = 0.97 kPa
B.2.1 +X-direction (wind from left when you view plan) : (Load Case - 5) +X-direction is towards right along grids A, B, C, etc.
Note: Wind on walls below roof will be applied as uniform load at grid column. Wind on parapet walls will be applied as concentrated loads at roof level. H = tributary height of parapet wall 1.0 m W = tributary width, m
A = H x W, m2
Fx = Wind load on parapet = Pw x A = kN at (STAAD joint)
wx = Wind load on wall = Pw x W = kN/m at (STAAD memb)
Concentrate load at top of column where roof is exist (Refer STAAD File : 8829.std)
About grid 1
Along grid-A Wind ward = 4.64 kN W = 3.000 m
Along grid-B Wind ward = 9.28 kN W = 6.000 m
Along grid-D Wind ward = 4.64 kN W = 3.000 m
N
O
.
A B C
Along grid-D Wind ward = 2.90 kN W = 1.875 m
BY: Along grid-F Wind ward = 6.38 kN W = 4.13 m
Along grid-K Wind ward = 6.38 kN W = 4.13 m
BY:-DATE:- Along grid-L Wind ward = 2.90 kN W = 1.88 m
BY Along grid-L Wind ward = 5.41 kN W = 3.500 m
DATE:-Along grid-P Wind ward = 5.41 kN W = 3.500 m
BY:-
DATE:- BY:-
DATE:-INDEX PLANT REV NO.
15 of
87
East Of Unayzah JOB ORDER NO DWG CONT SHT
T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 APPVD D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL C H K 'D D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 BY AJ EC AJ EC AJ EC CHECKED KSN 30.04.07 OPRG. DEPT REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CERTIFIED ENG'G. DEPT.
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING Saudi Arabia
About grid 15
Along grid-A Leeward = 2.90 kN W = 3.000 m
Along grid-B Leeward = 5.80 kN W = 6.000 m
Along grid-D Leeward = 2.90 kN W = 3.000 m
About grid 14
Along grid-D Leeward = 2.10 kN W = 2.175 m
Along grid-G Leeward = 3.74 kN W = 3.875 m
Along grid-J Leeward = 3.70 kN W = 3.825 m
Along grid-L Leeward = 2.05 kN W = 2.125 m
About grid 19
Along grid-A Leeward = 4.35 kN W = 4.500 m
Along grid-C Leeward = 5.80 kN W = 6.000 m
Along grid-D Leeward = 3.55 kN W = 3.675 m
Along grid-H Leeward = 5.80 kN W = 6.000 m
Along grid-L Leeward = 6.28 kN W = 6.500 m
Along grid-P Leeward = 3.38 kN W = 3.500 m
Calculation of member load due to wall. About grid 1
Along grid-A Wind ward = 4.64 kN/m W = 3.000 m
Along grid-B Wind ward = 9.28 kN/m W = 6.000 m
Along grid-D Wind ward = 7.54 kN/m W = 4.875 m
Along grid-F Wind ward = 6.38 kN/m W = 4.125 m
N
O
.
A B C
Along grid-K Wind ward = 6.38 kN/m W = 4.125 m
BY:
Along grid-L Wind ward = 8.31 kN/m W = 5.375 m
BY:-
DATE:-Along grid-P Wind ward = 5.41 kN/m W = 3.500 m
BY
DATE:- About grid 15
Along grid-A Leeward = 2.90 kN/m W = 3.000 m
BY:-
DATE:-Along grid-B Leeward = 4.35 kN/m W = 4.500 m
BY:-
DATE:-INDEX PLANT REV NO.
16 of 87 C T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W CE-050622 C70 SHEET NO. DRAWING NO. DRAWING TITLE NEW 132/13.8 KV SUBSTATION # 8829 B DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND KSN 30.04.07 OPRG. DEPT ENG'G. DEPT. REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CHECKED BY AJ EC AJ EC AJ EC D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 C H K 'D D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL
Along grid-C Leeward = 2.90 kN/m W = 3.000 m
Along grid-D Leeward = 1.45 kN/m W = 1.500 m
About grid 14
Along grid-G Leeward = 3.74 kN/m W = 3.875 m
Along grid-J Leeward = 3.70 kN/m W = 3.825 m
Along grid-L Leeward = 2.05 kN/m W = 2.125 m
About grid 19
Along grid-A Leeward = 4.35 kN/m W = 4.500 m
Along grid-C Leeward = 5.80 kN/m W = 6.000 m
Along grid-D Leeward = 3.55 kN/m W = 3.675 m
Along grid-H Leeward = 5.80 kN/m W = 6.000 m
N
O
.
A B C Along grid-L Leeward = 6.28 kN/m W = 6.500 m
BY: Along grid-P Leeward = 3.38 kN/m W = 3.500 m
BY:- DATE:-BY DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
17 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED KSN 30.04.07 OPRG. DEPT ENG'G. DEPT. REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CHECKED BY AJ EC AJ EC AJ EC D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 APPVD C H K 'D
B.2.2 -X-direction (wind from right when you view plan) : (Load Case - 7) -X-direction is towards left along grids A, B, C, etc.
Calculation of joint loads due to parapet wall. Concentrate load at top of column where roof is exist About grid 19
Along grid-A Wind ward = 6.96 kN W = 4.500 m
Along grid-C Wind ward = 9.28 kN W = 6.000 m
Along grid-D Wind ward = 5.68 kN W = 3.675 m
Along grid-H Wind ward = 9.28 kN W = 6.000 m
Along grid-L Wind ward = 10.05 kN W = 6.500 m
Along grid-P Wind ward = 5.41 kN W = 3.500 m
About grid 15
Along grid-A Wind ward = 4.64 kN W = 3.000 m
Along grid-B Wind ward = 6.96 kN W = 4.500 m
Along grid-C Wind ward = 4.64 kN W = 3.000 m
Along grid-D Wind ward = 2.32 kN W = 1.500 m
About grid 14
Along grid-G Wind ward = 5.99 kN W = 3.875 m
Along grid-J Wind ward = 5.91 kN W = 3.825 m
Along grid-L Wind ward = 3.29 kN W = 2.125 m
About grid 1
Along grid-A Leeward = 2.90 kN W = 3.000 m
Along grid-B Leeward = 5.80 kN W = 6.000 m
Along grid-D Leeward = 4.71 kN W = 4.88 m
Along grid-F Leeward = 3.99 kN W = 4.13 m
Along grid-K Leeward = 3.99 kN W = 4.13 m
N
O
.
A B C Along grid-L Leeward = 5.19 kN W = 5.38 m
Along grid-P Leeward = 3.38 kN W = 3.500 m
BY: Calculation of member load due to wall.
About grid 19
BY:-DATE:- Along grid-A Wind ward = 6.96 kN/m W = 4.500 m
BY
DATE:- Along grid-C Wind ward = 9.28 kN/m W = 6.000 m
BY:-DATE:- Along grid-D Wind ward = 5.68 kN/m W = 3.675 m
BY:-
DATE:-INDEX PLANT REV NO.
18 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C SHEET NO.
Along grid-H Wind ward = 9.28 kN/m W = 6.000 m
Along grid-L Wind ward = 10.05 kN/m W = 6.500 m
Along grid-P Wind ward = 5.41 kN/m W = 3.500 m
About grid 15
Along grid-A Wind ward = 4.64 kN/m W = 3.000 m
Along grid-B Wind ward = 6.96 kN/m W = 4.500 m
Along grid-C Wind ward = 4.64 kN/m W = 3.000 m
Along grid-D Wind ward = 2.32 kN/m W = 1.500 m
About grid 14
Along grid-G Wind ward = 5.99 kN/m W = 3.875 m
Along grid-J Wind ward = 5.91 kN/m W = 3.825 m
N
O
.
A B C Along grid-L Wind ward = 3.29 kN/m W = 2.125 m
About grid 1
BY: Along grid-A Leeward = 1.45 kN/m W = 1.500 m
BY:- Along grid-B Leeward = 5.80 kN/m W = 6.000 m
DATE:-BY Along grid-D Leeward = 4.71 kN/m W = 4.875 m
DATE:-BY:- Along grid-F Leeward = 3.99 kN/m W = 4.125 m
DATE:- BY:-
DATE:-INDEX PLANT REV NO.
19 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC APPVD C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 SHEET NO.
Along grid-K Leeward = 3.99 kN/m W = 4.125 m
Along grid-L Leeward = 5.19 kN/m W = 5.375 m
Along grid-P Leeward = 3.38 kN/m W = 3.500 m
B.2.3 +Z-direction (wind from top when you view plan) : (Load Case - 6) +Z-direction is towards bottom along grids 1, 2, 3, etc.
Calculation of joint loads due to parapet wall. (Refer STAAD File : 8829.std) About grid A
Along grid-1 Wind ward = 9.28 kN W = 6.000 m
Along grid-5 Wind ward = 18.55 kN W = 12.00 m
Along grid-9 Wind ward = 18.55 kN W = 12.00 m
Along grid-15 Wind ward = 9.28 kN W = 6.000 m
Along grid-15 Wind ward = 3.87 kN W = 2.500 m
Along grid-17 Wind ward = 9.28 kN W = 6.000 m
Along grid-19 Wind ward = 5.41 kN W = 3.500 m
About grid D
Along grid-1 Wind ward = 4.45 kN W = 2.875 m
Along grid-3 Wind ward = 9.28 kN W = 6.000 m
Along grid-5 Wind ward = 9.28 kN W = 6.000 m
N
O
.
A B C Along grid-7 Wind ward = 9.28 kN W = 6.000 m
Along grid-9 Wind ward = 8.62 kN W = 5.575 m
Along grid-11 Wind ward = 6.96 kN W = 4.500 m
BY: Along grid-14 Wind ward = 5.49 kN W = 3.550 m
Along grid-15 Wind ward = 2.32 kN W = 1.500 m
About grid P
BY:- Along grid-1 Leeward = 2.78 kN W = 2.875 m
DATE:- Along grid-3 Leeward = 5.80 kN W = 6.000 m
Along grid-5 Leeward = 5.80 kN W = 6.000 m
BY Along grid-7 Leeward = 5.80 kN W = 6.000 m
DATE:- Along grid-9 Leeward = 5.39 kN W = 5.575 m
Along grid-11 Leeward = 4.35 kN W = 4.500 m
BY:- Along grid-14 Leeward = 4.88 kN W = 5.050 m
DATE:- Along grid-16 Leeward = 4.83 kN W = 5.000 m
Along grid-18 Leeward = 4.35 kN W = 4.500 m
BY:- Along grid-19 Leeward = 2.42 kN W = 2.500 m
DATE:-INDEX PLANT REV NO.
20 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C SHEET NO.
Calculation of member load due to wall. About grid A
Along grid-15 Wind ward = 3.87 kN/m W = 2.500 m
Along grid-17 Wind ward = 9.28 kN/m W = 6.000 m
Along grid-19 Wind ward = 5.41 kN/m W = 3.500 m
About grid D
Along grid-1 Wind ward = 4.45 kN/m W = 2.875 m
Along grid-3 Wind ward = 9.28 kN/m W = 6.000 m
Along grid-5 Wind ward = 9.28 kN/m W = 6.000 m
Along grid-7 Wind ward = 9.28 kN/m W = 6.000 m
Along grid-9 Wind ward = 8.62 kN/m W = 5.575 m
Along grid-11 Wind ward = 6.96 kN/m W = 4.500 m
N
O
.
A B C
Along grid-14 Wind ward = 5.49 kN/m W = 3.550 m
BY:
Along grid-15 Wind ward = 2.32 kN/m W = 1.500 m
BY:- DATE:-BY DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
21 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC APPVD C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 SHEET NO.
About grid P
Along grid-1 Leeward = 2.79 kN/m W = 2.875 m
Along grid-3 Leeward = 5.82 kN/m W = 6.000 m
Along grid-5 Leeward = 5.82 kN/m W = 6.000 m
Along grid-7 Leeward = 5.82 kN/m W = 6.000 m
Along grid-9 Leeward = 5.41 kN/m W = 5.575 m
Along grid-11 Leeward = 4.37 kN/m W = 4.500 m
Along grid-14 Leeward = 4.90 kN/m W = 5.050 m
Along grid-16 Leeward = 4.85 kN/m W = 5.000 m
Along grid-18 Leeward = 4.37 kN/m W = 4.500 m
N
O
.
A B C Along grid-19 Leeward = 2.43 kN/m W = 2.500 m
BY: B.2.4 -Z-direction (wind from bottom when you view plan) : (Load Case - 8) -Z-direction is towards top along grids 1, 2, 3, etc.
About grid P
BY:- Along grid-1 Wind ward = 4.44 kN W = 2.875 m
DATE:- Along grid-3 Wind ward = 9.28 kN W = 6.000 m
Along grid-5 Wind ward = 9.28 kN W = 6.000 m
BY Along grid-7 Wind ward = 9.28 kN W = 6.000 m
DATE:- Along grid-9 Wind ward = 8.62 kN W = 5.575 m
Along grid-11 Wind ward = 6.96 kN W = 4.500 m
BY:- Along grid-14 Wind ward = 7.81 kN W = 5.050 m
DATE:- Along grid-16 Wind ward = 7.73 kN W = 5.000 m
Along grid-18 Wind ward = 6.96 kN W = 4.500 m
BY:- Along grid-19 Wind ward = 3.87 kN W = 2.500 m
DATE:-INDEX PLANT REV NO.
22 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C SHEET NO.
About grid L
Along grid-1 Wind ward = 4.44 kN W = 2.875 m
Along grid-3 Wind ward = 9.28 kN W = 6.000 m
Along grid-5 Wind ward = 9.28 kN W = 6.000 m
Along grid-7 Wind ward = 9.28 kN W = 6.000 m
Along grid-9 Wind ward = 8.62 kN W = 5.575 m
Along grid-11 Wind ward = 6.96 kN W = 4.500 m
Along grid-14 Wind ward = 5.49 kN W = 3.550 m
Along grid-18 Wind ward = 5.41 kN W = 3.500 m
Along grid-19 Wind ward = 5.41 kN W = 3.500 m
About grid A
Along grid-1 Wind ward = 9.28 kN W = 6.000 m
Along grid-5 Wind ward = 18.55 kN W = 12.00 m
Along grid-9 Wind ward = 18.55 kN W = 12.00 m
Along grid-15 Wind ward = 9.28 kN W = 6.000 m
Along grid-17 Leeward = 5.82 kN W = 6.000 m
Along grid-19 Leeward = 3.40 kN W = 3.500 m
Calculation of member load due to wall.
N
O
.
A B C
About grid P, L & D
Along grid-1 Wind ward = 4.44 kN/m W = 2.875 m
BY:
Along grid-3 Wind ward = 9.28 kN/m W = 6.000 m
BY:-
DATE:-Along grid-5 Wind ward = 9.28 kN/m W = 6.000 m
BY
DATE:-Along grid-7 Wind ward = 9.28 kN/m W = 6.000 m
BY:-
DATE:-Along grid-9 Wind ward = 8.62 kN/m W = 5.575 m
BY:-
DATE:-INDEX PLANT REV NO.
23 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC APPVD C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 SHEET NO.
Along grid-11 Wind ward = 6.96 kN/m W = 4.500 m
Along grid-14 Wind ward = 7.81 kN/m W = 5.050 m
Along grid-16 Wind ward = 7.73 kN/m W = 5.000 m
Along grid-18 Wind ward = 6.96 kN/m W = 4.500 m
Along grid-19 Wind ward = 3.87 kN/m W = 2.500 m
About grid A
Along grid-15 Leeward = 2.43 kN/m W = 2.500 m
Along grid-17 Leeward = 5.82 kN/m W = 6.000 m
Along grid-19 Leeward = 3.40 kN/m W = 3.500 m
N O . A B C BY: BY:- DATE:-BY DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
24 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C SHEET NO.
B.3 SEISMIC LOAD
Calculation of Total Loads.
DL at Transformer Roof level: (EL 13.80)
Roof area = 432 m2
36 x 12.00 = 432 m2 Dead load intensity roof level = 1.00 kN/m2
Roof load = 432 x 1.00 = 432 kN
Self wt of col.(600x300 and av 1.85m ht ; 8 nos.) = 64 kN Self wt of col.(600x400 and av 1.85m ht ; 8 nos.) = 85 kN Wt. of parapet wall ( avarage 1 m ht., 96 m length ) = 345.6 kN Wt. of 300 thk. wall ( 1.85 m ht., 36 m length ) = 479.5 kN Wt. of 200 thk. wall ( 1.85 m ht., 48 m length ) = 319.7 kN Roof beams longitudinal (120m length ; Avg. 400x600) = 691.2 kN W1 = Transformer Roof DL = 2417 kN
DL at GIS Roof level : (EL 10.10)
Roof area = 432 m2
36 x 12.00 = 432 m2 Dead load intensity roof level = 6.27 kN/m2
Roof load = 432 x 6.27 = 2710 kN
Self wt of col.(400x500 and av 1.525m ht ; 4 nos.) = 29 kN Self wt of col.(600x400 and av 1.525m ht ; 7 nos.) = 61 kN Self wt of col.(600x400 and av 3.325m ht ; 7 nos.) = 134 kN Wt. of parapet wall ( avarage 1 m ht., 60 m length ) = 216 kN Wt. of 300 thk. wall ( 1.525 m ht., 60 m length ) = 658.8 kN Wt. of 300 thk. wall ( 3.325 m ht., 36 m length ) = 479.5 kN
N
O
.
A B C Roof beams longitudinal ( 96m length ; Avg. 400x600 ) = 553 kN
W2 = GIS Roof DL = 4842 kN
BY: DL at 13.8kv Switchgear Roof & Aux. Trans. Roof level : (EL 4.5)
Swithchgear Roof area = 301 m2
43 x 7.00 = 301 m2 BY:- Dead load intensity roof level = 8.82 kN/m2
DATE:- Roof load = 301 x 8.82 = 2656 kN
Aux. transformer bay roof load ( load = 1 kpa) = 35 kN ( 1*5*7 ) BY Self wt of col.(400x500 and av 2.25m ht ; 13 nos.) = 140 kN
DATE:- Self wt of col.(600x400 and av 3.75m ht ; 7 nos.) = 151 kN Wt. of parapet wall ( avarage 1 m ht., 62 m length ) = 223.2 kN BY:- Wt. of 300 thk. wall ( 2 m ht., 43 m length ) = 619.2 kN DATE:- Wt. of 300 thk. wall ( 3.75 m ht., 36 m length ) = 972 kN Wt. of 200 thk. wall ( 3.325 m ht., 36 m length ) = 319.7 kN BY:- Roof beams longitudinal ( 110m length ; Avg. 400x600 ) = 633.6 kN
DATE:- W3 = Swgr. Roof DL = 5750 kN
INDEX PLANT REV NO.
25 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
DRAWING TITLE DRAWING NO. SHEET NO.
NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED KSN 30.04.07 OPRG. DEPT ENG'G. DEPT. REVISIONS DRAWN D.Banerjee DATE: 30.04.07 CHECKED BY AJ EC AJ EC AJ EC D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 APPVD C H K 'D
DL at Control Room , Battery Room & telecom room Roof level : (EL 4.5) Roof area ( 12 x 12 + 12 x 12 ) = 288 m2 Dead load intensity roof level = 10.77 kN/m2
Roof load = 288 x 10.77 = 3103 kN
Self wt of col.(400x500 and av 2.25m ht ; 10 nos.) = 108 kN Self wt of col.(600x400 and av 3.75m ht ; 5 nos.) = 86 kN Self wt of col.(600x300 and av 3.75m ht ; 2 nos.) = 43 kN Wt. of parapet wall ( avarage 1 m ht., 36 m length ) = 129.6 kN Wt. of 300 thk. wall ( 2 m ht., 36 m length ) = 518.4 kN Wt. of 200 thk. wall ( 2 m ht., 36 m length ) = 345.6 kN Wt. of 300 thk. wall ( 3.75 m ht., 12 m length ) = 324 kN Wt. of 200 thk. wall ( 3.75 m ht., 12 m length ) = 216 kN Roof beams longitudinal ( 90m length ; Avg. 400x600 ) = 518.4 kN
W4 = Control Roof DL = 5392 kN
DL at tie beam level: (EL 4.5)
Wt. of 300 thk. wall ( 3.75 m ht., 48 m length ) = 1296 kN Wt. of 200 thk. wall ( 3.75 m ht., 72 m length ) = 1296 kN Self wt of col.(600x400 and av 3.75m ht ; 27 nos.) = 583 kN Tie Beam ( 300x500 size & 84m length) = 302.4 kN
W5 = Total DL = 3478 kN
DL at tie beam level: (EL 7.5)
Wt. of 300 thk. wall ( 3.00 m ht., 48 m length ) = 1037 kN Wt. of 200 thk. wall ( 3.00 m ht., 72 m length ) = 1037 kN
N
O
.
A B C Self wt of col.(600x400 and av 3.00m ht ; 27 nos.) = 467 kN
Tie Beam ( 300x500 size & 84m length) = 302.4 kN
W6 = Total DL = 2843 kN
BY:
DL at basement top level (GIS & Switchgear area) (EL 0.00)
BY:- Area = (12x36 + 7x36) = 684 m2
DATE:- Floor load = 684 x 5.30 = 3625 kN
Transverse beams (100m length ; 400x500) = 480 kN
BY Transverse beams (72m length ; 300x600) = 311 kN
DATE:- Self wt of col.(600x400 and av 2.25m ht ; 18 nos.) = 233 kN Self wt of col.(500x400 and av 2.25m ht ; 9 nos.) = 97 kN BY:- Wt. of 300 thk. wall ( 2.25 m ht., 84 m length ) = 1361 kN DATE:- Wt. of 200 thk. wall ( 2.25 m ht., 70 m length ) = 756 kN
Basement top DL = 7548 kN
BY:-
DATE:-INDEX PLANT REV NO.
26 of
87 CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE C SHEET NO.
Dead load increase = 10% of live load (equipment)
Live Load = 4000 kN
dead load increase = 400 kN
DL at basement top level (GIS & Switchgear area) = W7= 7948 kN DL at Grade Beam level (EL 0.00)
Transverse beams (45m length ; 300x1250) = 405 kN Transverse beams (65m length ; 300x600) = 280.8 kN
Self wt of col. = 400 kN
Wt. of 300 thk. wall ( 2.25 m ht., 48 m length ) = 777.6 kN Wt. of 200 thk. wall ( 2.25 m ht., 72 m length ) = 777.6 kN Grade Beam level DL = W8 = 2641 kN
W1 = Transformer Roof DL = 2417 kN W2 = GIS Roof DL = 4842 kN N O . A B C W3 = Swgr. Roof DL = 5750 kN W4 = Control Roof DL = 5392 kN
W5 = DL at tie beam level: (EL 4.5) = 3478 kN
BY: W6 = DL at tie beam level: (EL 7.5) = 2843 kN
W7 = DL- basement top level(GIS & Switchgear area) = 7948 kN
W8 = Grade Beam level DL = 2641 kN
BY:- Total W = kN DATE:-BY DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
27 of
87
East Of Unayzah JOB ORDER NO DWG CONT SHT
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING Saudi Arabia CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC APPVD C H K 'D
Central Region Branch
ىطسولا ةقطنملا عرف
T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 35310 SHEET NO.
Calculation of base shear (using UBC 1997 and static load procedure) Base is Cable Cellar slab level. Z = seismic zone coefficient , Zone 1(Table 16I) = 0.075
soil profile type is SD (as per UBC Sec. 1636.2)
Cv = seismic coefficient (Table 16R) = 0.18
Ca = seismic coefficient (Table 16Q) = 0.12
R = numerical coefficient (Table 16-N) = 3.50 (OMRF) I = importance factor (Table 16K) = 1.00
Ct = numerical coeff. = 0.03
hn = height above the base to roof level = 13.0 m ave.
= 42.64 ft ave. T = fundamental period of vibration of structure = 0.501 sec
= Ct * (hn)^0.75
V = base shear = Cv * I / (R * T) * W = 0.103 x W
Vmax. = 2.5*Ca* I/ R * W = 0.086 x W use this
Vr = reqd. base shear = 0.086 x W = 3037 kN
Vertical distribution of base shear
Ft = lateral force at top = 0.00 for T < 0.7 sec.
F = lateral force at any level = W x h *(Vr - Ft)
N
O
.
A B C ∑W x h
Level above base Dead load Ht above base W x h F=Fx=Fz
BY: (W) kN (h) m
Transformer Roof 2417 17.35 ave. 41938 451 kN
GIS Roof 4842 13.65 ave. 66094 711 kN
BY:- Swgr. Roof 5750 7.60 ave. 43700 470 kN
DATE:- Control Roof 5392 7.60 ave. 40981 441 kN
Tie beam EL4.5 3478 7.6 ave. 26430 285 kN
BY Tie beam EL7.5 2843 10.6 ave. 30131 324 kN
DATE:- Basement top 7948 3.1 ave. 24637 265 kN
Grade beam level 2641 3.1 ave. 8187 88 kN
BY:- ∑ Wxh =
DATE:- Note: As per UBC Code sec. 1630.6, the storey shear force at any level shall be distributed to the various elements of the vertical lateral-force-resisting system in BY:- proportion to their rigidities, considering the rigidity of the roof or floor diaphragm.
DATE:-INDEX PLANT REV NO.
28 of
87 SHEET NO. NEW 132/13.8 KV SUBSTATION # 8829
B C70 CE-050622
DESIGN CALC. OF CONTROL & SWITCHGEAR BUILDING CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR
FOR ORDERING MATERIALS UNTIL
CERTIFIED AND
DRAWING TITLE DRAWING NO.
OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W C 282098
B.3.1 Transformer Roof level: Horizontal distribution of lateral force F to each column. Seismic in X-direction : (Load Case - 1 & 3) X-direction is along grids A, B, C, etc.
(Refer STAAD File : 8829.std) b = column size along z-axis F = 451 kN d = column size along x-axis
H = column height
Rx = rigidity = 1 use relative rigidities
H^3 / (12* Iz) + 3 * H / A ie mult. values
Rigidity formula is from STRUCTURAL ENGRG HANDBOOK by by 1,000 Gaylord and Gaylord
A = area = b x d
Iz = moment of inertia abt z-axis = 1 / 12 * b * d^3
Fx = F * (Rx / Total Rx) = seismic force in each column
Frame in Grid A: Grids are based on roof framing plan.
Grid b d H Iz A Rx Fx 1 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN 5 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN 9 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN 15 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN Frame in Grid B: 1 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN 5 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN 9 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN 15 0.60 0.30 3.70 0.001 0.18 0.31 17.2 kN Frame in Grid D: 1 0.60 0.40 3.70 0.003 0.24 0.73 40.1 kN N O . A B C 3 0.60 0.40 3.70 0.003 0.24 0.73 40.1 kN 5 0.60 0.40 3.70 0.003 0.24 0.73 40.1 kN 7 0.60 0.40 3.70 0.003 0.24 0.73 40.1 kN BY: 9 0.60 0.40 3.70 0.003 0.24 0.73 40.1 kN 11 0.60 0.40 3.70 0.003 0.24 0.73 40.1 kN 14 0.60 0.40 3.70 0.003 0.24 0.73 40.1 kN BY:- 15 0.50 0.40 3.70 0.003 0.20 0.61 33.4 kN DATE:-Total RX = BY Total Fx = 451 DATE:- BY:- DATE:- BY:-
DATE:-INDEX PLANT REV NO.
29 of
87
East Of Unayzah Saudi ArabiaJOB ORDER NO DWG CONT SHT
CERTIFIED
THIS DRAWING IS NOT TO BE USED FOR CONSTRUCTION OR FOR ORDERING MATERIALS UNTIL CERTIFIED AND DATED
DRAWING TITLE DRAWING NO.
NEW 132/13.8 KV SUBSTATION # 8829 B C70 CE-050622 OPRG. DEPT ENG'G. DEPT. D.Banerjee DATE: 30.04.07 CHECKED KSN 30.04.07 D A TE 8 /M a y /0 7 1 6 /J u n /0 7 1 2 /Au g /0 7 REVISIONS DRAWN D E S C R IP TIO N ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R BASE D ESI G N SU BM IT T AL ISSUED F O R D ET AI L D ESI G N SU BM IT T AL BY AJ EC AJ EC AJ EC APPVD C H K 'D T HIS DR A W ING A ND T HE I NF O RM A T IO N CONT A INE D HE RE IN A RE T HE S O L E P ROP E RT Y O F S A UD I E L E CT RICIT Y CO . NO RE P RODU CT IO N I N F UL L O R I N P A RT S HA L L B E O B T A INE D F ROM T HIS DO CU M E NT WIT HOUT T HE WR IT T E N CONS E NT O F I T S O W NE R. C 31060103001 CE - 050357 8.2 SHEET NO.