DFS GROUNDING PROCEDURE

Data Flow Systems, Inc. assumes no responsibility for any errors that may appear in this document, nor does it make any commitment to update the information contained

herein. However, questions regarding the information contained in this document are welcomed.

Data Flow Systems also reserves the right to make changes to the RTU grounding procedure and to the information contained in this document at any time without notice.

NOTICE

© Data Flow Systems, Inc.

605 N. John Rodes Blvd., Melbourne, FL 32934 Phone 321-259-5009 • Fax 321-259-4006

(2)

Page 2 of 14 Scope:

The purpose of this procedure is to outline the process of grounding DFS equipment to meet electrical safety requirements, lightning suppression requirements, and improve RF signal Propagation.

Requirements:

• Must have an earth ground clamp meter (recommended: Fluke 1630-2-FC or Megger DET14C).

• Must possess the NFPA 70E Cat 0 1,000VAC/ 1,500VDC rated gloves and other PPE.

• A locate must be performed before any work can be done with a new ground rod.

• The ground wire should be direct burial solid #6 (preferred) or #6 stranded in conduit.

(Note: #6 strand wire should be run within conduit. #6 sold bare wire should be ran outside of conduit)

• Zinc based Cold Galvanizing Compound Spray and tools to drive the rod will also be needed.

• All personnel implementing this process should have completed NFPA 70E or other electrical safety Training.

Note: Underground locates Must have been completed and NFPA 70E (Cat 0) 1,000VAC/ 1,500VDC rated Gloves and other Personal Protection Equipment (PPE) are Required prior to proceeding any further with this procedure.

INSTRUCTIONS:

Section One: Tower Mounted RTU Grounding. (See illustration 1 and 2)

1. If possible, disable the main AC power for the station or building where the grounding process is being applied.

2. Verify the locate markers are not near the location where the ground rod is being placed.

3. At a position adjacent to the concrete pad nearest to the back of the tower's rear leg, drive the 5/8” X 10' ground rod in the ground until just below concrete pad.

4. Grounding: Determine if the site work is completed.

4.1. Temporary Ground (site work not complete) - Run a #6 solid copper wire between the copper grounding rod and the tower base. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J- clamp with copper screw to attach the temporary ground to the tower leg.

4.2. Permanent Ground (site work complete) - Run a continuous run of #6 solid copper wire from the polyphaser mounting bolt, tower leg J-Clamp, DFS ground rod, and the local utility ground rod. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J-clamp with copper screw to attach the tower rear leg.

(3)

Page 3 of 14 Illustration 1 – Ground wire connected to Tower Leg

5. Once the grounding system is established, measure the resistance to Earth ground using an Earth ground clamp meter. With the display of the meter facing you, measure between the J-Clamp and the Ground rod clamp. The resistance should measure less than 25 Ω (ohm’s) (NEC minimum ground resistance requirement). The ideal resistance for lightning suppression and RF signal efficiency is less than 5 Ω.

6. If the grounding system’s resistance does not meet the 25 Ω requirement, an additional ground rod is needed. Place second ground rod no less than 6ft (2M) from the first ground rod. There must be a continuous run of #6 copper wire and no more than 1 conductor for each ground rod clamp.

(See illustration 2 below)

(4)

Page 4 of 14 Illustration 2 – Ground wire connected to Tower Leg using 2 ground Rods

7. Once grounding resistance and bonding has met the 25 Ω minimum, spray all Ground Rod clamps and J-clamps with a zinc based Cold Galvanizing Compound Spray for preventing oxidation from affecting the grounding system’s resistance to corrosion.

(5)

Page 5 of 14 Section Two: Unistrut mounted panel Grounding. (See illustration 3 and 4)

1. If possible, disable the main AC power for the station or building where the grounding process is being applied.

2. Verify the locate markers are not near the location where the ground rod is being placed.

3. At a position adjacent to the concrete pad nearest to the galvanized antenna mast, drive the 5/8” X 10' ground rod into the ground until just below concrete pad.

4. Grounding: Determine if the site work is completed.

4.1. Temporary Ground (site work not complete) - Run a #6 solid copper wire between the copper grounding rod and the base of the galvanized antenna mast. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J-clamp with copper screw to attach the temporary ground to the base of the

galvanized antenna mast.

4.2. Permanent Ground (site work complete) - Run a continuous run of #6 solid copper wire from the polyphaser mounting bolt, antenna mast J-Clamp, DFS ground rod, and the local utility ground rod. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J-clamp with copper screw to attach the base of the antenna mast.

Illustration 3 – Ground wire connected to antenna mast mounted on Unistrut

(6)

Page 6 of 14 5. Once the grounding system is established, measure the resistance to Earth ground using an Earth Ground clamp

meter. With the display of the meter facing you, measure between the J-Clamp and the Ground rod clamp. The resistance should measure less than 25 Ω (ohm’s) (NEC minimum ground resistance requirement). The ideal resistance for lightning suppression and RF signal efficiency is less than 5 Ω.

6. If the grounding system’s resistance does not meet the 25 Ω requirement, an additional ground rod is needed. Place second ground rod no less then 6ft (2M) from the first ground rod. There must be a continuous run of #6 copper wire and no more than 1 conductor for each ground rod clamp.

(See illustration 4 below)

Illustration 4 – Ground wire connected to antenna mast mounted on Unistrut using 2 ground Rods

7. Once grounding resistance and bonding has met the 25 Ω minimum, spray all Ground Rod clamps and J-clamps with a zinc based Cold Galvanizing Compound Spray for preventing oxidation from affecting the grounding system’s resistance to corrosion.

(7)

Page 7 of 14 Section Three: Building mounted RTU/panel grounding. (See illustration 5 through 9) (Note: The bond to the Utility Ground Rod can be made by connecting the polyphaser to the electrical Service Ground)

1. If possible, disable the main AC power for the station or building where the grounding process is being applied.

2. Verify the locate markers are not near the location where the Ground rod is being placed.

3. At a position adjacent to the concrete pad nearest to the back of the tower's rear leg, drive the 5/8” X 10' ground rod in the ground until just below concrete pad.

4. Grounding: Determine if the site work is completed.

4.1. Temporary Ground (site work not complete) - Run a #6 solid copper wire between the copper grounding rod and the tower base. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J- clamp with copper screw to attach the temporary ground to the tower leg.

4.2. Permanent Ground (site work complete) - Run a continuous run of #6 copper wire from the polyphaser mounting bolt, tower leg J-Clamp, DFS ground rod, and the building’s utility ground rod. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J-clamp with copper screw to attach the tower rear leg.

Illustration 5 – Ground wire connected to Tower Leg

(8)

Page 8 of 14 Illustration 6 – Ground wire connected to Tower Leg using 2 ground Rods

(9)

Page 9 of 14 Illustration 7 – stranded ground wire in conduit connected to Tower Leg

5. Once the grounding system is established, measure the resistance to earth ground using an Earth Ground clamp meter. With the display of the meter facing you, measure between the J-Clamp and the Ground rod clamp. The resistance should measure less than 25 Ω (ohm’s) (NEC minimum ground resistance requirement). The ideal resistance for lightning suppression and RF signal efficiency is less than 5 Ω.

6. If the grounding system’s resistance does not meet the 25 Ω requirement, an additional ground rod is needed. Place second ground rod no less than 6ft (2M) from the first ground rod. There must be a continuous run of #6 copper wire and no more than 1 conductor for each ground clamp.

7. Once grounding resistance and bonding has met the 25 Ω minimum, spray all Ground Rod clamps and J-clamps with a zinc based Cold Galvanizing Compound Spray for preventing oxidation from affecting the grounding system’s resistance to corrosion.

(10)

Page 10 of 14 Illustration 8 – Stranded ground wire in conduit connected to Tower Leg (Note: The green wire on the polyphaser is bonded to the building’s electrical service ground.)

(11)

Page 11 of 14 Illustration 9 – Stranded ground wire to roof mounted antenna. (Note: The green wire on the polyphaser is bonded to the building’s electrical service ground.)

(12)

Page 12 of 14 Section Four: Building mounted CTU grounding. (See illustration 10 and 11) (Note: The bond to the Utility Ground Rod can be made by connecting the polyphaser to the electrical Service Ground.)

1. If possible, disable the main AC power for the station or building where the grounding process is being applied.

2. Verify the locate markers are not near the location where the ground rod is being placed.

3. At a position adjacent to the concrete pad nearest to the back of the tower's rear leg, 3.1. drive the 5/8” X 10' ground rod in the ground until just below concrete pad.

4. Grounding: Determine if the site work is completed.

4.1. Temporary Ground (site work not complete) - Run a #6 solid copper wire between the copper grounding rod and the tower base. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J- clamp with copper screw to attach the temporary ground to the tower leg.

4.2. Permanent Ground (site work complete) - Run a continuous run of #6 copper wire from the polyphaser mounting bolt, tower leg J-Clamp, DFS ground rod, and the building’s utility ground rod. Attach the wire to the ground rod with a 5/8” tear drop ground rod clamp. Use a 1-1/4” J-clamp with copper screw to attach the tower rear leg.

5. Once the grounding system is established, measure the resistance to earth ground using an Earth Ground clamp meter. With the display of the meter facing you, measure between the J-Clamp and the Ground rod clamp. The resistance should measure less than 25 Ω (ohm’s) (NEC minimum ground resistance requirement). The ideal resistance for lightning suppression and RF signal efficiency is less than 5 Ω.

6. If the grounding system’s resistance does not meet the 25 Ω requirement, an additional ground rod is needed. Place second ground rod no less than 6ft (2M) from the first ground rod. There must be a continuous run of #6 copper wire and no more than 1 conductor for each ground clamp.

7. Once grounding resistance and bonding has met the 25 Ω minimum, spray all Ground Rod clamps and J-clamps with a zinc based Cold Galvanizing Compound Spray to prevent any oxidation from affecting the grounding system’s resistance to corrosion.

(13)

Page 13 of 14 Illustration 10 – Stranded CTU ground wire in conduit connected to CTU Tower Leg (Note: The green wire on the

polyphaser is bonded to the building’s electrical service ground.)

(14)

Page 14 of 14 Illustration 11 – Stranded CTU ground wire in conduit connected to CTU Tower Leg (Note: The green wire on the

polyphaser is bonded to the building’s electrical service ground.)

References

Related documents

Stick a copper ground rod (or a 12” piece of copper pipe) in the Earth and attach a wire from it into the house through a window or through a hole in the wall1. Use the ground hole in

Connect the copper wire from the light fixture (A) to the mounting unit (AA) by securing it with the pre-installed ground screw.. Connect the black to black (power), the

• For installation in Canada: If fixture is supplied with ground wire, wrap ground wire around ground screw on mounting bracket (B).. Tighten

Connect the hanger ball/downrod assembly ground wire, mounting bracket ground wire and receiver ground wire to the ground wire in outlet box6. WARNING: Failure to connect

If your outlet box has a ground wire (green or bare copper) connect the wall transmitter's ground wire to it; otherwise connect the wall transmitter's ground wire directly to one

Mounting Bracket Keyway Pin Ball Hanger Support Rod Mounting Bracket Keyway Pin Ball Hanger Support Rod Ground Wire Support Rod Ball Hanger... Use wire connnectors to connect

 The appeals court judges focused their questioning on whether Puerto Rico was stuck in a “no man’s land” such that it is not eligible for Chapter 9 nor authorized to enact its

If an external ground rod con- nected to the meter socket is provided by the customer to meet NEC grounding requirements this ground rod will also meet Ameren’s require- ment for