REQUEST FOR COUNCIL ACTION

Date: 12/03/2018 Item No.: 9.f

Department Approval City Manager Approval

Item Description: Approve Resolution Awarding Contract for 2019 Sanitary Sewer Main Lining

Page 1 of 2

B ACKGROUND

1

The majority of the city’s sanitary sewer mains were constructed in the late 1950’s and early

2

1960’s, utilizing clay tile and reinforced concrete pipe. Over time the joints have failed allowing

3

root intrusion. The pipe material is also susceptible to cracking and construction damage. The

4

City began the sewer lining program in 2006 to rehabilitate the sewer mains and extend the life

5

of our sanitary sewers by 50 years or more. Lining technology essentially installs a new resin

6

pipe inside the original clay tile sewer main without digging up city streets, which results in

7

minimal disruption to residents during construction. The liner pipe is inserted into the main

8

through existing manholes and cured in place with a heat process. Each segment is typically

9

completed in one working day. Service line connections are reopened using a robotic cutter and

10

remote cameras. During the process, existing flows are bypassed using pumps. This technology

11

also prevents infiltration of groundwater into the main system and can be credited toward a

12

Metropolitan Council Environmental services inflow/ infiltration surcharge.

13

The 2019 Sanitary Sewer Main Lining Project includes lining for approximately 7 miles in areas

14

identified as having root intrusion or infiltration problems. Approximately 1.78 miles of the

15

project are within the City of Falcon Heights. The City of Roseville has executed a joint powers

16

construction agreement with Falcon Heights that includes this work. The City of Roseville will

17

invoice the City of Falcon Heights for any work completed within Falcon Heights.

18

The following six bids were opened on November 20, 2018:

19

CONTRACTOR BID TOTAL (Base

Bid)

Visu-sewer, Inc $858,385.45

Insituform Technologies USA, LLC $917,718.00

Michels Corporation $974,229.10

Lametti and Sons, Inc. $983,344.00

SAK Construction, LLC $1,117,831.65

Veit & Company, Inc. $1,135,301.75

Engineers Estimate $962,801.00

P OLICY O BJECTIVE

20

It is City policy to keep utility infrastructure in good operating condition, utilizing current

21

construction technologies that keep service disruption during construction to a minimum. Per

22

(2)

Page 2 of 2

State Statutes on municipal contracting, the City Council awards contracts to the lowest

23

responsible bidder. In this bid solicitation the lowest bidder is Visu-sewer, Inc.

24

F INANCIAL I MPACTS

25

We received six bids for the 2019 Sanitary Sewer Main Lining Project. The low bid submitted

26

by Visu-sewer, Inc, $858,385.45 is within the budgeted amount for this project. The funding

27

breakdown for the project is listed below:

28 29

Sanitary Sewer Utility Fund $654,117.45

Storm Sewer Utility Fund $22,140.00

Falcon Heights $182,128.00

Project Total $858,385.45

S TAFF RECOMMENDATION

30

Staff recommends Council approve a resolution awarding a contract for the 2019 Sanitary Sewer

31

Main Lining Project to the responsible low bidder, Visu-sewer, Inc. in the amount of

32

$858,385.45.

33

R EQUESTED C OUNCIL A CTION

34

Motion approving a resolution awarding contract for the 2019 Sanitary Sewer Main Lining Project in

35

the amount of $858,385.45 to Visu-sewer, Inc.

36

37

Prepared by: Jesse Freihammer, City Engineer Attachments: A: Resolution

B: Bid Abstract

(3)

Attachment A

EXTRACT OF MINUTES OF MEETING OF THE

CITY COUNCIL OF THE CITY OF ROSEVILLE

* * * * * * * * * * * * * * * * *

Pursuant to due call and notice thereof, a regular meeting of the City Council of the City of

1

Roseville, County of Ramsey, Minnesota, was duly held on the 3

rd

day of December, 2018, at

2

6:00 p.m.

3 4

The following members were present: ; and and the following were absent: .

5 6

Member introduced the following resolution and moved its adoption:

7 8

RESOLUTION No.

9

10

RESOLUTION AWARDING CONTRACT

11

FOR 2019 SANITARY SEWER MAIN LINING

12 13 14

WHEREAS, pursuant to advertisement for bids for the improvement, according to the plans

15

and specifications thereof on file in the office of the Manager of said City, said bids were

16

received on Tuesday, November 20, 2018, at 1:00 p.m., opened and tabulated according to

17

law and the following bids were received complying with the advertisement:

18 19

CONTRACTOR BID TOTAL (Base Bid)

Visu-sewer, Inc $858,385.45

Insituform Technologies USA, LLC $917,718.00

Michels Corporation $974,229.10

Lametti and Sons, Inc. $983,344.00

SAK Construction, LLC $1,117,831.65

Veit & Company, Inc. $1,135,301.75

Engineers Estimate $962,801.00

20 21 22

WHEREAS, it appears that Visu-sewer, Inc., is the lowest responsible bidder at the tabulated

23

price of $858,385.45 and

24 25

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Roseville,

26

Minnesota:

27 28

1. The Mayor and City Manager are hereby authorized and directed to enter into a

29

contract with Visu-sewer, Inc. for $858,385.45 in the name of the City of Roseville for

30

the above improvements according to the plans and specifications thereof heretofore

31

(4)

approved by the City Council and on file in the office of the City Manager.

32

2. The City Manager is hereby authorized and directed to return forthwith to all bidders

33

the deposits made with their bids except the deposits of the successful bidder and the

34

next lowest bidder shall be retained until contracts have been signed.

35 36

NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Roseville,

37

Minnesota:

38 39

The motion for the adoption of the foregoing resolution was duly seconded by Member , and

40

upon vote being taken thereon, the following voted in favor thereof: ; and and the

41

following voted against the same: .

42 43

WHEREUPON said resolution was declared duly passed and adopted.

44

(5)

Award Contract for 2019 Sanitary Sewer Main Lining

STATE OF MINNESOTA ) ) ss COUNTY OF RAMSEY )

I, the undersigned, being the duly qualified City Manager of the City of Roseville, County of Ramsey, State of Minnesota, do hereby certify that I have carefully compared the attached and foregoing extract of minutes of a regular meeting of said City Council held on the 3

rd

day of December, 2018, with the original thereof on file in my office.

WITNESS MY HAND officially as such Manager this 3

rd

day of December, 2018.

______________________________

Patrick Trudgeon, City Manager

(SEAL)

(6)

Attachment B

References

Related documents

I, the undersigned Secretary of the Board of Trustees of the West Des Moines Water Works of the City of West Des Moines, State of Iowa, do hereby certify that attached is a true

This class book has been written and designed to facilitate the introduction of centaur Characters into the City-State of the Invincible Overlord campaign world.ltcovers

The prescriptive based analysis covers the following areas of the building: the occupancy of the space; the structural elements present within the building and required by code;

NOW THEREFORE BE IT RESOLVED by the City Council of the City of Little Canada, County of Ramsey, State of Minnesota that the following amounts are proposed be levied for the

TANNER, City Clerk of the City of Chino, do hereby certify that the foregoing resolution was duly adopted by the City Council at a regular meeting held on the 19th day of August 2008,

Kovar, duly qualified and acting City Clerk for the City of David City, Nebraska, do hereby certify with regard to all proceedings of February 13, 2008; that all of the subjects

This thesis argues that codes that are based exclusively on the use of parallel networks (such as replication) or mainly on the use of serial networks (as it is seen in the split

I, Denise Gaida, County Auditor-Treasurer, Todd County, Minnesota hereby certify that I have compared the foregoing copy of the proceedings of the County Board of said County with