REQUEST FOR COUNCIL ACTION
Date: 12/03/2018 Item No.: 9.f
Department Approval City Manager Approval
Item Description: Approve Resolution Awarding Contract for 2019 Sanitary Sewer Main Lining
Page 1 of 2
B ACKGROUND
1
The majority of the city’s sanitary sewer mains were constructed in the late 1950’s and early
2
1960’s, utilizing clay tile and reinforced concrete pipe. Over time the joints have failed allowing
3
root intrusion. The pipe material is also susceptible to cracking and construction damage. The
4
City began the sewer lining program in 2006 to rehabilitate the sewer mains and extend the life
5
of our sanitary sewers by 50 years or more. Lining technology essentially installs a new resin
6
pipe inside the original clay tile sewer main without digging up city streets, which results in
7
minimal disruption to residents during construction. The liner pipe is inserted into the main
8
through existing manholes and cured in place with a heat process. Each segment is typically
9
completed in one working day. Service line connections are reopened using a robotic cutter and
10
remote cameras. During the process, existing flows are bypassed using pumps. This technology
11
also prevents infiltration of groundwater into the main system and can be credited toward a
12
Metropolitan Council Environmental services inflow/ infiltration surcharge.
13
The 2019 Sanitary Sewer Main Lining Project includes lining for approximately 7 miles in areas
14
identified as having root intrusion or infiltration problems. Approximately 1.78 miles of the
15
project are within the City of Falcon Heights. The City of Roseville has executed a joint powers
16
construction agreement with Falcon Heights that includes this work. The City of Roseville will
17
invoice the City of Falcon Heights for any work completed within Falcon Heights.
18
The following six bids were opened on November 20, 2018:
19
CONTRACTOR BID TOTAL (Base
Bid)
Visu-sewer, Inc $858,385.45
Insituform Technologies USA, LLC $917,718.00
Michels Corporation $974,229.10
Lametti and Sons, Inc. $983,344.00
SAK Construction, LLC $1,117,831.65
Veit & Company, Inc. $1,135,301.75
Engineers Estimate $962,801.00
P OLICY O BJECTIVE
20
It is City policy to keep utility infrastructure in good operating condition, utilizing current
21
construction technologies that keep service disruption during construction to a minimum. Per
22
Page 2 of 2
State Statutes on municipal contracting, the City Council awards contracts to the lowest
23
responsible bidder. In this bid solicitation the lowest bidder is Visu-sewer, Inc.
24
F INANCIAL I MPACTS
25
We received six bids for the 2019 Sanitary Sewer Main Lining Project. The low bid submitted
26
by Visu-sewer, Inc, $858,385.45 is within the budgeted amount for this project. The funding
27
breakdown for the project is listed below:
28 29
Sanitary Sewer Utility Fund $654,117.45
Storm Sewer Utility Fund $22,140.00
Falcon Heights $182,128.00
Project Total $858,385.45
S TAFF RECOMMENDATION
30
Staff recommends Council approve a resolution awarding a contract for the 2019 Sanitary Sewer
31
Main Lining Project to the responsible low bidder, Visu-sewer, Inc. in the amount of
32
$858,385.45.
33
R EQUESTED C OUNCIL A CTION
34
Motion approving a resolution awarding contract for the 2019 Sanitary Sewer Main Lining Project in
35
the amount of $858,385.45 to Visu-sewer, Inc.
36
37
Prepared by: Jesse Freihammer, City Engineer Attachments: A: Resolution
B: Bid Abstract
Attachment A
EXTRACT OF MINUTES OF MEETING OF THE
CITY COUNCIL OF THE CITY OF ROSEVILLE
* * * * * * * * * * * * * * * * *
Pursuant to due call and notice thereof, a regular meeting of the City Council of the City of
1
Roseville, County of Ramsey, Minnesota, was duly held on the 3
rdday of December, 2018, at
2
6:00 p.m.
3 4
The following members were present: ; and and the following were absent: .
5 6
Member introduced the following resolution and moved its adoption:
7 8
RESOLUTION No.
9
10
RESOLUTION AWARDING CONTRACT
11
FOR 2019 SANITARY SEWER MAIN LINING
12 13 14
WHEREAS, pursuant to advertisement for bids for the improvement, according to the plans
15
and specifications thereof on file in the office of the Manager of said City, said bids were
16
received on Tuesday, November 20, 2018, at 1:00 p.m., opened and tabulated according to
17
law and the following bids were received complying with the advertisement:
18 19
CONTRACTOR BID TOTAL (Base Bid)
Visu-sewer, Inc $858,385.45
Insituform Technologies USA, LLC $917,718.00
Michels Corporation $974,229.10
Lametti and Sons, Inc. $983,344.00
SAK Construction, LLC $1,117,831.65
Veit & Company, Inc. $1,135,301.75
Engineers Estimate $962,801.00
20 21 22
WHEREAS, it appears that Visu-sewer, Inc., is the lowest responsible bidder at the tabulated
23
price of $858,385.45 and
24 25
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Roseville,
26
Minnesota:
27 28
1. The Mayor and City Manager are hereby authorized and directed to enter into a
29
contract with Visu-sewer, Inc. for $858,385.45 in the name of the City of Roseville for
30
the above improvements according to the plans and specifications thereof heretofore
31
approved by the City Council and on file in the office of the City Manager.
32
2. The City Manager is hereby authorized and directed to return forthwith to all bidders
33
the deposits made with their bids except the deposits of the successful bidder and the
34
next lowest bidder shall be retained until contracts have been signed.
35 36
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Roseville,
37
Minnesota:
38 39
The motion for the adoption of the foregoing resolution was duly seconded by Member , and
40
upon vote being taken thereon, the following voted in favor thereof: ; and and the
41
following voted against the same: .
42 43
WHEREUPON said resolution was declared duly passed and adopted.
44
Award Contract for 2019 Sanitary Sewer Main Lining