Design of low/zero carbon buildings learning
88
0
0
Full text
Outline
Taf Ely Learning Campus, Coleg Morgannwg
An extend and retrofit secondary school for an expanding local population in Plymouth, with BAM Constuction.
Oak Meadow Primary School in Wednesfield is amongst the first primary schools in the UK to be Passivhaus certified
Secondary School, Klaus-Weiler-Fraxern
Paxton Primary School by Sunesis
Summary of Findings
Related documents
Internal gains from equipment gave significantly increased cooling demand in the advanced office but this effect was offset by reduced heating demands for the typical
Born (2001) proposed the match assessment method mainly for RE systems and demand profiles. Two matching elements, magnitude and phase, are mainly used to judge how well