© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3247

Implementation Based ERP Module for Construction Site Management

MR. Rohit Chaudhari

1

, Ass. Prof. Rahul Jain

2

1

M. Tech. (Construction Management) Student, Sandip University Nasik, India,

2

Ass. Prof. Dept. of civil Engineering, Sandip University Nasik, India,

---***---Abstract -

A significant number of major construction companies embarked on the implementation of integrated information technology solutions such as enterprise resource planning ERP systems to better integrate various business functions. However, these integrated systems in the construction sector present a set of unique challenges, different from those in the manufacturing or other service sectors. There have been many cases of failure in implementing ERP systems in the past, so it is critical to identify and understand the factors that largely determine the success or failure of ERP implementation in the construction industry. This paper presents the process of developing an ERP systems success model to guide a successful ERP implementation project and to identify success factors for ERP systems completion. The paper identifies factors associated with the success and failure of ERP systems, and develops a success model to analyze the relationships between key factors and the success of such systems. The goal of the ERP systems success model is to better evaluate, plan, and implement ERP projects and help senior managers make better decisions when considering ERP systems in their association. Enterprise resource planning ERP was originated in the manufacturing industry. It provides a general working surroundings for an enterprise to integrate its major business management functions with one single common database so that information can be shared and efficient communications can be achieved between management functions. The enterprise resource planning software market has been growing at a very fast pace over the last few years and has been predicted to keep growing rapidly in the long term. Since the functioning of the construction enterprise is different from other domain industries. There is a need to develop a specific construction enterprise oriented ERP. The application under development will provide complete solution to manage the entire functioning of construction firm. Implementing Business Intelligence in the Construction ERP will help managerial staff in decision making. Thus this construction ERP will contribute in overall functioning, growth and development of the construction organization.

Key Words: ERP Implementation, Enterprise Resource Planning, Construction Organization

1. INTRODUCTION

ERP systems have been widely adopted in industries such as manufacturing because they give a company an integrated platform for taking orders, procuring parts, managing production, and controlling inventory, financials, and distribution.ERP solutions generally are effective at supporting supply chain processes in which a manufacturing company takes an order for product, and uses that product’s bill of material (BOM) structure within ERP to trigger the needed materials required to manufacture the product. This closed-loop supply chain process within ERP works well for many manufacturing companies, and has even been enhanced with product configuration capabilities for make-to-order manufacturers. The trouble is, engineering, construction and infrastructure projects aren’t based on ordering products, and subsequently, don’t use pre-established BOM structures. When it becomes time to start building a new stadium, one doesn’t order from a list of stock parts or options. Instead, the challenge revolves around establishing and bidding out many scopes of work. These scopes of work need be estimated, reviewed, approved, and revised as needed. There are often hundreds of changes to scopes of work during a construction project, ranging from significant design changes like expanding a parking lot, to a simpler change such as a substitute material a subcontractor needs to use. As a result, instead of needing an ERP system geared to materials requirements planning, the AEC industry needs an ERP system that is project and asset-centric and geared to estimating scopes of work, managing subcontracts, and exerting control of project costs, timescales, quality and risk.

The main objective of this successful ERP systems implementation and providing factors associated with the success of ERP systems in engineering and construction firms. To do so, the identified factors affecting the success or failure of ERP systems, and develops an ERP system success model to analyze the relationships between factors and the success of such systems

1.2

ERP in Construction

(2)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3248

produces one-of-a-kind, prototype-like products. Also, the construction industry operates project-based activities that are carried out by many different parties which may be geographically dispersed. As different organizational entities, each of the project participants has different goals to accomplish in the project. Furthermore, the amount of information and its time sensitiveness in the construction industry makes it hard to manage. For these reasons, generic or standard ERP systems intended originally for manufacturing or non construction service industries are not able to address the unique business needs of the construction industry. Extensive customization is required to respond to these specific needs. This has been the primary reason to date for the low implementation rate of the ERP systems in the construction industry. In order to address the needs of the construction industry, an ERP system intended for construction related applications should be based in a large part on the life cycle of the project. In addition, it should be compatible with the way construction firms are conducting their business. Industry specific processes and accounting standards should be redesigned and embedded in the system comprehensively. Furthermore, the system should possess the necessary interfaces with standard engineering, scheduling, and office software. Access to information from sources worldwide should be facilitated through the use of the Internet.

2. LITERATURE REVIEW

2.1 Beliz Ozorhon and Emrah Cinar

The major objective of the research reported in this paper is to explore the critical success factors (CSFs) of ERP implementation in the construction industry in developing countries. In this respect, based on an extensive literature review, 14 CSFs were identified and a questionnaire survey was conducted to analyze the role of those CSFs on the performance of ERP implementation. The data is collected from 90 construction firms from Turkey. The statistical analysis results show that top management support and commitment, clear goals and objectives, project team competence, effectiveness of the project leader, and cooperation between team members are the most significant drivers of success. Factor analysis was also employed on the data and the findings suggest three dimensions, namely (1) human factors, (2) organization, and (3) technology. Findings of the research reported in this paper are expected to help senior managers and consultants implement ERP systems in construction firms in an effective manner.

2.2

Sudhanva Kadol, Digvijay Patil,

et.al

This paper presents an efficient ERP system to manage different departments in accordance with for the managerial the company policies and customer requirements. India is a developing nation, with globalization widely making impact over its economy. It is observed that large amount of development is mostly concentrated towards the country’s urban infrastructure. Due to larger population migrating towards cities it is necessary to accommodate and provide basic infrastructural facilities to their ever increasing demands. So it is necessary for the construction enterprises to efficiently manage their functioning and address the customer requirements by balancing the functioning of individual departments in the construction enterprise. Construction ERP is an ultimate solution to manage entire enterprise under a single roof. ERP is responsible for integrating business processes within an enterprise. This will only automate the functioning of Construction Company. To enable decision making tier of the company based upon history and future risks BI and DSS are implemented using feedback logic.

2.3 Hans Voordijk, Arjen Van Leuven and Albertus Laan

In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures than successes. This study tries to understand the factors that lead to the success or failure of ERP in large construction firms by focusing on the fits between the following pairs of elements in ERP implementations: business and IT strategy, maturity of the IT infrastructure and the strategic role of IT, and the implementation method and organizational change. The premise of this study is that for an ERP implementation to be successful these elements must somehow fit together. Empirical research was conducted through a case, study of three ERP implementations in different business units of a Dutch-based construction firm. Implementing different systems within one company is typical of the way large construction firms in the Netherlands have dealt with ERP. The study shows that the success of ERP implementations depends on consistent patterns between: IT strategy and business strategy, IT maturity and the strategic role of IT, and the implementation method and organizational change.

2.4 Vivek Kumar and Dr. S. Srinivasan

(3)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3249

industries. Supply chain consist of various components/ identities like supplier, manufacturer, factories, warehouses, distributions agents etc. These identities are involved for supplying raw materials, components which reassembles in factory to produce a finished product. With the increasing importance of computer based communication technologies, communication networks are becoming crucial in supply chain management. Given the objectives of the supply chain to have the right products in the right quantities, at the right place, at the right moment and at minimal cost, supply chain management is situated at the intersection of different professional sectors. This is particularly the case in construction, since building needs for its fabrication the incorporation of a number of industrial products.

3. ENTERPRISE RESOURCE PLANNING IN CONSTRUCTION INDUSTRY

3.1 Enterprise Resource Planning

Enterprise resource planning ERP has its origins in manufacturing and production planning systems. The early systems were created three decades ago with the advent of materials requirement planning MRP. This primarily organized the storage and allocation of production materials. The term ERP was born when the production oriented systems were integrated with purchasing, financials, human resources, and other front-office applications to enhance management of all business operations across the enterprise. The scope of ERP offerings expanded in the mid-1990s to include other back-office functions such as order management, financial management, warehousing, distribution, quality control, asset management, and human resources.

3.2

Construction Enterprise Resource Planning

The availability of resources defines the production capability of a contractor. In general, a construction company can access two categories of resources: Internal resources, which the company owns; and External resources, which the company can obtain from the open market at a price. The common objective is to maximize the usage of the company’s internal resources and use the market to balance the company’s operation. Given that construction projects are transient in nature, span different lengths of time periods, and require different resources, it is usually very difficult to achieve a balance between the production capability and the actual workload on hand for a construction enterprise all the time. In practice, a construction company has various ways to adjust its operations to approach such a balance. For instance, when the company does not have enough jobs, it may rent out some of its owned equipment and may bid lower prices on new projects. On the other hand, the contractor may rent outside equipment, recruit personnel, or request its employees to work overtime

3.3 Supply chain management

The supply chain has been defined as `the network of organisations that are involved, through upstream and downstream linkages, in the different processes and activities that produce value in the form of products and services in the hands of the ultimate customer.

SCM views the entire supply chain rather than just the next part or level, and aims to increase transparency and alignment of the supply chain's co-ordination and configuration, regardless of functional or corporate boundaries The basic idea of SCM is to recognise the interdependency in the supply chain, and thereby improve its configuration and control based on such factors as integration of business processes.

There are also other illuminating typologies of SCM. First, there are development issues of SCM, including order information transparency, reduction in variability, synchronizing of material flows, and management of critical resources and configuration of the supply chain. Second, there are strategies for SCM including establishment of stable partnerships, modular outsourcing of components, design for suitability form manufacture, flexible manufacturing technologies, evolution of the supply chain with the product life cycle, and information acquisition and sharing Third, there are levels of SCM that can be distinguished, including initial partnership logistics management and` genuine SCM.

4. DATA COLLECTION AND ANALYSIS

4.1 Questionnaire Survey

(4)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3250

with ERP. Only large construction companies like Bechtel, Bovis Lend lease, Turner Construction, etc. could share their experiences with the researchers. The findings are summarized in the following section.

4.2 Major Findings

Knowledge about ERP systems and their implementation

 58% (7 out of 12) of the respondents were aware of the ERP systems in general.

 33% (4 out of 12) of the respondents indicated that they were earlier contacted by an ERP vendor about the possible implementation of ERP systems in their organizations.

 8% (1 out of 12) respondents think that ERP system will work “very well” in their organization and

 51% (6 out of 12) think that it will work to “some extent”. The rest of the respondents are either “not sure” or have the opinion that ERP will “not work” in their setup.

 58% (7 out of 12) respondents indicate that the ERP systems, if implemented, will be beneficial for their organization. From the above findings, it can be concluded that a slightly more than half of the respondents are aware of the ERP systems and they think that ERP systems could work in their organizations and will benefit the organization. However, a good number of contractors showed fear that such systems will not work well in their organization due to the small size of the organization, limited resources and not adequate technical skills.

4.3 Research Methodology

In the research reported in this paper, a questionnaire was designed to measure the effects of various factors in ERP implementation success. The survey was administered to the members of the major associations related to construction business that would provide significant information on the perception and practices of ERP systems in the Turkish construction industry. The questionnaires were sent to 152 members of the Turkish Contractors Association (TCA), 127 members of Association of Turkish Consulting Engineers and Architects (ATCEA), and 56 members of The Turkish Employers’ Association of Construction Industries (TEACI). These associations represent a major portion of the civil engineering professionals in Turkey. A total of 90 questionnaires were returned out of 335 sent out, resulting in a 27% response rate. The survey consists of three main parts, as follows: General information about the company and the respondent, Type and phase of ERP system in use (if any), and CSFs of ERP implementation.

General Information about the Respondents

The average age of the respondents is 32 years and their experience in construction industry in average is 8 years. About 90% of the respondents are aged less than 40. The average age of the companies that are surveyed is around 20. Among the respondents, 19% have or less and 21% have a total turnover value of. Also, 36% of the companies have or more turnover values. The majority (40%) of the companies have more than 500 employees. Among the respondents, 20% are at managerial level, 24% are at chief level, and 42% are engineers and architects. In terms of the departments, 61% of the respondents work at the technical office, 14% of them work at the construction site, and 11% of them work at the design department

.

Critical Success Factors of ERP Implementation

(5)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3251

Table- 1: Critical Success Factors of ERP Implementation

Identifier Variables Mean SD Variance

V1 Top management support and commitment 3 1.57 2.46

V2 Project team competence 3 1.46 2.13

V3 Clear goals and objectives 3 1.48 2.18

V4 Team composition 3 1.44 2.07

V5 Effectiveness of project leader 3 1.43 2.05

V6 Cooperation between team members 3 1.40 1.96

V7 Vendor support 3.5 1.37 1.89

V8 Choice of ERP software package 3 1.55 2.41

V9 Training and support for users 3 1.36 1.86

V10 Choice of ERP modules 3.5 1.52 2.30

V11 Organizational change management 3.5 1.34 1.79

V12 Use of consultants 4 1.33 1.77

V13 End-user involvement 3 1.32 1.75

V14 Startup and testing the system 3 1.35 1.82

Chart - 1: Critical Success Factors of ERP Implementation

The following chart shown as the critical success factors of ERP implementation. In which descriptive statistics of the CSFs based on the 30 responses collected from the construction firms. Result is suggested that the maximum SD of Top management support and commitment is 1.57 which is are greater than other. And minimum SD of End-user involvement is 1.33 which is less significant.

(6)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3252

The above chart shown as the critical success factors of ERP implementation. In which descriptive statistics of the CSFs based on the 30 responses collected from the construction firms. Result is suggested that the maximum Variance of Top management support and commitment is 2.46 which is are greater than other. And minimum Variance of End-user involvement is 1.75 which is less significant.

5. RESULT AND DISCUSSION

5.

1 Abstract Sheet of Project

In table no 5.76 shows the abstract sheet of project. In that table includes the description of various item their quantity & amount. We have to calculate amount required to complete various items of project with their standard unit. Standard Rates per unit of various items taken from DSR. Finally total cost required to complete project is calculated which include 4% Electrification cost, 3% Water Supply & Sanitation cost & 5% Supervision charges. The cost of project is 2824933.49 Rs. & considering all charges the total project cost is 3163926.00 Rs.

Table- 2: Abstract Sheet

Sr.

No. Description Of Item Quantity Unit Rate (Rs) Amount

1 Excavation for column pits in soft soil etc. 287.601 Cum 270 77652.27

2 P.C.C. for footing concrete 26.314 Cum 2800 73679.2

3 R.C.C. footing steel 2.754 m tun 4000 11016

4 R.C.C. column up to plinth 2.601 m tun 4000 10404

5 concrete in R.C.C column up to plinth 10.969 Cum 2800 30713.2

6 R.C.C of underground water tank 1.6963 m tun 4000 6785.2

7 concrete in underground water tank 10.946 Cum 2800 30648.8

8 R.C.C lift up to plinth 0.685 m tun 4000 2740

9 concrete R.C.C lift up to plinth 20.8 Cum 2800 58240

10 R.C.C plinth beam 0.438 m tun 4000 1752

11 concrete in R.C.C plinth beam 4.77 Cum 2800 13356

12 Murum filling in plinth 206.91 Cum 550 113800.5

13 P.C.C for plinth 1:3:6 26.314 Cum 2800 73679.2

14 R.C.C column in superstructure 10.76 m tun 4000 43040

15 concrete in column in superstructure 3.21 Cum 10000 32100

16 R.C.C beam 1.6 m tun 4000 4480

17 concrete in R.C.C beam 12.402 Cum 2800 49608

18 R.C.C staircase up to ground 0.4602 m tun 4000 1840.8

19 concrete staircase up to ground 6.067 Cum 2800 16987.6

20 R.C.C lift up to ground 0.439 m tun 4000 1756

21 concrete lift up to ground 4.209 Cum 2800 11785.2

22 R.C.C Basement top 1.473 m tun 4000 5892

23 concrete in basement top 19.25 Cum 2800 53900

24 R.C.C column in first floor 10.52 m tun 4000 42080

25 concrete in R.C.C column in first floor 3.1 Cum 2800 8680

26 Providing brick work for superstructure (0.15 m brick wall) 32.93 Cum 5000 164650

27 R.C.C lintel beam, R.C.C loft & Chajja first floor 0.978 m tun 4000 3912 28 concrete in R.C.C lintel beam, R.C.C loft & Chajja 4.838 Cum 2800 13546.4

(7)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3253

30 concrete R.C.C lift up to fisrt floor 4.2 Cum 2800 11760

31 R.C.C slab with w. p. finishing 1.74 Cum 8500 14790

32 concrete in slab 37.75 Cum 8500 320875

33 Providing Sand faced plaster for External Wall including scaffolding, curing etc. 172.98 Sqm 435 75246.3

34 Providing Nero Finish plaster for Internal Wall including scaffolding, curing etc 271.44 Sqm 370 100432.8

35 Providing & laying colored glazed tiles for flooring & dado etc 10.08 Sqm 1005 10130.4

36 Providing & laying Vitrified Tile Flooring on a lime mortar bed including filling joints with cement slurry

curing ,polishing etc 129.28 Sqm 1150 148672

37 Providing & laying Marble Window frame including filling joints with cement slurry curing ,etc 22.41 Sqm 1800 40338

38 Providing & Fixing C.T.W door with frame & fixture ,oil paint etc. comp. 15.015 Nos 22500 337837.5

39 Providing & fixing Black coated Aluminium Section window with grill& glass fitting etc. 22.41 Sqm 5000 112050

40 Providing Granite Kitchen otta with tile Fitting, Granite cup - Board ,etc comp. 1 Nos 37000 37000

41 Providing S.S. grilling for Staircase ,Balcony & porch etc 226.02 Rmt. 2296 518941.92

42 Providing & applying Oil bond distemper for Internal wall etc. comp 271.44 Sqm 190 51573.6

43 Providing & applying approved quality Cement paint including cleaning & curing etc. 271.44 Sqm 140 38001.6

Cost 2824933.49 4% Electrification 112997.34 3% Water Supply & Sanitation 84748.1

5%Supervision charges 141246.68 Total Cost Rs. 3163925.51

Say Rs. 3163926

5.2

MSP Result

Microsoft project is a project management software product, developed and sold by Microsoft. It is designed to assist a project manager in developing a schedule, assigning, and resources to tasks tracking progress, managing the budget and analyzing workloads.

(8)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3254

Fig-2: Resource sheet

Table- 3: Cash flow report for project

Year Quarter Week Cost Cumulative Cost

2018 Q4 Week 39 42355.44 42355.44

Week 40 761.92 43117.36

Week 41 37157.12 80274.48

Week 42 68480 148754.48

Week 43 0 148754.48

Week 44 0 148754.48

Week 45 77830.24 226584.72

Week 46 0 226584.72

Week 47 0 226584.72

Week 48 0 226584.72

Week 49 0 226584.72

Week 50 0 226584.72

Week 51 0 226584.72

Week 52 0 226584.72

Q4 Total 226584.7 226584.72

2018 Total 226584.7 226584.72

2019 Q1 Week 0 0 226584.72

Week 1 39010.4 265595.12

Week 2 0 265595.12

Week 3 0 265595.12

Week 4 21102.72 286697.84

Week 5 0 286697.84

Week 6 43513.92 330211.76

Week 7 0 330211.76

Week 8 29266.72 359478.48

Week 9 172.32 359650.8

Week 10 0 359650.8

Week 11 0 359650.8

Q1 Total 133066.1 359650.8

Q2 Week 12 38430.88 398081.68

Week 13 0 398081.68

Week 14 0 398081.68

Week 15 32733.28 430814.96

Week 16 98199.84 529014.8

Week 17 17303.44 546318.24

Week 18 0 546318.24

Week 19 92777.6 639095.84

Week 20 74504.96 713600.8

Week 21 0 713600.8

(9)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3255

Week 23 1925.28 870526.08

Week 24 0 870526.08

Q2 Total 510875.3 870526.08

Q3 Week 25 445333.4 1315859.52

Week 26 223880.3 1539739.84

Week 27 0 1539739.84

Week 28 21192.88 1560932.72

Week 29 19963.6 1580896.32

Week 30 0 1580896.32

Week 31 0 1580896.32

Week 32 37192.48 1618088.8

Week 33 1529.36 1619618.16

Week 34 672 1620290.16

Week 35 672 1620962.16

Week 36 672 1621634.16

Week 37 156925.3 1778559.44

Week 38 0 1778559.44

Q3 Total 908033.4 1778559.44

Q4 Week 39 296889 2075448.4

Week 40 371718 2447166.4

Week 41 606.8 2447773.2

Week 42 614.64 2448387.84

Week 43 40541.84 2488929.68

Week 44 0 2488929.68

Week 45 0 2488929.68

Week 46 37192.48 2526122.16

Week 47 1305.36 2527427.52

Week 48 672 2528099.52

Week 49 672 2528771.52

Week 50 672 2529443.52

Week 51 156507.5 2685951.04

Q4 Total 907391.6 2685951.04

2019 Total 2459366 2685951.04

2020 Q1 Week 0 641.76 2686592.8

Week 1 148444.5 2835037.28

Week 2 445333.4 3280370.72

Week 3 75435.84 3355806.56

Week 4 0 3355806.56

Week 5 0 3355806.56

Week 6 41156.48 3396963.04

Week 7 0 3396963.04

Week 8 0 3396963.04

Week 9 376.48 3397339.52

Week 10 37251.12 3434590.64

Week 11 2287.6 3436878.24

Week 12 672 3437550.24

Q1 Total 751599.2 3437550.24

Q2 Week 13 672 3438222.24

Week 14 672 3438894.24

Week 15 387612 3826506.24

Week 16 1536 3828042.24

Week 17 0 3828042.24

Week 18 0 3828042.24

Week 19 371111.2 4199153.44

Week 20 297171.8 4496325.28

Week 21 0 4496325.28

Week 22 1540.8 4497866.08

Week 23 39927.2 4537793.28

(10)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3256

Week 25 0 4537793.28

Q2 Total 1100243 4537793.28

Q3 Week 26 38104.48 4575897.76

Week 27 1417.36 4577315.12

Week 28 672 4577987.12

Week 29 672 4578659.12

Week 30 672 4579331.12

Week 31 157037.3 4736368.4

Week 32 0 4736368.4

Week 33 222666.7 4959035.12

Week 34 445333.4 5404368.56

Week 35 1213.6 5405582.16

Week 36 0 5405582.16

Week 37 40286.4 5445868.56

Week 38 0 5445868.56

Q3 Total 908075.3 5445868.56

Q4 Week 39 0 5445868.56

Week 40 19696.48 5465565.04

Week 41 19278.24 5484843.28

Week 42 2658.32 5487501.6

Week 43 2667.84 5490169.44

Week 44 2667.84 5492837.28

Week 45 1669.92 5494507.2

Week 46 672 5495179.2

Week 47 672 5495851.2

Week 48 4255.2 5500106.4

Week 49 22171.2 5522277.6

Week 50 22171.2 5544448.8

Week 51 22171.2 5566620

Q4 Total 120751.4 5566620

2020 Total 2880669 5566620

2021 Q1 Week 0 14963.6 5581583.6

Week 1 13522.08 5595105.68

Week 2 13522.08 5608627.76

Week 3 6761.04 5615388.8

Q1 Total 48768.8 5615388.8

2021 Total 48768.8 5615388.8

Grand Total 5615389 5615388.8

(11)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3257

Table- 4: Earned value overtime report

Year Quarter Week Earned Value Planned Value AC

2018 Q4 2018 Week 39 42355.44 42355.44 42355.44

2018 Week 40 43117.36 43117.36 43117.36 2018 Week 41 80274.48 80274.48 80274.48 2018 Week 42 148754.48 148754.48 148754.5 2018 Week 43 148754.48 148754.48 148754.5 2018 Week 44 148754.48 148754.48 148754.5 2018 Week 45 200641.3067 226584.72 226584.7 2018 Week 46 200641.3067 226680 226584.7 2018 Week 47 200641.3067 226680 226584.7 2018 Week 48 200641.3067 226680 226584.7 2018 Week 49 200641.3067 247782.72 226584.7 2018 Week 50 200641.3067 249906.24 226584.7 2018 Week 51 200641.3067 291296.64 226584.7 2018 Week 52 200641.3067 291296.64 226584.7

2019 Q1 2019 Week 0 200641.3067 320649.52 226584.7

2019Week 1 200736.5867 320735.68 226680 2019 Week 2 200736.5867 320735.68 226680 2019Week 3 200736.5867 320735.68 226680 2019Week 4 221839.3067 359166.56 247782.7 2019 Week 5 221839.3067 359166.56 247782.7 2019 Week 6 265353.2267 359166.56 291296.6 2019 Week 7 265353.2267 408266.48 291296.6 2019 Week 8 294619.9467 506466.32 320563.4 2019 Week 9 294792.2667 507403.12 320735.7 2019 Week 10 294792.2667 507403.12 320735.7 2019 Week 11 294792.2667 618736.24 320735.7

Chart - 4: Earned Value Overtime Report

3. CONCLUSIONS

(12)

© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal

| Page 3258

change this ambiguity, this research has studied the possible impacts of the C-ERP using both theoretical and practical approaches. The study concentrated on the effects of C-ERP in the project environment. With the aid of system dynamics principles, this study identified the major variables that influence the successful evaluation of C-ERP in the construction industry. Qualitative system dynamics modeling was utilized to study the effect that a variable has on each other

From the present study we drawn the following conclusions,

 ERP is an integrated computer software system that integrates various aspects of the construction industry like planning, organizing, controlling, coordinating and directing

 ERP is efficient planning software which should be applied in all the projects to get quality work within the constraints of money and time.

 ERP also helps in optimum usage of the resources minimizing the wastage thus leading to economy and completing the work within the stipulated time limits.

REFERENCES

[1] Andrejs Tambovcevs, “ERP System Implementation: A Case Study of the Construction Enterprise”, Riga Technical

University ISSN 1822-6515 Economics and Management, 2010.

[2] Beliz Ozorhon and Emrah Cinar “Critical Success Factors Of Enterprise Resource Planning Implementation In Construction:

Case of Turkey”, Journal Management Engineering, 2015.

[3] Booyoung Chung, Mirosław J. Skibniewski and Young Hoon Kwak “Developing ERP Systems Success Model for the

Construction Industry”, Journal of Construction Engineering and Management ASCE, March 2009.

[4] Boo Young Chung, Mirosław J. Skibniewski and et.al. “Analyzing Enterprise Resource Planning System Implementation

Success Factors In The Engineering–Construction Industry”, Journal Of Computing In Civil Engineering, 2008.

[5] Hans Voordijk, Arjen Van Leuven And Albertus Laan, “Enterprise Resource Planning In A Large Construction Firm:

Implementation Analysis”, Construction Management and Economics, Vol - 21, Pp - 511-521, 2013.

[6] Jonathan Jingsheng Shi, M.Asce And Daniel W. Halpin, M.Asce, “Enterprise Resource Planning For Construction Business

Management” Journal of Construction Engineering and Management ASCE, Pp-214-221, 2003.

[7] Jyh-Bin Yang, Chih-Tes Wu & Chiang-Huai Tsai “Selection of an ERP System for A Construction Firm In Taiwan: A Case

Study” Automation in Construction, Vol -16, Pp - 787–796, 2007.

[8] Kang Yuena, Wen Yangeng & Zhou Qun, “A Mode of Combined ERP and KMS Knowledge Management System Construction” International Conference on Solid State Devices and Materials Science, Pp - 2228-2234, 2012.

[9] Mirosław J. Skibniewski and Saumyendu Ghosh, “Determination Of Key Performance Indicators With Enterprise Resource

Planning Systems In Engineering Construction Firms”, Journal of Construction Engineering and Management, Vol -.135 Pp - 965-978, 2009.

[10] Omer Tatari , Daniel Castro-Lacouture, A.M.ASCE and Mirosław J. Skibniewski, M.Asce ,“Performance Evaluation of

Construction Enterprise Resource Planning Systems”, Journal of Construction Engineering and Management, Vol No- 24 Pp - 198-206, 2008.

[11] Ruben Vrijhoef, Lauri Koskela, “The Four Roles of Supply Chain Management In Construction”, European Journal of Purchasing & Supply Management, Vol – 6, Pp - 169-178, 2000.

[12] S.M. Hong-Minh1, R. Barker, and M.M. Naim, “Construction Supply Chain Trend Analysis”, Construction Supply Chain Trend Analysis, Pp- 86-96. 26-28, 1999.

[13] Sudhanva Kadol, Digvijay Patil, et.al, “An Enterprise Resource Planning (ERP) For A Construction Enterprise along with

Business Intelligence (Bi)”, International Journal Of Innovative Research In Science, Engineering And Technology, Vol - 3, Issue 2, 2014

[14] Syed M. Ahmed, Irtishad Ahmad & et.al, “Implementation of Enterprise Resource Planning (ERP) Systems in the

Construction Industry” Construction Research Congress, 2003.

[15] Thomas A. Carbone, Donald D. Tippett, “Project Risk Management Using The Project Risk Fmea”, Engineering Management

Journal, Vol. 16, No. 4, 2004.

[16] Vivek Kumar1 and Dr. S. Srinivasan, “A Review Of Supply Chain Management Using Multi-Agent System”, IJCSI

International Journal of Computer Science Issues, Vol. 7, Issue 5, 2010.

[17] Xiaoming Jiang, YiLi & Xiaolin Zhou, “Even A Rich Man Can Afford That Expensive House: ERP Responses to

References

Related documents

The Sacramento Country Day School Technology Department and Committee are committed to researching and assisting in the planning of implementation steps to support the

Figure 5.12 Fabricated Tags (Sensors) (A) Single line embroidered tag with IC attached with epoxy glue on cotton (B) Vertical embroidered tag with IC attached with epoxy glue

Hence a policy of domestic inflation targeting, which achieves a simultaneous stabilization of both domestic prices and the output gap, entails a substantially larger volatility of

While our algorithm resembles this philosophy, it has the following significant differences: (1) [14] only talks about nearest neighbor and range query on the database, we show how it

[r]

2. When the display changes to “ SETTINGS ”, depress the button again. When display shows “ RST BCNT ” push program button once the display will show current value e.g. Once

When two animals play hawk, the cost of losing is given by the cost, C, since one of the opponents is going to be injured. Either contestant has a 1/2 probability of losing so

ในระดับ ชื่อ หรือ ค า หรือ ประโยคที่ต้องการ Block ได้ 3.19 สามารถ บล็อก Website ที่เป็น HTTPS ได้. 3.20 สามารถตั้งค่า Bock การท