• No results found

Conference Call Information

N/A
N/A
Protected

Academic year: 2021

Share "Conference Call Information"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

© Copyright August 16, 2011 [email protected]

CM-UG Meeting Minutes – 7.20.2011

Conference Call Information

All CM-UG calls unless otherwise noted will

use the following dial in information:

*** NEW DIAL IN NUMBER ***

*US Conferencing Number:

1 800 504 8071

*

*7-Digit Access Code: 4461126*

Agenda:

1. Upcoming CM-UG Events

2. Segment discussion Webex info

3. Issues/Concerns

4. Tuner Corruption Issue

5. Matrix 42 Discussion

6. User Interaction

(2)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

Meeting info for August CM-UG call (Segment discussion)

Conference Call Information

*** NEW DIAL IN NUMBER ***

*US Conferencing Number:

1 800 504 8071

*

*7-Digit Access Code: 4461126*

Topic: CM-UG.com User Group Call Date: Wednesday, August 17, 2011

Time: 10:00 am, Pacific Daylight Time (San Francisco, GMT-07:00) Meeting Number: 757 550 956

Meeting Password: CMUG

---To join the online meeting (Now from mobile devices!)

---1. Go to https://bmc.webex.com/bmc/j.php?ED=156232317&UID=1162263787&PW=NOGMwYWI5YjA3&RT=MiM0

2. If requested, enter your name and email address.

3. If a password is required, enter the meeting password: CMUG 4. Click "Join".

(3)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

© Copyright August 16, 2011 [email protected]

Upcoming CM-UG Events

July 2011 User Group Call

Wednesday July 20th, 2011 - 1PM Eastern / Noon Central

Monthly Feature: Matrix42/ChangeBase info from Edward

August 2011 User Group Call

Wednesday August 17th, 2011 - 1PM Eastern / Noon Central

Monthly Feature: New segment.xml information from BMC

September 2011 User Group Call

Wednesday September 21st, 2011 - 1PM Eastern / Noon Central

Monthly Feature: tbd

Upcoming Events

Reminder:

The CM-UG call is normally the 3

rd

Wednesday of each month at 12 noon central time.

(4)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

Suggest a topic:

If you have a topic you would like to discuss as a

monthly feature please send an email to

[email protected]

Potential Meeting Topics/Demos

Open to presentations from CM-UG Members and Vendors.

Upcoming CM-UG Events

– Member Presentations:

Stopping channel shopping (Josh L)

Custom inventory scanning (Jason M)

– Custom Reporting interfaces

– Custom ARS interfaces

– Vendor Presentations:

Marimba 8.2 Roadmap (BMC)

AdminStudio Info (Flexera)

– Marimba/Matrix42 VDI Solutions

– BMC Product Roadmaps

(5)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

Issues/Concerns

– Channel Corruption issue in 8.1

– Oracle Database issue in 8.1

– Support of FDCC scanning and inventory of those using it.

– Reports from those who have upgraded to 8.2

(6)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

Tuner Corruption

– Channel Corruption issue in 8.1, please join discussion on the forums:

https://communities.bmc.com/communities/thread/53459?tstart=0

(7)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

•8.1.01 tuner corruption, upgrade to 005a noticed less corruption?

• 004 – Some users still seeing corruption

• Inode corruption issue, a few fixes in 005a which resolve

• Detection Method – SQL method

• On forums – SQL only, need oracle

• Only works if inventory is not corrupted

• Customers with issues:

Jason - Hermann

John – Belmont

Gobi – 004 -still seeing corruption

Chris A – Rewrite query for Oracle DB

(8)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

• Migration: XP->7 zero touch, etc

• ChangeBase: Automated app checker for Win7/Streaming/AppV

• Green – good to go

• Yellow – may need shim/fixes

• Red – will not upgrade

• VDI: Virtual Desktop Initiative

• Full blown VDI solution

Citrix based solution is most supported

• Repeater level component must be Windows OS

• Perhaps support for Celestix/Linux in the future

(9)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

CM-UG – Mailing List

User Email Group:

Sign up for the group email and subgroup emails here:

http://Subscribe.CM-UG.com

(10)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

CM-UG - User Interaction

Join the LinkedIn Group =

http://www.linkedin.com/groups?gid=1774296

(11)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

CM-UG - User Interaction

BMC Developer Network

Please register an account on the new BMC developer network.

These forums are very nice and provide a single place now for all BMC products.

BBCA Forums

(12)

Configuration Management – User Group (formerly: Marimba Users Group)

www.CM-UG.com

Marimba Jobs

Jobs.CM-UG.com

Look for CM

related positions

Post Req’s for CM

related positions

References

Related documents

arc able to walk are collected. A place where wounded arc collec ted and attended by the personnel of a field ambu l ance. gun is fired. That portion of the forces in

 Step 5 (cont’d): Run a Kinematic test. b) Notice the Spring is. highlighted indicating an update

Our award-winning team creates these experiences for our clients and their customers using research, strategy, design, technology, communications, media and data....

The increasing plant population triggered plants to grow taller, but reduced chlorophyll content index (CCI), number of trifoliate leaf per plant (LN), leaf area per plant

Figure 57. Survey solid angle as a function of flux limit in the full, soft, and hard bands for the 250 ks E-CDF-S main catalog. The vertical dotted lines indicate the median fluxes

The main purpose of this study was to identify the functional use of Korean and English, and language development within the context of a Korean Community and

A ten year capital plan is in place that reflects new capital projects for growth or regulatory compliance, and the replacement of existing assets to manage risk and deliver

Amber, tells me that “everything she was taught, was under the umbrella of us as Black women”. This quote from Amber’s interview presents an overview for this