Form -1
Mining Plan
&
Pre-feasibility Report
TO OBTAIN ENVIRONMENTAL CLEARANCE
FOR QUARRYING OF BLACK GRANITE (DOLERITE)
(EXTENT: 2.81.0Ha)-B2 PROJECT
IN
S.F.Nos: 79,80,258/2B,258/6A & 258/6B
Village: Naduvanapalli
Taluk: Krishnagiri
District: Krishnagiri
State: Tamilnadu
SUBMITTED TO
State Level Environment Impact Assessment Authority (SEIAA),
Government of Tamilnadu
Chennai
SUBMITTED BY
M/s.M.C.B. Granites and Exports Pvt.Ltd.,
No.315, Mahalakshmi Towers,
Opp. To TNEB, Royakotta road,
Hosur,
INDEX FILE
S.No
DESCRIPTION
PAGE
NOS
1
To Obtain Environmental clearance
3
2
Environmental clearance Format
5-9
3
Declaration letter
11
4
Demand Draft
13
5
Form-1
15-53
6
Approved Mining Plan Along With
Approval Letter
55-163
7
Pre-Feasibility Report
165-221
8
VAO signed for quarry site
205
9
Baselines Studies
223-247
10
Affidavit Document
249-251
11
Copy of Explosive License
253-255
12
Consolidated Above Document In
PDF Format (DVD)
Checklist for receiving the application of Minor Mineral Proposals
S. No Documents/Information required for Initial Scrutiny Yes/No Page No
1. Processing fee in the form of DD as per GO Yes 13
2. Duly filled and signed by both RQP/Consultant & Proponent in Mining of Minor Minerals Checklist
Yes 1-(f)
3. Duly filled and signed by both RQP/Consultant & Proponent in Form- 1
Yes 53
4. Duly Prepared and Signed by both RQP / Consultant & Proponent Pre Feasibility report
Yes 221
5. Approved Mining Plan duly attested with seal by Assistant / Deputy Director / Commissioner of Geology and Mining
Yes 121
6. Precise area communication letter from District Collector / Principal Secretary to Government
Yes 123
7. Certificate from the VAO /Tashildhar stating details of habitation located within 500m radius from the boundary of the proposed site along with FMB sketch
No 251-B
8. Acknowledgement copy of the application submitted to NBWL if applicable
Not applicable - 9. Letter from the AD/DD mines about the details (Name of the
Owner, S.F.No, Extent & distance from the boundary of this quarry) of other quarries
(Proposed/Existing/Abandoned quarries) within a radius of 500m from the boundary of the proposed quarry site (Applicable for Rough stone/Granite)
Not applicable 251-A
10. Affidavit from the applicant regarding all the general conditions stipulated in the EIA notification 2006
Yes 249
11. Affidavit from the applicant stating the habitation, details of other quarry permanent structures within 500m, child labour etc
Yes 249
12. Documents of village records, FMB, Combined Sketch, Patta, Chitta, Adangal, consent letter, etc., and also 1km & 10 km radius map, surface plan duly attested by the AD/DD/Commissioner of Geology and Mining and signed by concerned authorities
Yes
125-139,149,1 53
To consider the proposal for the grant of Environmental Clearance for Grey Granite quarrying in at 2.81.0Ha in S.F.No: 79, 80, 258/2B, 258/6A & 258/6B of Naduvanapalli Village in Krishnagiri Taluk,
Krishnagiri District by M/s. M.C.B. Granites and Exports Pvt.Ltd., The salient features of the proposal are as follows:
S.No: Details of the proposal : Data furnished Page No:
1.
Name of the owner/Firm
:
M/s.M.C.B. Granites and Exports Pvt.Ltd., No.315, Mahalakshmi Towers,
Opp. To TNEB, Royakotta road, Hosur, Krishnagiri District -635109 Mobile No: 91597 77770 3,19,55,1 23,165 2. Type of quarrying (Savudu/Rough stone/ Sand/Granite) :
It is a Grey Granite quarry Project in Naduvanapalli Village.
3,19,55,1 23,167 3. S.F.No of the quarry site with
area break up :
S.F.No: 79, 80, 258/2B, 258/6A & 258/6B 3,19,55,1 23,165 4. Village in which situated : Naduvanapalli Village 3,19,55,1
23,165 5. Taluk in which situated : Krishnagiri Taluk 3,19,55,1
23,165 6. District in which situated : Krishnagiri District 3,19,55,1
23,165 7. Extent of quarry (in ha) 2.81.0Ha 3,19,55,1
23,165 8. Period of quarrying proposed : Mining license applied for period of twenty years only.
Mining plan period for the first five years
57,83,123 9. Production (Quantity in m
3 )
: The proposed quantity @ (10%) is about 1860m
3
of Grey Granite for a period of five years.
17,97,169 10. Latitude and Longitude of all
corners of the quarry site :
12°41'40"N to12°41'48"N 78°10'23"E to 78°10'31"E
17,83,169
11. Topo sheet No : 57 L/02 17,83,169
12.
Precise area communication approved by the District Collector with date
: Letter No: 17456/MME2/2015-1, dated:18.01.2016 123
13.
Mining plan approved by the Assistant Director of the District with date
:
Letter. No: 8856/MM5/2015 Dated: 10.02.2016. 55
14.
Water Requirement:
1. Drinking & Domestic purpose (in KLD)
2. Dust suppression & Green Belt (in KLD)
;
Purpose Quantity KLD
Source
Drinking 0.3KLD Water vendors Domestic purpose 0.3KLD From Existing bore hole
nearby quarry area Dust suppression and
Afforestation
0.4KLD From Existing bore hole nearby quarry area
33,171
15. Depth of quarrying : The applicant proposed Grey Granite up to 10m for a period of five years.
101
16.
Project cost (including EMP
cost) :
The total project cost including EMP cost (A+B+C) is about Rs. 44,65,000/- (Rupees Forty four lakhs Sixty five thousand only)
113,173
17. EMP cost : The total EMP cost is about Rs. 2,65,000/- (Rupees Two lakhs sixty five thousand only)
Checklist for Mining of Minor Mineral 2.81.0Ha mine lease area
S.No Details of the proposal : Data furnished Page No
1. Name of the owner/Firm : M/s.M.C.B. Granites and Exports Pvt.Ltd., 3,19,55,1
23,165 2.
Correspondence Address with Pin Code
:
No.315, Mahalakshmi Towers, Opp. To TNEB, Royakotta road, Hosur,
Krishnagiri District -635109
3. Email Address : [email protected] 19,177
4. Mobile Number : 91597 77770 19,177
5. Type of quarrying (Earth/ Rough stone/Sand/Granite) : It is a Grey Granite quarry Project in Naduvanapalli Village. 3,19,55,123,167
6. S.F. No of the Quarry site : S.F.No: 79, 80, 258/2B, 258/6A & 258/6B 3,19,55,1
23,165 7.
Village in which situated, Town Panchayat/ Panchayat Union in which the village is situated
:
Village Panchayat : Naduvanapalli Panchayat Union : Krishnagiri
3,19,55,1 23,165
8. Taluk in which situated : Krishnagiri Taluk 3,19,55,1
23,165
9. District in which situated : Krishnagiri District 3,19,55,1
23,165
10. Extent of quarry (in Ha) : 2.81.0Ha 3,19,55,1
23,165
11. New or existing quarry : It is New proposal Grey Granite Quarry Project in
Naduvanapalli Village.
3,19,55,1 23,169
12.
If in case of existing Rough Stone/ Blue Metal/ Granite Quarry, the length, width and depth to which quarrying has already been done (below the ground level/ above the ground level)
:
It is New proposal Grey Granite Quarry Project in Naduvanapalli Village.
3,19,55,1 23,169
13.
If quarrying had been done below the ground level/above the Ground level, the height of quarrying
: It is New proposal Grey Granite Quarry Project in Naduvanapalli Village.
3,19,55,1 23,169
14.
Name of the owner who had earlier undertaken the quarrying & a copy of mining lease issued with date
:
It is New proposal Grey Granite Quarry Project in Naduvanapalli Village.
3,19,55,1 23,169
15.
Proof of land ownership. If owned patta copy.
If not own patta land agreement/ lease copy entered with the owner (to be enclosed)
:
It is a Patta land; vide Patta no. 81. It is a company own patta land.
83,129
17.
Production (quantity in m3)
:
The proposed quantity (10%) is about 1860m3 (or) 329
Lorry Loads of Black Granite for a period of five years. Per year for lorry loads = 329 lorry loads/5 years =66 lorry loads per year.
Total number of effective working days = 280days per year Per months for lorry loads = 66 lorry loads /12 months
(280days)= Maximum 5 lorry load per month
The applicant proposed up to a depth of 10m
(2m topsoil + 3m weathered rock + 5m Black Granite) for a period of five years.
Descriptio n ROM (m3) Reser ves 10% (m3) waste 90% (m3) Weathe red rock (m3) Top soil (m3) Side burde n (m3) Geological reserves 223000 22300 200700 65256 43504 25664 0 Mineable Reserves 75035 7504 67531 22152 17168 4710 Five years reserves 18600 1860 16740 13986 11352 - 17,91,93, 97,169 18. Method of Mining :
The quarrying operation will be carried out by Open cast semi mechanized mining method with 5.0m vertical bench with a bench width of 5.0m is being proposed.
23,95,169
19. Top soil/ Overburden in case of Rough Stone/ Blue Metal : The thickness of Gravelly soil is about 2m. The generation of topsoil about 11352m3 for a period of five years.
97,107
20.
Quantity of rejects in m3 in case of Granite Mining.
:
Total waste is 94393m3 (67531m3of Granite waste @ 90% + 22152m3 of weathered rock+ 4710m3 of side burden) for entire life period.
Total waste is 30726m3 (16740m3of Granite waste @ 90% + 13986m3 of weathered rock) for a period of five years.
93,97
21.
Length, Width, Depth & Proposed Quarry in meters.
:
Dimension of the year wise:
L (m) Max W(m) Max D (m) Max
132 43 10
Ultimate pit dimensions
Length (m) Width (m) Depth (m)
(Max)
148 59 30
97,101
22.
Land use pattern for a radius of 1Km around the quarry site such as Agriculture, Habitation etc.,
: Description Percentage % Trees – 20% Road – 10% Agricultural land – 40% Habitation – 10% Tank – 05% Hillock – 15% 149 23.
Details of other quarries for a radius
of 1Km, around the quarry site. :
The village Topo sketch map showing the quarry proposed site.
There is no quarry within the radius of 500m
149
25.
Aerial distance to the interstate borders, in case of Rough Stone/ Blue Metal/ Granite quarry to be obtained from IRS, Anna University.
:
The interstate boundary is situated 3km away from the Eastern side of the area.
49,173,20 7
26.
In case of Rough Stone/ Blue Metal/
Granite quarry no objection
certificate from the concerned
district Forest Officer/ Wild Life Sanctuaries/ National Parks/ HACA/ Western Ghats region if the quarry site is within 15 Kms of these areas.
:
There are no wild life sanctuaries, National parks, HACA, Western Ghats, within the radius of 15km.
49,173,20 7
27.
Aerial distance to the nearest
eco-sensitive areas, CRZ, Forests,
Monuments etc., within 15Kms of these areas.
:
There is no CRZ, Monuments, forest and sensitive areas within the radius of 15km.
Naralapalli reserved forest is situated 6km away from the SE side of the area.
49,173,20 7
28. Latitude and Longitude of all corners of the quarry site. : 12°41'40"N to12°41'48"N 78°10'23"E to 78°10'31"E 17,83,169
29. Topo Sheet No : 57 L/02 17,83,169
30.
Copy of explosives license and a
consent letter/ agreement of
competent recognized person who has agreed to handle explosive for the blasting, in case of Rough Stone/ Blue Metal/ Granite quarry.
:
A copy of consent letter and license copy enclosed. 253,255
31.
Brief details of APC measures proposed to be proposed to be implemented.
:
The granite stones are quarried as undamaged dimensional stones without involving deep hole drilling and heavy blasting, fragmentation and generation of lumps, fines or dust is negligible. Water will be sprinkled for the suppression air borne dust from mine approach roads waste dumps on regular intervals using water tankers.
117
32.
Mine Closure Plan to be furnished in Mining plan.
:
In the Grey Granite quarry operations the maximum depth about 30m for the entire lease period this is based on the market potential at present scenario.
After completion of quarry operation the quarried out land will be land will be fenced and maintained with barbed wire to prevent inherent entry of the Public and cattle. Garland drains will be constructed around the quarry to prevent the surface run off rain water.
119
33.
Scheme of Mining prepared by (Xerox copy of certificate to be attached)
:
M.IFTHIKHAR AHMED, M.Sc., F.G.S.,M.B.A., M.M.E.A,
RQP/MAS/183/2004/A
59,121,14 1
34.
Precise area communication
approved by the District Collector :
The Precise area communication letter was issued by the Principal Secretary, Industries (MME.2) Department
Government of Tamilnadu, Chennai vide Letter No:
17456/MME2/2015-1, dated:18.01.2016
123
35.
Mining plan approved by the Deputy/ Assistant Director of the
District. :
The Mining Plan was Approved by the Commissioner of
Geology and Mining, Chennai vide Letter. No:
8856/MM5/2015 Dated: 10.02.2016.
36.
Water requirement :
a) Drinking & domestic
purposes in KLD.
b) Dust suppression (in KLD)
c) Green belt (in KLD)
:
Drinking Water –0.3 KLD & Domestic purpose
Dust Suppression – 0.3 KLD Green belt -0.4 KLD Total – 1.0 KLD 33,171 37. Source of water : Purpose Sources Drinking & Domestic Purpose
Packaged drinking water is available from the nearby approved water vendors Dust suppression From Existing Borehole on nearby quarry Green belt
development
From Existing Borehole on nearby quarry
33,171
38. Ground water table : The Ground water is about 55mt depth from ground level. 29,85,169
39.
Project Cost (excluding EMP Cost) :
The Project cost:
A. Fixed Asset cost = Rs. 9, 00,000/- B. Operational cost = Rs. 33, 00,000/-
C. EMP cost = Rs. 2,65,000/-
Total cost = Rs. 44,65,000/-
113,173
40. EMP Cost : The total EMP cost is about Rs. 2,65,000/- 113,173
41. Disclosure RQP : M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,
RQP/MAS/183/2004/A
59,121,14 1
42.
Soft copy of the Form–1,
Pre –feasibility report and Mining plan in CD.
:
There is enclosed Soft copy for form –1, Pre – feasibility report and mining plan in CD.
257
43.
Key map showing the approach roads to the site to be attested by the
Deputy/ Assistant Director of
Geology and Mining of the
concerned District.
:
The Route map showing with approach roads to the site is enclosed Plate No: IC
147
44.
Village map with S.F. Nos& salient
features such as vegetation,
habitations etc., for a radius of 500m around the quarry site.
:
Village map with S.F.No and Salient features such as vegetation, habitation etc., for 500mt radius is enclosed as Plate no. VIII & Annexure - III
149
45.
If lakes, Ponds, river, nallah, odai etc. are situated near the quarry site permission from the concerned PWD authorities for mining
There is no Rivers/Stream, Lakes, and Reservoir within the 500m distance to the lease applied area.
Tank is situated within the radius of 500m.
49,173,20 7
46.
Section map for mining to be attested by the Deputy/ Assistant Director of Geology and Mining of the concerned District.
:
The Geological Plan and section in 1:1000 & 1:500 scale is enclosed: IV.
155
47.
Photograph of the proposed Mining site with S.F.No and attested by at least VAO.
:
The Photo of the quarry site is enclosed. 205
48. Form –I To be signed by applicant : I am hereby signed 53
49.
Pre- Feasibility Report to be signed
by applicant. :
Pre-feasibility report has been signed by the applicant 221
50. First and last page and the page at which quantity of mining has been :
First page and last page and the quantity proposed in the plan have been signed by the Commissioner of Geology
worked out to be signed by the
Deputy/Assistant Director of
Geology and Mining of the
concerned District.
and Mining.
51.
Affidavit from the applicant that child labor is not being employed in
the mining activity. :
It is been ensured that the labor will not be employed less than 18 years, No child labor will engaged or entertained for any kind of quarrying operations. All the labor engaged for quarrying operations will be insured during the quarry lease period.
249,251
52.
Affidavit from the applicant
regarding planting of trees around the quarry site in fulfillment of the Green belt commitment furnished.
:
Affidavit from the applicant regarding the proposal for planting trees around the quarry and fulfillment of greenbelt commitment is enclosed
249,251
53.
Details (POD) Regarding
communicating the proposal to the members of the committee.
:
1. Signature of the applicant
For M/s.M.C.B. Granites and Exports Pvt.Ltd.,
(Srinivasan Madhu) Managing Director
2. Signature of the Recognized qualified person
M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,
NADUVANAPALLI BLACK GRANITE (DOLERITE) QUARRY LEASE APPLIED AREA (2.81.0Ha)
M/s. M.C.B. Granites and Exports Pvt.Ltd., has applied for Environmental clearance for the proposed
quarry Black Granite for over an extent of 2.81.0Ha in S.F.No: 79, 80, 258/2B, 258/6A & 258/6B
of Naduvanapalli Village in Krishnagiri Taluk, Krishnagiri District. Salient features of the proposal are as follows:
S. No:
Details of the proposal
: Data furnished Page No:
1. Name of the Owner +
Firm
: M/s.M.C.B. Granites and Exports Pvt.Ltd.,
No.315, Mahalakshmi Towers, Opp. To TNEB, Royakotta road, Hosur,
Krishnagiri District -635109 Mobile No: 91597 77770
3,19,55,1 23,165
2. Location of the
quarry-S.F.No.
: S.F.No: 79, 80, 258/2B, 258/6A & 258/6B of
Naduvanapalli Village in Krishnagiri Taluk, Krishnagiri District
3,19,55,1 23,165
3. Purpose of Application : It is a Black Granite quarry Project in Naduvanapalli
Village.
3,19,55,1 23,167
4. Extent of quarry in Ha- : 2.81.0Ha 3,19,55,1
23,165
5. Land use planning
a) Mining b) Storage of Topsoil over burden c) Infrastructure Road d) Utilized Area Total : Description Area to be Required at the present
Mining Plan period(ha)
Area at the end of life of quarry (Ha)
Area under quarry 0.56.8 0.80.0
Waste dump 0.37.0 0.37.0 Infrastructure 0.01.0 0.01.0 Roads 0.01.0 0.01.0 Green Belt 0.20.0 0.73.2 Stocking blocks 1.65.2 0.88.8 Grand Total 2.81.0 2.81.0 23,119,21 1 6. Production (quantity in m3)
: The proposed quantity (10%) is about 1860m3 (or) 329
Lorry Loads of Black Granite for a period of five years. Per year for lorry loads = 329 lorry loads/5 years =66 lorry loads per year.
Total number of effective working days = 280days per year
Per months for lorry loads = 66 lorry loads /12 months (280days)= Maximum 5 lorry load per month
The applicant proposed up to a depth of 10m
(2m topsoil + 3m weathered rock + 5m Black Granite) for a period of five years.
Descriptio n ROM (m3 ) Reser ves 10% (m3 ) waste 90% (m3 ) Weathe red rock (m3 ) Top soil (m3 ) Side burde n (m3 ) Geological reserves 223000 22300 200700 65256 43504 25664 0 Mineable Reserves 75035 7504 67531 22152 17168 4710 Five years reserves 18600 1860 16740 13986 11352 - 17,91,93, 97,169
7. Top soil & overburden (quantity in m3)
: The thickness of Gravelly soil is about 2m. The
generation of topsoil about 11352m3 for a period of five years.
8. Method of Mining : The quarrying operation will be carried out by Open cast semi mechanized mining method with 5.0m vertical bench with a bench width of 5.0m is being proposed.
23,95,169
9. Life of Mine as per
approved mining plan
: Mining license applied for period of twenty years only.
Mining plan period for the first five years
57,83,123 10. Height / width of the
bench
: Height 5.0m & Width 5.0m 23,95,169
11. Source of water / quantity required : Quantity required (in litres) Source 33,171
a. Drinking & Domestic Purpose
0.3 KLD Packaged drinking water is available from the approved water vender
b. Dust Suppression 0.3KLD From Existing bore hole on nearby quarry
C. Afforestation 0.4 KLD From Existing bore hole on nearby quarry
12. Waste water
Sewage water Mode of disposal
: :
There is no waste water. 37,213
The septic tank is constructed on permanent structure with in the quarry lease area.
To local Panchyat Authority
13. APC Measures : 1.Mist Spray using water tankers,
2. Enclosed covered system. (Tarpaulin) for transportation.
39,
14. Ariel distance of nearest habitation : S. N o Name of the Village Approximate Distance & Direction from lease
hold area Approximate population 1. Vepanapalli 2km – NE 1200 2. Kadavarapalli 2km – NW 300 3. Nachikuppam 3km – NW 500 4. Naduvanapalli 1km – SE 300 5. Thattatharai 5km – S 400 6. Verupasandhiram 5km – SW 500 49,111209
15. Ariel distance from
Reserve forest, Sensitive
areas, Forest, Bird
sanctuaries, Wild life
sanctuaries, National
parks, Monuments etc., within 15km
: Naralapalli reserved forest is situated 6km away from the
SE side of the area. Bird Sanctuaries – Nil Wild life sanctuaries - Nil National Park – Nil Monuments – Nil
49,173,20 7
16. Land owner ship
document Own patta land Lease
Govt. Poromboke
: : :
It is a Patta land; vide Patta no. 81. It is a company own patta land.
83,129
17. Land use classification : It is New proposal Black Granite Quarry Project in
Naduvanapalli Village.
3,19,55,1 23,169
18. Mining plan prepared by
:
M.IFTHIKHAR AHMED, M.Sc., F.G.S.,M.B.A., M.M.E.A,
RQP/MAS/183/2004/A
59,121,14 1
19. Approved by : The Mining Plan was Approved by the Commissioner of
Geology and Mining, Chennai vide Letter. No:
8856/MM5/2015 Dated: 10.02.2016.
55
20 Precise area statement
Approved by
: The Precise area communication letter was issued by the
Principal Secretary, Industries (MME.2) Department
Government of Tamilnadu, Chennai vide Letter No:
17456/MME2/2015-1, dated:18.01.2016
123
22. Nearby lake / river/ odai / channel etc.
: There is no Rivers/Stream, Lakes, and Reservoir within
the 500m distance to the lease applied area. Tank is situated within the radius of 500m.
49,173,20 7
23. Latitude / Longitude : 12°41'40"N to12°41'48"N
78°10'23"E to 78°10'31"E
17,83,169
24. GI Sheet No. : 57 L/02 17,83,169
25. Project Cost(Project cost +EMP cost)
: The Project cost:
A. Fixed Asset cost = Rs. 9, 00,000/-
B. Operational cost = Rs. 33, 00,000/-
C. EMP cost = Rs. 2,65,000/-
Total cost = Rs. 44,65,000/-
113,173
26. EMP Cost (Capital and
recurring)
: The total EMP cost is about Rs. 2,65,000/- 113,173
27. Water table : The Ground water is about 55mt depth from ground
level.
29,85,169
28. Interstate boundary : The interstate boundary is situated 3km away from the
Eastern side of the area.
49,173,20 7
29. Western Ghats : There is no Western Ghats region within the radius of
15km.
49,173,20 7
From:
M/s.M.C.B. Granites and Exports Pvt.Ltd.,
No.315, Mahalakshmi Towers,
Opp. To TNEB, Royakotta road,
Hosur,
Krishnagiri District -635109
Mobile No: 91597 77770
To:
THE CHAIRMAN,
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,
PANAGAL BUILDING, SAIDAPET,
CHENNAI
Sir,
Sub: Submission of Approved Mining Plan (
Letter. No: 8856/MM5/2015 Dated:
10.02.2016
) Form–1 and Pre-feasibility report and Mining plan for obtaining
Environmental Clearance for our Naduvanapalli Black Granite (Dolerite) Quarry
Lease applied area- Reg.,
****************
I am here by submitting the processing fee in the form of demand draft for rupees one
lakh, along with Form-1 and Pre-feasibility report and Mining plan to your good office for
obtaining clearance from SEIAA, Chennai, for our Naduvanapalli Black Granite (Dolerite)
quarry Lease applied area for over an extent of
2.81.0Ha
in
S.F.No. 79, 80, 258/2B, 258/6A &
258/6B
of Naduvanapalli Village, Krishnagiri Taluk and Krishnagiri District, Tamilnadu.
I have submitted all the relevant documents to your good office to the best of our
knowledge. If any clarifications are required, we are ready to submit the same to your office at
your convenient time. Also we are ready to present the project in front of the committee.
Hence we request your good office to kindly process our application and allow us to
present our project at the earliest.
Thanking you.
Yours sincerely
For M/s.M.C.B. Granites and Exports Pvt.Ltd.,
(Srinivasan Madhu)
Managing Director
Place: Krishnagiri