Form -1

Mining Plan

&

Pre-feasibility Report

TO OBTAIN ENVIRONMENTAL CLEARANCE

FOR QUARRYING OF BLACK GRANITE (DOLERITE)

(EXTENT: 2.81.0Ha)-B2 PROJECT

IN

S.F.Nos: 79,80,258/2B,258/6A & 258/6B

Village: Naduvanapalli

Taluk: Krishnagiri

District: Krishnagiri

State: Tamilnadu

SUBMITTED TO

State Level Environment Impact Assessment Authority (SEIAA),

Government of Tamilnadu

Chennai

SUBMITTED BY

M/s.M.C.B. Granites and Exports Pvt.Ltd.,

No.315, Mahalakshmi Towers,

Opp. To TNEB, Royakotta road,

Hosur,

(2)

INDEX FILE

S.No

DESCRIPTION

PAGE

NOS

1

To Obtain Environmental clearance

3

2

Environmental clearance Format

5-9

3

Declaration letter

11

4

Demand Draft

13

5

Form-1

15-53

6

Approved Mining Plan Along With

Approval Letter

55-163

7

Pre-Feasibility Report

165-221

8

VAO signed for quarry site

205

9

Baselines Studies

223-247

10

Affidavit Document

249-251

11

Copy of Explosive License

253-255

12

Consolidated Above Document In

PDF Format (DVD)

(3)

Checklist for receiving the application of Minor Mineral Proposals

S. No Documents/Information required for Initial Scrutiny Yes/No Page No

1. Processing fee in the form of DD as per GO Yes 13

2. Duly filled and signed by both RQP/Consultant & Proponent in Mining of Minor Minerals Checklist

Yes 1-(f)

3. Duly filled and signed by both RQP/Consultant & Proponent in Form- 1

Yes 53

4. Duly Prepared and Signed by both RQP / Consultant & Proponent Pre Feasibility report

Yes 221

5. Approved Mining Plan duly attested with seal by Assistant / Deputy Director / Commissioner of Geology and Mining

Yes 121

6. Precise area communication letter from District Collector / Principal Secretary to Government

Yes 123

7. Certificate from the VAO /Tashildhar stating details of habitation located within 500m radius from the boundary of the proposed site along with FMB sketch

No 251-B

8. Acknowledgement copy of the application submitted to NBWL if applicable

Not applicable - 9. Letter from the AD/DD mines about the details (Name of the

Owner, S.F.No, Extent & distance from the boundary of this quarry) of other quarries

(Proposed/Existing/Abandoned quarries) within a radius of 500m from the boundary of the proposed quarry site (Applicable for Rough stone/Granite)

Not applicable 251-A

10. Affidavit from the applicant regarding all the general conditions stipulated in the EIA notification 2006

Yes 249

11. Affidavit from the applicant stating the habitation, details of other quarry permanent structures within 500m, child labour etc

Yes 249

12. Documents of village records, FMB, Combined Sketch, Patta, Chitta, Adangal, consent letter, etc., and also 1km & 10 km radius map, surface plan duly attested by the AD/DD/Commissioner of Geology and Mining and signed by concerned authorities

Yes

125-139,149,1 53

(4)

To consider the proposal for the grant of Environmental Clearance for Grey Granite quarrying in at 2.81.0Ha in S.F.No: 79, 80, 258/2B, 258/6A & 258/6B of Naduvanapalli Village in Krishnagiri Taluk,

Krishnagiri District by M/s. M.C.B. Granites and Exports Pvt.Ltd., The salient features of the proposal are as follows:

S.No: Details of the proposal : Data furnished Page No:

1.

Name of the owner/Firm

:

M/s.M.C.B. Granites and Exports Pvt.Ltd., No.315, Mahalakshmi Towers,

Opp. To TNEB, Royakotta road, Hosur, Krishnagiri District -635109 Mobile No: 91597 77770 3,19,55,1 23,165 2. Type of quarrying (Savudu/Rough stone/ Sand/Granite) :

It is a Grey Granite quarry Project in Naduvanapalli Village.

3,19,55,1 23,167 3. S.F.No of the quarry site with

area break up :

S.F.No: 79, 80, 258/2B, 258/6A & 258/6B 3,19,55,1 23,165 4. Village in which situated : Naduvanapalli Village 3,19,55,1

23,165 5. Taluk in which situated : Krishnagiri Taluk 3,19,55,1

23,165 6. District in which situated : Krishnagiri District 3,19,55,1

23,165 7. Extent of quarry (in ha) 2.81.0Ha 3,19,55,1

23,165 8. Period of quarrying proposed : Mining license applied for period of twenty years only.

Mining plan period for the first five years

57,83,123 9. Production (Quantity in m

3 )

: The proposed quantity @ (10%) is about 1860m

3

of Grey Granite for a period of five years.

17,97,169 10. Latitude and Longitude of all

corners of the quarry site :

12°41'40"N to12°41'48"N 78°10'23"E to 78°10'31"E

17,83,169

11. Topo sheet No : 57 L/02 17,83,169

12.

Precise area communication approved by the District Collector with date

: Letter No: 17456/MME2/2015-1, dated:18.01.2016 123

13.

Mining plan approved by the Assistant Director of the District with date

:

Letter. No: 8856/MM5/2015 Dated: 10.02.2016. 55

14.

Water Requirement:

1. Drinking & Domestic purpose (in KLD)

2. Dust suppression & Green Belt (in KLD)

;

Purpose Quantity KLD

Source

Drinking 0.3KLD Water vendors Domestic purpose 0.3KLD From Existing bore hole

nearby quarry area Dust suppression and

Afforestation

0.4KLD From Existing bore hole nearby quarry area

33,171

15. Depth of quarrying : The applicant proposed Grey Granite up to 10m for a period of five years.

101

16.

Project cost (including EMP

cost) :

The total project cost including EMP cost (A+B+C) is about Rs. 44,65,000/- (Rupees Forty four lakhs Sixty five thousand only)

113,173

17. EMP cost : The total EMP cost is about Rs. 2,65,000/- (Rupees Two lakhs sixty five thousand only)

(5)

Checklist for Mining of Minor Mineral 2.81.0Ha mine lease area

S.No Details of the proposal : Data furnished Page No

1. Name of the owner/Firm : M/s.M.C.B. Granites and Exports Pvt.Ltd., 3,19,55,1

23,165 2.

Correspondence Address with Pin Code

:

No.315, Mahalakshmi Towers, Opp. To TNEB, Royakotta road, Hosur,

Krishnagiri District -635109

3. Email Address : [email protected] 19,177

4. Mobile Number : 91597 77770 19,177

5. Type of quarrying (Earth/ Rough stone/Sand/Granite) : It is a Grey Granite quarry Project in Naduvanapalli Village. 3,19,55,123,167

6. S.F. No of the Quarry site : S.F.No: 79, 80, 258/2B, 258/6A & 258/6B 3,19,55,1

23,165 7.

Village in which situated, Town Panchayat/ Panchayat Union in which the village is situated

:

Village Panchayat : Naduvanapalli Panchayat Union : Krishnagiri

3,19,55,1 23,165

8. Taluk in which situated : Krishnagiri Taluk 3,19,55,1

23,165

9. District in which situated : Krishnagiri District 3,19,55,1

23,165

10. Extent of quarry (in Ha) : 2.81.0Ha 3,19,55,1

23,165

11. New or existing quarry : It is New proposal Grey Granite Quarry Project in

Naduvanapalli Village.

3,19,55,1 23,169

12.

If in case of existing Rough Stone/ Blue Metal/ Granite Quarry, the length, width and depth to which quarrying has already been done (below the ground level/ above the ground level)

:

It is New proposal Grey Granite Quarry Project in Naduvanapalli Village.

3,19,55,1 23,169

13.

If quarrying had been done below the ground level/above the Ground level, the height of quarrying

: It is New proposal Grey Granite Quarry Project in Naduvanapalli Village.

3,19,55,1 23,169

14.

Name of the owner who had earlier undertaken the quarrying & a copy of mining lease issued with date

:

It is New proposal Grey Granite Quarry Project in Naduvanapalli Village.

3,19,55,1 23,169

15.

Proof of land ownership. If owned patta copy.

If not own patta land agreement/ lease copy entered with the owner (to be enclosed)

:

It is a Patta land; vide Patta no. 81. It is a company own patta land.

83,129

(6)

17.

Production (quantity in m3)

:

The proposed quantity (10%) is about 1860m3 (or) 329

Lorry Loads of Black Granite for a period of five years. Per year for lorry loads = 329 lorry loads/5 years =66 lorry loads per year.

Total number of effective working days = 280days per year Per months for lorry loads = 66 lorry loads /12 months

(280days)= Maximum 5 lorry load per month

The applicant proposed up to a depth of 10m

(2m topsoil + 3m weathered rock + 5m Black Granite) for a period of five years.

Descriptio n ROM (m3) Reser ves 10% (m3) waste 90% (m3) Weathe red rock (m3) Top soil (m3) Side burde n (m3) Geological reserves 223000 22300 200700 65256 43504 25664 0 Mineable Reserves 75035 7504 67531 22152 17168 4710 Five years reserves 18600 1860 16740 13986 11352 - 17,91,93, 97,169 18. Method of Mining :

The quarrying operation will be carried out by Open cast semi mechanized mining method with 5.0m vertical bench with a bench width of 5.0m is being proposed.

23,95,169

19. Top soil/ Overburden in case of Rough Stone/ Blue Metal : The thickness of Gravelly soil is about 2m. The generation of topsoil about 11352m3 for a period of five years.

97,107

20.

Quantity of rejects in m3 in case of Granite Mining.

:

Total waste is 94393m3 (67531m3of Granite waste @ 90% + 22152m3 of weathered rock+ 4710m3 of side burden) for entire life period.

Total waste is 30726m3 (16740m3of Granite waste @ 90% + 13986m3 of weathered rock) for a period of five years.

93,97

21.

Length, Width, Depth & Proposed Quarry in meters.

:

Dimension of the year wise:

L (m) Max W(m) Max D (m) Max

132 43 10

Ultimate pit dimensions

Length (m) Width (m) Depth (m)

(Max)

148 59 30

97,101

22.

Land use pattern for a radius of 1Km around the quarry site such as Agriculture, Habitation etc.,

: Description Percentage % Trees – 20% Road – 10% Agricultural land – 40% Habitation – 10% Tank – 05% Hillock – 15% 149 23.

Details of other quarries for a radius

of 1Km, around the quarry site. :

The village Topo sketch map showing the quarry proposed site.

There is no quarry within the radius of 500m

149

(7)

25.

Aerial distance to the interstate borders, in case of Rough Stone/ Blue Metal/ Granite quarry to be obtained from IRS, Anna University.

:

The interstate boundary is situated 3km away from the Eastern side of the area.

49,173,20 7

26.

In case of Rough Stone/ Blue Metal/

Granite quarry no objection

certificate from the concerned

district Forest Officer/ Wild Life Sanctuaries/ National Parks/ HACA/ Western Ghats region if the quarry site is within 15 Kms of these areas.

:

There are no wild life sanctuaries, National parks, HACA, Western Ghats, within the radius of 15km.

49,173,20 7

27.

Aerial distance to the nearest

eco-sensitive areas, CRZ, Forests,

Monuments etc., within 15Kms of these areas.

:

There is no CRZ, Monuments, forest and sensitive areas within the radius of 15km.

Naralapalli reserved forest is situated 6km away from the SE side of the area.

49,173,20 7

28. Latitude and Longitude of all corners of the quarry site. : 12°41'40"N to12°41'48"N 78°10'23"E to 78°10'31"E 17,83,169

29. Topo Sheet No : 57 L/02 17,83,169

30.

Copy of explosives license and a

consent letter/ agreement of

competent recognized person who has agreed to handle explosive for the blasting, in case of Rough Stone/ Blue Metal/ Granite quarry.

:

A copy of consent letter and license copy enclosed. 253,255

31.

Brief details of APC measures proposed to be proposed to be implemented.

:

The granite stones are quarried as undamaged dimensional stones without involving deep hole drilling and heavy blasting, fragmentation and generation of lumps, fines or dust is negligible. Water will be sprinkled for the suppression air borne dust from mine approach roads waste dumps on regular intervals using water tankers.

117

32.

Mine Closure Plan to be furnished in Mining plan.

:

In the Grey Granite quarry operations the maximum depth about 30m for the entire lease period this is based on the market potential at present scenario.

After completion of quarry operation the quarried out land will be land will be fenced and maintained with barbed wire to prevent inherent entry of the Public and cattle. Garland drains will be constructed around the quarry to prevent the surface run off rain water.

119

33.

Scheme of Mining prepared by (Xerox copy of certificate to be attached)

:

M.IFTHIKHAR AHMED, M.Sc., F.G.S.,M.B.A., M.M.E.A,

RQP/MAS/183/2004/A

59,121,14 1

34.

Precise area communication

approved by the District Collector :

The Precise area communication letter was issued by the Principal Secretary, Industries (MME.2) Department

Government of Tamilnadu, Chennai vide Letter No:

17456/MME2/2015-1, dated:18.01.2016

123

35.

Mining plan approved by the Deputy/ Assistant Director of the

District. :

The Mining Plan was Approved by the Commissioner of

Geology and Mining, Chennai vide Letter. No:

8856/MM5/2015 Dated: 10.02.2016.

(8)

36.

Water requirement :

a) Drinking & domestic

purposes in KLD.

b) Dust suppression (in KLD)

c) Green belt (in KLD)

:

Drinking Water –0.3 KLD & Domestic purpose

Dust Suppression – 0.3 KLD Green belt -0.4 KLD Total – 1.0 KLD 33,171 37. Source of water : Purpose Sources Drinking & Domestic Purpose

Packaged drinking water is available from the nearby approved water vendors Dust suppression From Existing Borehole on nearby quarry Green belt

development

From Existing Borehole on nearby quarry

33,171

38. Ground water table : The Ground water is about 55mt depth from ground level. 29,85,169

39.

Project Cost (excluding EMP Cost) :

The Project cost:

A. Fixed Asset cost = Rs. 9, 00,000/- B. Operational cost = Rs. 33, 00,000/-

C. EMP cost = Rs. 2,65,000/-

Total cost = Rs. 44,65,000/-

113,173

40. EMP Cost : The total EMP cost is about Rs. 2,65,000/- 113,173

41. Disclosure RQP : M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,

RQP/MAS/183/2004/A

59,121,14 1

42.

Soft copy of the Form–1,

Pre –feasibility report and Mining plan in CD.

:

There is enclosed Soft copy for form –1, Pre – feasibility report and mining plan in CD.

257

43.

Key map showing the approach roads to the site to be attested by the

Deputy/ Assistant Director of

Geology and Mining of the

concerned District.

:

The Route map showing with approach roads to the site is enclosed Plate No: IC

147

44.

Village map with S.F. Nos& salient

features such as vegetation,

habitations etc., for a radius of 500m around the quarry site.

:

Village map with S.F.No and Salient features such as vegetation, habitation etc., for 500mt radius is enclosed as Plate no. VIII & Annexure - III

149

45.

If lakes, Ponds, river, nallah, odai etc. are situated near the quarry site permission from the concerned PWD authorities for mining

There is no Rivers/Stream, Lakes, and Reservoir within the 500m distance to the lease applied area.

Tank is situated within the radius of 500m.

49,173,20 7

46.

Section map for mining to be attested by the Deputy/ Assistant Director of Geology and Mining of the concerned District.

:

The Geological Plan and section in 1:1000 & 1:500 scale is enclosed: IV.

155

47.

Photograph of the proposed Mining site with S.F.No and attested by at least VAO.

:

The Photo of the quarry site is enclosed. 205

48. Form –I To be signed by applicant : I am hereby signed 53

49.

Pre- Feasibility Report to be signed

by applicant. :

Pre-feasibility report has been signed by the applicant 221

50. First and last page and the page at which quantity of mining has been :

First page and last page and the quantity proposed in the plan have been signed by the Commissioner of Geology

(9)

worked out to be signed by the

Deputy/Assistant Director of

Geology and Mining of the

concerned District.

and Mining.

51.

Affidavit from the applicant that child labor is not being employed in

the mining activity. :

It is been ensured that the labor will not be employed less than 18 years, No child labor will engaged or entertained for any kind of quarrying operations. All the labor engaged for quarrying operations will be insured during the quarry lease period.

249,251

52.

Affidavit from the applicant

regarding planting of trees around the quarry site in fulfillment of the Green belt commitment furnished.

:

Affidavit from the applicant regarding the proposal for planting trees around the quarry and fulfillment of greenbelt commitment is enclosed

249,251

53.

Details (POD) Regarding

communicating the proposal to the members of the committee.

:

1. Signature of the applicant

For M/s.M.C.B. Granites and Exports Pvt.Ltd.,

(Srinivasan Madhu) Managing Director

2. Signature of the Recognized qualified person

M. Ifthikhar Ahmed, M.Sc., F.G.S., M.B.A., M.M.E.A.,

(10)

NADUVANAPALLI BLACK GRANITE (DOLERITE) QUARRY LEASE APPLIED AREA (2.81.0Ha)

M/s. M.C.B. Granites and Exports Pvt.Ltd., has applied for Environmental clearance for the proposed

quarry Black Granite for over an extent of 2.81.0Ha in S.F.No: 79, 80, 258/2B, 258/6A & 258/6B

of Naduvanapalli Village in Krishnagiri Taluk, Krishnagiri District. Salient features of the proposal are as follows:

S. No:

Details of the proposal

: Data furnished Page No:

1. Name of the Owner +

Firm

: M/s.M.C.B. Granites and Exports Pvt.Ltd.,

No.315, Mahalakshmi Towers, Opp. To TNEB, Royakotta road, Hosur,

Krishnagiri District -635109 Mobile No: 91597 77770

3,19,55,1 23,165

2. Location of the

quarry-S.F.No.

: S.F.No: 79, 80, 258/2B, 258/6A & 258/6B of

Naduvanapalli Village in Krishnagiri Taluk, Krishnagiri District

3,19,55,1 23,165

3. Purpose of Application : It is a Black Granite quarry Project in Naduvanapalli

Village.

3,19,55,1 23,167

4. Extent of quarry in Ha- : 2.81.0Ha 3,19,55,1

23,165

5. Land use planning

a) Mining b) Storage of Topsoil over burden c) Infrastructure Road d) Utilized Area Total : Description Area to be Required at the present

Mining Plan period(ha)

Area at the end of life of quarry (Ha)

Area under quarry 0.56.8 0.80.0

Waste dump 0.37.0 0.37.0 Infrastructure 0.01.0 0.01.0 Roads 0.01.0 0.01.0 Green Belt 0.20.0 0.73.2 Stocking blocks 1.65.2 0.88.8 Grand Total 2.81.0 2.81.0 23,119,21 1 6. Production (quantity in m3)

: The proposed quantity (10%) is about 1860m3 (or) 329

Lorry Loads of Black Granite for a period of five years. Per year for lorry loads = 329 lorry loads/5 years =66 lorry loads per year.

Total number of effective working days = 280days per year

Per months for lorry loads = 66 lorry loads /12 months (280days)= Maximum 5 lorry load per month

The applicant proposed up to a depth of 10m

(2m topsoil + 3m weathered rock + 5m Black Granite) for a period of five years.

Descriptio n ROM (m3 ) Reser ves 10% (m3 ) waste 90% (m3 ) Weathe red rock (m3 ) Top soil (m3 ) Side burde n (m3 ) Geological reserves 223000 22300 200700 65256 43504 25664 0 Mineable Reserves 75035 7504 67531 22152 17168 4710 Five years reserves 18600 1860 16740 13986 11352 - 17,91,93, 97,169

7. Top soil & overburden (quantity in m3)

: The thickness of Gravelly soil is about 2m. The

generation of topsoil about 11352m3 for a period of five years.

(11)

8. Method of Mining : The quarrying operation will be carried out by Open cast semi mechanized mining method with 5.0m vertical bench with a bench width of 5.0m is being proposed.

23,95,169

9. Life of Mine as per

approved mining plan

: Mining license applied for period of twenty years only.

Mining plan period for the first five years

57,83,123 10. Height / width of the

bench

: Height 5.0m & Width 5.0m 23,95,169

11. Source of water / quantity required : Quantity required (in litres) Source 33,171

a. Drinking & Domestic Purpose

0.3 KLD Packaged drinking water is available from the approved water vender

b. Dust Suppression 0.3KLD From Existing bore hole on nearby quarry

C. Afforestation 0.4 KLD From Existing bore hole on nearby quarry

12. Waste water

Sewage water Mode of disposal

: :

There is no waste water. 37,213

The septic tank is constructed on permanent structure with in the quarry lease area.

To local Panchyat Authority

13. APC Measures : 1.Mist Spray using water tankers,

2. Enclosed covered system. (Tarpaulin) for transportation.

39,

14. Ariel distance of nearest habitation : S. N o Name of the Village Approximate Distance & Direction from lease

hold area Approximate population 1. Vepanapalli 2km – NE 1200 2. Kadavarapalli 2km – NW 300 3. Nachikuppam 3km – NW 500 4. Naduvanapalli 1km – SE 300 5. Thattatharai 5km – S 400 6. Verupasandhiram 5km – SW 500 49,111209

15. Ariel distance from

Reserve forest, Sensitive

areas, Forest, Bird

sanctuaries, Wild life

sanctuaries, National

parks, Monuments etc., within 15km

: Naralapalli reserved forest is situated 6km away from the

SE side of the area. Bird Sanctuaries – Nil Wild life sanctuaries - Nil National Park – Nil Monuments – Nil

49,173,20 7

16. Land owner ship

document Own patta land Lease

Govt. Poromboke

: : :

It is a Patta land; vide Patta no. 81. It is a company own patta land.

83,129

17. Land use classification : It is New proposal Black Granite Quarry Project in

Naduvanapalli Village.

3,19,55,1 23,169

18. Mining plan prepared by

:

M.IFTHIKHAR AHMED, M.Sc., F.G.S.,M.B.A., M.M.E.A,

RQP/MAS/183/2004/A

59,121,14 1

19. Approved by : The Mining Plan was Approved by the Commissioner of

Geology and Mining, Chennai vide Letter. No:

8856/MM5/2015 Dated: 10.02.2016.

55

20 Precise area statement

Approved by

: The Precise area communication letter was issued by the

Principal Secretary, Industries (MME.2) Department

Government of Tamilnadu, Chennai vide Letter No:

17456/MME2/2015-1, dated:18.01.2016

123

(12)

22. Nearby lake / river/ odai / channel etc.

: There is no Rivers/Stream, Lakes, and Reservoir within

the 500m distance to the lease applied area. Tank is situated within the radius of 500m.

49,173,20 7

23. Latitude / Longitude : 12°41'40"N to12°41'48"N

78°10'23"E to 78°10'31"E

17,83,169

24. GI Sheet No. : 57 L/02 17,83,169

25. Project Cost(Project cost +EMP cost)

: The Project cost:

A. Fixed Asset cost = Rs. 9, 00,000/-

B. Operational cost = Rs. 33, 00,000/-

C. EMP cost = Rs. 2,65,000/-

Total cost = Rs. 44,65,000/-

113,173

26. EMP Cost (Capital and

recurring)

: The total EMP cost is about Rs. 2,65,000/- 113,173

27. Water table : The Ground water is about 55mt depth from ground

level.

29,85,169

28. Interstate boundary : The interstate boundary is situated 3km away from the

Eastern side of the area.

49,173,20 7

29. Western Ghats : There is no Western Ghats region within the radius of

15km.

49,173,20 7

(13)

From:

M/s.M.C.B. Granites and Exports Pvt.Ltd.,

No.315, Mahalakshmi Towers,

Opp. To TNEB, Royakotta road,

Hosur,

Krishnagiri District -635109

Mobile No: 91597 77770

To:

THE CHAIRMAN,

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,

PANAGAL BUILDING, SAIDAPET,

CHENNAI

Sir,

Sub: Submission of Approved Mining Plan (

Letter. No: 8856/MM5/2015 Dated:

10.02.2016

) Form–1 and Pre-feasibility report and Mining plan for obtaining

Environmental Clearance for our Naduvanapalli Black Granite (Dolerite) Quarry

Lease applied area- Reg.,

****************

I am here by submitting the processing fee in the form of demand draft for rupees one

lakh, along with Form-1 and Pre-feasibility report and Mining plan to your good office for

obtaining clearance from SEIAA, Chennai, for our Naduvanapalli Black Granite (Dolerite)

quarry Lease applied area for over an extent of

2.81.0Ha

in

S.F.No. 79, 80, 258/2B, 258/6A &

258/6B

of Naduvanapalli Village, Krishnagiri Taluk and Krishnagiri District, Tamilnadu.

I have submitted all the relevant documents to your good office to the best of our

knowledge. If any clarifications are required, we are ready to submit the same to your office at

your convenient time. Also we are ready to present the project in front of the committee.

Hence we request your good office to kindly process our application and allow us to

present our project at the earliest.

Thanking you.

Yours sincerely

For M/s.M.C.B. Granites and Exports Pvt.Ltd.,

(Srinivasan Madhu)

Managing Director

Place: Krishnagiri

References

Related documents

In this paper, we discuss theoretical and numerical aspects by extending the results of Broek et al., 2003; Engwerda, 2005,2006 in the deterministic case to the

DGAT2 (A) protein expression and MTP (B) activity in liver from rats fed an obesogenic diet for six weeks, and then fed a standard diet (C), or a standard diet supplemented

As we decreased the stimulus size keeping other parameters constant, speed tuning curves shifted toward slower speeds, meaning that for a smaller stimulus, neurons preferred a

ned and expanded in culture and slower rate of human tooth embryogenesis are the barriers to be overcome for successful clinical application of concepts of tissue

1. Diffusion and Boltzmann expansion 2. RF oscillating sheaths for IEDF tailoring 4. Double Layers and beam instabilities 5. Positive and negative ion beams.. RFEA principle electron

Imagine your mum opening up an email from you featg a jaunty narrative of driver para controlador de ethernet para gigabyte ga-631m- es2c v2 Problem was solved, but now, when

A central aim of this research was to investigate how painting could provide an experience of major world issues from which we are, for the most part, removed. Visual information

Comparando a produção de biomassa no lenho (Tabela 2) com a quantidade de nutrientes estocados no mesmo (Tabela 3), verifica-se que para nitrogênio e cálcio,