Ada County Highway District • 3775 Adams Street • Garden City, ID • 83714 • PH 208 387-6100 • FX 345-7650 • www.achdidaho.org
Mary May, President Kent Goldthorpe, Vice-President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner
Planning & Programming
12 Oct 2020
STAFF REPORT
TO:
FROM:
Edinson Bautista - Sr. Transportation Planner - [email protected]
SUBJECT:
2020 Master Street Map Update Adoption
MEETING:
Commission Meeting - 28 Oct 2020
ATTACHMENT(S):
Mary May, President Kent Goldthorpe, Vice-President Rebecca W. Arnold, Commissioner Sara M. Baker, Commissioner Jim D. Hansen, Commissioner
Committed to Service
Planning & Project Management Division
October 8, 2020
TO:
Commissioners, Director, and Deputy Directors
FROM:
Edinson Bautista, Sr. Transportation Planner
SUBJECT:
2020 Master Street Map Update
Staff Report for the October 21, 2020
Commission Meeting
___________________________________________________________________________________
Executive Summary
During the October 21
stmeeting, staff will present the 2020 Master Street Map update for
consideration for adoption.
Facts & Findings
The Master Street Map (MSM) was formally adopted on January 27, 2010 along with the Master Street
Map Purpose and Amendment Procedures (section 3111 in ACHD’s Policy Manual). Section 3111
requires a review and update to the Map be completed every 2 years. The MSM was last amended on
May 16, 2018.
The MSM is an element of the Transportation/Land Use Integration Plan (TLIP) and serves the
following purposes:
• Define a shared vision of the future roadway network between ACHD and its partner agencies
based on approved Comprehensive Plans and street typologies
• Establish a county-wide right-of-way preservation map
• Establish an existing and future collector network map
Per ACHD Policy 3111.3, the Master Street Map may only be amended in response to development
application or comprehensive plan modifications initiated by ACHD’s partner agency.
The proposed MSM includes the following major amendments:
• Hill Rd, Gary Ln to 36
thSt. - Reduction of the planned number of lanes from 3 lanes to 2 lanes
• Maple Grove Rd, Fairview Ave. to McMillan Rd - Reduction of the planned number of lanes
from 5 lanes to 3 lanes
• Overland Rd, Linder Rd to Locust Grove Rd - Reduction of the planned number of lanes from 7
lanes to 5 lanes
The proposed modifications are consistent with the 2020 Capital Improvement Plan update and have
been reviewed and agreed to at a staff level by ACHD’s partner agencies.
On July 9
th, ACHD received a letter from the City of Boise council requesting additional modifications
including addition of roundabouts at Lake Hazel Road at Apple Street and Amyx Road/Freight, review
of the planned number of lanes at Warm Springs Ave from Wise Way to Eckert Road, and addition of
Mitchell St extension, north and south of Amity Rd. After review of these requests, ACHD Staff
included the addition of the identified roundabouts. The remaining requests do not conform with prior
approvals by the City and Commission regarding the planned developments in these areas and therefore
are not recommended for inclusion at this time.
Fiscal Implications
The MSM provides ACHD with a clear strategy for right-of-way to be preserved for future build-out of
the roadway system. By preserving for future needs through development, ACHD is able to construct
needed improvements at a lower cost and with less disruption than would occur if the right-of-way was
not preserved.
Policy Implications
The MSM is developed in partnership with ACHD’s land use partners. It presents a shared vision to
meet future transportation needs for all modes. Regular review of the MSM is required as per ACHD
Policy Manual Section 3111 to allow adaptations and modifications to be made, continuing to ensure
future plans meet ACHD and its partners shared vision. The MSM is also a key tool that is used for
project development, scoping, and is directly tied to the ACHD Integrated Five-Year Work Plan and
Capital Improvements Plan.
Alternatives
1. Adopt Resolution 2324 approving the Master Street Map and associated tables as amended.
2. Do not adopt Resolution 2324. Provide specific direction to staff for modifications.
Recommendation
Staff recommends the Commission adopt Resolution 2324 approving the Master Street Map as
amended.
Attachment(s)
Resolution 2324 Approving the Master Street Map Amendment
11 X 17 List of Proposed Modifications
11 X 17 Draft of MSM Amendment
11 X 17 Draft of Amended Roundabout Layer
11 X 17 Draft of Amended MSM with Segment Numbers
RESOLUTION 2324 – APPROVAL AND ADOPTION OF ADA COUNTY HIGHWAY
DISTRICT’S MASTER STREET MAP - 1
RESOLUTION NUMBER 2324
BY THE ADA COUNTY HIGHWAY DISTRICT BOARD OF COMMISSIONERS:
SARA M. BAKER, REBECCA W. ARNOLD, JIM D. HANSEN, KENT GOLDTHORPE,
AND MARY MAY
A RESOLUTION PROVIDING FOR THE APPROVAL AND ADOPTION OF ADA
COUNTY HIGHWAY DISTRICT’S MASTER STREET MAP.
WHEREAS, Ada County Highway
District (“ACHD”) is the single countywide highway
district in and for Ada County, Idaho created pursuant to Idaho Code, Chapter 14, Title 40,
and has exclusive jurisdiction over the public right-of-way; and
WHEREAS, pursuant to Idaho Code Section 67-6508, and 67-6517, the ACHD Master
Street Map serves as a planning tool that works in concert with ACHD’s partner
agencies comprehensive plans and future acquisitions maps. The Master Street Map
creates a shared vision between ACHD and its partner agencies by capturing
information about future roadway characteristics based on land use plans and
transportation goals; and
WHEREAS, the ACHD Master Street Map incorporates three products of the
Transportation Land Use Integration Plan (“TLIP”) that was developed to establish a
planning framework for ACHD to interact with its partner agencies, specifically: 1) a shared
vision of the future roadway network between ACHD and its partner agencies based upon
approved Comprehensive Plans and street typologies; 2) a county wide right-of-way
preservation map; and 3) an existing and future collector network map; and
WHEREAS, at its regular meeting on January 27, 2010, the Ada County Highway District
Board of Commissioners approved and adopted Resolution 920, establishing a new
Section 3111 of the ACHD Policy Manual entitled “Master Street Map Purpose and
Amendment Procedures” which in part, sets forth the purpose of the Master Street Map
and identifies the elements of the Master Street Map; and
WHEREAS, ACHD staff has prepared and amended and updated the Master Street Map
for the Ada County Highway District Board of Commissioner’s consideration, approval, and
adoption, as set forth in Exhibit “A” attached hereto; and
WHEREAS, it is in the best interest of the citizens of Ada County, Idaho, for the Ada
County Highway District Board of Commissioners to approve and adopt the amended
and updated Master Street Map as set forth in Exhibit “A” attached hereto.
NOW, THEREFORE, BE IT RESOLVED, by the Ada County Highway District Board of
Commissioners that it does hereby approve and adopt the amended and updated
Master Street Map as set forth in Exhibit “A” attached hereto.
RESOLUTION 2324 – APPROVAL AND ADOPTION OF ADA COUNTY HIGHWAY
DISTRICT’S MASTER STREET MAP - 2
BE IT FURTHER RESOLVED that the Master Street Map shall be in full force and
effective immediately upon adoption and approval.
ADOPTED AND APPROVED by the Board of Commissioners of the Ada County
Highway District at its regular meeting held on this 28
thday of October 2020.
ADA COUNTY HIGHWAY DISTRICT
BOARD OF COMMISSIONERS
By: _____________________________
By: _____________________________
Mary May, President
Kent Goldthorpe, Vice President
By: _____________________________
By: _____________________________
Rebecca W. Arnold, Commissioner
Sara M. Baker, Commissioner
By: _____________________________
Jim D. Hansen, Commissioner
No Street Location Request City MSM 2018
1 Irving Court Five Mile to Meadwoland Drive Modify commercial collector to residential collector Boise
2 Lake Hazel/Eisenman
Intersection Modify location to reflect actual right‐of‐way for future roundabout. Boise
3 Lake Hazel Rd
Extension/Proposed Collector Orchard Rd Extension/Eisenman Rd
Include proposed roundabouts at arterial and collector intersections at Lake Hazel extension between Pleasant Valley Rd to Eisenman Rd Boise
4 Locust St/Haines St/Pierce St Franklin St to Shenandoah Dr Consolidate collectors into a single collector, recommendation Pierce Boise
5 Middlefork St Cole/Maple Grove Shift proposed alignment to not include Middlefork. Instead, align with Aquarius or Bienapfl on the west and McGlochlin on the east. Boise
6 Mitchell St Arabian/Amity Reflect existing conditions and remove connection to Amity Rd Boise
7 Mitchell St Lake Hazel Rd/Highlander Rd Add a north‐south collector that connect Highlander Rd and Lake Hazel Rd and a east‐west collector connecting Five Mile Rd and Desert Ave Boise 8 Columbia Rd ‐ new collectors
network Southeast Columbia Rd and Technology Ln Add residential collectors as proposed through development Boise
9 Production St Gowen/Lake Hazel Modify name to Apple and change planned lanes from 5 lanes to 3
lanes. Boise
10 Proposed collectors Pleasant Valley/New Pleasant Valley Consolidate collector to one connection to new Pleasant Valley and align all roads to intersect Lake Hazel at 90 degrees. Boise
11 Records Ave North of Ustick Modify commercial collector to residential collector Boise
12 Saturn Rd Targee/Victory Align proposed collector to the adjacent propety lines Boise
No Street Location Request City MSM 2018
2020 Master Street Map Update ‐ Minor Modifications
13 Saxton Ave and Bluebird Dr Pierce Park/Gary Lane Reduce classification from collector to local. Boise
14 Syringa Valley Various
Add collector network in the area north of Syringa to Gowen extension and between Cole and Orchard. Add an east‐west street that aligns with Sagebrush Way.
Boise
15 Ten Mile Creek Road Pleasant Valley/Five Mile Change from rural arterial to residential arterial Boise
16 Thomas Lane South of Franklin Align north‐south linework portion with the existing pavement. Boise
17 Utahna Rd East of Horseshoe Bend Road Reduce classification from collector to local Boise
18 Valley Heights Hubbard/Columbia Add collector Boise
19 Westminster Pl and Settlers
Ave Cole/Ustick area Modify commercial collector to neighborhood collector Boise
20 Aikens St Southeast of Eagle and State St
Need to extended Aikens Street to 2nd Street as a town center collector and designate 2nd Street from Idaho to Plaza as a TC Collector
Eagle
21 Beacon Light Rd East of Palmer Lane Extend residential arterial west to Palmer Lane. Eagle
22 Echohawk Way Hill Rd/Sadie Dr Add residential collector Eagle
23 Flint Drive Park Lane/Fisher Parkway Designate Flint Drive as a Residential Collector between Park Lane
and Fisher Parkway Eagle
24 Golden Crown Way Escalate to Floating Feather Designate as a residential collector Eagle
No Street Location Request City MSM 2018
2020 Master Street Map Update ‐ Minor Modifications
26 Idaho St East of Eagle Rd Extend collector to connect to Stierman as a town center collector Eagle
27 Lanewood Rd North of Beacon Light Extend Lanewood north of Beacon Light Rd and designate as a
residential collector. Eagle
28 Old Valley Rd Designate as a town center collector Eagle
29 Olde Park Place Aikens to Plaza Dr Designate as a town center collector Eagle
30 Plaza Dr Eagle Rd/State St Change Plaza Drive to a town center collector Eagle
31 Proposed collector South of Beacon Light (Highway
16/Palmer Lane) Designate as a commercial collector 1/4 mile south of Beacon Light Eagle
32 State St Highway 44/Ballentyne Modify to commercial minor arterial Eagle
33 Deer Flat Rd Proposed Arterial/Cloverdale Modify residential collector to residential arterial Kuna
34 Linder/Columbia Designate roadway at the intersection as Transitional/Commercial Arterial Kuna 35 Linder/Deer Flat Rd Designate roadway at the intersection as Transitional/Commercial Arterial Kuna 36 Linder/Hubbard Designate roadway at the intersection as Transitional/Commercial Arterial Kuna
37 Linder/Kuna Rd Designate roadway at the intersection as Town Center Arterial Kuna
No Street Location Request City MSM 2018
2020 Master Street Map Update ‐ Minor Modifications
39 Calderwood Dr 0.25 miles south of Overland Rd and
Meridian Rd Extend collector road to Ice Bear Way Meridian
40 Classic Dr Mid‐mile of Black Cat Rd, Ustick Rd/Cherry
Ln Remove proposed collector Meridian
41 Cobalt Dr Southeast of Franklin Rd and Ten Mile Rd Adjust alignment following existing roadway Meridian
42 Cooper Point Dr Bonito Way/Cobalt Point Way Add collector Meridian
43 Harris St Linder Rd/Meridian Rd Modify alignment to reflect approved development Meridian
44 Howry Ln Mid‐mile, south of Amity Rd, Eagle
Rd/Cloverdale Rd Modify to existing collector Meridian
45 Topaz Ave, View CIR, and
Movado Way North of Overland Rd and Movado Way Add collector at Topaz Ave, View CIR, and Movado Way Meridian
46 Peaceful Pond Dr Eagle Rd/Cloverdale Modify to show approved alignment. Meridian
47 Proposed collector Northwest of Black Cat Rd/Chinden Blvd Align to the existing collector Meridian
48 Proposed collector Mid mile collector at McDemortt between
No Street Location Request City MSM 2018
2020 Master Street Map Update ‐ Minor Modifications
49 New proposed collector Southwest of Black Cat Rd/ Chinden Blvd Add collector that connects Black Cat Rd to Levi Ln. and McDemortt
Rd to Levi Ln. Meridian
50 Proposed collector Southwest of McMillan Rd and Black Cat
Rd Modify alignment of midblock collector Meridian
51 Proposed collector Northeast of Black Cat Rd/Franklin Rd Modify proposed collector to existing and extend collector to Umbria
Hill Ave Meridian
52 Proposed collector Southwest of Black Cat Rd/Franklin Rd Adjust alignment as approved through the comprehensive plan Meridian
53 Proposed collector West leg of Ten Mile Rd and Vanguard
Way Show alignment following approved development Meridian
54 Proposed collector Northwest of Meridian and Amity Rd Remove collector since it was not required through development Meridian
55 Proposed collector Harris St/Amity Rd (mid‐mile) Revise to show approvals Meridian
56 Proposed collector Northwest of Meridian and Amity Rd Align collector following approved development Meridian
57 Proposed collector Star Rd/McMillan Rd Review the proposed collectors east of Star Rd based on the city
comprehensive plan update Meridian
58 Proposed collector Southwest Columbia and Eagle Rd Review arterial alignment with the topography and property lines
including the north‐south collector off columbia at mid‐mile. Meridian
59 Proposed roundabout Locust Grove, Amity/Victory Remove Roundabout. No justification with existing developments. Meridian
No Street Location Request City MSM 2018
2020 Master Street Map Update ‐ Minor Modifications
61 Spanish Fork Way Heavy Timber Dr/Overland Rd Add existing roadway as residential collector Meridian
62 State Ave Northeast of Pine Ave and Locust Grove
Rd Adjust alignment as approved through development Meridian
63 Tree Crest Dr Northeast of Black Cat Rd/Chinden Blvd Modify to existing Meridian
64 Waltman Ln Muscovy Ave/Meridian Rd Add existing roadway as collector and include connection to
Corporate Meridian
65 Wilson Ln Southeast of Locust Grove and Fairview
Ave Add collector that connects Locust Grove to proposed collector Meridian
66 Star Rd SH 44/ Floating Feather Rd Modify roadway classification from residential collector to
residential minor arterial Star
67 Can Ada Rd SH 44/ Lanktree Gulch Rd Modify roadway classification from residential collector to
residential minor arterial Star
68 Moyle Ave SH44/ Wildbranch St Add residential collector Star
69 Proposed Collector Short Rd/Palmer Ln Add commercial collector Star
No Street Location Request City MSM 2018
1 Glenwood Rd Mountain View Dr/Cole Rd Removal from the MSM Boise
2 Hill Rd Gary Ln/36th St Modify proposed cross section from 3 lanes to 2 lanes Boise
3 Maple Grove Rd Fairview Ave/McMillan Rd Modify proposed cross section from 5 lanes to 3 lanes Boise
4 Overland Rd Linder Rd/Locust Grove Rd Modify proposed cross section from 7 lanes to 5 lanes Meridian
FAIRVIEW AVE 20TH ST GOWEN RD FI VE M IL E R D BEACON LIGHT RD FLOATING FEATHER RD FRANKLIN RD 36TH ST M AP LE G R O VE R D MCMILLAN RD C LO VE R D AL E R D M ER ID IA N R D USTICK RD PINE AVE CHERRY LN SW AN F AL LS R D OVERLAND RD LO C U ST G R O VE R D AMITY RD COLUMBIA RD VICTORY RD STATE ST WARM SP RIN GS AV E LAKE HAZEL RD EMERALD ST C O LE R D CHINDEN BLVD DEER FLAT RD BL AC K C AT R D AMITY RD CA RTW RIG HT R D EA G LE R D PA LMER L N LI N D ER R D ST AR R D W ILL OW C RE EK R D FE DE RA L W AY LI N D ER R D TE N M IL E R D KING RD EA G LE RD KUNA MORA RD GR EE NH UR ST R D KUNA RD C AN A D A R D HUBBARD RD H W Y 16 PL EA SA N T VA LL EY RD M C DER M O TT R D BOGU S BA SIN RD TENM ILE CREEK RD BLACKS CRE EK RD MSM Arterials State System*
State System (New Alignment)* Mobility Arterials
Mobility Arterials (New Alignment) Mobility Corridor (Under Study) Residential Moblity Arterial
Residential Mobility Arterial(New Alignment) Transitional/Commercial Planned Commercial Residential Neighborhood Residential Town Center Industrial Rural
Arterial(No typology designated) Under Study
Proposed Planned Commercial Proposed Residential
Proposed Residential Neighborhood Proposed Towncenter
Proposed Industrial Proposed Rural
Proposed Arterial (No typology assigned) Proposed Under Study
MSM Collectors Commercial Industrial Residential Town Center Traditional Neighborhood Rural
Collector(No typology designated) Proposed Commercial** Proposed Industrial** Proposed Residential** Proposed Town Center**
Proposed Traditional Neighborhood** Proposed Rural**
Proposed Collector(No typology Designated)**
MSM Roundabouts***
Single Lane Multi-lane Dual Lane Triple Lane
The Ada County Highway District (ACHD) created the Master Street Map in collaboration with Ada County and its six cities to better link land-use and transportation planning. The Master Street Map is one of the key elements of the ACHD Transportation and Land Use Integration Plan. The Master Street Map is a living document and is not binding on future Commissions.
Ada County
Master Street Map
* Roadways identified as state facilities are only included to show the transportation system as a whole; planning for these corridors is under jurisdiction of the Idaho Transportation Department. ** Alignments of roadways identified as proposed collectors are subject to development review.
***Roundabouts locations may be adjusted to accommodate topographic constraints. N 16 th St S 15th St S America na Blvd E Jefferso n St N 15 th St E McKinley St N 13 th St N 8th St W Fort St E Wa rm Sp rings Ave S 3rd St N 23 rd S t S 9th St N 9th St N 6th St N 2n d St S 16 th St S 12 th St S 13th S t S 11 th St S 10 th St S Ca pitol Blvd N 4th St N 11 th St N 1s t St N 5th St N 14 th St E M yrtle St W S ho relin e Dr Interstate 184 W S tate St W M ain St W H ays St W Id aho St W B annock S t W Jefferso n St W Riv er St Inte rstate 1 84 W Main St E Reserve St W Fairview Ave E Fro nt St
Boise Downtown
µ
The Ada County Highway District (ACHD) created the Master StreetMap in collaboration with Ada County and its six cities to better link land-use and transportation planning. The Master Street Map is one of the key elements of the ACHD Transportation and Land Use Integration Plan. The Master Street Map is a living document and is not binding on future Commissions.
Ada County
Master Street Map
MSM_Roundabouts_Points
Dual-Lane
Multi-Lane
Single-Lane
Triple-Lane*
MEMR2 M R 5 M G 11 IDAH-DN TN-8 FM 5-1 US7 WS2 CL1 3-2 C L8 MR1 PI4-3 FM 11 DF3 CH3 VA 3 M W 2 UD-2 HR1-3 LI 2 M R7 HB3 US13-3 FM 9-2 BA3 LI 3 H R 1-2 MM4-1 AM10-X M R 6 TM 13 -1 I-84-I-184 EW I-84-I-184 OV3-1 LI 10 I-84-I-184 FR3 LI 9-2 MV1 LI 9-1 PR1 FL1 SH 55 -3 LG 12 OST.S1 VA1 LI4 RH1 LI 11 -1 C R 2 DC3 VI6-1 LH6-1 ER1 I-84 -I-184 AMBL VD1 SW FLL6 -2 HB2 HB1-2 I-84-I-184 FRO-11 MM2 PI3-2 EA 10 -1 LG 8-2 M G 7 C O 7 MM3-2 EA 9-2 BCNST2 HB4 C O 14 -4 FM 3 M G 12 -1 O X-2 KU7-2-1 I-84-I-184 NH2-C C O 12 I-84 -I-184 I-84-I-184 LI 1-2 VI10-1 BC3 TMC3-X KU7-3 SH16 -R-1 1 AM12 I-8 4-I-1 84 COL3 ST.S 1-DN TN-3 I-84 -I-184 BS3 ST 4 VI12 SH69-1 C L1 2-2 HB8-x FL1 DF5 WRMSPRGS-3 CHI-15 VI5-1 SG2 BBR3 10MI-2 KG5-2 BS4-1 BC 1-2 DF4 KU9 COL5-1 KU3 BL4-1 HB6 LT 1-2 FM 1-1 36TH -2 OV12 BC 8-2 AM5-2 KU5-2 TM 2-4 SH55 -9 CO16 -1 VI6-2 GOW1-2 SH44-6 OV7-2 DF6 RH2-1 EMERA1 FL1-C FR12 C O11 -1 BC 1-1 PV 7-2 FM 1-4 FM 9-4 FS TM 11 -1 MM9-2 OX-1 EX 2-2 C L1 4-2 FM 5-2 SH21-8 M G 9-2 CR3 LI 12 -2 CH I-17 PC B2-2 EA5-2 US10-3 M R 2 M G10 -2 MG 13 MS-DNTN-2 FW 1-1 EX1-2 US6-2 O R 4 HB1-5 LG 10 -2 PI5-1 HB5 US14-2 LG 2-X BA5 BC 6-1 TM 12 -1 G H2 BS6-X C O 10 -2 BC 10 -2 SH16-R-6 FR7-2 SH44-11 FR5-2 LG 11 -2 M R 3 C R 4-1 SH44-3 TM 6-1 EA 12 OV14 LI 8-2 LH6-2 OV13 CH1-1 AM2-1 M W 3 LH5-1 FL2-C SH44-4 AM11 AM3-2 FM 6 AM4-1 SH 16 -3 C AR 2 BA4 EA 10-2 TE CHW 1 PCB1 BR D W Y-10 TM 9-2 MM5-2 US11-2 SH 16-4 TM 13 -2 C O 13 -1 SH16-R-2 WRMSP RG S-1 LI 14 LH-O -NC FV1-2 US9-1 ES 2-X CHI-10 C AR 1 VA 2 FM 12 -2 SH16 -R-1 2 O R 3 SH 55 N -2 FM 13 TM 1-2 SH44-14 BBR2 C R 1 M G 5 ST.S-2 M G 2 MM7 CHI-7 C L2 M D M T6 EA 1-5 HB6-X BA2 CHI-1 SH 69-2 H BL VD US1 MM1 CHI-3 SH 55 N -3 SH44-1 COL1 M G 1-N C FR6 SH 55 -1 0 C O 5 EA 11 AP-OVER-EXT-1 SH44-2-2 CHI-5 BC 13 ST 1 US4 LI 16 VI2 KU1 KU6 VI1 OV4 DF1 C A2 C L7 BC 12 FV6 LH1 SW FL L2 US3 FR2 AM7 BL1-1 TM 5 C L4 KG10 ST 2 US5 LG 2 VI9 FR1 COL7 M D M T1 CHI-4 C A1 FV3 SH69 -5 LH2 SH 69 -3 CHI-8 LG 1 COL6 M D M T7 LH3 CH2 FV2 M G 2-X LG 6 LG 3 KG6 PI2 LI 7 LI 5 KG4 LI 6 M DM T2 LH7 C L3 KG1 BC 7 BC 4 FR4 EA 4 M D M T8 BC 5 KU2 SH 69 -7 SH 55 -1 1 LG 7 SH 69-8 CH4 FM 7-2 BC 2 COL2 VI3 VI7 SH 69 -6 M G 6 TM 4 OV6 LH9 TM 7 SH 55 -1 2 PV 4 LH4 KG12 C O 4 FM 8 HB7 TM 3 KU8 AM9 SH 69 -4 C L9 BC 1-3 M D M T4 AM1 LH8 OV8 KG11 FR9 KMR3 EA 6 LG 4 OV9 AM8 M G 8 US8 US2 PV 5 FV5 FR8 MM8 LI 15 CHI-6 KG7 M D M T3 C L6 KG9-X CHI-2 BC 11 VI8 C L5 FV4 MM6 AM6 SH44-8 LG 5 CO 7-NC KG8-X EA 3 LH11-X PV 6 VM1 VI11 VI4 OV11 KG3 FV7 C L1 -4 KG2 TCRC-2 C O 6 EA 8 EA 7 CHI-13 G R 1 EA2 LH10 WW PBLV D MG 4-X CH I-16 36TH -3 BL4-2 NH1 BL4-3 FL4 BA1 M G 1 SG1 TC RC -3 O X-3 AER-X HR 1-1 SH55 N-5 LG 1-X LH12-X BA3 SH55N -4 ES1 SH21-6 DC2 DF6 SH44-5 MG3-X FL3 GH1 ST 3 FH-N L4 BS6-1 SW FL L1 CW-BBR-N C1 CO-AMX-NC CW 1 FOR 1 BL5 FM 2 FL5 TMC2 FH -N L2 BL3 CHPRL2-X SH 55 -13 TE CHW 2-X SH 69 -X -A LT 1-2 APP HR1-5 KMR1 ST.S-1 KMR5 BR SH 16-6 PV 8 DC1 LI13 FH-NL1 TMC1 W RM SP RG S-6 CLBA SW FL L4 W CR K-1 SH44-7 W CR K-2 FH-NL 3 CHPR L2 SH16 -1-2 KMR4 SH 16-5 GOW1-1 I-84-I-184 LH13-X AER SH 16-1 FW2 SH55 N-6 KMR2 KMR6 BB R 1-2 SH21-10 I-84-I-18 4 I-84-I-1 84 I-84-I-184 I-84-I-184 I-84-I-184 I-84-I-184 CHI-9 I-84 -I-184 MSM Arterials State System*
State System (New Alignment)* Mobility Arterials
Mobility Arterials (New Alignment) Mobility Corridor (Under Study) Residential Moblity Arterial
Residential Mobility Arterial(New Alignment) Transitional/Commercial Planned Commercial Residential Neighborhood Residential Town Center Industrial Rural
Arterial(No typology designated) Under Study
Proposed Planned Commercial Proposed Residential
Proposed Residential Neighborhood Proposed Towncenter
Proposed Industrial Proposed Rural
Proposed Arterial (No typology assigned) Proposed Under Study
MSM Collectors Commercial Industrial Residential Town Center Traditional Neighborhood Rural
Collector(No typology designated) Proposed Commercial** Proposed Industrial** Proposed Residential** Proposed Town Center**
Proposed Traditional Neighborhood** Proposed Rural**
Proposed Collector(No typology Designated)**
MSM Roundabouts***
Single Lane Multi-lane Dual Lane Triple Lane
The Ada County Highway District (ACHD) created the Master Street Map in collaboration with Ada County and its six cities to better link land-use and transportation planning. The Master Street Map is one of the key elements of the ACHD Transportation and Land Use Integration Plan. The Master Street Map is a living document and is not binding on future Commissions.
Ada County
Master Street Map
* Roadways identified as state facilities are only included to show the transportation system as a whole; planning for these corridors is under jurisdiction of the Idaho Transportation Department. ** Alignments of roadways identified as proposed collectors are subject to development review.
***Roundabouts locations may be adjusted to accommodate topographic constraints. 16TH -DNT N-2 CB 3-DNTN -4 6T H-DNTN -1 15TH -DNT N-4 FRO-8 MYR-5 IDAH -DNTN-5 JEFF -DNT N-12 MS-D NTN-10 MYR-10 ST.S 1-DN TN-2 JEFF -DNTN-16 JEFF -DNTN-8 FRO-4 IDAH -DNTN-2 JEFF -DNTN-3 IDAH -DNTN-8 MS-D NTN-16 FRO-1 MS-D NTN-6 IDAH -DNTN-13 MS-D NTN-13 MYR-8 FRO-6 HAY S-DN TN-2 ST.S 1-DN TN-8 5T H-DNTN -3 WS2 FS CB 3-DNTN -1 9T H-DNTN -2 15TH-DNTN-1 AB-D NTN ST.S1-DN TN-5 FRO-9 MYR-1 MY R-3 FT-D NTN CB 2-DNTN -3 MYR-11 BRDW Y FRO-11 AMBLVD 2 ST.S1-D NTN-1 FV-DNTN-3 ST.S1-DN TN-3 MS-DNTN-2 9T H-DNTN -1 I-84-I-184
Boise Downtown
Master Street Map: Arterial Street List (DRAFT)
Street Code Street Name Street Typology Existing Lanes Planned Lanes: Construction Planned Lanes: Preservation
ROW: Project
ROW:
Preservation Parking Comments Related Studies
10MI‐1 10MILE INTERCHANGE INTERSTATE NFI* NPI* NPI*
10MI‐2 10MILE INTERCHANGE INTERSTATE NFI* NPI* NPI*
10MI‐3 10MILE INTERCHANGE INTERSTATE NFI* NPI* NPI*
10MI‐4 10MILE INTERCHANGE INTERSTATE NFI* NPI* NPI*
10MI‐5 10MILE INTERCHANGE INTERSTATE NFI* NPI* NPI*
10MI‐6 10MILE INTERCHANGE INTERSTATE NFI* NPI* NPI*
15TH‐DNTN‐1 15TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
15TH‐DNTN‐10 15TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
15TH‐DNTN‐11 15TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
15TH‐DNTN‐12 15TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
15TH‐DNTN‐2 15TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
15TH‐DNTN‐3 15TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
15TH‐DNTN‐4 15TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
15TH‐DNTN‐5 15TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
15TH‐DNTN‐6 15TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
15TH‐DNTN‐7 15TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
15TH‐DNTN‐8 15TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
15TH‐DNTN‐9 15TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
16TH‐DNTN‐1 16TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐2 16TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐3 16TH ST Towncenter Arterial 4 NFI* 4 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐4 16TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐5 16TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐6 16TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐7 16TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐8 16TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
16TH‐DNTN‐9 16TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
27TH‐1 27TH ST Towncenter Arterial 4 NFI* 4 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
27TH‐2 27TH ST Towncenter Arterial 4 NFI* 4 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
27TH‐3 27TH ST Neighborhood Residential Arterial 3 NFI* 3 NPI* 74 Restriping, Roadway to Bikeway Master Plan:
Level 2
27TH‐4 27TH ST Towncenter Arterial 3 NFI* 3 NPI* 74 Restriping, Roadway to Bikeway Master Plan:
Level 2
27TH‐5 27TH ST Neighborhood Residential Arterial 3 NFI* 3 NPI* 74 Restriping, Roadway to Bikeway Master Plan:
Level 2
36‐CW‐NC 36TH‐CARTWRIGHT
CONNECTION Residential Arterial (New) 0 NFI* 2 NPI* 62 Northwest Foothills Transportation Plan
36TH‐1 36TH ST Neighborhood Residential Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
36TH‐2 36TH ST Residential Arterial 3 NFI* 3 NPI* 74 Roadway to Bikeway Master Plan: Level 2 Northwest Foothills Transportation Plan
36TH‐3 36TH ST Neighborhood Residential Arterial 2 NFI* 3 NPI* NPI*
5TH‐DNTN‐1 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
5TH‐DNTN‐2 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
5TH‐DNTN‐3 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
5TH‐DNTN‐4 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
5TH‐DNTN‐5 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
5TH‐DNTN‐6 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
5TH‐DNTN‐7 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
5TH‐DNTN‐8 5TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
6TH‐DNTN‐1 6TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
6TH‐DNTN‐2 6TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
6TH‐DNTN‐3 6TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
6TH‐DNTN‐4 6TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI*
6TH‐DNTN‐5 6TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
6TH‐DNTN‐6 6TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
6TH‐DNTN‐7 6TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
6TH‐DNTN‐8 6TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
8TH‐DNTN 8TH ST Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 1
9TH‐DNTN‐1 9TH ST Mobility Arterial 4 NFI* 4 NPI* NPI*
9TH‐DNTN‐2 9TH ST Towncenter Arterial 4 NFI* 4 NPI* NPI*
9TH‐DNTN‐3 9TH ST Towncenter Arterial 4 NFI* 4 NPI* NPI*
NFI*: No Funded Improvement
Master Street Map: Arterial Street List (DRAFT)
Street Code Street Name Street Typology Existing Lanes Planned Lanes: Construction Planned Lanes: Preservation
ROW: Project
ROW:
Preservation Parking Comments Related Studies
9TH‐DNTN‐4 9TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
9TH‐DNTN‐5 9TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
9TH‐DNTN‐6 9TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
9TH‐DNTN‐7 9TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
9TH‐DNTN‐8 9TH ST Towncenter Arterial 3 NFI* 3 NPI* NPI*
AB‐DNTN AVENUE B Towncenter Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
AER AERIE LN To Be Decided 0 NFI* 2 NPI* TBD
AER‐X Foothills recommended
street links To Be Decided 0 NFI* 2 NPI* TBD
AM1 AMITY RD Rural Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 80,81, Roadway
to Bikeway Master Plan: Level 3
AM10 AMITY ROAD Industrial Arterial 2 NFI* 3 NPI* 74 South Meridian Transportation Plan
AM10‐X AMITY RD‐EXTENSION Industrial Arterial(New) 0 NFI* 3 NPI* 74
AM11 AMITY RD Industrial Arterial 2 NFI* 2 NPI* 76 Roadway to Bikeway Master Plan: Level 3
AM11‐X AMITY RD‐EXTENSION Industrial Arterial(New) 0 NFI* 3 NPI* 74
AM12 AMITY RD Industrial Arterial 2 NFI* 2 NPI* 76 Roadway to Bikeway Master Plan: Level 3
AM12 AMITY RD Industrial Arterial 2 NFI* 2 NPI* 76 Roadway to Bikeway Master Plan: Level 3
AM2‐1 AMITY RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 69, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM2‐2 AMITY RD Planned Commercial Arterial 2 5 5 97 100 Meridian Pathways: Comment 69, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM3‐1 AMITY RD Planned Commercial Arterial 2 5 5 97 100 Meridian Pathways: Comment 69,72, Roadway
to Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM3‐2 AMITY RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 69,72, Roadway
to Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM4‐1 AMITY RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 79, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM4‐2 AMITY RD Planned Commercial Arterial 2 5 5 97 100 Meridian Pathways: Comment 73, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM5‐1 AMITY RD Planned Commercial Arterial 2 5 5 97 100 Meridian Pathways: Comment 73, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM5‐2 AMITY RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 74,78, Roadway
to Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM6 AMITY RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 78, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
AM7 AMITY RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 3
AM8 AMITY RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
AM9 AMITY RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
AMBLVD1 AMERICANA BLVD Neighborhood Residential Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
AMBLVD1 AMERICANA BLVD Neighborhood Residential Arterial 4 NFI* 4 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
AMBLVD2 AMERICANA BLVD Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
AMX‐X AMYX LN‐EXTENTION Towncenter Arterial(New) 0 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
AP‐OVER‐EXT‐1 AIRPORT‐OVERLAND
EXTENSION Residential Arterial (New) 0 NFI* 3 NPI* 78
Subject to development, Roadway to Bikeway
Master Plan: Level 2 Airport‐Overland Study
AP‐OVER‐EXT‐2 AIRPORT‐OVERLAND
EXTENSION Residential Arterial (New) 0 NFI* 3 NPI* 78
Subject to development, Roadway to Bikeway
Master Plan: Level 2 Airport‐Overland Study
AP‐OVER‐EXT‐3 AIRPORT‐OVERLAND
EXTENSION Planned Commercial Arterial (New) 0 NFI* 3 NPI* 78
Subject to development, Roadway to Bikeway
Master Plan: Level 2 Airport‐Overland Study
APP APPLE ST Industrial Arterial(New) 0 NFI* 3 NPI* 78
APS1 APPLE ST Trasitional/Commercial Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
AV1‐1 AVALON ST Towncenter Arterial 2 3 5 87 96 Roadway to Bikeway Master Plan: Level 2
AV1‐2 SH‐69 STATE NFI* NPI* NPI*
BA1 BOISE AVE Neighborhood Residential Arterial 2 NFI* 2 NPI* NPI* E Roadway to Bikeway Master Plan: Level 2
BA2 BOISE AVE Neighborhood Residential Arterial 3 NFI* 3 NPI* NPI* E Roadway to Bikeway Master Plan: Level 2
BA3 BOISE AVE Neighborhood Residential Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
BA3 BOISE AVE Neighborhood Residential Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
BA4 BOISE AVE Neighborhood Residential Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
BA5 BOISE AVE Neighborhood Residential Arterial 2 NFI* 2 NPI* NPI* E Roadway to Bikeway Master Plan: Level 2
BBR1‐1 BOGUS BASIN RD Rural Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 1
NFI*: No Funded Improvement
Master Street Map: Arterial Street List (DRAFT)
Street Code Street Name Street Typology Existing Lanes Planned Lanes: Construction Planned Lanes: Preservation
ROW: Project
ROW:
Preservation Parking Comments Related Studies
BBR1‐2 BOGUS BASIN RD Rural Arterial 2 NFI* 2 NPI* NPI* Ada County Request: Bike Lanes Desired,
Roadway to Bikeway Master Plan: Level 1
BBR2 BOGUS BASIN RD Neighborhood Residential Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2 Hackberry Ranch Subdivision: See Commission notes
BBR3 BOGUS BASIN RD Planned Commercial Arterial 2 NFI* 2 NPI* NPI* E Roadway to Bikeway Master Plan: Level 2
BBR4 BOGUS BASIN RD Towncenter Arterial 3 NFI* 3 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
BC10‐1 BLACK CAT RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 26,39, TenMile Interchange Plan, Roadway to Bikeway Master Plan: Level 3 BC10‐2 BLACK CAT RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 26,39, TenMile Interchange Plan, Roadway to Bikeway Master Plan: Level 3
BC11 BLACK CAT RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 26, Roadway to
Bikeway Master Plan: Level 3
BC1‐1 Kuna Comprehensive Plan (
New Alignment) Residential Arterial (New) 0 NFI* 3 NPI* 78
BC12 BLACK CAT RD Residential Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 11,15, Roadway
to Bikeway Master Plan: Level 3 BC1‐2 Kuna Comprehensive Plan (
New Alignment) Residential Arterial (New) 0 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
BC13 BLACK CAT RD Residential Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 4,11, Roadway to
Bikeway Master Plan: Level 3
BC1‐3 BLACK CAT RD To Be Decided 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
BC2 BLACK CAT RD To Be Decided 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
BC3 BLACK CAT RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
BC4 BLACK CAT RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
BC5 BLACK CAT RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
BC6‐1 BLACK CAT RD Rural Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 82, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
BC6‐2 BLACK CAT RD Residential Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 82, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
BC7 BLACK CAT RD Residential Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 68, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
BC8‐1 BLACK CAT RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3 South Meridian Transportation Plan
BC8‐2 BLACK CAT RD Residential Arterial 2 5 5 97 100 Roadway to Bikeway Master Plan: Level 3 South Meridian Transportation Plan
BC9‐1 BLACK CAT RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 46, Roadway to
Bikeway Master Plan: Level 3 South Meridian Transportation Plan
BC9‐2 BLACK CAT RD Residential Arterial 2 5 5 97 100 Meridian Pathways: Comment 39,40,46,
Roadway to Bikeway Master Plan: Level 3 South Meridian Transportation Plan
BCNST1 BEACON ST Neighborhood Residential Arterial 4 NFI* 4 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
BCNST2 BEACON ST Neighborhood Residential Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
BL1‐1 BEACON LIGHT RD Residential Arterial 2 NFI* 3 NPI* 78 E Roadway to Bikeway Master Plan: Level 3
BL1‐2 BEACON LIGHT RD Planned Commercial Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 3
BL2 BEACON LIGHT RD Planned Commercial Arterial 2 3 3 TBD 100 In accordance with the Commission's direction and intent, the Master Street Map will reflect that ACHD will no longer preserve right of way for a proposed five‐lane Beacon Light Road but will instead preserve 96 feet of right of way, only with developmen, Roadway to Bikeway Master Plan: Level 3 NFI*: No Funded Improvement NPI*: No Planned Improvement 3 of 23
Master Street Map: Arterial Street List (DRAFT)
Street Code Street Name Street Typology Existing Lanes Planned Lanes: Construction Planned Lanes: Preservation
ROW: Project
ROW:
Preservation Parking Comments Related Studies
BL3 BEACON LIGHT RD Residential Arterial 2 3 3 TBD 100 In accordance with the Commission's direction and intent, the Master Street Map will reflect that ACHD will no longer preserve right of way for a proposed five‐lane Beacon Light Road but will instead preserve 96 feet of right of way, only with developmen, Roadway to Bikeway Master Plan: Level 3 BL4‐1 BEACON LIGHT RD Rural Arterial 2 3 3 TBD 100 In accordance with the Commission's direction and intent, the Master Street Map will reflect that ACHD will no longer preserve right of way for a proposed five‐lane Beacon Light Road but will instead preserve 96 feet of right of way, only with developmen, Roadway to Bikeway Master Plan: Level 3 BL4‐2 BEACON LIGHT RD Rural Arterial 2 3 3 TBD 100 In accordance with the Commission's direction and intent, the Master Street Map will reflect that ACHD will no longer preserve right of way for a proposed five‐lane Beacon Light Road but will instead preserve 96 feet of right of way, only with developmen, Roadway to Bikeway Master Plan: Level 3 BL4‐3 BEACON LIGHT RD Rural Arterial 2 3 3 TBD 100 In accordance with the Commission's direction and intent, the Master Street Map will reflect that ACHD will no longer preserve right of way for a proposed five‐lane Beacon Light Road but will instead preserve 96 feet of right of way, only with developmen, Roadway to Bikeway Master Plan: Level 3 BL5 BEACON LIGHT RD Rural Arterial 2 3 3 TBD 100 In accordance with the Commission's direction and intent, the Master Street Map will reflect that ACHD will no longer preserve right of way for a proposed five‐lane Beacon Light Road but will instead preserve 96 feet of right of way, only with developmen, Roadway to Bikeway Master Plan: Level 3
BR BAKER RD Residential Arterial 2 NFI* 2 NPI* NPI*
BRA1 BRIDGE AVE Transitional/Commercial Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
BRDWY BROADWAY AVE Towncenter Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
BRDWY‐1 BROADWAY STATE NFI* NPI*
BRDWY‐10 BROADWAY STATE NFI* NPI*
BRDWY‐11 BROADWAY STATE NFI* NPI*
BRDWY‐12 BROADWAY STATE NFI* NPI*
BRDWY‐13 BROADWAY STATE NFI* NPI*
BRDWY‐14 BROADWAY STATE NFI* NPI*
BRDWY‐15 BROADWAY STATE NFI* NPI*
BRDWY‐2 BROADWAY STATE NFI* NPI*
BRDWY‐3 BROADWAY STATE NFI* NPI*
BRDWY‐4 BROADWAY STATE NFI* NPI*
BRDWY‐5 BROADWAY STATE NFI* NPI*
BRDWY‐6 BROADWAY STATE NFI* NPI*
NFI*: No Funded Improvement
Master Street Map: Arterial Street List (DRAFT)
Street Code Street Name Street Typology Existing Lanes Planned Lanes: Construction Planned Lanes: Preservation
ROW: Project
ROW:
Preservation Parking Comments Related Studies
BRDWY‐7 BROADWAY STATE NFI* NPI*
BRDWY‐8 BROADWAY STATE NFI* NPI*
BRDWY‐9 BROADWAY STATE NFI* NPI*
BS1 BROOKESIDE LN Residential Arterial (New) 0 NFI* 2 NPI* 62
BS2 BROOKESIDE LN Towncenter Arterial(New) 0 NFI* 2 NPI* 62
BS3 BROOKESIDE LN Residential Arterial (New) 0 NFI* 2 NPI* 62
BS4‐1 BROOKESIDE LN Residential Arterial 3 NFI* 5 NPI* 96
BS4‐2 BROOKESIDE LN Residential Arterial 2 NFI* 2 NPI* NPI*
BS5 BROOKESIDE LN Residential Arterial 2 NFI* 5 NPI* 96
BS6‐1 BROOKESIDE LN To Be Decided 0 NFI* 2 NPI* TBD
BS6‐2 BROOKESIDE LN To Be Decided 0 NFI* 5 NPI* TBD
BS6‐X Foothills recommended
street links To Be Decided 0 NFI* 2 NPI* TBD
BW1 BOWN WAY Towncenter Arterial 2 NFI* 2 NPI* NPI* E Roadway to Bikeway Master Plan: Level 2
CA1 CAN ADA RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3
CA2 CAN ADA RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3
CAR1 CAN ADA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
CAR2 CAN ADA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
CAR2 CAN ADA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
CB1‐DNTN‐1 CAPITOL BLVD Mobility Arterial 4 NFI* 4 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB1‐DNTN‐5 CAPITOL BLVD Mobility Arterial 6 NFI* 6 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB2‐DNTN2 CAPITOL BLVD Mobility Arterial 4 NFI* 4 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 2
CB2‐DNTN‐3 CAPITOL BLVD Mobility Arterial 3 NFI* 3 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 2
CB2‐DNTN4 CAPITOL BLVD Mobility Arterial 3 NFI* 3 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB3‐DNTN‐1 CAPITOL BLVD Mobility Arterial 4 NFI* 4 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB3‐DNTN‐2 CAPITOL BLVD Towncenter Arterial 2 NFI* 2 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB3‐DNTN‐3 CAPITOL BLVD Towncenter Arterial 2 NFI* 2 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB3‐DNTN‐4 CAPITOL BLVD Towncenter Arterial 2 NFI* 2 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB3‐DNTN‐5 CAPITOL BLVD Towncenter Arterial 2 NFI* 2 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 3
CB4‐DNTN‐1 CAPITOL BLVD Towncenter Arterial 1 NFI* 1 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 2
CB4‐DNTN‐2 CAPITOL BLVD Towncenter Arterial 1 NFI* 1 NPI* NPI* Capital Boulevard Streetscape Plan, Roadway to
Bikeway Master Plan: Level 2
CH1‐1 CHERRY LN Planned Commercial Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 25, Roadway to
Bikeway Master Plan: Level 2
CH1‐2 CHERRY LN Residential Arterial 2 NFI* 5 NPI* 100 Meridian Pathways: Comment 26, Roadway to
Bikeway Master Plan: Level 2
CH2 CHERRY LN Residential Arterial 5 NFI* 5 NPI* NPI* Meridian Pathways: Comment 26, Roadway to
Bikeway Master Plan: Level 2
CH3 CHERRY LN Mobility Arterial 5 NFI* 5 NPI* NPI* Meridian Pathways: Comment 27
CH3 CHERRY LN Mobility Arterial 5 NFI* 5 NPI* NPI* Meridian Pathways: Comment 27
CH3 CHERRY LN Mobility Arterial 5 NFI* 5 NPI* NPI* Meridian Pathways: Comment 27
CH4 CHERRY LN Mobility Arterial 5 NFI* 7 NPI* 124 Roadway to Bikeway Master Plan: Level 3 Fairview Avenue Corridor Management Strategy
CHI‐1 CHINDEN BLVD STATE NFI* NPI*
CHI‐10 CHINDEN BLVD STATE NFI* NPI*
CHI‐11 CHINDEN BLVD STATE NFI* NPI*
CHI‐12 CHINDEN BLVD STATE NFI* NPI*
CHI‐13 CHINDEN BLVD STATE NFI* NPI*
CHI‐14 CHINDEN BLVD STATE NFI* NPI*
CHI‐15 CHINDEN BLVD STATE NFI* NPI*
NFI*: No Funded Improvement
Master Street Map: Arterial Street List (DRAFT)
Street Code Street Name Street Typology Existing Lanes Planned Lanes: Construction Planned Lanes: Preservation
ROW: Project
ROW:
Preservation Parking Comments Related Studies
CHI‐16 CHINDEN BLVD STATE NFI* NPI*
CHI‐17 CHINDEN BLVD STATE NFI* NPI*
CHI‐18 CHINDEN BLVD STATE NFI* NPI*
CHI‐19 CHINDEN BLVD STATE NFI* NPI*
CHI‐2 CHINDEN BLVD STATE NFI* NPI*
CHI‐20 CHINDEN BLVD STATE NFI* NPI* Roadway to Bikeway Master Plan: Level 3
CHI‐21 CHINDEN BLVD STATE NFI* NPI*
CHI‐22 CHINDEN BLVD STATE NFI* NPI*
CHI‐3 CHINDEN BLVD STATE NFI* NPI*
CHI‐4 CHINDEN BLVD STATE NFI* NPI*
CHI‐5 CHINDEN BLVD STATE NFI* NPI*
CHI‐6 CHINDEN BLVD STATE NFI* NPI*
CHI‐7 CHINDEN BLVD STATE NFI* NPI*
CHI‐8 CHINDEN BLVD STATE NFI* NPI*
CHI‐9 CHINDEN BLVD STATE NFI* NPI*
CHPRL2 CHAPPARRAL RD Rural Arterial 2 NFI* 2 NPI* TBD
CHPRL2‐X Foothills recommended
street links To Be Decided 0 NFI* 2 NPI* TBD
CL10 CLOVERDALE RD Residential Arterial 5 5 5 90 96 Roadway to Bikeway Master Plan: Level 3
CL11‐1 CLOVERDALE RD Industrial Arterial 5 5 5 93 96 Roadway to Bikeway Master Plan: Level 2
CL11‐2 CLOVERDALE RD Residential Arterial 2 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CL11‐2 CLOVERDALE RD Residential Arterial 2 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CL11‐3 CLOVERDALE RD Towncenter Arterial 2 5 5 88 96 Roadway to Bikeway Master Plan: Level 2
CL12‐1 CLOVERDALE RD Towncenter Arterial 5 5 5 88 96 Roadway to Bikeway Master Plan: Level 2
CL12‐2 CLOVERDALE RD Residential Arterial 5 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CL12‐3 CLOVERDALE RD Planned Commercial Arterial 5 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CL13‐1 CLOVERDALE RD Planned Commercial Arterial 5 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CL13‐2 CLOVERDALE RD Residential Arterial 5 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CL13‐2 CLOVERDALE RD Residential Arterial 5 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CL1‐4 CLOVERDALE RD Rural Arterial 2 NFI* 3 NPI* 100 Roadway to Bikeway Master Plan: Level 3
CL14‐1 CLOVERDALE RD Residential Arterial 5 NFI* 5 NPI* 96 Roadway to Bikeway Master Plan: Level 2 Northwest Foothills Transportation Plan
CL14‐2 CLOVERDALE RD Trasitional/Commercial Arterial 5 NFI* 5 NPI* 96 Roadway to Bikeway Master Plan: Level 2 Northwest Foothills Transportation Plan
CL2 CLOVERDALE RD Rural Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL3 CLOVERDALE RD Rural Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL4 CLOVERDALE RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL5 CLOVERDALE RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL6 CLOVERDALE RD Residential Arterial 2 5 5 90 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL7 CLOVERDALE RD Residential Arterial 2 5 5 90 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL8 CLOVERDALE RD Residential Arterial 2 5 5 90 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL8 CLOVERDALE RD Residential Arterial 2 5 5 90 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL8 CLOVERDALE RD Residential Arterial 2 5 5 90 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CL9 CLOVERDALE RD Residential Arterial 2 5 5 90 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CLBA COLUMBIA Residential Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
CO10‐1 COLE RD Neighborhood Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO10‐2 COLE RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CO11‐1 COLE RD Neighborhood Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO11‐2 COLE RD Residential Arterial 3 NFI* 3 NPI* 75 E Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO12 COLE RD Residential Arterial 5 NFI* 5 NPI* 96 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO12 COLE RD Residential Arterial 3 NFI* 3 NPI* 75 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO13‐1 COLE RD Industrial Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO13‐2 COLE RD Industrial Arterial 7 NFI* 7 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CO14‐1 COLE RD Trasitional/Commercial Arterial 7 NFI* 7 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CO14‐2 COLE RD Trasitional/Commercial Arterial 7 NFI* 7 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CO14‐3 COLE RD Residential Arterial 5 5 5 90 96 Roadway to Bikeway Master Plan: Level 2
CO14‐4 COLE RD Trasitional/Commercial Arterial 5 5 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CO15‐1 COLE RD Trasitional/Commercial Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CO15‐2 COLE RD Trasitional/Commercial Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CO15‐3 COLE RD Trasitional/Commercial Arterial 4 NFI* 4 NPI* NPI* Level 2 from Fairview to Maxwell
CO16‐1 COLE RD Residential Arterial 4 NFI* 4 NPI* NPI* Level 2 from Wilshire to Fairview
CO16‐2 COLE RD Residential Arterial 4 NFI* 4 NPI* NPI*
NFI*: No Funded Improvement
Master Street Map: Arterial Street List (DRAFT)
Street Code Street Name Street Typology Existing Lanes Planned Lanes: Construction Planned Lanes: Preservation
ROW: Project
ROW:
Preservation Parking Comments Related Studies
CO17‐1 COLE RD Neighborhood Residential Arterial 4 NFI* 4 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
CO17‐2 COLE RD Neighborhood Residential Arterial 3 3 3 NPI* NPI*
CO4 COLE RD Industrial Arterial 2 NFI* 2 NPI* NPI*
CO5 COLE RD Residential Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CO6 COLE RD Rural Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO7 COLE RD Rural Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO7‐NC COLE RD‐NEW CONNECTION Rural Arterial (New) 0 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
CO8‐NC COLE RD‐NEW CONNECTION Neighborhood Residentiall Arterial(New) 0 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO9 COLE RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3 South West Boise Study
CO9‐NC COLE RD‐NEW CONNECTION Residential Arterial (New) 0 NFI* 3 NPI* 100 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
CO‐AMX‐NC COLE RD‐AMYX EXTENTION Residential Arterial (New) 0 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South West Boise Study
COL1 COLUMBIA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
COL2 COLUMBIA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
COL3 COLUMBIA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
COL3 COLUMBIA RD Transitional/Commerciall Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2
COL4‐1 COLUMBIA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South Meridian Transportation Plan
COL4‐1 COLUMBIA RD Transitional/Commerciall Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South Meridian Transportation Plan
COL4‐2 COLUMBIA RD Transitional/Commerciall Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South Meridian Transportation Plan
COL5‐1 COLUMBIA RD Transitional/Commerciall Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South Meridian Transportation Plan
COL5‐2 COLUMBIA RD Residential Arterial 2 NFI* 3 NPI* 78 Roadway to Bikeway Master Plan: Level 2 South Meridian Transportation Plan
COL6 COLUMBIA RD Residential Arterial 2 NFI* 3 NPI* 78 Meridian Pathways: Comment 95, Roadway to
Bikeway Master Plan: Level 2 South Meridian Transportation Plan
COL7 COLUMBIA RD Residential Arterial 2 NFI* 3 NPI* 78 Meridian Pathways: Comment 95,96, Roadway
to Bikeway Master Plan: Level 2 South Meridian Transportation Plan
CR1 CURTIS RD Residential Arterial 3 NFI* 3 NPI* NPI* E Roadway to Bikeway Master Plan: Level 2
CR2 CURTIS RD Planned Commercial Arterial 4 NFI* 4 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CR2 CURTIS RD Planned Commercial Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CR3 CURTIS RD Trasitional/Commercial Arterial 5 NFI* 5 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
CR4‐1 CURTIS RD Residential Arterial 4 NFI* 4 NPI* NPI* Level 2 from Plymouth to Fairview, Roadway to
Bikeway Master Plan: Level 3
CR4‐2 CURTIS RD Residential Arterial 6 NFI* 6 NPI* NPI* Roadway to Bikeway Master Plan: Level 3
CW1 CARTWRIGHT RD Rural Arterial 2 NFI* 2 NPI* NPI*
Ada County Request: Include wide shoulders for bike/ped, Roadway to Bikeway Master Plan: Level 2
Northwest Foothills Transportation Plan
CW1 CARTWRIGHT RD Rural Arterial 2 NFI* 2 NPI* NPI*
Ada County Request: Include wide shoulders for bike/ped, Roadway to Bikeway Master Plan: Level 2
Northwest Foothills Transportation Plan CW‐BBR‐NC1 CART WRIGHT‐BOGUS BASIN
ROAD CONNECTION Rural Arterial (New) 0 NFI* 2 NPI* 62 Roadway to Bikeway Master Plan: Level 2 Northwest Foothills Transportation Plan
DC1 DRY CREEK RD Residential Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
DC2 DRY CREEK RD Residential Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
DC3 DRY CREEK RD Towncenter Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
DC4 DRY CREEK RD Residential Arterial 2 NFI* 2 NPI* NPI* Roadway to Bikeway Master Plan: Level 2
DF1 DEER FLAT RD Residential Arterial 2 NFI* 2 NPI* 96 Roadway to Bikeway Master Plan: Level 1
DF2 DEER FLAT RD Residential Arterial 3 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 2
DF3 DEER FLAT RD Residential Arterial 3 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 2
DF3 DEER FLAT RD Transitional/Commercial Arterial 3 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 2
DF4 DEER FLAT RD Residential Arterial 3 5 5 90 100 Roadway to Bikeway Master Plan: Level 3
DF4 DEER FLAT RD Transitional/Commercial Arterial 3 5 5 90 100 Roadway to Bikeway Master Plan: Level 2
DF5 DEER FLAT RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3
DF5 DEER FLAT RD Transitional/Commercial Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3
DF6 DEER FLAT RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 3
DF6 DEER FLAT RD Residential Arterial 2 NFI* 5 NPI* 100 Roadway to Bikeway Master Plan: Level 2
NFI*: No Funded Improvement