EXPO 2016 ANTALYA
GUIDE FOR LOGISTICS,
Content
Logistics Procedures
1. Transport Plan and Time Limitations
2. Required Documents on arrival of materials in Turkey
3. Transportation Loading and Unloading of Materials
4. Place of Delivery for the Materials
5. Unpacking and Delivery of the Exhibition Materials
6. Packaging
7. Shipping Marks
8. Insurance
9. Logistics Center and Storages
10. Return Shipment of Goods
Customs Procedures
11. Customs Inspection
12. Taxes and Charges
13. Entry and Exit of Goods in Expo Site
14. Loading and Unloading Services
Quarantine Procedures
15.
Goods
Prohibited
from
Entry
16. General Conditions and Instructions
17.
Contact
Info
Annex
-1 List
of
Exhibition
Materials
Annex
-2
Section
Layout
Plan
Annex -3
Application Form for Storage Service
Annex
-4 Employment
Lease
Form
Annex -5
Employment and Equipment Lease Form
Annex -6
Designated Logistics Service Providers
2
2
3
3
4
4
5
5
5
7
7
7
7
8
8
10
10
11
12
13
14
15
16
EXPO 2016 ANTALYA
GUIDE FOR LOGISTICS, CUSTOMS and QUARANTINE
Logistics Procedures
1. Transport Plan and Time Limitations
1.1. Official Participants are advised to use the Antalya Airport and Antalya Seaport for the entrance of their goods to Turkey.
1.2. The list of goods and articles related to EXPO 2016 Antalya which are not for personal use and which will be brought to Turkey by an Official Participant, shall be submitted at least 45 days (different periods of time shall apply for plants) prior to their shipment, to complete the necessary procedures and obtain the entrance permission of the Customs Office and Inspection and Quarantine Authority. The documents indicating the goods and articles related to EXPO 2016 Antalya shall be presented at the port of entry.
1.3. The transport plan shall include the name of the transportation company, packing list, departure and arrival date and shipment plan for post EXPO 2016 Antalya.
2. Required Documents on arrival of Materials in Turkey Required Documents for Declarations:
• Customs Declaration • Custom Clearance • Bill of Lading / Air Waybill
• Invoice (company seal and signature)
←
• Delivery Order
Required Documents for Customs:
• Customs Clearance Instructions ( company seal) • Bill of Lading / Air Waybill
• Invoice (company seal and signature) • Certificate of Origin ( Packing ID)
• Packing List (company seal and signature) • Transport Contract (company seal and signature) • Delivery Order
2.2. For sea shipment, The Organizer recommends Official Participants to employ FCL (Full Container Load). LCL (Less than Container Load) is not advised as it usually takes 1-2 weeks to separate goods after their arrival to ports, which may delay the arrangement of the exhibition materials.
2.3. The list of exhibition products and other materials (Annex-1) and the layout plan (Annex-2) must be delivered to the logistics services provider (accredited by the Organizer or which is selected by the Official Participants) at least 20 days in advance of the date of arrival in Antalya at the exhibition area.
2.4. Customs documents shall be submitted to the customs officials by the logistics service provider at least 3 days in advance of the arrival of materials at the Antalya exhibition area.
2.5. The list of exhibition products and other materials (Annex-1) the layout plan (Annex-2) shall be signed by the Commissioner General of Section or authorized representative and submitted to the Organizer to follow customs clearance, tax procedures and monitoring logistics operations.
3. Transportation Loading and Unloading of Materials
3.1. Official Participants are responsible for the transportation, handling and discharging of the goods which will be used during EXPO.
3.2. Official Participants may choose their transportation companies for transporting their goods and exhibition materials to the EXPO 2016 Antalya Customs area. The list of accredited logistics service providers (Annex-6) is provided by the Organizer.
3.3. Official Participants are obliged to appoint a representative in Turkey who will be responsible of fulfilling the procedures for transportation, customs clearance and handling of cargo and shall submit the contact information to the Organizer. Official participants shall also notify the Organizer of their first shipment of goods 60 days prior to arrival.
3.4. The Organizer shall cover transportation costs for the entrance and exit of plants and materials intended for the building of stands of Official Participants from the Turkish national border (customs post, port, and airport) to the EXPO 2016 Antalya site.
4. Place of Delivery for the Materials
4.1. The shipper’s name and consignee’s name should be the same on transportation documents. The title of the Organizer should not be written on the documents as the consignee.
5. Delivery of the Exhibition Items and Unpacking
5.1. After Official Participants or their authorized representatives complete the relevant procedures for customs clea-rance and inspection, exhibition items are delivered to participants’ gardens and/or their storages by the Organizer.
6. Packaging
6.1. Official Participants are responsible for taking all kinds of measures for the safety of exhibition products and other materials against any collision, displacement of packages, or exposure to weather conditions (storm, rain, etc.) during transportation.
6.2. Packaging with Wood
6.2.1. Official Participants are recommended to use wooden packaging if they have the goods to be shipped back after Expo ends. Wooden packages must be disinfected.
6.2.2. The exhibition products and materials shall be packaged in cases or crates suitable for re-use during their re-shipment.
6.2.3. The cargo with wooden packaging material (including wood pallets) is subject to inspection and quarantine procedures according to international inspection and quarantine requirements for cargo with wood packaging material. All kinds of wooden packing materials (pallet, crates, boxes, wedges, etc. with thickness less than 6 mm) must be treated (heat treatment or methyl bromide fumigating) and marked by authorized companies.
6.2.4. Wooden packaging materials shall be labeled with the International Plant Protection Convention (IPPC) mark and ISPM 15 standard.
6.2.5. If wooden packages are not labeled or marked with the special marking prescribed by IPPC, the desig-nated logistics service providers will ship them back to the country of origin.
6.3. Packing for Return Shipment
6.3.1. The exhibition materials which will be shipped back after the end of Expo 2016, will be packed by the logistics service providers of Official Participants or their representatives.
6.3.2. Without the confirmation by the Organizer and approval by the customs, the Official Participants shall not carry or transport any exhibits out of the area before, during and after the EXPO 2016 Antalya.
7. Shipping Marks
Official Participants or their logistics service providers shall label each piece of shipment at least on two sides of the package with standard shipping marks. The format is given below:
Organization Name ( EXPO Name) EXPO 2016 Antalya International Horticultural Exposition
Country of Origin
Gross / Net Weight (kg) (kg)
Size: Length x Width x Height (cm) (cm)
Official Participant Package No.
For each package that weighs more than 1000 kg, its “Top,” “Front,” “Back,” “Fragile,” “Vertical,” and “Lifting Point”
shall be indicated outside the package in accordance with international warning signs. The packages are required to stand upright.
8. Insurance
Official Participants are recommended to have their exhibition materials insured against transportation risks.
9. Logistics Center and Storages
Logistics Center and storages are located in the south west of EXPO 2016 Antalya area.
←
←
9.1. The Organizer shall allocate dry storages (20m2) within the EXPO Site for Official Participants. For storage, The
Storage Application Form (Annex-3) shall be filled.
9.2. Maximum two (2) personnel who are assigned by Official Participants and who are notified to the Organizer will be allowed enter the storage area.
9.3. Logistics activities are categorized in 4 steps:
9.3.1. Pro-EXPO
9.3.2. Inside the EXPO Site
9.3.3. Outside the EXPO 2016 Site
9.3.4. Post-EXPO
9.3.1. Pro-EXPO
The construction of Outdoor Gardens may start on October 1, 2015 at the earliest, and shall be completed by March 15, 2016 at the latest. Official Participants and Non- Official Participants shall carry out their construction works
between 08.00 am and 6.00 pm.
Installation Date and Time for Long Term Indoor Gardens
The installation of Indoor Gardens may start on December 15, 2015 at the earliest, and shall be completed by March 15, 2016 at the latest. Official Participants and Non- Official Participants shall carry out their construction works
between 08.00 am and 6.00 pm.
Installation Date and Time Short Term Periods for Indoor Gardens
The installation of Indoor Gardens will start after signing the Participation Contract and the approval of the participa-tion, and seven (7) days prior to starting date of the each period. The installation will be completed six (6) days. The Indoor Gardens will be ready one (1) the day prior to starting date of the each period.
Official Participants and Non- Official Participants shall carry out their construction works between 08.00 am and 6.00 pm.
9.3.2. Inside the EXPO 2016 Site
23 Nisan – 30 Ekim 2016 tarihleri boyunca Resmi Katılımcılar, Organizatörü üç (3) gün önce bilgilendirmek koşulu ile taşınmasını talep edecekleri malzemeler, her gün 08:00 – 02:00 saatleri arasında kendilerine tahsis edilen depo alanından bahçelerine, bahçelerinden depo alanına Organizatör tarafından ücretsiz olarak yapılacaktır.
9.3.3. Outside the EXPO Site
Between April 23 and October 30, 2016, Official Participants shall submit their transport requests to the Organizer three (3) days prior. The transportation from the warehouses within the EXPO Site to the gardens will be performed by the Organizer free of charge between 08.00 am to 02.00 pm.
9.3.4. Post-EXPO
Official Participants who wish to dismantle their outdoor gardens, will carry out dismantling works starting on No-vember 1, 2016 at the earliest and complete by November 30, 2016 at the latest. The exhibition areas shall return as they are received to Organizer. Dismantling will be carried out between 08.00 am and 6.00 pm.
Dismantling Date and Time for Long-Term Indoor Gardens
Indoor gardens will be dismantled after the Expo ends. Dismantling will start on November 1, 2016 at the earliest, and will be completed on November 30, 2016 at the latest. Dismantling will be carried out between 08.00 am and
6.00 pm.
Short-Term Periods for Indoor Gardens
1 st Period April 23 - May 23, 2016 2 nd Period May 24 - June 24, 2016 3 rd Period June 25 - July 25, 2016 4 th Period July 26 - August 26, 2016
5 th Period August 27 - September 27, 2016
6 th Period September 28 - October 30, 2016
9.4. If Official Participants shall require cold storage and refrigerator vehicle, they shall hire them from their logistics service providers at their own cost.
10.Return Shipment of Goods
Customs procedures of return shipment of goods shall be done by logistics service providers of Official Participants after EXPO 2016 Antalya ends.
Customs Procedures
11. Customs Inspection
11.1. Organizer will establish a customs area at the EXPO 2016 Antalya site. Official Participants shall go through formalities for customs declaration, inspection and quarantine for imports within a specified period of time which will be determined by the Turkish Customs, the inspection and quarantine authorities, and the Organizer.
12. Taxes and Charges
12.1. Official Participants shall fulfill all obligations associated with the payment of the relevant fees and taxes incur-red in connection with transportation, customs clearance, inspection and quarantine, storage and handling of cargo.
13. Entry and Exit of Goods to Expo Site
13.1. The entry of goods into Customs Inspection and Quarantine Area in the site and exit of goods from site will be carried out in accordance with the Organizer’s directives regarding the schedule and the special routes to be used.
13.2. The exit of goods from the site is subject to a written approval of the Turkish Customs and Inspection and Qua-rantine authorities, and an exit permit issued by the Organizer.
14. Handling Services
14.1. For exhibition materials that are heavy and oversized or that require special loading and positioning, the repre-sentative appointed by the Official Participant shall be present at the EXPO Site beforehand and provide a detailed layout diagram.
14.2. For goods to be delivered to Turkish custom territory, the relevant provisions of the Paris Convention of Novem-ber 22, 1928 relating to International Exhibitions and the relevant provisions of Customs Annex of the Paris Conven-tion shall be implemented.
Goods to benefit from temporary admission are as follows:
14.2.1. The exhibition materials, supplies and equipment imported by Official Participants during EXPO 2016 Antalya shall be treated as goods imported on a temporary basis. Those to be re-exported after the end of EXPO 2016 Antal-ya shall be exempted from customs duty and import VAT. Those to be retained for use or sale are subject to customs, inspection and quarantine procedures, applicable customs duty and import VAT according to regulations.
14.2.2. Exhibition materials, supplies and equipment mentioned in paragraph 1 include: • Goods and items for display or demonstration during EXPO 2016 Antalya;
• Goods and items required for demonstrating the exhibited machines or instruments;
• Construction and decoration materials, machinery and equipment which Official Participants need for ins-talling temporary exhibition stands, their maintenance and dismantling;
• Furniture, decorations, office supplies, consumables to be used by Official Participants for the performance of their duties;
• Films, presentations, video cassettes, sound cassettes, user manuals, advertisement materials, CDs, and exhibition devices to be used for the presentation and promotion of the exhibitions.
• Imported performance supplies, transportation means and special vehicles required for the presentation of EXPO-related cultural events organized by Official Participants.
Quarantine Procedures
15. Goods Prohibited from Entry
The following goods are prohibited to be imported imported to Turkey: • All kinds of narcotic substances,
• Silk-worm sperm,
• Prohibited Plants and Plant Products according to the Country of Origin (Table 1),
• Gaming equipment and machines (roulette, tilt, table football, and similar automatic or semi-automatic gaming equipment and machines used by the hands or feet and which require chance and fortune or skills),
• Counterfeit-origin goods and envelopes (counterfeit-origin goods and all kinds of empty envelopes, tapes, label stamps, and similar goods to be used on goods of Turkish origin and to indicate them to be of another country of origin or to give such an impression, written or printed with a foreign language and invoices for foreign compa-nies not resident in Turkey and of a nature capable of showing documents which may be issued in Turkey as if they were issued in other countries, whether signed or not signed)
• Ozone depleting substances,
• Chemicals part of the annex of the Chemical Weapons Convention, • Bulk alcoholic beverages,
Tablo 1:Prohibited Plants, Plants Products and Country of Origin
The list of plants, plant products, and growing environments which are banned from entry is given in Plant Quaranti-ne Regulation Annex III. However, in the part on Special Conditions of Annex IV of the same Regulation, importation of plants with vegetative soil and growing medium turf is permitted to be subject to plant health controls.
Please see the following link:
In Turkish:
http://mevzuat.basbakanlik.gov.tr/Metin.Aspx?MevzuatKod=7.5.15548&MevzuatIliski=0&sourceXmlSearch=-karantinas%C4%B1
In English
http://www.tarim.gov.tr/Sayfalar/EN/Mevzuat.aspx?OgeId=15
Regulation on plant quarantine
Excluding plants with soil and growing medium turf specified in the “Special Requirements” section in Annex-4; Agriculture intended:
PLANTS AND PLANT PRODUCTS COUNTRIES OF ORIGIN
Soil All countries
Natural fertilizer All countries
Cotton unseed All countries
Woods of Coniferales (as fuel) All countries
Isolated barks of Castanea Mill., Quercus L., Acer saccharum, Populus L. All countries Of the family Palmae (Arecaceae);
Areca catechu (Areca palm), Arecastrum romanzoffianum, Arenga pinnata, Borassus flabellifer, Brahea armata, Butia capitata, Calamus merillii,
Caryota maxima (Giant Mountain Fishtail Palm), C. cumingii,
Cocos nucifera (Coconut palm),
Corypha gebang, (Syn.:C. elata, C. utan), Elaeis guineensis (African oil palm), Howea forsteriana,
Jubea chilensis, Livistonia australis,
Livistona decipiens (Syn.:Livistona decora) (Ribbon Fan Palm), Metroxylon sagu,
Oreodoxa regia (Syn:Roystonea regia) (West Indian palm), Phoenix canariensis (Canary Island date palm),
P. dactylifera (Date palm), P. sylvestris (Silver date palm),
Sabal umbraculifera (Syn.:Sabal palmetto, Cabbage palmetto), Trachycarpus fortunei (Syn.:Chamaerops excelsa) (Chusan Palm), Washingtonia spp.,
Chamaerops humilis,
Plants of Phoenix theophrasti and of the family Agavaceae
Plants of Agave americana intended for planting, having a diameter of the stem at the base of over 5 cm, other than fruits and seeds
Egypt, Spain, Italy, France, Greece, Bahrain, Bangladesh, Cambodia, China, India, Indonesia, Iran, Iraq, Israel, Japan, Jordan, Kuwait, Laos, Malaysia, Myanmar, Oman, Pakis-tan, Philippines, Qatar, Saudi Arabia, Singapore, Sri Lanka, Syria, Taiwan, Thailand, United Arab Emirates, Viet-nam, Australia, Papua New Guinea, Samoa, Solomon Islands
16. General Conditions and Instructions 16.1. Labour and Equipment Service Rates
For additional labour, equipment and its personnel, Official Participants shall fill and submit the “Employment Lease Form” (Annex-4), “Employment and Equipment Lease Form” ( Annex- 5) to the Organizer at least three (3) days prior of transportation of the goods. The costs of these extra services will be covered by Official Participants.
17.Contact Info Münir Galip Tuzcu
T: +90 242 242 39 76 F: +90 242 311 88 32
e-mail: munirgalip.tuzcu@expo2016.org.tr
Aziz Burak Kıvrak
T:+90 242 242 39 76 F:+90 242 311 88 32
e-mail: burak.kivrak@expo2016.org.tr
Important Note:
The time limitations mentioned in this guide aims to facilitate the management of logistics, customs and quarantine procedures properly. However, due to reasonable factors, in the case of situations out of time limitations, our agency shall continue to provide the necessary assistance and support to the participants.
Annex - 1 List of Exhibition Materials Li st of Exh ib iti on M ater ia ls Se rg i Ürü nl er i L ist esi Offic ia l P ar tic ip an t Re smi Ka tıl ım cı Pa ge N o. Sa yf a N o . 1 Tr an sp or tati on Ula şı m A ra cı
o
La nd / Kar a Ca se N o. Pa ke t No . N et Wei gh t (k g) G ros s W ei gh t (kg ) Brü t Ağ ırlık Len gth (c m ) Geni şl ik (cm ) De scr ipt io n a nd S pe ci fic at io ns in Tu rki sh Aç ıkl ama v e Ö ze lli kl er i ( Tü rkç e) De scr ipt io n a nd S pe ci fic at io ns in E ng lis h Aç ık la m a ve Ö ze llik le ri (İn gi lizce) Q uan tity M iktar Un it Pr ic e ( TL) Bi rim F iy at ( TL) To tal (TL) To pl am ( TL) To tal (US D) To pl am (U SD ) To tal C ost, In suranc e an d Fr eig ht (C IF) Va lue To pl am M al , Sig or ta , N av lu n Değ er i Re tur n Ge ri Dö nüş So ld Satı lac ak Damag ed /L ost/S to l en Hasar lı / Kay ıp / Çal ın tı Do nated Bağış Di sca rde d /De st ro ye d Atı lan / Ta hr ip Tot al (U SD) Vo lum e ( cbm ) Ha ci m (cb m ) Signa tu re of A uth or ized Pe rso n Cl ear an ce Tas fiye B ilgi si Plea se p ut a √ in th e bo x Lü tf en ku tu la ra √ koyun uz LO G ISTI CS C EN TER O F EXPO 20 16 A NT AL YA EXPO 20 16 A NT AL YA L O JİST İK M ERKE Zİo
Air / Ha va
ANN
EX I
EK-1
o
Sea / De ni z He igh t ( cm ) Yü kse kl ik (c m ) Da teAnnex - 2 Materials Layout Plan
ANNEX II
EK-2
Page No. 1 Sayfa No. 1 Official ParticipantResmi Katılımcı
Date
Tarih
Representative of Official Resmi Katılımcı Temsilcisi
GSM
Cep Telefonu
Arrival Date of Goods
Malzeme Geliş Tarihi
Other Requests
Diğer Talepler
Name of Goods
Malzmelerin Adı Case No. Kutu No.
Gross Weight (Kg) Brüt Ağırlık (kg) Net Weight (kg) Net Ağırlık (kg) Width (cm) Genişlik (cm) Height (cm) Yükseklik (cm) Volume (cbm) Hacim (cbm)
LOGISTICS CENTER OF EXPO 2016 ANTALYA
EXPO 2016 ANTALYA LOJİSTİK MERKEZİ
Section Layout Plan
Alan Yerleşim Planı
A representative shall be present on the site during customs clearance, inspection and quarantine formalities
Malzemelerin geliş tarih bilgisine göre gümrük, muayene ve karantina alanında yetkililer tarafından yapılan denetimler sırasında temsilcinizin geçici denetleme alanında mutlaka bulunması.
Please list your exhibition materials below
Lütfen sergi ürün ve malzemelerinizi aşağıda listeleyiniz.
Please inform Logistics Center in advance if any special equipment such as crane , extra forklift etc.are needed to handle the exhibition materials
Annex 3 - Application Form for Storage Service Official Participant
Resmi Katılımcı Ülke Consignor Gönderen Firma Name -Surname İsim -Soyisim Title Görevi GSM Cep Telefonu e-mail List of Goods Malzeme Listesi Weight (kg) Ağırlık (kg) Length (cm) Uzunluk (cm) Width (cm) Genişlik (cm) Height (cm) Yükseklik (cm)
Duration for storage from yy /mm/dd Depolama Süresi gün / ay / yıl Special Requests Özel Talepler Date - Signature Tarih - İmza
LOGISTICS CENTER OF EXPO 2016 ANTALYA APPLICATION FORM FOR STORAGE SERVICE
EXPO 2016 ANTALYA LOJİSTİK MERKEZİ DEPO BAŞVURU FORMU
Description of Goods
Malzemelerin Detayı
Contact Information / İletişim BilgileriOfficial Participant
Resmi Katılımcı
Date of the Lease
Kiralama Tarihi
No. of Leasing Days
Kiralama Gün Sayısı
Place to Work
Çalışma Yeri
Contact Person of Official Participant
Resmi Katılımcı Ülke İlgili Kişisi
GSM
Cep Telefonu
Applicaiton Date
Başvuru Tarihi
Type of Equipment Ekipman Türü No. of Person İnsan Gücü SayısıWorking Hours Starting Time
Mesai Saati Başlangıç
LOGISTICAL CENTER OF EXPO 2016 ANTALYA
Employment Lease Form
EXPO 2016 ANTALYA LOJİSTİK MERKEZİ
İNSAN GÜCÜ TALEP FORMU
Annex 5 - Employment and Equipment Lease Form
Official Participant
Resmi Katılımcı
Date of the Lease
Kiralama Tarihi
No. of Leasing Days
Place to Work
Çalışma Yeri
Contact Person of Official Participant
Resmi Katılımcı Ülke İlgili Kişisi
GSM
Cep Telefonu
Applicaiton Date
Başvuru Tarihi
Type of Work
İş Türü İnsan Gücü Sayısı No. of Person
Working Hours Starting Time
Mesai Saati Başlangıç
LOGISTICAL CENTER OF EXPO 2016 ANTALYA
Employment and Equipment Lease Form
EXPO 2016 ANTALYA LOJİSTİK MERKEZİ
İNSAN GÜCÜ VE EKİPMAN TALEP FORMU
Company Name DB SCHENKER ARKAS
Contact Person Coşkun Bilen Sertaç Yolcu
e-mail coskun.bilen@schenkerarkas.com.tr sertac.yolcu@schenkerarkas.com.tr
Tel +90212 465 61 45 ext.5281 +90212 465 61 45 ext.5276
Fax +90212 465 61 35 +90212 465 61 35
Company Name SOLMAZ NAKLİYAT
Contact Person Yalçın Dorman Serkan Çalışkan
e-mail yalcin.dorman@solmaz.com serkan.caliskan@solmaz.com
Tel +90212 292 13 24 +90212 292 13 24
Fax +90212 249 68 18 +90212 249 68 18
Company Name HOROZ LOJİSTİK
Contact Person Umut Zıraman Duygu Şafak
e-mail umut.ziraman@horoz.com.tr duygu.safak@horoz.com.tr
Tel +90242 258 03 98 +90212 456 10 00
Fax - -
Company Name DHL GLOBAL FORWADING
Contact Person Sevgi Gelgör Şefik Can Tekin
e-mail sevgi.gelgor@dhl.com can.tekin@dhl.com
Tel +90242 311 53 03 ext. 2104 +90242 311 53 03 ext. 2113
Fax +90242 311 53 32 +90242 311 53 32
Company Name TNT INTERNATIONAL EXPRESS
Contact Person Burcu Gökakın Diler Şaşmaz
e-mail burcu.gokakin@tnt.com diler.sasmaz@tnt.com
Tel +90242 311 20 82 +90242 311 20 82
Fax +90242 311 20 72 +90242 311 20 72
Company Name KÜHNE NAGEL
Contact Person Şakir Ekmekçioğlu Ozan Halisdemir
e-mail sakir.ekmekcioglu@kuhne-nagel.com ozan.halisdemir@kuhne-nagel.com
Tel +90212 485 48 48 +90212 485 48 48
Fax +90212 485 80 84 +90212 485 80 84
Company Name NETLOG LOJİSTİK
Contact Person Akın Altun Hüseyin Okumuş
e-mail akin.altun@netlog.com.tr huseyin.okumus@netlog.com.tr
Tel +90242 258 15 80 ext.125 +90242 258 15 80 ext.118
Fax - -
Company Name MERKÜR LOJİSTİK
Contact Person Burçin Gündoğdu Burak Gürcü
e-mail burcin@merkurgroup.com.tr burak@merkurgroup.com.tr
Tel +90242 322 56 60 +90242 322 56 60
Fax +90242 322 56 70 +90242 322 56 70
Company Name SEZGİN GÜMRÜK MÜŞAVİRLİĞİ