BSR Notes ictad

N/A
N/A
Protected

Academic year: 2021

Share "BSR Notes ictad"

Copied!
14
0
0

Loading.... (view fulltext now)

Full text

(1)

ALL RATES ARE COMMON TO

COLOMBO, GAMPAHA & KALUTARA DISTRICTS

(Rates effective from 2008.01.01 until further notice)

(2)

CONTENTS Item

Description Page

A Notes iii - xiii

B Excavation 1

C Concrete 2

D Form Work 4

E Reinforcement 5

F Brick Masonary 5

G Hollow & Solid Block Masonary 6

H Rubble Masonary 6 J Flooring Waterproofing 6 7 K Plastering 8 L Tiling 8

M Colour Washing, Painting & Polishing 10

N Doors & Windows 11

P Brass Founder 12

Q Roofing & Ceiling 12

R Gutters & Down Pipes 14

S Sanitary Fittings 15

T Plumbing 18

U Drainage 21

V Electrical Installation 24

W Metal Work 32

Y Structural Steel Work 38

Z Maintenance Work 39

AA Miscellaneous 42

(3)

iii

BUILDING SCHEDULE OF RATES General Notes

1. This Building Schedule of Rates (BSR) become operative from 01.01.2008 and shall be valid until further notice. The rates given herein are the maximum rates adoptable in preparation of Bill of Quantities of the estimates for Building Construction, Additions and Improvements and Repair (Maintenance) works. In case where the Resources are available at lesser rates depending on area and locality, such rates are to be used.

2. The rates include an overhead and profit component, but do not include VAT. Provisions should be made separately in the estimate for the payment of VAT and should also allow Contingencies (up to a maximum of 10% of the BOQ total). Provision for price escalation should be separately allowed in the estimate.

3. In preparation of Bill of Quantities, the item description shall conform to that relevant item as appearing in this Building Schedule of Rates, so as to avoid any ambiguity.

4. Recommended cement brand names for concreting, brick masonary and rubble masonary are “Holcim”, “Mahaweli Marine”, “Mitsui”, “Ambuja”, “UltraTech Ceylinco Cement” or any other brand conforming to SLS 107-2002 and approved by the Divisional Engineer based on a laboratory test report.

5. The rates indicated herein are valid only for the material conforming to the relevant standards as indicated in the covering letter and also as per under Item (8) and the workmanship and finished quality of work should conform to be following ICTAD specification document series.

(a) Specification for Building Work (SCA/4 Volume I) (b) Specification for Sanitary Installation (SCA/4 Volume II)

(c) Specification for Water Supply & Sewerage and Storm Water Drainage Work (SCA/3/2).

(d) Specification for Electrical and Mechanical Work associated with Building and Civil Engineering (SCA/8).

6. For concrete work, instructions issued by the Circular No. 2/98 and 3/98 of the Engineering Organization are to be adhered to. Before making full payment for concreting work, Divisional Engineer should get at least 3 sample cubes tested for 28 days strength at an approved testing laboratory.

7. The rates for formwork will be applicable only for the relevant form material.

8. Material specifications are as follows : (i) Concrete constituent materials :

(a) Cement – SLS 107: 2002 (b) Aggregate – BS 812/BS 882

(c) Steel Reinforcement – SLS 375/1996

Concrete mixers should be used for all reinforced concreting exceeding 1 (one) Cube. Poker vibrators should be used to compact the concrete

(4)

(ii) Ready-mix concrete shall conform to SLS 114 (iii)Hollow Blocks shall conform to SLS 855 (iv) Structural steel shall conform to BS 4360

(v) Aluminium extrusions shall conform to BS 1474 and BS 1615 and extruted from AA 6063

(vi) Structural steel should be of or 43 to conform to BS 7668: 1994 (vii) List of approved electrical fittings are as follows.

LIST OF APPROVED ELECTRICAL FITTINGS

No. Item Relevant Standard

Specifications

Recommended Brand Names

01 Sunk Switches 10A B.S. 3676 Legrand, M.K., K.I.K, Orange

02 13A Switched Socket Outlets, plugs & Adopters

B.S. 1363 Legrand, M.K., K.I.K., Orange

03 5A and 15A Switched Socket Outlets

B.S. 546 Legrand, M.K., K.I.K., Orange

04 R.C.C.B./R.C.D. B.S. 4293, IEC 1008, BS

EN 61008 F & G (Australia) Siemens (Germany) Crabtree (U.K.) Merlin Gerin (France) Legrand (France) 05 M.C.B. IEC 898 or BS.EN 60898 or IEC 947-2 or B.S. 3871:Part I F & G (Astralia) Siemens (Germany) Crabtree (U.K.) Merlin Gerin (France) Legrand (France) 06 Consumer Unit B.S. 5486 Part I & Part

13, LEC 439-1 or BS EN 60439-3 IEC 695-2-1 ABB (Germany) ABC (Singapore) Crabtree (U.K.) Hager (France) Legrand (France) 07 M.C.C.B. L.E.C. 947-2:1989 BS EN 60947-2:1992 Legrand (France) Merlin Gerin (France) Terrasaki (Japan) Klokner Moeller (Germany) Crabtree (U.K.) 08 Cu/PVC/SWA/PVC Cables Cu/PVC/PVC Cables B.S. 6346 B.S. 6004:1995 & SLS 733:1995

ACL (Sri Lanka) Wilson (Singapore) Kelani (Sri Lanka)

09 Cu/XLPE/SWA/PVC Cables

Cu/XLPE/PVC Cables

B.S. 5467B.S. 5467 ACL (Sri Lanka) Wilson (Singapore) Kelani (Sri Lanka) 10 Fluorescent Ballasts with

Screw Type Terminals

I.E.C. 920, 921 & 922 ESEN 60928

Schwabe (Germany) ATCO (Australia) B.G. (U.K.)

(5)

v 11 Fluorescent Lamps

Colour : Cool White (4000K) IEC 81 B.S. 1853 Osram (Germany) Tungsram (Hungary) Philips (Holland) GE (USA) Sylvania (USA) Westinghouse (USA) 13 Steel Enclosures (Epoxy

Powder coated finish)

I.E.C. 529 for degree of protection

BSEN 60529

Elsteel (Sri Lanka) Legrand (France) Himel (Spain) Enlotek (India) Metalix (Sri Lanka) 14 Exhaust Fans BS 5060

I.E.C. 879:1987

KDK (Japan) Alstom (UK) National (Japan)

15 PVC Conduits BS 4607 & BS 6099 National, Authon, Duro, S-lon.

16 G.I. Conduits BS 4568 Part I Matsushita, Maruichi, Pusan or any U.L. approved U.S. Brands.

17 Moeller Richardson Projects

(Pvt.) Ltd.

18 Ceiling Fans KDK, National

List of Cable brands in Sri Lanka with SLS Certificate ACL, KML, KELANI, ALUCOP, RUHUNU, KAMAL

(vii) The following timber species should be used for construction work unless otherwise specifically stated in the description of the BOQ.

Timber Usage for BSR Trade Items Approved Timber (a). Roof frame and ceiling frame Alubo, Bato Domba, Bedi-Del

(Wal-Del), Burutha, Dambu,

Daw, Dawata, Domba, Dun,

Etatibiriya, Gammalu, Hadewaka,

Halmilla, Hora (Pressure

Impregnated), Liyan, Mee, Na, Palu,

Teak, Treated Kempas, Thawvama,

Uberiya, Welipana, Wewarana.

Imported timber Balau, Bitis,

Kampur, Kempus, red Balaue,

Merbau

(b). Door, Window and Fanlight, Weld mesh Alubo, Bata-Domba, Bedi-Del (Wal frame Del), Balau, Bitis, Burutha, Dambu,

Dawata, Domba, Dun, Etatimbiriya,

Hadewaka, Halmilla, Ketakara,

Kohomba, Kolon, Kumbuk, Liyan,

Mee, Milla, Na, Palu, Sooriyamara,

Teak, Thawvama, Uberiya, Welang,

Wewarana, Welipana.

©. Door, Window & Fanlight Sashes Halmilla, Kirihambiliya, Kohomba,

Kolon, Mahogany,Sooriyamara,

(6)

(d). Timber Ceiling Planks, Panelling Cyprus, Eucalyptus Microcoris,

Kirihambiliya, Lunumidella, Tualang

(e). Valance/Barge Boards Ginisapu, Kumbuk, Wal-Del

(f). Partition Frame Cyprus

(g). Floor Boards Na, Kubuk,Sooriya mara (h). Furniture Items Etatimbiriya, Hooriyamara,

Kolon, Kohomba, Mahogany, Mee,

Na, Nadun, Sooriyamara, Teak.

(viii) All PVC pipes shall conform to SLS 147.

9. The approved rates for the following trade items listed in the following table are meant for single storeyed (Ground floor only) buildings.

Hence, allowances to be made in the rates for lift in respect of work on upper floors. The percentages indicated in the Table below should be added to obtain the rates applicable to the upper floors.

Items First Floor Second Floor Third Floor

Formwork (Sqrs) 3% 5% 7%

Plastering (Sqrs) 5% 10% 15%

Floor Tiling (Sqrs) 2% 4% 6%

Wall Tiling (Sqrs) 2% 4% 6%

Roof Calicut Tile (Sqrs) 3% 6% 9%

Roof asbestos (sqrs) 3% 5% 7%

Ceiling Works (Sqrs) 3% 5% 7%

Painting (Sqrs) 3% 6% 9%

10. Following conversion factors should apply for the rates when it is necessary to convert from the Imperial Units to Metric.

Conversion: Imperial to Metric factor (1foot x 0.3048 = metre)

To convert Rate per To Rate per Multiply the Present Rate by Cube M3 0.35 Square M2 0.108 Sq.ft. M2 10.76 L.ft. M 3.28 Cwt. Kg 0.02

(7)

vii 11. IRON and STEEL gauge systems

Standard Wire Gauge. Birmingham Wire Gauge

No. SWG BWG mm inch mm inch 20 0.914 0.036 0.996 0.0392 18 1.219 0.048 1.257 0.0495 16 1.626 0.064 1.588 0.0625 12. Units

To convert “Litres to “Galloons” multiply by 0.2205 “Miles to “Kilometers” multiply 1.609

“Kilo to “Pounds” multiply by 2.205 13. Steel

Dia. Mm Dia. Inch Normal Weight

Kg per meter 25 1 3.854 20 3/4 2.466 16 5/8 1.578 12 1/2 0.888 10 3/8 0.617 6 1/4 0.222

14. Method of Measurement shall be done in accordance with SLS 573:1999 (Revised) edition.

15. Incorporation of a preliminary bill for works costing over Rs. 500,000/= is mandatory. Please refer Annexure for sample preliminary bill items. The values

indicated are only for guidance and you are advised to insert only the relevant items and cost based on contract period and amount of contract.

16. The trade names, brand names along with catalogue numbers have been used purely to describe certain items in order to fully describe the expected quality, appearance, finish and performance characteristics of the relevant fitting. However, mere

appearance of the brand name does not mean to restrict to that particular brand and any other brand having similar characteristics are acceptable provided prior approval is obtained for use of such brands.

17. Following item descriptions shall be used to describe the water proofing in side toilets, and measurements to be taken accordingly.

(8)

(a). Water proofing inside shower areas and toilets :

Application of water proofing agent “Barralastic” or an approved equivalent brand to the entire toilet floor and up to 1.50 m (5’-0”) height on to the masonry wall the function between the wall and concrete floor shall be treated with a non-wooyen reinforced fiber mesh entire work shall be done in conformity to the

manufacturer’s specifications. This item is payable only upon the submission of a written guarantee jointly by the Contractor and the water proofing material supplier.

(b). Certificate for Water Proofing:

Contractor shall submit a written certificate to the effect that all the material used and workmanship was in conformity to the water proofing material manufacturer’s

requirements and has been installed as per the manufacturer’s specifications. ©. Warranty for Water Proofing:

Contractor shall submit a 10 year written warranty jointly with the water proofing manufacturer/Supplier to the effect that “The treated surface has a 10 year warranty against dampness/and/or moisture penetration due to defective workmanship and/or defective material and that in the event of a failure, the material equipment and labour necessary for the rectification work will be provided free of charge.

18. Guide for Preparing a Preliminary Estimate for proposal identification. 1. Visit the site and make a note on the field book :

(i) Ownership of the land and availability of survey plan and contour survey plan (ii) Soil types up to 6’-0” depth.

Classify soil as - Sand - Clay

- Sandy clay (if a sand content is more than 50%).

- Clayey sand

- Peat.

(iii)Depth of water table under normal weather condition. (iv) Disposal of rain water

- is the site to be filled ?

- is the main drain available in the road ?

(v) Necessity of leveling/filling the ground, retaining walls, boundary wall, fence, gate and culvert (either Hume pipe or concrete slabs over masonary/concrete drain).

(vi) Pipe water with pump + Overhead tank Well water with pump + overhead tank.

(9)

ix

In case of a new well to dig; get a location yield and water quality check from the Water Supply & Drainage Board of from Water Resources Board.

- Preliminary investigation - Rs. 26,250/= - Detailed investigation - Rs. 300,000/=

(They will give a detailed estimate after preliminary investigation). (vii) Availability of electricity.

2. Desk Study and Preparation of an Itemized Estimate (without a B.O.Q.) The covering letter should read as ……….. The tentative cost estimate for the proposed work is Rs. ………… The break-up of item costs are as given below. The detailed estimate will be forwarded upon the approval of plans and after preparing a detailed B.O.Q.. In the mean time, please obtain the local authority approval for the construction

Items to reflect in the tentative estimate are :

(a) Construction of the proposed building = Rs. ………. (@ 2750/= per Sq.ft. on hard ground)

(@ 3200/= per Sq.ft. on soft ground)

(@ 3400/= for storeyed buildings on hard ground) (@ 3800/= for storeyed buildings on soft ground).

(b) Construction of gate 12’-0” wide and culvert = Rs. ………. ©.1 Construction of boundary wall of 6’-0” height

@ 2500/= per L.ft. = Rs. ………..

or

©.2 Construction of a fence with PVC coated metal wire to 5’-0”

height with plinth wall @ 3000/= per L.Ft. = Rs. ……… (d) Soil investigation fee (for two bore holes) = Rs. 70,000/= (e) External service connection – 3 phase = Rs. 50,000/= (f) External water supply or well + sump + O.H. tank = Rs. ………

Sub Total = X

Add 10% as Contingencies = A

Add 10% of (or 5% for less than 6 months) as price

Escalation = B

Total approximate Cost P = Rs. X+A+B ===========

Add 15% VAT = Rs. Q

Total Estimated cost T.E.C = Rs. P+Q Rounded to nearest Thousand.

(10)

3. Preparation of a Detailed BOQ

Upon the receipt of an allocation this is how to proceed.

(a) Submit the Survey Plan (should be a scaled plan without reduction during copying), confirm the ownership of the land, and functional requirements of the building to the Architect through Director (Buildings) or Director (Engineering). (b) Arrange a site inspection with the Architect, Chief Engineer (Designs), Chief

Engineer (W.S. & S).

(c) Get the Architectural Sketch Plan approved from the Head of Institution concerned.

(d) Send a copy of the approved Architectural Sketch Plan to the Architect (with or without modifications) to prepare the Council Drawings.

(e) Inform the Client to get the local authority approval based on Council drawings.

(f) In the mean time, following drawings shall be obtained before proceeding with the preparation of the detailed BOQ.

- Detailed Architectural Drawing including floor plans, elevations, sections, door/window schedule, finishing schedule, staircase and railing details, ceiling details.

- Structural Drawings including foundation details, columns, floor beams/slabs/stairs, roof frame work (if necessary, ceiling frame work), retaining walls etc.

- Water supply, waste water, sewerage, plumbing layout drawings including drain pipe positions, cleaning eyes, floor gullies, manholes, septic tanks and soakage pits.

- Electrical layout plan including wiring diagram, fitting locations, mains, D.B.s locations etc.

- External storm water (rainwater) disposal drawing.

19. Only upon the receipt of the above detailed drawings shall the BOQ be prepared.

Rate to be Comprehensive

The rates for each item of measured work, must be comprehensive and must include for complying with the details on the drawings, description in the bills of quantities, relevant specifications, cover all the obligation under the contract and all matters and things necessary for the proper construction, completion and maintenance of the works.

In the preparation of the BOQ, following act as a guideline.

1. BOQ item descriptions shall be as per BSR item description wherever possible.

(11)

xi

2. Preamble notes shall be used with the BOQ.

3. Follow the standard method of measurement SLS 573:1999 (revised edition) to extract the quantities from the drawings.

4. A preliminaries bill is mandatory for all works costing over Rs. 500,000/=. 5. In case of type plans, ensure the ground conditions meet with the

prescribed soil bearing pressure appearing on the structural plan. 6. In the respective BOQ trade items, indicate the following .

“Contractor shall submit the following samples for approval when requested to do so.

(a) Brass hinges, casement stays, door locks, door closers (b) Sample aluminium sections along with a test report (c) Mix design report for the ready mix concrete

(d) Samples of bib taps, gate valves, sanitary fittings fixtures (e) Ceramic tile samples

(f) Electrical fittings

(g) Timber samples for door/window frames

(h) Specific guarantees from the manufacturer/authorized agent for sanitary fittings, door locks, ceiling fans, electrical accessories of MCB, MCCB, RCCB, water proofing material

(i) Water pressure test report for the plumbing system

(j) Electrical system test from a Chartered Electrical Engineer

(k) Slump test and concrete cube test is mandatory for all concrete work. (l) In case of earth compaction, the field density of the fill shall be

measured with the sand cone method or any other appropriate method.

20.A Preliminary Bill (for Works between (0.5m–1.0m), (1m–5m),(5m–10m), (10m–25m)

Item Description 0.5m-1.0m 1 m-5m 5m-10m 10m-25m 20.A.1 Allow lump sum to

construct, furnish and maintain Contractor’s site office.

10,000/= 15,000/= 25,000/= 30,000/=

20.A.2 Allow lump sum to protect materials and plant.

3,500/= 4,500/= 6,000/= 10,000/= 20.A.3 Allow lump sum to obtain

electricity and water for the site.

5,300/= 7,500/= 12,000/= 15,000/=

20.A.4 Allow lump sum for the provision of sanitary facilities to be Contractor’s staff.

3,200/= 5,000/= 5,000/= 7,000/=

20.A.5 Allow lump sum to barricade the site with a fence and a gate.

_ 4,000/= 4,000/= 6,000/=

20.A.6 Allow lump sum for providing a name board of (size to define) and to erect at a 7’-0” height.

(12)

20. A.7. Allow lump sum for insurance, performance bond and guarantee = Rs. 4,800.00 per one million projects

For projects costing over 5m, contractor shall employ to following personal 20. A.8 Construction management services (Engineer, Technical Officer)

Rate Per Month

1. Graduate Engineer with 3 Years experience = Rs.25,000.00 2. NCT qualified Technical officer with 3 Years experience = Rs.15,000.00

Rs.40,000.00

20.B Preliminary Bill (for works costing over Rs. 25 Million)

Divisional Engineer to decide on the necessity of each and every item for the work concerned. The total preliminary cost is in the range of 3-4% of the building construction cost.

20.B.1. Allow lump sum for providing performance bond, insurance/bank guarantees – payment to be done either for the actual amount or for the quoted sum which ever

is less.

20.B.2. Allow lump sum for insurance against the following: (a) Work at site and property

(b) Accident and injury to workmen (c) Third party

(d) Material (e) Theft

(f) Riot and civil commotions (g) Flooding.

20.B.3 Provision of a sum to construct, furnish and maintain site office for the Consultant’s staff the requirements are :

- 12’-0”x 10’-0” Office with a toilet

- 2 No. 3’-6”x 2’-0” Tables with lockable drawers and 6 No. plastic chairs.

- One ceiling fan with two lights - Steel four drawer cupboard - Water filter and water heater - 3 pairs of gun boots and 3 helmets - Drawing rack

- 4’-0”x 2’-0” Display board

- Pentium III Computer with a Dot matrix printer (wide carriage) - Direct telephone line with fax

- First-Aid Box

(13)

xiii

20.B.4 Provision of a sum to construct, furnish and maintain a site office for the Contractor’s staff.

20.B.5 Provision of a sum to construct and maintain facilities for Contractor’s staff accommodation

20.B.6 Provision of a sum to construct sanitary facilities for workmen

20.B.7 Provision of a sum to construct facilities to store materials and plants.

20.B.8 Provision to supply and temporary storage of water including plumbing work an d service connection or to use the Client’s facility and to make a monthly payment. 20.B.9 Provision to obtain temporary electricity connection and maintain throughout the construction period.

20.B.10 Provision to erect fence, barricades (describe)

20.B.11 Provision to safeguard the works, material and plants against theft, Watchers including provision for shelter and torches.

20.B.12 Allow lump sum for maintaining temporary roads

20.B.13 Allow lump sum for safety, health and welfare of the workmen as per statutory requirements

20.B.14 Setting out of the works through a licensed Surveyor and submission of a sign survey drawing of the premises.

20.B.15 Establishment of permanent bench works and reference points of the column/building grids.

20.B.16 Erection of a sign board with the building elevation on a screen point fixed to a G.I. frame work of 6’-0”x 4’-0” at 7’-0” above Ground level (letter height 3”). 20.B.17 Allow for the Construction management (resident Engineer and Technical Officers ….. ) described throughout the construction.

20.B.18 Employment of a Quality Assurance Engineer under the direct supervision of the Consultant and to establish a quality assurance system including documentation. 20.B.19 Hiring of a air-conditioned vehicle with driver for the exclusive use of the

Consultant throughout the construction period. Maximum per month mileage of 300km and only on week days between 8.00 a.m. and 6.00 p.m.

20.B.20 Allow for scaffolding (describe)

20.B.21 Allow for survey equipment, slump cone, cube moulds

20.B.22 Preparation of As-built drawings of A-1 size for the entire building including structural services and landscape.

20.B.23 Cleaning the building including dis-infection of sanitary fittings and premises including carting away debris and submission of a list of moveable and

(14)

References

Related documents

Theorem 4.2 (Morse Lemma for Symmetric Spaces of Higher Rank). In light of this definition, the Theorem 4.2 is equivalent to saying that the uniformly regular uniform quasigeodesics

The key segments in the mattress industry in India are; Natural latex foam, Memory foam, PU foam, Inner spring and Rubberized coir.. Natural Latex mattresses are

The purpose of this study was to evaluate the diagnostic utility of real-time elastography (RTE) in differentiat- ing between reactive and metastatic cervical lymph nodes (LN)

Conversely, 43.7% of all respondents who misused prescription drugs met criteria for alcohol dependence, problem gambling, and (or) had used illicit drugs in the past year..

• Speed of weaning: induction requires care, but is relatively quick; subsequent taper is slow • Monitoring: Urinary drug screen, pain behaviors, drug use and seeking,

that cattle grazing in the Brazilian Pantanal affects dung beetle functional groups differently 368. (Slade et al ., 2007), evidencing that large roller beetles are the

Each year, the authorized organization representative of each FDA is required to review and sign the annual operating agreement which authorizes the FDA to participate in the

Planning for the 1999 Iowa Oral Health Survey began in the spring of 1999 and included personnel from the Dental Health Bureau of the Iowa Department of Public Health,