WELCOME
WELCOME
T
T
O
O
BUS BODY BUILDING
BUS BODY BUILDING
PROJECT
PROJECT
PRESENTED BY PRESENTED BY
K.S.SYED AFSALK.S.SYED AFSAL
D.THIRUNAVUKKARASUD.THIRUNAVUKKARASU
B.SWARNA A TULASIB.SWARNA A TULASI
A.KEERTHANA A.KEERTHANA NAGADEVINAGADEVI
R.JAYR.JAYA LA LAKSHMIAKSHMI
II B.com II B.com
Kongu Arts & Science College Kongu Arts & Science College
Erode Erode
ORIGIN OF BUS
ORIGIN OF BUS
BOD
BOD
Y BUILDING
Y BUILDING
In the yIn the year 1952 LG.Balakrisear 1952 LG.Balakrishnan started LGB Coach .hnan started LGB Coach .
Gained Gained the knowledge the knowledge of of this process fromthis process from
G.D
G.D.NAIDU who dismant.NAIDU who dismantled a led a bus,bought frombus,bought from
foreign.
foreign.
In TIn TamilNadu Karur amilNadu Karur was was considered as its considered as its origin place.origin place.
In 1972 the employIn 1972 the employees & wees & workers orkers scattered from scattered from LGBLGB & started
& started their own ctheir own coaches.oaches.
Karur is considered as suitable place because requiredKarur is considered as suitable place because required raw materials a
CHASSIS
CHASSIS
TATA
CHASSIS
CHASSIS
MID POINT
CHASSIS
CHASSIS
CHASIS VARIETY:
CHASIS VARIETY:
a)210 inchesa)210 inches b)222 inchesb)222 inches c)205 inchesc)205 inches d)218 inchesd)218 inches
e)232 inches/4200mme)232 inches/4200mm
The chassis are h
The chassis are handed over to the company anded over to the company with the
with the engine nengine number umber and rand registration egistration number number on theiron their side.
KITS
KITS
Kits are readymade pre-welded angles.Kits are readymade pre-welded angles.
Kits are meant for Kits are meant for uniform model uniform model buses.buses.
AD
AD
V
V
ANT
ANT
A
A
GES:
GES:
The main advantage in the kit model is that theThe main advantage in the kit model is that the
company need not wait for the chassis from the
company need not wait for the chassis from the
customer.
customer.
KITS
KITS
FLOOR KIT
KITS
KITS
LEFT & RIGHT KITS
ASS
ASSEMBL
EMBLING
ING ST
ST
AGE
AGE
WELDED ANGLES
WELDED ANGLES
furnished with SAL WOOD
FIBRE REINFORCED PLASTICS
FIBRE REINFORCED PLASTICS
T
T
o
o
av
av
oid
oid
water
water
le
le
ak
ak
age
age
f
f
ib
ib
re
re
reinforc
reinforc
ed pl
ed pl
astics are used.
astics are used.
This f
This f
ibre materials reduces w
ibre materials reduces w
eight
eight
and helps in mileage
and helps in mileage
These f
These f
ibres are made out
ibres are made out
of
of
readymade moulds of different
readymade moulds of different
shapes.
FIBRE RE-INFORCED PLASTICS
FIBRE RE-INFORCED PLASTICS
A A chemical chemical cotcote e called Pcalled PVVA is A is applied. applied. This This cotcote e will bewill be
con
converted as thin polythene sheeverted as thin polythene sheets within fewts within few
minutes.
minutes.
Then a mixture of Gel Then a mixture of Gel Cote,Catalyst,Resin andCote,Catalyst,Resin and COBOL
COBOLT are appliT are applied.ed.
This fibre is a non heat conductor.This fibre is a non heat conductor.
Can repair the damages easily,need not be replacedCan repair the damages easily,need not be replaced entirely
FIBRE REINFORCED PLASTICS
FIBRE REINFORCED PLASTICS
FIBRE MADE FRONT
FIBRE MADE FRONT
COWL
COWL
FIBRE used for FRONT COWL
FIBRE used for FRONT COWL & DASH BOARD
SHEET METAL
SHEET METAL
This is an alternat
This is an alternat
iv
ive for FIBRE.
e for FIBRE.
These are fixed over the KITS.
These are fixed over the KITS.
Each meta
Each meta
ls ar
ls are joined th
e joined through
rough
BEEADING.
BEEADING.
These are more
These are more
strong tha
strong tha
n FIBRE
n FIBRE.
.
SHE
SHEET
ET MET
MET
AL
AL
FRONT PANELLING
SHE
SHEET
ET MET
MET
AL
AL
sheet metals are placedsheet metals are placed
for outer PANELLING
for outer PANELLING
Between metal & angles,Between metal & angles, THERMOCOAL are placed as
THERMOCOAL are placed as
heat resistant.
FLOORING
FLOORING
DENSIFIEDDENSIFIED
PLYWOOD are fixed for PLYWOOD are fixed for f
floorilooring .ng .
Each PLYWOOD areEach PLYWOOD are attached through
attached through BEEADING.
BEEADING.
Diamond shaped,Diamond shaped, plain,round designs plain,round designs plywoods are available. plywoods are available.
ROOFING
ROOFING
PLYWOOD FIXED BEFORE
PLYWOOD FIXED BEFORE
ELECTRICAL WORKS
ELECTRICAL WORKS
COMPLETION OF ROOFING
COMPLETION OF ROOFING
W
ELECTRICAL
ELECTRICAL WORK
WORK
S
S
This works would be done after space allocated for
This works would be done after space allocated for
TV sets,cabinet for players &
TV sets,cabinet for players &
speakers
speakers
Tube Lights & Lamps in roof
Tube Lights & Lamps in roof
Decorative lights placed in roof
Decorative lights placed in roof
ELECTRICAL WORKS
ELECTRICAL WORKS
This workThis work
involv
involves mes majorajor
human risk.
human risk.
Time consumingTime consuming
too long.
FITTINGS
FITTINGS
57+2 s
57+2 seats only aseats only as
per GOVT.rules per GOVT.rules SeatsSeats LightsLights
IGR & PostIGR & Post
LaftLaft Crathy Crathy CurtainsCurtains
INNER FITTINGS
INNER FITTINGS
Driver partitionDriver partition
SeatsSeats Post,IGR,Crathy Post,IGR,Crathy HandleHandle LightingsLightings
Sound systemSound system
Video Video proprovisionvision
Battery boxBattery box
Lafts on either sidesLafts on either sides
DRIVER PARTITION
DRIVER PARTITION
Route board &Route board &
connection board
connection board
Almira Almira
Engine bannetEngine bannet
MirrorMirror, , firfirst aidst aid
box, bottle holder
box, bottle holder
Player cabinetPlayer cabinet
UPS,Swith boardUPS,Swith board
Seat facingSeat facing
driver
FITTINGS
FITTINGS
Jack k
Jack knife nife entrancentrance e doordoor Expertise IGR works &Expertise IGR works & ventilat
OUTER FITTINGS
OUTER FITTINGS
Front & rear glassFront & rear glass
Doom LightDoom Light
Indicator sIndicator s
Wiper Wiper, Nam, Name boare boardd
Rear view mirrorRear view mirror
Windo Windowsws
Entrance shutterEntrance shutter
LaddersLadders
luggage scrollersluggage scrollers
WATER LEAK TEST BOOTH
WATER LEAK TEST BOOTH
This is used to testThis is used to test
water
water leakage leakage afterafter sheet metal is fixed sheet metal is fixed
W Water ater will bewill be
sprayed out from sprayed out from EVERY NOOK & EVERY NOOK & CORNER
CORNER
This work will beThis work will be
held before painting held before painting
PAINTING
PAINTING
This process is done after fitting This process is done after fitting stagestage
Financial risk is included in this workFinancial risk is included in this work
Moderate Moderate climate is friclimate is friendly to painting processendly to painting process
RISK FACTORS
RISK FACTORS :-
:-
Air Air pollutionpollution
RainfallRainfall
W Workorkers in-aers in-alertnesslertness
PAINTING
PAINTING
PATTY WORK
BOOTH
BOOTH
HOT DRIER PAINT BOOTH
COMPLETED PAINTING WORK
COMPLETED PAINTING WORK
EXTRA SPACES
EXTRA SPACES
SPACE FOR TOOLS
INVESTMENTS
INVESTMENTS
FIXED CAPITAL
FIXED CAPITAL
PLANT & MACHINERY = Rs 25,00,000 PLANT & MACHINERY = Rs 25,00,000 LAND
LAND & & BUILDING BUILDING = = Rs Rs 30,00,00030,00,000
(2 acres)
(2 acres)
W
W
ORKING CAP
ORKING CAP
IT
IT
AL
AL
Rs 20,00,000
Rs 20,00,000
Based on financial strength of the owner.
Based on financial strength of the owner.
Most
Most
of
of
the existing companies are running as a
the existing companies are running as a
medium scale business.
CONSTRUCTION COST DETAILS
CONSTRUCTION COST DETAILS
City City buses buses -Rs.4,40,00-Rs.4,40,0000
Moffisil Moffisil buses buses -Rs.4,75-Rs.4,75,000,000
Generator Generator buses buses -Rs.5,50,0-Rs.5,50,00000
Institutional busesInstitutional buses-Rs.5,00,-Rs.5,00,000000
CaraCaravons vons -Rs.8,00,-Rs.8,00,000 000 to to Rs.15,00,000Rs.15,00,000
Mini Mini buses& buses& omni omni buses buses -Rs.3,00,000-Rs.3,00,000
FOR COMPLETION OF WORK
FOR COMPLETION OF WORK
Time schedule for various kinds of buses:-
Time schedule for various kinds of
buses:-
City
City
buses
buses
:
:
10
10
days
days
.
.
Mofiss
Mofiss
il
il
buses
buses
:
:
10-12
10-12
days
days
.
.
Caravon
Caravon
bus
bus
es
es
:
:
40-45
40-45
days.
days.
Other types
Other types
(Institutional & travels):Around 20 days.
PROBLEMS OF EMPLOYEES
PROBLEMS OF EMPLOYEES
Protection to human life risk is
Protection to human life risk is
provided only as a
provided only as a
voluntary m
voluntary measure.
easure.
No
No
regularity of transa
regularity of transaction(
ction(as c
as c
ontract
ontract
basis).
basis).
No job security.
No job security.
PROBLEMS OF MANAGEMENT
PROBLEMS OF MANAGEMENT
No
No
labour f
labour f
low
low
though
though
demand i
demand i
s
s
tremendous.
tremendous.
Mechanisation
Mechanisation
is not possible due to
is not possible due to
non-standardisation.
non-standardisation.
T
T
raining of
raining of
employees should b
employees should b
e done
e done
mostly by companies.
mostly by companies.
Associations
Associations
are
are
strengthening
strengthening
only
only
at
at
recent times.
ASSOCIATION
ASSOCIATION
Association Association of Bus bodof Bus body buildy builders ers exist exist to to bring unity bring unity
among companies.
among companies.
They even arrangThey even arrange foreign trie foreign trips for industrips for industrial visit toal visit to
members at the
members at their oir own expenses.wn expenses.
As As associations associations are are not not functioning functioning effectiveffectivee
CLUSTERS are formed by interested groups.
CLUSTERS are formed by interested groups.
CLUSTERS are CLUSTERS are planned to be helpfuplanned to be helpful throughl through
subsidies.
EMPLOYERS SURVEY
EMPLOYERS SURVEY
1.EMPLOYMENT OPPORTUNITY 1.EMPLOYMENT OPPORTUNITY 23 23 15 15 12 12 50 50 46 46 30 30 24 24 100 100 0 0 20 20 40 40 60 60 80 80 100 100 120 120 e edduuccaattiioonnaal l qquuaalliiffiiccaattiioonn tteecchhnniiccaal l kknnoowwlleeddggee BBootthh TToottaall NO. OFNO. OF RESPONDENTSRESPONDENTS
PERCENTAGE OF RESPONDENT
2.RISK IN WORK 2.RISK IN WORK 0 0 10 10 20 20 30 30 40 40 50 50 60 60 70 70 80 80 90 90 100 100 M Moorree MMooddeerraattee LLooww TToottaall 20 20 15 15 15 15 50 50 40 40 30 30 30 30 100 100 NO. OF
NO. OF RESPONDENTSRESPONDENTS
PERCENTAGE OF RESPONDENTS
3.PREFERRED RISK POLICY PROVIDED BY THE COMPANY
3.PREFERRED RISK POLICY PROVIDED BY THE COMPANY
0 0 10 10 20 20 30 30 40 40 50 50 60 60 70 70 80 80 90 90 100 100 Risk Risk Insurance Insurance provident provident find find B Boonnuuss OOtthheerrss TToottaall 39 39 2 2 77 22 50 50 78 78 4 4 14 14 4 4 100 100 NO. OF
NO. OF RESPONDENTSRESPONDENTS
PERCENTAGE OF RESPONDENTS
4.MECHANIZATION LEADS T
4.MECHANIZATION LEADS TO DECREASE IN O DECREASE IN EMPLOYMENT OPPORTUNITYEMPLOYMENT OPPORTUNITY
42 42 8 8 50 50 84 84 16 16 100 100 0 0 2200 4400 6600 8800 110000 112200 Yes Yes No No Total Total PERCENTAGE OF RESPONDENTS PERCENTAGE OF RESPONDENTS NO. OF
5.Preference for training
5.Preference for training
47 47 3 3 50 50 94 94 6 6 100 100 0 0 2200 4400 6600 8800 110000 112200
Training from seniors
Training from seniors
Training from institutions
Training from institutions
Total
Total
PERCENTAGE OF RESPONDENTS
PERCENTAGE OF RESPONDENTS
NO. OF
COMPLETED BUS
COMPLETED BUS
ORDINARY BUS
CERTAIN EXISTING COMPANIES
CERTAIN EXISTING COMPANIES
MAARUTHI C
MAARUTHI COOAACH BUILDERS,KARCH BUILDERS,KARURUR A
ATTAL CAL COOAACH BUILDERS,KARCH BUILDERS,KARURUR
SAKTHI COACH BUILDERS,KARUR SAKTHI COACH BUILDERS,KARUR INDIAN
INDIAN CCOAOACH BCH BUILDERS,KUILDERS,KARURARUR PEETEE
PEETEE COCOAACH BCH BUILDERS,KUILDERS,KARURARUR STAR COACH BUILDERS,KARUR STAR COACH BUILDERS,KARUR SUN COACH BUILDERS,ERODE SUN COACH BUILDERS,ERODE
CONCLUSION
CONCLUSION
The main aim of The main aim of this project is to invite youngsters tothis project is to invite youngsters to
do this business.
do this business.
A business A business having having sufficient Psufficient PROROFIT FIT & stand & stand as as aa SERVICE SECTOR.
SERVICE SECTOR.
Hope Hope you you all had a gall had a good time & a ood time & a clear clear picture aboutpicture about
this business.
this business.