• No results found

Bus Body Building

N/A
N/A
Protected

Academic year: 2021

Share "Bus Body Building"

Copied!
45
0
0

Loading.... (view fulltext now)

Full text

(1)

WELCOME

WELCOME

T

T

O

O

BUS BODY BUILDING

BUS BODY BUILDING

PROJECT 

PROJECT 

(2)

PRESENTED BY  PRESENTED BY 

K.S.SYED AFSALK.S.SYED AFSAL

D.THIRUNAVUKKARASUD.THIRUNAVUKKARASU

B.SWARNA A TULASIB.SWARNA A TULASI

 A.KEERTHANA  A.KEERTHANA NAGADEVINAGADEVI

R.JAYR.JAYA LA LAKSHMIAKSHMI

II B.com II B.com

Kongu Arts & Science College Kongu Arts & Science College

Erode Erode

(3)

ORIGIN OF BUS

ORIGIN OF BUS

BOD

BOD

Y BUILDING

Y BUILDING

In the yIn the year 1952 LG.Balakrisear 1952 LG.Balakrishnan started LGB Coach .hnan started LGB Coach .

Gained Gained the knowledge the knowledge of of this process fromthis process from

G.D

G.D.NAIDU who dismant.NAIDU who dismantled a led a bus,bought frombus,bought from

foreign.

foreign.

In TIn TamilNadu Karur amilNadu Karur was was considered as its considered as its origin place.origin place.

In 1972 the employIn 1972 the employees & wees & workers orkers scattered from scattered from LGBLGB & started

& started their own ctheir own coaches.oaches.

Karur is considered as suitable place because requiredKarur is considered as suitable place because required raw materials a

(4)

CHASSIS

CHASSIS

TATA

(5)

CHASSIS

CHASSIS

MID POINT

(6)

CHASSIS

CHASSIS

CHASIS VARIETY:

CHASIS VARIETY:

 a)210 inchesa)210 inches   b)222 inchesb)222 inches   c)205 inchesc)205 inches   d)218 inchesd)218 inches 

 e)232 inches/4200mme)232 inches/4200mm

The chassis are h

The chassis are handed over to the company anded over to the company   with the

 with the engine nengine number umber and rand registration egistration number number on theiron their side.

(7)

KITS

KITS

Kits are readymade pre-welded angles.Kits are readymade pre-welded angles.

Kits are meant for Kits are meant for uniform model uniform model buses.buses.

 AD

 AD

V

V

ANT

ANT

A

A

GES:

GES:

The main advantage in the kit model is that theThe main advantage in the kit model is that the

company need not wait for the chassis from the

company need not wait for the chassis from the

customer.

customer.

(8)

KITS

KITS

FLOOR KIT

(9)

KITS

KITS

LEFT & RIGHT KITS

(10)

ASS

ASSEMBL

EMBLING

ING ST

ST

AGE

AGE

 WELDED ANGLES

 WELDED ANGLES

furnished with SAL WOOD

(11)

FIBRE REINFORCED PLASTICS

FIBRE REINFORCED PLASTICS

T

T

o

o

av

av

oid

oid

water

water

le

le

ak

ak

age

age

f

f

ib

ib

re

re

reinforc

reinforc

ed pl

ed pl

astics are used.

astics are used.

This f

This f

ibre materials reduces w

ibre materials reduces w

eight

eight

and helps in mileage

and helps in mileage

These f

These f

ibres are made out

ibres are made out

of 

of 

readymade moulds of different

readymade moulds of different

shapes.

(12)

FIBRE RE-INFORCED PLASTICS

FIBRE RE-INFORCED PLASTICS

 A  A chemical chemical cotcote e called Pcalled PVVA is A is applied. applied. This This cotcote e will bewill be

con

converted as thin polythene sheeverted as thin polythene sheets within fewts within few

minutes.

minutes.

 Then a mixture of Gel Then a mixture of Gel Cote,Catalyst,Resin andCote,Catalyst,Resin and COBOL

COBOLT are appliT are applied.ed.

This fibre is a non heat conductor.This fibre is a non heat conductor.

Can repair the damages easily,need not be replacedCan repair the damages easily,need not be replaced entirely 

(13)

FIBRE REINFORCED PLASTICS

FIBRE REINFORCED PLASTICS

FIBRE MADE FRONT

FIBRE MADE FRONT

COWL

COWL

FIBRE used for FRONT COWL

FIBRE used for FRONT COWL & DASH BOARD

(14)

SHEET METAL

SHEET METAL

This is an alternat

This is an alternat

iv

ive for FIBRE.

e for FIBRE.

These are fixed over the KITS.

These are fixed over the KITS.

Each meta

Each meta

ls ar

ls are joined th

e joined through

rough

BEEADING.

BEEADING.

These are more

These are more

strong tha

strong tha

n FIBRE

n FIBRE.

.

(15)

SHE

SHEET

ET MET

MET

AL

AL

FRONT PANELLING

(16)

SHE

SHEET

ET MET

MET

AL

AL

sheet metals are placedsheet metals are placed

for outer PANELLING

for outer PANELLING

Between metal & angles,Between metal & angles, THERMOCOAL are placed as

THERMOCOAL are placed as

heat resistant.

(17)

FLOORING

FLOORING

DENSIFIEDDENSIFIED

PLYWOOD are fixed for PLYWOOD are fixed for f

floorilooring .ng .

Each PLYWOOD areEach PLYWOOD are attached through

attached through BEEADING.

BEEADING.

Diamond shaped,Diamond shaped, plain,round designs plain,round designs plywoods are available. plywoods are available.

(18)

ROOFING

ROOFING

PLYWOOD FIXED BEFORE

PLYWOOD FIXED BEFORE

ELECTRICAL WORKS

ELECTRICAL WORKS

COMPLETION OF ROOFING

COMPLETION OF ROOFING

 W

(19)

ELECTRICAL

ELECTRICAL WORK

WORK

S

S

This works would be done after space allocated for

This works would be done after space allocated for

TV sets,cabinet for players & 

TV sets,cabinet for players & 

speakers

speakers

Tube Lights & Lamps in roof 

Tube Lights & Lamps in roof 

Decorative lights placed in roof 

Decorative lights placed in roof 

(20)

ELECTRICAL WORKS

ELECTRICAL WORKS

This workThis work

involv

involves mes majorajor

human risk.

human risk.

Time consumingTime consuming

too long.

(21)

FITTINGS

FITTINGS

57+2 s

57+2 seats only aseats only as

per GOVT.rules per GOVT.rules  SeatsSeats  LightsLights 

IGR & PostIGR & Post

 LaftLaft  Crathy Crathy   CurtainsCurtains

(22)

INNER FITTINGS

INNER FITTINGS

Driver partitionDriver partition

 SeatsSeats  Post,IGR,Crathy Post,IGR,Crathy   HandleHandle  LightingsLightings 

Sound systemSound system

 Video  Video proprovisionvision

Battery boxBattery box

Lafts on either sidesLafts on either sides

(23)

DRIVER PARTITION

DRIVER PARTITION

Route board &Route board &

connection board

connection board

 Almira Almira

Engine bannetEngine bannet 

MirrorMirror, , firfirst aidst aid

box, bottle holder

box, bottle holder

Player cabinetPlayer cabinet 

UPS,Swith boardUPS,Swith board

Seat facingSeat facing

driver

(24)

FITTINGS

FITTINGS

 Jack k

 Jack knife nife entrancentrance e doordoor Expertise IGR works &Expertise IGR works &  ventilat

(25)

OUTER FITTINGS

OUTER FITTINGS

Front & rear glassFront & rear glass

Doom LightDoom Light

Indicator sIndicator s

 Wiper Wiper, Nam, Name boare boardd

Rear view mirrorRear view mirror

 Windo Windowsws

Entrance shutterEntrance shutter

LaddersLadders

luggage scrollersluggage scrollers

(26)

WATER LEAK TEST BOOTH

WATER LEAK TEST BOOTH

This is used to testThis is used to test

 water

 water leakage leakage afterafter sheet metal is fixed sheet metal is fixed

 W Water ater will bewill be

sprayed out from sprayed out from EVERY NOOK & EVERY NOOK & CORNER 

CORNER 

This work will beThis work will be

held before painting held before painting

(27)

PAINTING

PAINTING

This process is done after fitting This process is done after fitting stagestage

Financial risk is included in this workFinancial risk is included in this work

Moderate Moderate climate is friclimate is friendly to painting processendly to painting process

RISK FACTORS 

RISK FACTORS :-

:-

 Air  Air pollutionpollution

RainfallRainfall

 W Workorkers in-aers in-alertnesslertness

(28)

PAINTING

PAINTING

PATTY WORK

(29)

BOOTH

BOOTH

HOT DRIER PAINT BOOTH

(30)

COMPLETED PAINTING WORK

COMPLETED PAINTING WORK

(31)

EXTRA SPACES

EXTRA SPACES

SPACE FOR TOOLS

(32)

INVESTMENTS

INVESTMENTS

FIXED CAPITAL

FIXED CAPITAL

PLANT & MACHINERY = Rs 25,00,000 PLANT & MACHINERY = Rs 25,00,000 LAND

LAND & & BUILDING BUILDING = = Rs Rs 30,00,00030,00,000

(2 acres)

(2 acres)

 W

 W

ORKING CAP

ORKING CAP

IT

IT

AL

AL

Rs 20,00,000

Rs 20,00,000

Based on financial strength of the owner.

Based on financial strength of the owner.

Most

Most

of

of

the existing companies are running as a

the existing companies are running as a

medium scale business.

(33)

CONSTRUCTION COST DETAILS

CONSTRUCTION COST DETAILS

 City City buses buses -Rs.4,40,00-Rs.4,40,0000 

 Moffisil Moffisil buses buses -Rs.4,75-Rs.4,75,000,000 

 Generator Generator buses buses -Rs.5,50,0-Rs.5,50,00000 

 Institutional busesInstitutional buses-Rs.5,00,-Rs.5,00,000000 

 CaraCaravons vons -Rs.8,00,-Rs.8,00,000 000 to to Rs.15,00,000Rs.15,00,000 

 Mini Mini buses& buses& omni omni buses buses -Rs.3,00,000-Rs.3,00,000 

(34)

FOR COMPLETION OF WORK

FOR COMPLETION OF WORK

Time schedule for various kinds of buses:-

Time schedule for various kinds of

buses:-

City

City

buses

buses

:

:

10

10

days

days

.

.

Mofiss

Mofiss

il

il

buses

buses

:

:

10-12

10-12

days

days

.

.

Caravon

Caravon

bus

bus

es

es

:

:

40-45

40-45

days.

days.

Other types

Other types

(Institutional & travels):Around 20 days.

(35)

PROBLEMS OF EMPLOYEES

PROBLEMS OF EMPLOYEES

Protection to human life risk is

Protection to human life risk is

provided only as a

provided only as a

voluntary m

voluntary measure.

easure.

No

No

regularity of transa

regularity of transaction(

ction(as c

as c

ontract

ontract

basis).

basis).

No job security.

No job security.

(36)

PROBLEMS OF MANAGEMENT

PROBLEMS OF MANAGEMENT

No

No

labour f

labour f

low

low

though

though

demand i

demand i

s

s

tremendous.

tremendous.

Mechanisation

Mechanisation

is not possible due to

is not possible due to

non-standardisation.

non-standardisation.

T

T

raining of

raining of

employees should b

employees should b

e done

e done

mostly by companies.

mostly by companies.

 Associations

 Associations

are

are

strengthening

strengthening

only

only

at

at

recent times.

(37)

ASSOCIATION

ASSOCIATION

 Association  Association of Bus bodof Bus body buildy builders ers exist exist to to bring unity bring unity 

among companies.

among companies.

 They even arrangThey even arrange foreign trie foreign trips for industrips for industrial visit toal visit to

members at the

members at their oir own expenses.wn expenses.

 As  As associations associations are are not not functioning functioning effectiveffectivee

CLUSTERS are formed by interested groups.

CLUSTERS are formed by interested groups.

 CLUSTERS are CLUSTERS are planned to be helpfuplanned to be helpful throughl through

subsidies.

(38)

EMPLOYERS SURVEY

EMPLOYERS SURVEY

1.EMPLOYMENT OPPORTUNITY 1.EMPLOYMENT OPPORTUNITY 23 23 15 15 12 12 50 50 46 46 30 30 24 24 100 100 0 0 20 20 40 40 60 60 80 80 100 100 120 120 e edduuccaattiioonnaal l qquuaalliiffiiccaattiioonn tteecchhnniiccaal l kknnoowwlleeddggee BBootthh TToottaall NO. OF

NO. OF RESPONDENTSRESPONDENTS

PERCENTAGE OF RESPONDENT

(39)

2.RISK IN WORK 2.RISK IN WORK 0 0 10 10 20 20 30 30 40 40 50 50 60 60 70 70 80 80 90 90 100 100 M Moorree MMooddeerraattee LLooww TToottaall 20 20 15 15 15 15 50 50 40 40 30 30 30 30 100 100 NO. OF

NO. OF RESPONDENTSRESPONDENTS

PERCENTAGE OF RESPONDENTS

(40)

3.PREFERRED RISK POLICY PROVIDED BY THE COMPANY

3.PREFERRED RISK POLICY PROVIDED BY THE COMPANY

0 0 10 10 20 20 30 30 40 40 50 50 60 60 70 70 80 80 90 90 100 100 Risk Risk Insurance Insurance provident provident find find B Boonnuuss OOtthheerrss TToottaall 39 39 2 2 77 22 50 50 78 78 4 4 14 14 4 4 100 100 NO. OF

NO. OF RESPONDENTSRESPONDENTS

PERCENTAGE OF RESPONDENTS

(41)

4.MECHANIZATION LEADS T

4.MECHANIZATION LEADS TO DECREASE IN O DECREASE IN EMPLOYMENT OPPORTUNITYEMPLOYMENT OPPORTUNITY

42 42 8 8 50 50 84 84 16 16 100 100 0 0 2200 4400 6600 8800 110000 112200  Yes  Yes No No Total Total PERCENTAGE OF RESPONDENTS PERCENTAGE OF RESPONDENTS NO. OF

(42)

5.Preference for training

5.Preference for training

47 47 3 3 50 50 94 94 6 6 100 100 0 0 2200 4400 6600 8800 110000 112200

Training from seniors

Training from seniors

Training from institutions

Training from institutions

Total

Total

PERCENTAGE OF RESPONDENTS

PERCENTAGE OF RESPONDENTS

NO. OF

(43)

COMPLETED BUS

COMPLETED BUS

ORDINARY BUS

(44)

CERTAIN EXISTING COMPANIES

CERTAIN EXISTING COMPANIES

 MAARUTHI C

 MAARUTHI COOAACH BUILDERS,KARCH BUILDERS,KARURUR  A

 ATTAL CAL COOAACH BUILDERS,KARCH BUILDERS,KARURUR

SAKTHI COACH BUILDERS,KARUR SAKTHI COACH BUILDERS,KARUR INDIAN

INDIAN CCOAOACH BCH BUILDERS,KUILDERS,KARURARUR PEETEE

PEETEE COCOAACH BCH BUILDERS,KUILDERS,KARURARUR STAR COACH BUILDERS,KARUR STAR COACH BUILDERS,KARUR SUN COACH BUILDERS,ERODE  SUN COACH BUILDERS,ERODE 

(45)

CONCLUSION

CONCLUSION

The main aim of The main aim of this project is to invite youngsters tothis project is to invite youngsters to

do this business.

do this business.

 A business  A business having having sufficient Psufficient PROROFIT FIT & stand & stand as as aa SERVICE SECTOR.

SERVICE SECTOR. 

Hope Hope you you all had a gall had a good time & a ood time & a clear clear picture aboutpicture about

this business.

this business.

References

Related documents

April 2015 Petra Posedel Šimović, Marina Tkalec and Maruška Vizek..

McKenna Kerrigan (MC) Dominika Dzurny (MC) Anton Nguyen(MC) McKenna Kerrigan (MC) Dominika Dzurny (MC) Zachary & Madison Coriarty Konrad Dzurny Harold Taylor (MC) Zachary

physicians, affiliated clinicians, sleep technologists and staff are dedicated to helping you with your sleep issues. Please take a few minutes to fill out this questionnaire

Athletes who do not present a Horse’s Passport and/or Recognition Card, or one that is not correctly validated, or failing to meet other passport requirements

Total fertilization with rising doses of municipal sewage sludge and an equal dose of wheat straw, in comparison with the control objects, re- sulted in an

As the main factor of production shifts from land (before tk ) to physical capital (between tk and th) and then to human capital (after th), the relative economic and hence

Problem ‹ size/complexity of research ‹ developing evidence- based policy ‹ lack of access ‹ organizational barriers Problem ‹ size/complexity of research ‹ developing evidence-

Lifepaths 1st Term Length Benefits Special Rules Hazardous Duty Rank 2nd Term Length Benefits Special Rules Hazardous Duty Rank 3rd Term Length Benefits