KABLE MYANMAR FACTORY PROJECT

KABLE MYANMAR FACTORY PROJECT

METHOD OF STATEMENT FOR ELECTRICAL WORK

METHOD OF STATEMENT FOR ELECTRICAL WORK

PRESENTED BY

PRESENTED BY

GOLDEN FUTURE MYANMAR POWER

GOLDEN FUTURE MYANMAR POWER

April 4th 2019

April 4th 2019

(2)

1.

1. IntroductionIntroduction 2.

2. Scope of WorkScope of Work 3.

3. Method of Statement for Excavation, Pipe Laying and Back FillingMethod of Statement for Excavation, Pipe Laying and Back Filling 4.

4. Method of Statement for Manhole CastingMethod of Statement for Manhole Casting 5.

5. Method of Statement for Lamp post ErectionMethod of Statement for Lamp post Erection 6.

6. Method of Statement for CablingMethod of Statement for Cabling 7.

7. Method of Statement for Transformer InstallationMethod of Statement for Transformer Installation 8.

8. Method of Statement for MV/LV Panel InstallationMethod of Statement for MV/LV Panel Installation 9.

9. Method of Statement for Termination of MV Method of Statement for Termination of MV CableCable 10.

10.Method of Statement for Lighting Fixture InstallationMethod of Statement for Lighting Fixture Installation 11.

(3)

1.

1. INTRODUCTIONINTRODUCTION

This Method of Statement is issued as a confidential document and at all times This Method of Statement is issued as a confidential document and at all times remains the property of GFMP. This MOS is a live document and will be remains the property of GFMP. This MOS is a live document and will be updated from time to time to incorporate changing site circumstance and updated from time to time to incorporate changing site circumstance and

client’s recommendations. Copies of this plan will be provi

client’s recommendations. Copies of this plan will be provided toded to subcontractors and other parties working under GFMP.

subcontractors and other parties working under GFMP.

2.

2. SCOPE OF WORKSCOPE OF WORK

Supply, Delivery and Installation of Electrical System. Supply, Delivery and Installation of Electrical System.

3.

3. METHOD OF STATEMENT FOR EXCAVATION, PIPE LAYING AND BACK FIMETHOD OF STATEMENT FOR EXCAVATION, PIPE LAYING AND BACK FI LLINGLLING 1.1

1.1 Scope of ActivityScope of Activity

The Scope of Method of Statement is to describe the method of The Scope of Method of Statement is to describe the method of excavation for HDPE Flexible pipe laying for the proposed KALBE excavation for HDPE Flexible pipe laying for the proposed KALBE Project, Thilawa SEZ A, Yangon, Myanmar.

Project, Thilawa SEZ A, Yangon, Myanmar. 1.2

1.2 Site ObservationSite Observation

Before Commencement of the planned work, carry out examination Before Commencement of the planned work, carry out examination of the physical condition of

of the physical condition of the area for ongoing activities, blockagesthe area for ongoing activities, blockages of Ingress/ Egress and the weather

of Ingress/ Egress and the weather condition.condition. 1.3

1.3 Method of StatementMethod of Statement Preparation Preparation

 Load all equipment required for JobLoad all equipment required for Job 

 Report to KDK and received approvalReport to KDK and received approval 

 Put on personal protective equipmentPut on personal protective equipment 

 Inform all other contractors in the area of start to workInform all other contractors in the area of start to work 

 Liaise with Main contractor and other contractor to beLiaise with Main contractor and other contractor to be

ensure safe operation ensure safe operation

 Cordon of work areaCordon of work area 

 Ensure the area to be worked and exit points are clear ofEnsure the area to be worked and exit points are clear of

obstruction obstruction

(4)

 Determine location of underground servicesDetermine location of underground services

Producer Producer

 Provide copies of the shop drawings, copy of the permit toProvide copies of the shop drawings, copy of the permit to

work & necessary instructions. Briefly introduce the work & necessary instructions. Briefly introduce the workers on the safety aspects & safe work procedures. workers on the safety aspects & safe work procedures. Barricade the area of working.

Barricade the area of working.

 Mark out area to be excavated with marker paintMark out area to be excavated with marker paint 

 Bring excavator onto site following safety proceduresBring excavator onto site following safety procedures

listed above listed above

 Ensure trained banksman is available to watch excavationEnsure trained banksman is available to watch excavation

work work

 Dig out ground as per contract drawings to required sizeDig out ground as per contract drawings to required size

and depth and depth

 All excavations must be left safe at the end of each dayAll excavations must be left safe at the end of each day 

 The bottom of trench will be compacted prior toThe bottom of trench will be compacted prior to

installation of

installation of sand bedding sand bedding for the pfor the pipeipe

 The pipe will be laydown as The pipe will be laydown as indicated on the approvedindicated on the approved shop drawings and according to

shop drawings and according to manufacturemanufacturer’s writingr’s writing

instruction instruction

 After pipe laying, back fill will start step After pipe laying, back fill will start step by step.by step.

1.4 Waste Management 1.4 Waste Management

All waste materials to be removed from site on a daily basis. Trash All waste materials to be removed from site on a daily basis. Trash collecting bags are to be provided at the working areas. All general collecting bags are to be provided at the working areas. All general waste to be thrown into the

waste to be thrown into the provided trash bags according to the typeprovided trash bags according to the type of garbage (Segregate waste before disposal) and should be disposed of garbage (Segregate waste before disposal) and should be disposed in to the relevant metal

in to the relevant metal waste bins provided.waste bins provided. Wooden crates or palettes must be

(5)

To perform general housekeeping every day after the

To perform general housekeeping every day after the workwork Mass housekeeping exercise to be performed on weekly basis Mass housekeeping exercise to be performed on weekly basis

4.

4. METHOD OF STATEMENT FOR MANHOLE CASTINGMETHOD OF STATEMENT FOR MANHOLE CASTING 1.1

1.1 Scope of ActivityScope of Activity

The Scope of Method of Statement is to describe the method of The Scope of Method of Statement is to describe the method of excavation and electrical manhole casting for propose KALBE Project, excavation and electrical manhole casting for propose KALBE Project, Thilawa SEZ A,

Thilawa SEZ A, Yangon, Myanmar.Yangon, Myanmar. 1.2

1.2 Site ObservationSite Observation

Before Commencement of the planned work, carry out examination Before Commencement of the planned work, carry out examination of the physical condition of the

of the physical condition of the area for ongoing activities, blockagesarea for ongoing activities, blockages of Ingress/ Egress and the weather

of Ingress/ Egress and the weather condition.condition. 1.3

1.3 Method of StatementMethod of Statement Preparation Preparation

 Load all equipment required for JobLoad all equipment required for Job 

 Report to KDK and received approvalReport to KDK and received approval 

 Put on personal protective equipmentPut on personal protective equipment 

 Inform all other contractors in the area of start to workInform all other contractors in the area of start to work 

 Liaise with Main contractor and other contractor to beLiaise with Main contractor and other contractor to be

ensure safe operation ensure safe operation

 Cordon of work areaCordon of work area 

 Ensure the area to be worked and exit points are clear ofEnsure the area to be worked and exit points are clear of

obstruction obstruction

 Ensure that safe access and Ensure that safe access and egress is maintainedegress is maintained 

 Determine location of underground servicesDetermine location of underground services

Producer Producer

 Provide copies of the shop drawings, copy of the permit toProvide copies of the shop drawings, copy of the permit to

work & necessary instructions. Briefly introduce the work & necessary instructions. Briefly introduce the

(6)

Barricade the area of working. Barricade the area of working.

 Mark out area to be excavated with marker paintMark out area to be excavated with marker paint 

 Bring excavator onto site following safety proceduresBring excavator onto site following safety procedures

listed above listed above

 Ensure trained banksman is available to watch excavationEnsure trained banksman is available to watch excavation

work work

 Dig out ground as per contract drawings to required sizeDig out ground as per contract drawings to required size

and depth and depth

 All excavations must be left safe at the end of each dayAll excavations must be left safe at the end of each day 

 The bottom of trench will be compacted prior toThe bottom of trench will be compacted prior to

installation of

installation of sand bedding sand bedding for the pfor the pipeipe

 Start fabricating rebar work at the work shop and Start fabricating rebar work at the work shop and InstallInstall

rebar at designated manhole. rebar at designated manhole.

 After finished rebar work, pour coAfter finished rebar work, pour concrete ncrete step by step.step by step.

1.4 Waste Management 1.4 Waste Management

All waste materials to be removed from site on a daily basis. Trash All waste materials to be removed from site on a daily basis. Trash collecting bags are to be provided at the working areas. All general collecting bags are to be provided at the working areas. All general waste to be thrown into the

waste to be thrown into the provided trash bags according to the typeprovided trash bags according to the type of garbage (Segregate waste before disposal) and should be disposed of garbage (Segregate waste before disposal) and should be disposed in to the relevant metal

in to the relevant metal waste bins provided.waste bins provided.

Wooden crates or palettes must be dismembered before disposal Wooden crates or palettes must be dismembered before disposal

(7)

5.

5. METHOD OF STATEMENT FOR LAMP POST METHOD OF STATEMENT FOR LAMP POST Erection.Erection. 1.1

1.1 Scope of ActivityScope of Activity

The Scope of Method of Statement is to describe the method of The Scope of Method of Statement is to describe the method of erection for the proposed KALBE Project, Thilawa SEZ A, Yangon, erection for the proposed KALBE Project, Thilawa SEZ A, Yangon, Myanmar.

Myanmar. 1.2

1.2 Site ObservationSite Observation

Before Commencement of the planned work, carry out examination Before Commencement of the planned work, carry out examination of the physical condition of the

of the physical condition of the area for ongoing activities, blockagesarea for ongoing activities, blockages of Ingress/ Egress and the weather

of Ingress/ Egress and the weather condition.condition. 1.3

1.3 Method of StatementMethod of Statement Preparation Preparation

 Load all equipment required for JobLoad all equipment required for Job 

 Report to KDK and received approvalReport to KDK and received approval 

 Put on personal protective equipmentPut on personal protective equipment 

 Inform all other contractors in the area of start to workInform all other contractors in the area of start to work 

 Liaise with Main contractor and other contractor to beLiaise with Main contractor and other contractor to be

ensure safe operation ensure safe operation

 Cordon of work areaCordon of work area 

 Ensure the area to be worked and exit points are clear ofEnsure the area to be worked and exit points are clear of

obstruction obstruction

 Ensure that safe access and Ensure that safe access and egress is maintainedegress is maintained 

 Determine location of underground servicesDetermine location of underground services

Producer Producer

 Provide copies of the shop drawings, copy of the permit toProvide copies of the shop drawings, copy of the permit to

work & necessary instructions. Briefly introduce the work & necessary instructions. Briefly introduce the workers on the safety aspects & safe work procedures. workers on the safety aspects & safe work procedures. Barricade the area of working.

Barricade the area of working.

 Mark out area to be excavated with marker paintMark out area to be excavated with marker paint 

 After excavation put precast base at excavated area andAfter excavation put precast base at excavated area and

back filling. back filling.

(8)

 Ensure all lifting tackle is check for its capacity andEnsure all lifting tackle is check for its capacity and

adequacy for the weight of pole

adequacy for the weight of pole being lifted.being lifted.

 Attached a single loop sling around the Attached a single loop sling around the pole atpole at

approximately two third of overall height, taking care not approximately two third of overall height, taking care not to damage the pole finish. The slings shall not be

to damage the pole finish. The slings shall not be wrapped tight around the pole

wrapped tight around the pole

 On the opposite side of the lifting side attached theOn the opposite side of the lifting side attached the

safety rope from the sling and attached the other end to safety rope from the sling and attached the other end to hook which is to be hooked into the access door. Ensure hook which is to be hooked into the access door. Ensure the safety rope is taught at all time

the safety rope is taught at all time

 Began lifting the pole. After lifting the top of the poleBegan lifting the pole. After lifting the top of the pole

approximately approximately

 After pipe laying, back fill will start step After pipe laying, back fill will start step by step.by step.

1.4 Waste Management 1.4 Waste Management

All waste materials to be removed from site on a daily basis. Trash All waste materials to be removed from site on a daily basis. Trash collecting bags are to be provided at the working areas. All general collecting bags are to be provided at the working areas. All general waste to be thrown into the

waste to be thrown into the provided trash bags according to the typeprovided trash bags according to the type of garbage (Segregate waste before disposal) and should be disposed of garbage (Segregate waste before disposal) and should be disposed in to the relevant metal

in to the relevant metal waste bins provided.waste bins provided. Wooden crates or palettes must be

(9)

9 9

References

Related documents

Therefore, our understanding is that 100% of all claims costs are attributed to the motorcycle class in cases where a motorcycle rider is involved in an accident not involving

Ensure appropriately marked asbestos waste disposal bags are available. Carry out the work with as few people present as possible. A decision on whether to segregate the asbestos

An analysis of the economic contribution of the software industry examined the effect of software activity on the Lebanese economy by measuring it in terms of output and value

All garbage/trash inside or outside must be disposed of properly and removed from the building in Boulder Junction Transfer Site bags (“Boulder Bags”)

 

Q: If a unit charges into combat and, on the turn it charges, the last of the enemy unit it is fighting are removed as casualties due to Daemonic Instability, the Unstable special

Masks are picked up your waste must be clear plastic bags of trash pickup schedule the city of my containers is on collection day falls on trash schedule near me.. Electronic

use of mobile devices, including those owned by individuals. The  North Carolina Budget Manual