(1)

1

Cement Bond Logging

with DSLT

(2)

Outline CBL-VDL

Introduction to Cementing

Role of cementing

Mechanics

Sonic as a Cement Evaluation tool

Hardware

Operations

Parameters & Setup

LQC & Hints

Normalization

Safety

(3)

3

CBL-VDL

(4)
(5)

5

Role of primary cementing

Conductor Casing (spudded)

Isolate loose surface sediments Avoid surface corrosion

Surface Casing

Isolate sweet water zones Mounting rig BOP and later CSG strings

Oil string (Casing/Liner)

Isolate production zones

Avoid hydrocarbon loss to thief zones Reduce water production

Intermediate Casing

Isolate loose or high pressure formation

(6)

b

Environment

Fluid filled casing

Cement top.

Poor cement to formation bond. (example: due to mud-cake)

Formation

Micro-Annulus due to expansion of casing during cement job.

Less than perfect cement job. Two stage cement job.

(7)

7

Role of secondary cementing

Repair defects in primary cementing job

Unsuccessful primary cementing

Casing corrosion, leaking, split

(8)

Causes of bad cementing

Mechanical problems

Poor pipe centralisation

 Hole conditions: Poor removal of mud from around pipe Channels or missing cement

Pressure problems

Influx of formation fluid

 Loss of cement into permeable zone: Permeable, weakened or missing cement

Micro-and cement annulus

(Casing flexing contraction)

 Changes in pressure inside casing before setting  Over pressuring the casing after cement setting

(9)

9

(10)

Why run CBL-VDL

• Primary application is to evaluate the quality of the

casing cement job

• Secondary but equally important application is to

depth match the open hole GR to the cased hole CCL

• The CBL-VDL-GR-CCL becomes the cased hole base

(11)

11

Sonic Path in Cased Hole

CBL measures casing to cement bond

VDL indicates cement to formation bond if casing to

(12)

Cement to Casing Bond

If the casing is well bonded, the

sound will be attenuated as it travels through the casing

The received amplitude will be low We measure E1 amplitude and call it CBL Transit Time (TT) 2 4 3 1

(13)

13

Free Pipe Amplitude

If there is no cement bonded to the casing, then the amplitude will not be attenuated.

This is called the free pipe amplitude. CBL: Free Pipe 2 4 3 1

(14)

Less Than Perfect Bond

The more “free” pipe or

“contaminated” cement in an interval , the poorer the bond.

If the cement job is not perfect, the amplitude will not decrease as

much.

2

4 3 1

(15)

15

(16)

Sound Transmission

Water Steel

Cement

Sound

The amount of sound transmitted depends on the acoustic

impedance (Z) difference between the two materials

•If Z1/Z2 is high, low transmittance

•If Z1/Z2 is low, high transmittance

Z1 Z2

(17)

17

Sonic Path in Cased Hole

VDL

CBL

(18)

5ft VDL

5ft VDL gives deeper depth of investigation than 3ft CBL

5ft VDL indicates cement to formation bond if casing to

(19)

19

Expected Free Pipe CBL Values

Casing size Weight (lb/ft) Expected free-pipe reading SLS-W SLS-C 5 in. 15 245 238 77mV 18 243 236 21 241 234 5.5 in. 15.5 254 248 71 mV 17 253 247 20 251 245 23 250 243 7 in. 23 278 271 61 mV 26 276 270 29 275 268 32 273 267 35 272 265 38 271 264 40 269 262 7.625 in. 26.4 288 282 59 mV 29.7 287 280 33.7 285 278 39 283 276 9.625 in. 40 320 313 52 mV 43.5 318 312 47 317 310 53.5 315 308 10.75 in. 40.5 340 333 50 mV 45.5 339 332 48 338 331 51 337 330 54 336 329 55.5 335 328 13.375 in. 48 385 378 47 mV 68 380 373 Estimated transit time (msec) (ETT)

These values are for water filled casing

(20)

Factor effecting tool response

Eccentering

Cycle skipping

Fast Formation

(if good cement)

Fluid Type

Stretch

Casing Size

(21)

21

Eccentering

As in open hole, the amplitude is dramatically decreased when the tool is eccentered.

This will give show an incorrectly good bond.

Since the travel distance is

decreased, the transit time will also decrease.

Transit Time (TT)

A bad log which

cannot be played back.

2

4 3 1

(22)

Eccentering Effects

(23)

23

Cycle Skipping

(24)
(25)

25

Micro Annulus

A micro annulus is caused by the expansion of the casing under pressure during cementing.

E1 amplitude is larger than it should be (poorer bond than actual)

A pressure pass can be used to eliminate the micro annulus.

CBL: Poor Bond

2

4 3 1

(26)

Interpretation Hints

VDL

TYPE OF BOND CBL CASING FORMATION

AMPLITUDE ARRIVALS ARRIVAL

Free Pipe High Large Very Weak or none

Good Casing -

to - Cement - Low Weak Strong

to - Formation

Good Casing Bond

- Poor Formation Bond Low Moderate to Weak Weak or none

Microannulus, Channeling,

Thin Cement Sheath High Moderate Moderate

(27)

27

(28)

Cement to Formation Bond

2

4 3 1

(29)

29

Conclusion

CBL – VDL Measurement Provides

Casing to Cement Bond

Cement to Formation Bond

Zonal Isolation

Channels / Patchy Cement Identification

References

Related documents

Welfare of newborn and future generations now increases after the reform since these cohorts can reduce their capital income tax burden significantly by saving in the accounts

Communicate to the SWAs interested in applying for and using the 1099 data how to overcome: the complexity of the IRS application process; the difficulty in meeting the IRS

For example, the same error in the input wind speed that is used in the surface roughness correction or in the reflected galactic radiation will result in a much larger uncertainty

The symbol table following appeared in the “Last Will and Testament” of Basilius Valentinus. It has been augmented with symbols from other sources such as the Alchemist’s Handbook

Blank for Page Turn... giocoso

This isn’t surprising, as the impedance of the inductor and the impedance of the capacitor essentially cancel each other out as they have approximately the same magnitude but

Column (1) in Table VII shows that, in and of itself, privatization does not have a significant effect on the leverage of regulated firms, but regulatory independence does:

Ozka definicija pa opredeljuje družinsko podjetje kot tisto, pri katerem so v poslovanje vpleteni družinski člani več generacij, ter ima managerske odgovornosti več kot en član