Envisioning the Facilities of The Future –

Collaborative & Integrated Program

Planning

(2)

Facilities Management Programs

AALAC Accreditation Program Support Adopt-A-Spot Program

Asset Management

Architecture Pond/Wildlife Habitat Program Auto/Fleet Program

Building Coordinator Program

Business Plans Program Management Campus Recreation Capital Plan FCA/ Renewal Planning Program

Childcare Accreditation Program Support

Classroom Operations (Physical Program Support) Classroom Projects Capital Planning

CLICK (Creating Literacy In Computer Knowledge) Communications & Marketing Program

Continuing Service Agreements (CSA) Cooperative & State Contract Utilization CRDM Program

Custodial Program

Elevator PM & Repairs Program

FSC / Work Management Support Program FAMIS & Work Management

FCA Planned Audit Program Fire/Life Safety Program FM Employee Recognition

FM Staff Advisory & Diversity Committee FM Professional Development

FM Mandatory Staff Training FM Sustainability

Fountains Maintenance & Renewal Infrastructure Planning

Job Order Contracting (JOC) Kitchen/Dining PM Plan Locks & Keys Centralization Metering Program Plan

Facilities Operational Contracting Program

Parking & Transportation Projects (2 Year Capital Plan) Parking Garage Management Program

PM & Zone Maintenance Program

Plant Ops Employee Orientation/Onboarding Program PREP Planning Program

Procurement & Inventory Process Program Project Delivery Program & Training

Radio/Communications Program Rigging PM & Repairs Program SHRL Capital Plan Support

Solid Waste & Recycling Program Uniform Program

University Centers Renewal Plan Support Wortham House Capital Plan

(3)

Program Highlight: Custodial Services Program

Service, Mission and Goals

The FM Custodial Services Program strives to provide the University with clean, safe and

environmentally friendly space, and works to ensure a quality learning environment for

faculty, staff and visitors in support of the University’s mission of teaching research and

community service.

Custodial Services support 106 Facilities over 11.3M GSF

Staff are critical to environmental services and are part of a distributed service model

integrated with auxiliaries in September 2011

Managed Care Level (APPA 3 is funded/targeted for new space)

Current Staffing Mix: 11 of 106 facilities are outsourced

o

10% Outsourced ($.95 / CSF)

o

90% In-House ($1.24 / CSF) - 183 FTE’s

2018 Target goal will be 40/60 Contract / In-House Split

o

Targeted model mix allows for funding efficiencies

o

Savings achieved through outsourcing allows for program reinvestment; service level

enhancements in all facilities

o

Mix will occur through natural attrition and staff reassignments to areas with gaps in

service (hours of operation) model –

this is not a personnel reduction effort, but a

strategic reinvestment plan.

(4)

Space Funding Levels

(5)

Funding Trend FY06-FY12

Category FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 Total Expenses $11,900,430 $11,087,366 $13,973,752 $12,801,338 $12,311,248 $12,930,429 $12,151,993 Campus E&G - GSF 5,249,639 5,249,639 5,483,228 5,405,985 5,576,458 5,245,264 5,594,204 Cost/GSF $2.27 $2.11 $2.55 $2.37 $2.21 $2.47 $2.17 CRDM Allowance * $10,000,000 $10,000,000 $10,000,000 $3,000,000 $2,539,397 $5,013,924 $8,396,345 CRDM/GSF $1.90 $1.90 $1.82 $0.55 $0.46 $0.96 $1.50 Total/GSF $4.17 $4.02 $4.37 $2.92 $2.66 $3.42 $3.67 Variance from APPA ($4.17) ($4.02) ($4.37) ($2.92) ($2.66) ($3.42) ($3.67) 5
(6)

Program Model: Reinvestment

6

Custodial Program Model Component Outline

• Custodial Program Elements

Level of Service by Space type – established and documented 2011

Personnel & Benefits: Market Wage is our Goal

Staff Equity (pay)

o Three phased equity review – first phase completed in FY12 brought custodial staff from 64% to 84% of market wage - $430,056 investment to date

o Deleted last minimum wage job pay grade 101 from the university – FY12

Space, Computer Access & Computer Literacy Training

o Computer room built with 36 terminals and access for all staff

o Computer Literacy Classes and Training scheduled and ongoing

o All training materials & communications now in English/Spanish

Equipment & Resources (capital equipment and supplies)

o Inventory and full replacement of custodial equipment planned for FY 13/14

Uniforms

– outsourcing and laundering in FY13 for all front line staff to improve appearance and comfort

Custodial Level of Service Training –

quarterly & annual – will be providing first formal training program ever (English & Spanish) for in house staff, custodial, level of service & EHS

Inspections & Quality Assurance

– post training FY 2013

Performance Metrics -

Customer Surveys to roll out by April 2013 and inspection results by September 2013 from McLemore Program Model
(7)

Custodial Program Elements Continued:

7

Contracts Targeted

:

o

Enhanced service level for high use and technical spaces (labs, food &

dining, etc.)

o

Contracting Elements: Target Historically Underutilized Business (HUB) to

ensure this contracting element supports the community in which UH resides

*All contracts to date are 100% HUB

o

New, Full Renovations or Auxiliary Spaces

Staffing, Shift & CSF Distribution

• Program plan will utilize contracting opportunities to fill service gaps for

mid-shift needs across campus – ongoing as contracts are executed

• Target of 1 FTE per 20,000-30,000 GSF based on space type

o

Research and Auxiliary space 1 FTE per 20-25,000 CSF

o

E&G & Administrative – 1 FTE per 30,000 CSF

o

Redistribution of FTE’s will allow for service enhancement in existing spaces

funded at a lower level

o

Classroom reinvestment is targeted (3 FTE’s being committed to classrooms this

year) 1 custodial and 2 maintenance

(8)

Custodial Program Elements Continued:

8

McLemore Building Maintenance RFQ730-12074

Janitorial Development Project for University of Houston Updated: January 14, 2013

Approximate

# Days Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9 Week 10 Week 11 Week 12 Week 13 Week 14 Equipment Inventory & Evaluation

Complete Inventory of All Equipment1 15 Condition Assessment & Repair Plan 7 Recommendations and Transition Plan 7

Including Capital Renewal / Replacement Plan

Training System Development & Initial Training

Develop Customized Program2, 3 15

Set up Specialized Training Modules 15

Develop New Employee Orientation 15

Training for Trainers 7

Initial Management & Employee Training Sessions 7

Inspection Services & System Setup

System Setup (by UH) 0

Monthly Inspections (15 per month) 3 Inspection Follow-up & Program Adjustments 7

Quarterly Training & Ongoing Support

Quarterly Continuing Education 7

Monthly Meeting 1

M. Knight with Managers & Supervisors

(9)

Planning Forward

Creativity, Innovation & Collaboration Have Become Critical

• Research & Residential Missions are top priorities

• Academic, Private & Public Partnerships are essential to our long term

success in all program areas

• Streamlining operations & simplifying processes in all areas

o

Space utilization and reduction in net new space, collaborative and flexible

space are core plan components

o

Leveraging spend & targeting investments (Facilities, Campus & System

Wide)

o

Improving Data & Technology (handhelds, work management systems,

database integrations and self-service modules, integrated space, facilities,

project and capital planning)

o

Reducing organizational complexity & improving operational efficiency

o

Continuous improvement of all service areas – must be flexible and scalable

o

Encourage & Reward Innovation, Flexibility & Accountability

o

People Are Our Business and They will Create The Future

o

Planning Ahead & Ask Why?

(10)

Discussion & Questions

References

Related documents

household head and household size had a positive impact on labor allocation to non-farm

Manufacturer & Exporter of Auto & Semi Auto Corrugated Box Manufacturing Plant, Auto Ruling Machinery, Automatic Ruling Machines, Automatic Folder Gluer for Cartoons,

Because all of the policies held within your multiple accounts are tied to your Purchaser ID and Unique Identification Number, you may submit one Proof of Claim form (which

The aim of the tobacco control strategy is not only to stimulate smoking cessation but also to protect non- smokers from passive exposure to tobacco smoke in public places, as well

While several studies have examined relationships between 5-HTTLPR and processing of facial emotions, most of these studies include younger adults and children. The impact of

Topography of lymph node metastases in prostate cancer patients undergoing radical prostatectomy and extended lymphadenectomy: results of a combined molecular and histo-

If the first two or more strokes are horizontals, the position is given to the first down or upstroke after the horizontals. the short sound of o. In words like gut, rut,

For instance, diabetic patients were highly adherent to various self- management practices such as blood glucose monitoring, foot care, and exercise practice, diet