MDM PROJECT BEST PRACTICE
| 2 ©www.arhis.com 2014
AGENDA
1. Presenting Arhis
1. Arhis presentation and value proposition 2. Arhis MDM projects approach.
3. Arhis MDM Factory
4. Energy domain MDM implementation
2. Presenting EDF Business case
1. Presenting EDF
2. EDF Hydro Generation 3. PRERHY Project
4. Project scope and achievements
| 3 ©www.arhis.com 2014
ARHIS VALUE PROPOSITION
A SWISS LEADER IN THE MDM FIELD !
Our focus is Master Data Management
Arhis is a clear leader in the MDM implementation space since its creation with more than 30 success stories
Capitalizing on Best Vendors solutions
A unique expertise on key vendors solutions (Informatica)
A value-added offering with a team of highly qualified MDM Hub engineers
Implementation best practices combined with a proven MDM project methodology.
Our value proposition : Customer Satisfaction at a reasonable Total Cost of Ownership
Speed of execution
Reliability in quality and delivery
Strong commitment
| 4 ©www.arhis.com 2014
ARHIS : A STRONG MDM EXPERTISE
| 5 ©www.arhis.com 2014
ARHIS : MDM PROJECT APPROACH
PHASED, ITERATIVE APPROACH USING INFORMATICA AND ARHIS TOOLS
“Agile” Iterations
ARHIS Factory
| 6 ©www.arhis.com 2014
ARHIS MDM FACTORY
BEST PRACTICES AND ACCELERATOR TOOLS
Methodology and Skills :
Factory Concepts have proven to work in large projects
Arhis has delivered MDM Vanilla in less than 2 months
100 screens , 80 base objects
Tools :
Schemagen concepts adopted by EDF and large customers as
Arhis methodology
Datagen intensivelly used for data generation (Tests)
SiFTester WebService Framework deployment accelerator
Reusable Components shapes :
| 7 ©www.arhis.com 2014
MDM IMPLEMENTATIONS OPTIONS
| 8 ©www.arhis.com 2014
ARHIS : MDM IN THE ENERGY SECTOR
VERY CENTRALISED HYBRID STYLE MDM IMPLEMENTATIONS
System live (Q2 2014)
Live by Q4 2014
Zurich Informatica day 2013
“GRT Gaz owns and operates
the
largest
High
Pressure
Natural
Gaz
network
in
Europe”
This year we present :
“A world leader in electricity”
Hybrid
Very CentralizedEDF PRERHY
Informatica Day
| 10
EDF: A GLOBAL LEADER
IN ELECTRICITY
We are a world leader in electricity
Covering all activities: generation (from nuclear to renewables), networks, sales and trading
We are an international group
With roots in Europe and long-term partnerships and cooperation agreements in high-growth countries
Key Figures :
€72.7 billion
in sales
39.3 million
customers
159,740 employees
worldwide
84.7% of generation does not emit
CO2| 11
EDF: AN INTERNATIONAL GROUP
| 12
EDF: ELECTRICITY GENERATION IN FRANCE
EDF PRERHY - Informatica Day - june 2014
Generation :
Nuclear: safety reinforced, Flamanville EPR to generate its first TWh in 2016 Hydropower: SuperHydro renovation program 73% (2012 results) completed and
RenouvEau project being deployed
| 13
EDF: HYDRO GENERATION IN FRANCE
EDF PRERHY - Informatica Day - june 2014
2 700 MW 7 600 MW 2 500 MW 2 600 MW 4 600 MW
DPIH (Direction of HydroPower Engineering & Generation) : 4 800 employees
5 Generation Units (Est, Alpes, …) 2 Engineering Units (CIH, DTG)
447 power plants , 1 200 generators
From 100 kW to 1 800 MW • 10% > 100 MW (50% of total) • 50% < 12 MW (10% of total) 640 dams , 3 500 valves 1 500 km galleries 270 km penstocks
Among them 100 are operated remotely
| 14
PRERHY PROJECT : CONTEXT & STAKES
PRERHY : « Projet de REnovation du Référentiel des moyens de production de
L'HYdraulique »
Renovation of the Hydropower Generation Assets Frame of Reference
CONTEXT : Several changes have significant impacts on DPIH organization :
Deployment of the RenouvEau renovation program : • Strong evolution of hydropower generation business processes
• Supported by a big effort to modernize the information system
Increase of regulatory constraints (safety)
A lot of hydro concessions to be renewed during the next years
STAKES : Governance of Master Data identified as a key success factor
To keep a strong knowledge of the generation portfolio
To validate and share master reference data among all stakeholders, from engineering
to generation teams
| 15
PRERHY: OBJECTIVES & MDM PROJECT
OBJECTIVES :
Overhaul of the repository of hydropower generation assets description • Extension of the depth of assets description
• Evolution to become master of data on its scope of data
Initialize master data values with a quality level sufficient to be recognized as the truth
Set up the master data governance organization at the DPIH level MDM Project :
New « DoReMHy v3 » application will be based on a MDM solution :
• In March 2013 , EDF has selected Informatica MDM Hub with BPM ActiveVOS option
• Use of ETL PowerCenter and Informatica Data Quality
Project plan has an iterative roadmap to implement business objects, services and
interfaces
On going : 1st iteration, (version) to be deployed in production end of 2014 3 iterations scheduled until end of 2015
| 16
PRERHY: ESTIMATE OF KEY FIGURES
31 Business Objects , classified into 19 « Categories »
290 Attributes , up to 45 attributes per Business Object
21 DataBases as source or / and target
<= 100 000 records with an estimate of 10% renewal per year
Potential Declared Users at the end of the project :
10 Administrators (business) 50 Data Stewards
1 000 Users with ability to create, modify, validate master data Up to 4 500 Users in consultation
| 17
PRERHY : ITERATIVE MDM IMPLEMENTATION
| 18 EDF PRERHY - Informatica Day - june 2014
| 19
ACHIEVEMENTS : P1 DELIVERED IN DUE TIME !
ITERATION 1 = P1 + P2
EDF PRERHY - Informatica Day - june 2014
Bugs Fixing P1 Documenta tion delivery Ta k e O v e r Business Rules Match and Merge Rules
Tests Prep HUB Model Technical Acceptance Périmètre 1 IDD Model Tests Prep Input / Output Flows Tests Prep MDM HUB UI FLOWS
Nov 1 Nov 2 2013Dec 1 Dec 2 Jan 1 Jan 2Année 2014Fev 1 Fev 2 Mars1
Project Management
Architecture and technical coordination
START End 2 End End 2 End End 2 End IDD Configuration Customization Presentation of « Vanilla» IT acceptance tests
EDF Package Installation
Installation Packages Mars2 2014 End of March
P2 Start
P1
| 20
ACHIEVEMENTS ITERATION 1 – PART 1
EDF PRERHY - Informatica Day - june 2014
DV3
P1
Around sixty base objects tables
More than sixty rules to implement between the ETL (Powercenter) and MDM HUB
Complexity of datastewardship controls, cardinalities, cleansing,
A rich User Interface
| 21
NEXT STEPS
EDF PRERHY - Informatica Day - june 2014
1.
FINISH P2 - ITERATION 1 CONSTRUCTION
2.
GET IT ACCEPTANCE FOR P2 (END OF Q2)
3.
GET USER ACCEPTANCE (Q3)
4.
GO LIVE (Q4 2014)
5.
ITERATION 2, 3 , … (2014, 2015…)
| 22
Q&A