METER DATA MANAGEMENT WORKSHOP

DECENTRALIZED SOLUTION

CASE STUDIES: SPAIN

Monica Gandolfi

Deputy Director – Promotion of Competition Regulation and Competition Department

CEER WORKSHOP ON METER DATA MANAGEMENT

(2)

2

Contents

OVERVIEW OF GAS AND ELECTRICITY RETAIL MARKETS IN SPAIN

THE EXISTING METER VALUE MANAGEMENT AND STORAGE MODEL

(3)

OVERVIEW OF GAS AND ELECTRICITY

RETAIL MARKETS IN SPAIN

(4)

4

The electricity retail market (2010 data)

Final demand 244 TWh Customers * 27 millions

DSOs > 300

Active suppliers > 100

The 3 main companies account for more than 90% of distribution

and 80% of retail supply

Distribution market shares (GWh)

Retail supply market shares (GWh)

7% Switching rate

72% Rate of permanence with supplier affiliated with DSO

Legal and functional unbundling

(5)

5

The gas retail market (2010 data)

Final demand 401 TWh Customers* > 7 millions

DSOs 6

Active suppliers > 60

The main company accounts for nearly 70% of distribution and

37% of retail supply

12% Switching rate

70% Rate of permanence with supplier affiliated with DSO

Distribution market shares (GWh)

Retail supply market shares (GWh) Legal and

functional unbundling

(6)

THE METER VALUE MANAGEMENT AND

STORAGE MODEL

(7)

Grant access to network under regulated TPA Perform meter reading Switching Billing Activations Deactivations Moving in/out 7

The Spanish retail market design: stakeholders’ roles

CUSTOMER SUPPLIER ONE CONTRACT Connections Desconnections Interventions on customers’ installations Information exchange regarding: meter data, switching and other business processes

DSO

(8)

8

The decentralized solution for information exchange

between suppliers and DSOs

DSO 1 SUPPLIER 1 DSO 2 SUPPLIER 2 DSO n SUPPLIER n

BILATERAL COMMUNICATIONS WITH DIFFERENT ELECTRONIC INTERFACES

EACH DSO KEEPS ITS OWN DATA STORAGE DSO 1 SUPPLIER 1 DSO 2 SUPPLIER 2 DSO n SUPPLIER n

BILATERAL COMMUNICATIONS WITH COMMON ELECTRONIC INTERFACE

EACH DSO KEEPS ITS OWN DATA STORAGE

THE SOLUTION IN THE ELECTRICITY MARKET

THE SOLUTION IN THE GAS MARKET

(9)

9

Standardization of communications for some processes

Example of information flowchart for a simple electricity switching process

(Published in OCSUM web page) OCSUM is a company established by regulation (RD 1011/2009), whose shareholders are suppliers (70%) and DSOs (30%) – it is

subject to CNE’s supervision

In both gas and electricity markets:

Agents have voluntarily agreed on detailed standard information flows regarding:

minimum contents of messages, actions to be taken, rejection causes, etc.

Agreements mainly apply to: switching, activations, deactivations and desconnections

and are updated on an ongoing basis

The switching office (OCSUM) supervises switching and communications between agents

Existing regulation only establishes general rules for these information exchanges

Comercializadora Entrante Distribuidora 1

• CUPS • CIF del cliente • Datos contacto (opcional ) • Plazo activación: fecha o período

lectura

SI NO

 Recepción comunicación de Comercializadora  Validación:

- Existencia del CUPS - Cliente correcto -…  Solicitud de contrato a la Distribuidora 2 • CUPS • Motivos de rechazo de la solicitud Comercializadora Saliente  Recepción de la comunicación de rechazo 11  Recepción de la comunicación de aceptación del cambio. • CUPS • Fecha prevista activación

y/o fecha de última lectura

• CUPS • Fecha de activación • Código contrato ATR • Datos de equipos y medidas • Parámetros contratados  Recepción de la comunicación de activación  Comunicación activación 5 1. A  Recepción de la comunicación de aceptación 2 • CUPS • Fecha prevista de activación

y/o fecha de última lectura • Parámetros contratados  Recepción de la comunicación de activación del cambio. • CUPS • Fecha de activación • Medidas de activación Envío con medidas de cierre * 6 C1 - CAMBIO DE COMERCIALIZADOR SIN CAMBIOS CONTRACTUALES

SOLO AT ¿Objeción Distribuidor? Envío con medidas de cierre* Máx. 5 días hábiles BT Máx.15 días naturales AT 6

*Excepto en solicitud de activación a fecha fija (de carácter voluntario por parte de los Distribuidores y sólo posible con Iberdrola Distribución), en cuyo caso se enviará la última lectura en lugar de la lectura de cierre si no se dispusiera de esta en la fecha del cambio.

(10)

10

Relevant regulation on access to DSO meter data

History

In 2002 introduction of first legal provisions on access to meter point data, but access

grounds were not well defined

Several competition cases emerged between 2007 and 2009 in electricity – Spanish

Competition Authority

Partly as a result of these cases regulation became stricter – perceived as a tool to foster

competition and prevent discriminatory use of information by DSO

Royal Decree 1011/2009 – homogenous regulation for gas and electricity meter point data

DSOs have the obligation to keep a data base of all meter points (SIPS) to allow for:

online consultation, without limits, of the data base

reception and validation of switching requests and other information exchanges

Failure to comply with this obligation is regarded as serious breach of law

(11)

11

The content of the meter point data base (SIPS)

Existing regulation establishes in detail the minimum data set to be included in the SIPS

Technical data

Unique meter point identification code

Exact location of the meter point

Voltage, network tariff, maximum authorized power, etc.

Monthly consumption over the two previous calendar years

Contracted power

Date of last supplier switching

Date of last reading

Non-payment indicator

Etc.

Customer data

Specification of whether owner is natural or legal person

Name and address of meter point owner

(12)

12

Customer rights as regards SIPS

Access to SIPS

Customers have the legal right to free access their consumption data in the SIPS

They can forbid DSOs to make these data accessible to suppliers:

Explicit written request to DSO

Request to be registered in the DSO data base and OCSUM must keep a copy

Customers cannot prevent his/her identification meter point code from being revealed in

case of non-payment

Decision of Spanish Highest Court of Appeal (December 2010)

SIPS regulation on private data exchange declared compatible with private data

protection legislation

SIPS regulation considered as proportionate and necessary to the aim of securing the

(13)

CONSIDERATIONS ON THE EXISTING

(AND FUTURE?) SOLUTIONS

(14)

14

Advantages and disadvantages of the existing

decentralized solution

COST EFFICIENCY Existing system

perceived as most cost efficient by DSOs

However, no CBA carried out to see whether central hub could be more cost efficient GOVERNANCE GOVERNANCE Clear ownership, management and financial structure of existing meter point data base

TRANSPARENCY Potential lack of

transparency and room for discriminatory

behaviour

Need for increasingly detailed and complex regulation

PROPORTIONALITY No alteration of DSOs data bases

Less intrusive than

introducing a new central hub system

IS THE BILATERAL DECENTRALIZED SOLUTION + MANDATORY REGULATION ACCEPTABLE?

(15)

15

Regulatory proposals to improve access to SIPS and

switching procedures

Inquiries and complaints received by CNE indicate that there is room for improvements

Not well defined roles and responsibilities for all agents

Room for some discretion by DSOs as meter data providers and market facilitators

Lack of specific time frames for some business processes

Etc.

The CNE has recently launched proposals to improve access to SIPs and switching procedures

Communications procedures to be established according to public and homogeneous

formats incorporated in detailed regulations (to be proposed by CNE, taking into account OCSUM proposal)

Establish detailed obligations and time frames for both suppliers and DSOs in relation with

(16)

16

Possible drivers for a potential move towards a

centralized solution ?

Competition developments have been a major driver towards existing regulation of free and unconditional access to SIPS

So far, most efforts dedicated to improve regulation/standardization rather than change current decentralized solution

Possible future drivers towards a centralized solution:

New entrants’ needs?

Further complaints and competition problems?

Changes related with the introduction of smart grids and demand response?

(17)

METER DATA MANAGEMENT WORKSHOP

DECENTRALIZED SOLUTION

CASE STUDIES: SPAIN

Monica Gandolfi

Deputy Director – Promotion of Competition Regulation and Competition Department

CEER WORKSHOP ON METER DATA MANAGEMENT

References

Related documents

His scientifi c interests are in insect chemical ecology, particularly the isolation and identifi cation of arthropod semiochemicals and their deployment in novel

Jackie generally answers the questions well; she uses a good deal of accurate language to produce extended discourse which is usually

In this paper, we propose SecControl, a new network protection framework bridging the gap between security tools and SDN technologies, to provide su ffi cient protection capabilities

– Extended thromboprophylaxis with rivaroxaban was significantly more effective than enoxaparin for venous thromboembolism prophylaxis, in patients undergoing total knee

[r]

To address these weaknesses, the European Commission proposed four Regula- tions 3 in September 2009 that aimed to restructure substantially EU financial super- vision, thereby

By considering the fact that the participants were allowed to choose more than one option in answering the questions, attitudes of surveyed physicians about the

The National Health Interview Survey, developed by HHS’s National Center for Health Statistics, was the source of measures of health status, behavior, and use of health care