CITY OF KISSIMMEE
BUILDING PERMIT MISCELLANEOUS/ACCESSORY
PERMIT #: _______________CODE IN EFFECT: 2010 FLORIDA BUILDING CODE PERMIT APPLICATIONS MUST BE FILLED OUT COMPLETELY 1. Construction Street Address:
2. Parcel ID: Subdivision:
3. Contractor: _______________________________________ License #: ________________________________________ Address: _________________________________________ Phone #: __________________________________________ Contact/Ext/Cell #: Fax # : 4. Owner: __________________________________________ Phone #: __________________________________________ Address: Fax #: 5. Architect/Designer: ________________________________ License #: ________________________________________ Address: Phone/Fax #: 6. Engineer: ________________________________________ License #: ________________________________________ Address: Phone/Fax #:
7. Is the Property: □ Single Family Residential □ Multi-Family □ Commercial □ Medical Office/Pharmacy 8. Proposed Work: □ Addition □ Alteration □ Pool/Spa □ Screen Enclosure □ Screen Room □ Re-roof
□ Demo □ Fence/Wall □ Shed □ Sign □ Tent □ Balloon □ Banner
9. Description of Work (Be specific): ___________________________________________________________________________ 10. Value of Work (include material and labor cost): $
Application Accepted By: Date: / / Plans Reviewed By: Date: / / Plans Approved By: Date: / / Fire Review Fee Building Review Fee Permit Fee Total Fee * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * NOTICE * * * * * * * * * * * * * * * * * * * * * * * * * * * * * SEPARATE PERMITS ARE REQUIRED FOR FIRE SYSTEMS, ALARMS, IRRIGATION, GAS, LOW-VOLTAGE, GREASE TRAPS, SIGNS, POOLS, FENCES, SCREEN ROOMS, AND OTHER ACCESSORY STRUCTURES. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTRUCTION AUTHORIZED IS NOT COMMENCED WITHIN 6 MONTHS OF
ISSUANCE, OR IF CONSTRUCTION OR WORK IS SUSPENDED OR ABANDONED, AT ANY TIME, FOR A PERIOD OF 6 MONTHS AFTER WORK IS COMMENCED.
WARNING TO OWNER: YOUR FAILURE TO RECORD A “NOTICE OF COMMENCEMENT” MAY RESULT IN YOUR PAYING TWICE FOR THE IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO BTAIN FINANCING, CONSULT WITH YOUR LENDER OR ATTORNEY BEFORE RECORDING YOUR “NOTICE OF COMMENCEMENT”.
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the
performance of construction. I further certify that no work has been commenced prior to the issuance of the permit, and that all work will conform to the applicable laws of construction under this jurisdiction.
_________________________________ ___/____/____ ________________________________ ___/____/___ Contractor Signature Date Owner Signature Date _________________________________ ________________________________
Printed Name Printed Name
**ALL PRE-SIGNED/ABSENTEE FORMS MUST BE NOTARIZED**
_________________________________ ___/____/____ Seal: Notary Signature Date
_____________________________________ Printed Name
***ADDENDUM***
“WARNING TO OWNER: YOUR FAILURE TO RECORD
A NOTICE OF COMMENCEMENT MAY RESULT IN
YOUR PAYING TWICE FOR IMPROVEMENTS TO YOUR
PROPERTY. A NOTICE OF COMMENCEMENT MUST BE
RECORDED AND POSTED ON THE JOB SITE BEFORE
THE FIRST INSPECTION. IF YOU INTEND TO OBTAIN
FINANCING, CONSULT WITH YOUR LENDER OR AN
ATTORNEY BEFORE RECORDING YOUR NOTICE OF
COMMENCEMENT.”
THE CITY OF KISSIMMEE HAS AN EXCLUSIVE
FRANCHISE AGREEMENT WITH WASTE
MANAGEMENT OF ORLANDO TO PROVIDE
COMMERCIAL SOLID WASTE COLLECTION AND
ROLL OFF SERVICES IN THE CITY LIMITS. THEY ARE
THE ONLY WASTE HAULER AUTHORIZED TO
PROVIDE THESE SERVICES IN THE CITY OF
KISSIMMEE. CALL 407-843-7370 FOR ROLL OFF
SERVICES.
CITY OF KISSIMMEE
DIVISION OF BUILDING SAFETY NOTICE TO CONTRACTOR
The following notice issued in compliance with the Florida Statue 553.844 pertaining to the requirements for the mitigation retrofitting of site-built, single family structures.
Effective October 1, 2007, all permits issued for the re-roofing of single-family residences constructed prior to the implementation of the Florida Building Code (March 1, 2002) shall comply with the requirements of the Hurricane Mitigation
Retrofit Manual (HMRM).
Contractor’s responsibility:
• Determine the age of the Single Family Residence (this may be done by using the Osceola County Property Appraiser’s website;
http://ira.property-appraiser.org, by searching the address for permits).
• Determine the wind region for the structure. Note: if the range found in the
parcel ID is 31 or lower. Use the City of Kissimmee code that requires the fastening requirements from Table 201.1 of the HMRM for wind speeds 110 or less.
• Ensure that the existing roof deck is fastened in accordance with section 201.1 of the HMRM
• Should the fastening of the roof deck not be in compliance with Table 201.1 of the HMRM, supplemental fastening will be required.
• Install a secondary water resistant barrier as required by section 201.2 of the
HMRM.
• At the time of final inspection, the contractor shall provide to the inspector, the completed Inspection Affidavit attesting to the fact that the applicable
requirements of the Hurricane Mitigation Retrofit Manual have been met.
Copies of the manual and the inspection affidavit are available for review at the City of Kissimmee Building Department.
HURRICANE MITIGATION RETROFITS FOR
EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES
101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built, single family residential structures to resist hurricanes shall be provided.
101.1 When a roof on an existing site-built, single family residential structure is replaced: (a) Roof-decking attachment and fasteners shall be strengthened and corrected as required
by section 201.1.
(b) A secondary water barrier shall be provided as required by section 201.2.
*101.1 affects the City of Kissimmee 110 mph wind load
101.2 When a roof is replaced on a building that is located in the wind-borne debris region as defined in s. 1609.2 of the Florida Building Code, Building and that has an insured value of $300,000 or more or, if the building is uninsured or for which documentation of insured value is not presented, has a just valuation for the structure for purposes of ad valorem taxation of $300,000 or more:
(a) Roof to wall connections shall be improved as required by section 201.3.
(b) Mandated retrofits of the roof-to-wall connection shall not be required beyond a 15 percent increase in the cost of re-roofing.
(c) Where complete retrofits of all the roof-to-wall connections as prescribed in Section 201.3 would exceed 15 percent of the cost of the re-roofing project, the priorities outlined in Section 201.3.5 shall be used to limit the scope of work to the 15 percent limit.
101.3 When any activity requiring a building permit that is applied for on or after July 1, 2008, and for which the estimated cost is $50,000 or more for a building that is located in the wind borne debris region as defined in s. 1609.2 of the Florida Building Code, Building and that has an insured value of $750,000 or more, or, if the building is uninsured or for which documentation of insured value is not presented, has a just valuation for the structure for purposes of ad valorem taxation of $750,000 or more.:
(a) Opening protections as required within the Florida Building Code, Building or Florida Building Code, Residential for new construction shall be provided.
101.4 When retrofit enhancement of gable end bracing is provided during construction which otherwise requires a permit the techniques in Appendix A shall be allowed.
201 Roof System Mitigation Techniques. Roof sheathing fastening, secondary water barriers, roof to wall connection and gable end bracing shall be permitted pursuant to this section.
201.1 Roof sheathing fastening for site-built single family residential structures. For site-built single family residential structures the fasteners and spacing required in Table
201.1 are deemed to comply with the requirements of Section 507.2.2 511.5, of the 2004 Florida Building Code, Existing Building.
Board roof decking secured with at least two 8d nails into roof framing members shall be deemed to be sufficiently connected. Board roof decking secured with smaller fasteners than 8d nails or with fewer than two 8d nails per board shall be deemed sufficiently connected if two 8d clipped head, round head, or ring shank nails are in place on each framing member.
Supplemental fasteners as required by Table 201.1 shall be 8d ring shank nails with round heads and the following minimum dimensions:
1. 0.113 inch nominal shank diameter
2. Ring diameter of 0.012 over shank diameter 3. 16 to 20 rings per inch
4. 0.280 inch full round head diameter 5. 2-1/4 inch nail length
Table 201.1
Supplement Fasteners at Panel Edges and Intermediate Framing Existing
fasteners
Existing spacing Wind speed 110 mph or less
supplemental fastening shall be
no greater than
Wind speed greater than 110 mph supplemental fastening shall be
no greater than
Staples or 6d Any 6” o.c.b 6” o.c. b
8d clipped head, round head, or ring shank
6” o.c. or less None necessary None necessary
8d clipped head or round head Greater than 6” o.c. 6” o.c.a 6” o.c.b 8d round head ring shank Greater than 6” o.c. 6” o.c.a 6” o.c.a
a. Maximum spacing determined based on existing fasteners and supplemental fasteners. b. Maximum spacing determined based on supplemental fasteners only.
201.2 Roof secondary water barrier for site-built single family residential structures. A secondary water barrier shall be installed using one of the following methods when roofing replacement when reroofing.
a) All joints in roof sheathing or decking shall be covered with a minimum 4 in. wide strip of self-adhering polymer modified bitumen tape applied directly to the sheathing or decking. The deck and self adhering polymer modified bitumen tape shall be covered with one of the underlayment systems approved for the particular roof covering to be applied to the roof.
CITY OF KISSIMMEE
DIVISION OF BUILDING SAFETY
INSPECTION AFFIDAVIT
Permit #: ______________
I, ____________________, licensed as a(n) *Contractor/Engineer/Architect/*Inspector
(Print name) (Circle license type)
License#: ______________
on or about _______________________, I did personally inspect the roof deck nailing (Date & Time)
and secondary water barrier work at ________________________________________ .
(Job Site Address)
Based upon that examination, I have determined the installation was done according to the Hurricane mitigation Retrofit Manual (Based on F. S. 553.844).
_____________________________________________________________________
Signature Print Name Date
STATE OF FLORIDA ________________________________
COUNTY OF OSCEOLA Notary Public
Sworn to and subscribed before me State Of Florida at Large
This _________________ day of Commission Expires: ______________ ________________, 20_______
Personally Known
□
Produced Identification□
Type of Identification produced ____________________________________ *General, Building, Residential, or Roofing Contractor or any individual certified under F.S. 468 to make such an inspection. Include photographs of each plane of the roof with the permit number of address number clearly shown marked on the deck for each inspection.