Study on standard manufacturing schedule

We analyzed interrelation between number of man-months and manufacturing term from the beginning of

project to cut-over about 203 system development projects and reached the conclusion that standard

manufacturing term was third root of number of man-months times 2.4.

We did not calculate correct values of ‘a ‘and ‘b’ of formula, i.e. ‘manufacturing term’ = ‘a’ x (number of man-months) ‘b’

multiplier, from distribution chart and did not get difficult expression. We got preferably plain formula and with it user and

vender can easily calculate number of man-months and manufacturing term in there meeting.

工期-工数グラフ

0 5 10 15 20 25 30 35 40 45 0 2.5 5 7.5 10 12.5 15

全体工数

全体工期

100人月

15人月

400人月

1000人月

2000人月

3000人月

Y

=2

.

X

T o

tal manufacturing term

Total no. of man-months

(2)

Assessment measure of manufacturing term and action

z

Important points about

manufacturing term (from specification definition phase to cut-over)

Same as left items

+

Management by super project manager

and full backup and control by total

company

Scheduling with PERT method

Assignment of the best member

Clean room

method

Arrangements in two-shift system

Forming customer-oriented test team

Utilization of system packages

Re-utilization of system parts

Same as left items

+

Assignment of good

programmers

Partial cut-over in

function or works

division

RAD + DOA

System performance

test in advance

Complete control of

specification changes

Total planning by

WBS and

phase-oriented system

development

methodology

Reviewing

completely

Rich test cases

Full utilization of

converted data

Sure control of

specification

Quality-oriented

test planning and

elaborate plan of

test cases

Split step cut-over

for stable operation

Other

countermeas

ure

To enhance short range scheduling (Daily

control)

To enhance middle

range scheduling

(Weekly Control)

To enhance middle

range scheduling

(Control of WBS by

division of roles)

To secure enough

time for system

tests

Countermeasur e by scheduling method

System development under unavoidable circumstances (Strategy of competition, sale of new products, putting on market, company integration and so on)

User’s request

Many cases in distribution industry

‘Cube root of number of man-months’ x 2.4 (For example: 1000 man-month project takes 24 month term)

Quality-oriented and no defect project such as banking system Basic concepts

about manufacturing term

Shortening term by more than 25% Shortening 25% term

Standard term Longer term than

(3)

(c) 2008 Japan Users Association of Information Systems

3

Productivity index

This chart shows several kinds of productivity index that were find out from under 1000

man-month projects.

They differ from kind of operation, kind of industry and degree of quality required. Therefore

they need to accumulate results and find out their own standard value.

51

107

46

107

155

Number of

data

12.6

0.88

87.5

0.88

116

0.98

Regression

formula

(Coefficient

of

correlation)

9.93

1.03

11.7

70.4

113

Weighted

average

Productivity

(FP /

man-month)

Productivity

(KLOC /

man-month)

FP unit price

(10 thousand

yen / FP)

KLOC unit

price (10

thousand yen /

KLOC)

Man-month unit

price (10

thousand yen /

man-month)

(4)

Unit price by development phase

As to unit price by development phase, we received 42 to 50 responses by each development phase.

They could be classified into two types. One is the system development that use package software,

as called below ‘package development’, and the other is it that is developed in scratch manner, as

called below ‘scratch-type development’.

Requirement

specification

phase

Designing

phase

Implementation

phase

Test phase

Total unit price

Number of projects

4

4

4

4

7

Maximum value

300.0

250.0

200.0

250.0

250.0

Average value

187.5

160.0

137.5

157.5

142.1

Minimum value

100.0

100.0

100.0

100.0

100.0

Number of projects

36

45

46

45

35

Maximum value

170.0

170.0

170.0

168.0

157.0

Average value

107.9

102.8

84.2

94.5

94.7

Minimum value

60.0

60.0

50.0

55.0

60.0

Number of projects

40

49

50

49

42

Maximum value

300.0

250.0

200.0

250.0

250.0

Average value

115.9

107.5

88.5

99.7

102.6

Minimum value

60.0

60.0

50.0

55.0

60.0

Total

Unit price by phase (10 thousand yen / month)

Package

development

Scratch-type

development

(5)

(c) 2008 Japan Users Association of Information Systems

5

JUAS survey report list in 2006

200 pages Evaluation of IT investment value

For polic

y

making

280 pages Survey on state of user’s behavior about IT in 2007 *

150 pages Survey on information security governance

500 pages System reference manual : Vol.2 *

This will be opened on the HP of IPA. (Total 300 pages) 100 pages

Text book for developing CIO of small-to-medium-sized company

This is included in ‘Survey on software metrics’ To develop ‘Training load map’.

Appendix

100 pages Standard for information system user’s skill *

250 pages Survey on software metrics in 2007*

Report Name of project

Cate gory

100 pages Survey team for sensitive ability of problem and its closure ability

(RST・・Requirement Specification Technology)

Survey team for application of OSS

200 pages Survey project for UVC

150 pages Survey project for usability *

Survey project for system development productivity

Surve

y

proj

ect

Study team for how to use IT by users

Study team for management of company information

Study team for system operation

Study team for intelligence sharing

Study team for human resource development

Not for sale Study team for IT policy

Stud

y

team

References

Related documents

Moreover, they may either be established by the members themselves or through mandate; and in that case, are often set up when the network first forms, to stimulate its growth through

This study is a systematic review and meta- analysis that was performed in clinical trial about the effect of vitamin D copmpared with placebo on CD4 count of

In addition to meeting the general University degree requirements, the student majoring in Sexuality, Gender, and Queer Studies must complete a required core program of 36

This study aims to test whether the liquidity proxied by Current Ratio (CR) has an effect on the dividend policy of manufacturing sector of consumer goods sector

BCG: Bacille de Calmette et Guérin; CER: cost effectiveness ratio; CFR: case fatality ratio; DALY: disability adjusted life year; DTP-Hep-Hib: diphteria, tetanus, pertussis,

In §5 we apply Corollary 1.2 to deduce sparse domination results for maximal functions, square functions and variation norm operators, as well as Cotlar-type operators associated

ovatum yielded triacylglycerols ( 5 ); the mesocarp also afforded 1a , 1b , 1,2-dioleylglycerol ( 6 ), and monounsaturated and saturated fatty acids; the nutshell

The cholesterol lowering drugs include statins, fibrates, bile acid sequestrants, inhibitors of intestinal sterol absorption, nicotinic acid derivatives and others