The product. SIMAC a machine simulator. Plan. Presentation of the simulation. Simulation, why? What : SIMAC product. Page 1 SIMAC

N/A
N/A
Protected

Academic year: 2021

Share "The product. SIMAC a machine simulator. Plan. Presentation of the simulation. Simulation, why? What : SIMAC product. Page 1 SIMAC"

Copied!
9
0
0

Loading.... (view fulltext now)

Full text

(1)

SIMAC 10-2003 -1

SIMAC a machine simulator

SIMAC

The product…

Plan

Presentation of the simulation

Simulation, why?

What : SIMAC product

1 1 2 2 3 3

(2)

SIMAC 10-2003 -3

SIMAC objectives

Virtual Machine Action-reaction software Mirror PLC Switch box Different from others simulation software:

SIMAC gives a perfect virtual machine −Structural description based on the

design plans of equipment

−Model is 100% objective

−No programming knowledge

−Total abstraction of the control part.

I/O Control Part

Representation of an automated

installation

Pr

in

cip

le

(3)

SIMAC 10-2003 -5

SIMAC simulation platform replaces completely the Operative Part of the installation Operative Part Control Part SIMAC Win 98, NT, 2000

SIMAC replaces the «Operative Part»

I/O

ex

ch

an

ge

without modules

Connection of several PLCs to a SIMAC unit

Plan

Presentation of the simulation

Simulation, why?

Simulation, why?

Simulation, why?

Simulation, why?

What : SIMAC product

1 1 2 2 3 3

(4)

SIMAC 10-2003 -7

SIMAC :

a machine simulator for better quality of control applications

Simulation of mechanical,hydraulic,electrical equipments and peripheral inputs/outputs connected to P.L.C

Adjustment and tests of automatisms applications in design department (Integrators,OEM,End Users) with safety, masked time, costs reduced,

Complete acceptance of P.L.C programs and Man Machine Interfaces (SCADA

applications),

Production and maintenance staff training on simulation platform (driving and repair « license »).

without modules

Simulation, why ? … Needs

- The process and/or the plant are not already builtor they are far awayfrom the development place.

- Tests in the engineering shop(BE) :

• Minimum material architecture, • Better work conditions for automation, • The virtual machine is 100% available, • More time for tests and modifications, • Destructive tests.

(5)

SIMAC 10-2003 -9

Simulation, why ? …Consequently

- It improves communicationbetween the different working teams :

mechanic team - electric team - control team - customers

- Simulation can show inaccurate terms in the customers requirements list (CdC) :

• occurrence of unexpected events,

• different interpretations of the specifications list depending on the team, • some technical characteristics, not considered initially.

⇒ It brings to the fore anomalies in the design dossiers.

- Operators and maintenance teams can be trained earlier

⇒ production at the earliest, better competences of the operators.

Testimonials in

www.se2e-prosyst.com

(6)

SIMAC 10-2003 -11

Robots :

example of mimic and panel

(7)

SIMAC 10-2003 -13

Plan

Presentation of the simulation

Simulation, why

?

What : SIMAC product

What : SIMAC product

What : SIMAC product

What : SIMAC product

1 1 2 2 3 3

one

DEVELOPPMENT environment =

An environment of description for all PLC brands and control systems

• Include numeric system simulation • Include analogical evolution simulation • Include I/O configurations of all PLC

several

RUNTIME for PLC =

Simulation drivers specific for every PLC

• Generically simulation environment • With specific functioning by PLC

SIMAC software offer = 2 products

One software One software One software One software license by license by license by license by product productproduct product

(8)

SIMAC 10-2003 -15

SIMAC ?

Simulation cycle / PLC program

RUN STOP Internal processing acquisition of inputs Program processing Outputs updating Inputs transmission Events calculation and simulation evolution Outputs receiving driver ∆∆∆∆%I ∆∆∆∆%Q func ti o n bl oc

SIMAC product

Hardware - software architecture

PC configuration:

PC or compatible

PIV 2 Go (or similar), 256Mo Windows 98, NT, 2000 17’ screen

Network configuration:

(9)

SIMAC 10-2003 -17

It is time to see the SIMAC

product…

References

Related documents

The Act on Insurance Contracts stipulates compulsory conditions for insurance agreements, including issues concerning the insurer’s obligation to inform the insured,

Weight of fetal fluids was calculated as gravid uterine weight minus total weights of gravid uterine tissues (fetus + uterus 4- caruncles + cotyledons + fetal membranes)..

In the present study, we identi fied risk factors for the increase in BMI during the course of diabetes. Female gender, low BMI at diabetes onset, intensi fied insulin therapy and

Hasil pengujian sistem speaker recognition dengan menggunakan metode dynamic time warping secara keseluruhan dapat dilihat pada Tabel 1 dan presentase akurasi pengenalan

With the above categories, we will be able to initiate an investigation to uncover what roles individual SNS users take and how they create, maintain, or change

Big Horn Powder River Carter Kalispell Magda Nelson (406)257-5245 [email protected] Helena Jamie Cain (406)841-2902 [email protected] Billings Darla Erickson

In translating the foreign currency financial statements of these subsidiaries into Korean won, income and expenses are translated at the average rate for the year and assets

1) Varying the Shape Weight during Iteration: During iterative optimization, since the initial shape is only a rough estimate, the color information should play a more important role