Sustain.Ability.

2012 Honeywell Users Group EMEA

Virtualization Solutions:

(2)
(3)

Virtualization… Today’s hot topic

More Virtual

Machines are being

deployed today than

physical

Over 40% of todays

machines are now

virtualized

Over 75% of servers

will be virtualized by

2014

Over 50% of our

largest customers

are already

virtualizing today at

L3/L4

Over 80% of our

largest customers

have plans to

virtualize at L2

(4)

Challenges for Plants Under Construction

Constant pressure to reduce construction times

Increasing design complexity

Geographically distributed nature of construction process.

(5)

Reduce computers

Other Customer Concerns

Challenges for Existing Systems

• Rate of change

• Management complexity

• Lack of skills

• Need to reduce overall lifecycle management costs

(6)
(7)
(8)
(9)

Customers Building New Plants

Design Independence

Start engineering straight away and extend freeze dates

Virtual FAT and Staging

Execute FAT without having to fly people in.

Flexible Hardware Procurement

Development can start without hardware

Design Opportunities

Reduce space, power, weight and cooling

New high availability options

Improved agility and flexibility

(10)

Customers with Lifecycle Challenges

Hardware Refresh Optimization

Facility and Utility Savings

System Management Benefits

High Availability Solutions for Computer Hardware

Improved Hardware, OS and App Compatibility

Simplified and lower risk upgrades and patching

(11)

Hardware Refresh Optimization

Customer Problem

Too many machines to maintain

Constant refresh churn

Impact of refreshes are high

Experion Virtualization Solutions

Virtualized Experion ICSS

Hardware optimized for TCO benefits

Customer Benefits

Reduced server and workstation count

Reduced refresh frequency and Impact

(12)

System Management Benefits

Customer Problem

Reduction in maintenance staff

Difficult to get the required skills

Pressure to deploy new projects faster

Experion Virtualization Solutions

Virtualized Experion ICSS

Central management console for the monitoring and deployment

Customer Benefits

Reduced administration time

Reduced time to provision new machines

(13)

System Management Benefits

Access the desktop of any virtual machine

from a single screen

(14)

System Management Benefits

See the status and performance of all VMs

from one window.

(15)

Facility and Utility Savings

Customer Problem

Fixed space in equipment rooms

Exhausting UPS capacity.

Challenges with cooling

Experion Virtualization Solutions

Virtualized Experion ICSS

Optimized for space, power and cooling

Customer Benefits

Avoid increases in UPS and cooling capacity

(16)

High Availability Solutions for Computer Hardware

Customer Problem

Disruption cased when upgrading

Continual desire for improved availability

Reduce recovery times

Experion Virtualization Solutions

Virtualized Experion ICSS

High availability hardware and virtualization features

Built in backup package optimized for virtualization

Customer Benefits

Improved availability over traditional control System

(17)

High Availability Solutions for Computer Hardware

(18)

Improved Hardware, OS and App Compatibility

Customer Problem

Difficult to get hardware for older OS’s

Multiple Apps running together one box

Experion Virtualization Solutions

Virtualized Experion ICSS

Extensive range of OS support

Isolate applications on a single box

Customer Benefits

Avoids PC refreshes due to OS obsolescence

(19)

Simplified and lower risk upgrades and patching

Customer Problem

Desire to reduce Migration time, risk and cost

Experion Virtualization Solutions

Virtualized Experion ICSS

Experion Off Process Solution

Migration service

Customer Benefits

Reduced Risk

Reduced Time

Once virtual machine is built, run for as long as hardware provides acceptable performance (OS and App Support excluded)

(20)

Simplified and lower risk upgrades and patching

(21)

Improved desktop security with lower heat & noise

Customer Problem

Desire to improve System Security

Reduce space, heat and noise

Improve reliability for desktops

Experion Virtualization Solutions

Virtualized Station Environment

High availability Use of Thin Clients

Customer Benefits

Improved System Security

Reduced space, heat and noise

(22)
(23)
(24)
(25)
(26)
(27)

Experion Virtualization Capabilities

Support for all Experion nodes

Supports all Series C controllers including a wide range of SCADA

interfaces

Single and Multiple Clusters

Supports the same performance limits as traditional deployments

FTE Compatible

Support for Experion Orion and R400

Comprehensive deployment guide

(28)

Experion Virtualization Thin Client Capabilities

Flex Stations and Console Stations supported

Honeywell qualified and supplied WYSE R10L

Highly secure and locked down Thin Client with no file system reducing

attack surface.

Up to two monitors supported

Optional Dual Ethernet support for additional reliability

Keyboard support for IKB (Serial/USB) and OEP Serial

Diskless and Fanless with very low power usage.

Making Control Rooms quieter

and more secure.

(29)

Virtual Machine Replication

Improved availability during maintenance or failure

Added new management network options

Non Redundant 2.5 and Standalone management network

Simplifies the deployment of virtualization infrastructure

Improved Backup / Restore Guidance

Supporting the latest version of VMware Data Recovery 2.0

Procedures on how to Backup the Backup

Officially recommending the Iomega PX4-300 D and PX4-300 R NAS

Support for Server 2008 for Flex and Console Stations

Single operating system for all virtual machines

Support for Serial IKB and OEP keyboards with thin clients

Released Q1 2012

(30)
(31)

1Q 2010

First Experion Virtualization Release

Support for Experion Off Process

Experion HS, LS and eServer

First advanced apps

1Q 2011

Support of Experion SCADA

Support of Experion SCADA virtualized for On Process. Shared Storage and for

transparent hardware upgrades and replacements

BCC Solution Released

4Q 2011

Experion is supported On Process for Cxx Controllers

Support for any sized Experion System talking to process controllers

Flex and Console Station support

2Q 2012

Experion Orion Support

1Q 2012

Experion On Process Update

Virtual Machine

Replication for increased availability

Server OS support for Stations

Improved keyboard support

Future

Experion High Availability Support with Blade

Support for Blade

hardware with Shared Storage

Automatic host recovery and transparent

hardware upgrades and replacements

Improved template support

Higher consolidation for servers and console

stattions

(32)

Next Experion Virtualization Release

Experion systems with process controllers will now support automatic

recovery from failed hosts

Experion systems with process controllers will support moving virtual machines transparently between hosts

Installation and Provisioning improvements

System management integration

Higher consolidation ratios for Experion Server and Console Station.

Benefits will include

Improved availability

Vastly improved deployment times.

Improved host usage efficiencies

Coming

Soon

(33)

Traditional Deployment

Before 30-node System 2 Experion Servers 18 Operator Stations 5 Engineering Stations Sim FDM Alm Mgmt ACE Domain Control

(34)

2 Experion Servers 18 Operator Stations 5 Engineering Stations Sim FDM Alm Mgmt ACE Domain Control

Virtual Deployment using regular servers

80%+ Reduction in Maintenance, Space, Energy Use and Better Security

Before

(35)

Each blade is a server

Experion Virtualization – Blade

Additional

80%

reduction

Virtual Deployment using Blade

Coming Soon

(36)

Blade Benefits

Compact

Supportable

Simple &

(37)

Why Honeywell?

Provide a solution not just a tick of approval

Full installation and configuration guide to aid in deployment

Ability to Design, Supply and Support these solutions

VMware certified TAC engineers in every region

Strategic, long-term approach to virtualization

Full roadmap outlining our vision

See virtualization as transformative and industry changing

Joint development effort with the industry leader VMware.

Domain expertise

(38)

What’s in the Demo Room?

Experion Virtualization Backup Control Center Solution

(39)
(40)

Summary

- Ease of Design, Implementation & Change management Reduced Computer Hardware with in built resilience.

Sustainability

Reliability

Flexibility

Fewer Spares, Easy

Maintenance, Reduced Refresh Costs

References

Related documents

In light of the momentum and continuing relevance of the lords of yesterday, 8 answering that challenge while acknowledging that historical context and respecting tribal

If it is the key that is stored in the online, then the systems permit delivery of encrypted data to recipients’ desktops, with a required multi-step recipient

A purse-string suture is then placed in the tip of the left atrial appendage and a linear cryoprobe is inserted inside the atrial appendage with its tip placed into the orifice of

Chapters 12-25, Teaching LearnLinc Classes, provide information about visiting the Virtual Campus, working with courses, preparing to join your first class, teaching a class, and

The P&H shovel line is combining its solid reputation of reliability with the proven Centurion ® Electrical Control System, time-tested DC systems, rugged structures and

Behavioral Corporate Finance: An Updated Survey Malcolm Baker and Jeffrey Wurgler.. NBER Working

Established in 1981, the Professional Crisis Management Association (PCMA) provides train- ing, certification and technology based solutions that help individuals and

(a) Permit condition.—The following permits issued by the department under the Solid Waste Management Act shall include a permit condition, if provided pursuant to this section,