• No results found

Projects and R&D activities

N/A
N/A
Protected

Academic year: 2021

Share "Projects and R&D activities"

Copied!
12
0
0

Loading.... (view fulltext now)

Full text

(1)

Prepared by S. Calatroni, V. Baglin and J.M. Jimenez ASEVA discussions, 18/11/2008

Projects and R&D activities

J.M. Jimenez

(2)

Vacuum, Surface and Coatings group*

Mandate

• Design, construction, operation, maintenance and upgrade of high & ultra-high vacuum systems for Accelerators and Detectors.

– Expertise and support on thin-walled vacuum chambers, windows and bellows compensation systems

– Expertise in vacuum sealing and leak-tightness technology

– Management of the industrial support contract for vacuum work in accelerators

• Coatings, surfaces treatments, surface and chemical analysis for Accelerators & Detectors. Expertise and support in the fields of:

– Coatings, electroplating and surface cleaning techniques – UHV characterization and of material and surfaces

(3)

Prepared by S. Calatroni, V. Baglin and J.M. Jimenez ASEVA discussions, 18/11/2008

Vacuum, Surface and Coatings group*

Structure

(4)

R&D related to CERN Projects (1)

• Operation of existing accelerators

o LHC Vacuum pilot sectors

o Pumping of and leak localization in big volumes containing large quantities of water and/or helium

o Interventions on arcs with a limited warming up

o Upgrade of bake out regulation controller & study of new heating and insulation approaches

o Operation with collimators

• Engineering studies

o Analysis and design of beam windows o Aluminum bellows for experiments o Composite beam vacuum chambers o Characterization of corrosion

(5)

Prepared by S. Calatroni, V. Baglin and J.M. Jimenez ASEVA discussions, 18/11/2008

R&D related to CERN Projects (2)

• Monitoring & Controls

o Control system development & upgrade of monitoring, e.g. alarms, interlocks, remote operation of diagnostics, etc

o New users interfaces for RGA & helium leak detectors o Controls for Electron Cloud & Vacuum Pilot Sectors • Dynamic vacuum & studies on related phenomenon

o Stimulated desorption (electrons, photons, low and high energy ions) o Electron cloud (PS,SPS, LHC)

o Secondary electron yield measurements (RT, ceramics, cold surfaces), coatings and clearing electrodes

o Gas density simulations • Laboratory activities

o Vacuum laboratory for everyday work (leak detection, pumping devices, outgassing of metals and plastics, ESD, vacuum gauges, thermal

desorption spectroscopy, permeation …)

o Outgassing measurements (high outgassing, UHV-type and big samples) o Calibration stands for all gauges and RGAs

o Preservation of bakeout (water vapour, CLIC application) o Leak detection : ultrasonic, H2, Ne22

o Sparking studies for CLIC accelerating structures (optical, electrical, vacuum)

(6)

R&D related to CERN Projects (3)

• Cleaning methods

o Follow up of solvent and detergent o Replacement of perchloroethylene

o Dry means (plasma O2, H2, radicals …) o Coatings facilities

o Carbon coatings and Low temperature NEG o XPS upgrade (quality control of coating)

o Follow up of available devices to be use for surface analysis • Chemistry

o Raman spectroscopy (vibrational spectroscopy to complete the analysis panel, characterize carbon coatings, cleaning efficiency and

characterization of pollution) • Resins and polymers

o Cianate ester based resins (large temperature working range, radiation resistant)

(7)

Prepared by S. Calatroni, V. Baglin and J.M. Jimenez ASEVA discussions, 18/11/2008

LHC Upgrade project

Approved

• Triplet upgrade (Q1-D2): vacuum issues, cold bore insulation, radiation hard polymers

• Consolidation and upgrade of detectors (Q1-Q1): new experimental chambers, vacuum profile simulations, ageing of fluids under

radiation

• Control system development & upgrade of monitoring (alarms, interlocks, remote operation of diagnostics)

• Support to AB for new LSS equipment

(8)

New injectors

• LINAC4 vacuum systems, control, layout and related studies, surface treatments and plating

– Approved, being procured and installed

• SPL studies for layout, vacuum systems, cryostat insulation vacuum, cavity surface treatments

– Design study by end 2011

• PS2 vacuum systems and layout

(9)

Prepared by S. Calatroni, V. Baglin and J.M. Jimenez ASEVA discussions, 18/11/2008

SPS Upgrade

Design study by end 2011

• Study of low SEY coatings for e-cloud reduction: coatings, lab characterization, SPS liner testing.

• Prototype dipole coating

• Study of clearing electrodes (classical and enamel) • Studies for scaling-up to full machine

(10)

CLIC and CTF3

• CLIC

– Design study by end 2011

– Material testing: resistance to high voltage breakdown

(experiments and simulations), thermal fatigue testing with laser

– Surface treatments for accelerating structures

– Vacuum design, study of water outgassing in small pipes, outgassing of breakdowns, numerical modelling for CLIC modules, novel vacuum chamber designs

(11)

Prepared by S. Calatroni, V. Baglin and J.M. Jimenez ASEVA discussions, 18/11/2008

HIE-ISOLDE

Project approved

• Development of cavity fabrication method, surface treatments, niobium coating

• Cryostat design (common vs. separate vacuum) • General vacuum systems and layout

(12)

Other projects

• Technology Transfer

– Working well with various European companies and Labs

• CAST (vacuum and He environments)

– Being operated

• MedAUSTRON

– Project approved (Austrian funding)

• LHeC

– Feasibility study

• N-TOF (corrosion studies)

References

Related documents

For the topologies studied, this suggests that in an idealized fractional bandwidth routed network the increase in network throughput achieved by improving the transceiver coding can

In heartbeat scheduling, the evaluation of a parallel pair begins according to the fully-sequential semantics, pushing a frame in the stack to describe the right branch..

Those six states are now six of the eight most expensive states in the country in which to buy non-group insurance because insurers say, “If we can’t tell who’s sick and

The effectiveness of ending sales tax avoidance on e-commerce purchases will depend on consumers’ substitution to cross-border shopping. This paper studies the degree to which

This section uses a class of examples to illustrate convergence from barter to a monetary average cost pricing equilibrium in a pure exchange economy with full double coincidence

 Při rozmrazování mrazáku nikdy nepoužívejte elektrické spotřebiče, jako jsou fény na vlasy, horkovzdušné ventilátory, parní čističe, rozmrazovací spreje nebo otevřené

For example, there are algebraic structure in algebraic codes such as Bose-Chaudhuri-Hocquenghem (BCH) codes and Reed-Solomon (RS) codes (see [4]), trellis structure in

1) If a medical, or surgical inpatient screens positive on the STOP- BANG tool, the RCP will call the attending physician or LIP to notify them of the patient’s increased risk of