BUSINESS CONTINUITY PLAN

Locations

Main Office: The Orchard, Staines Lane, Chertsey, Surrey KT16 8PS 01932 563662

Secondary Office: c/o Spelthorne Borough Council, Knowle Green, Staines-upon-Thames, Surrey TW18 1XB

01784 444200

Approved by Trustees: 21 Aug 2014 Next review due: Aug 2015

(2)

PREFACE

Business Continuity Management is a planning process that can be applied to any business, small or large, that helps to manage the risks that threaten its survival by providing a framework to ensure the resilience of the business so that it can continue to operate in the event of any disruption

This document has been developed to outline the general procedures to be taken in the event of a serious business disruption (or the threat thereof) affecting the operation of our key functions. A business interruption is defined as –

“An unwanted incident that threatens personnel, buildings, operational procedures or the reputation of the business which requires special measures to be taken to restore things back to normal.”

This Business Continuity Plan is the property of Age UK Runnymede and Spelthorne (AUKRS). It is an operational document which is constantly being monitored and updated to reflect our ongoing business operations.

Activation of this Plan is the responsibility of the Chief Officer, or, in their absence, the Deputy Chief Officer.

PLAN DISTRIBUTION LIST

(List who has a copy of your plan and where each copy is held. This will ensure that when you update the plan, you know who will need an updated copy)

Copy No. Name Location

1 Chief Officer Hardcopy in person

2 Deputy Chief Officer Hardcopy in person

3 Chair Hardcopy in person

4 General availability G:\In case of business emergency in pdf format

5 For amendment purposes G:\_Management (restricted)\Business Continuity in Word format

(3)

STAFF CASCADE - CONTACTS

(This list ensures that all key members of your staff are contacted and made aware of the incident. Make sure a list of all those contacted and those not contacted is kept)

Name Telephone Numbers

WORK HOME MOBILE

Chief Officer 01932 563662 01252 501436 0790 0008034

Deputy Chief Officer

01932 563662 07810750599 01252 781605 07891 838802 Chair Finance Manager 01932 563662 07904 241541 Treasurer 07813 191745 I & A Manager 01784 444200 07760 666317

KEY STAFF - ROLES & RESPONSIBILITIES

(In the event of an emergency, carry out the following actions)

Name Role Responsibilities

Tony Docker Chief Officer Initiate the plan, notifying third parties Di Cheeseman Deputy Chief Officer Evacuation of Chertsey location Ray Mayhill Finance Manager Integrity of IT system, including back

ups

Marion Maitland I & A Manager Evacuation of Staines location

OFF-SITE RECOVERY LOCATION

(Alternative work place to organise your recovery from)

If a location needs to be evacuated for more than one hour, people should either go home or go to the location at Chertsey or Staines after informing the AUKRS person in charge of their intentions.

(4)

Task Detail Completed IN FIRST HOUR

Chertsey location Notify first name on staff cascade list Notify other location

Relocate people

Test power

Establish damage Test phone system Test IT system Update cascade list Update other location Notify insurance company if relevant

Inform the CO immediately, or next name in cascade list if unavailable

Inform the Staines location, and relevant organisations in Business Contact list of current situation and

establish best method of future communication If building has been evacuated, allow them back into the building, subject to authorisation from the person in charge. If re-entry not authorised direct people to other AUKRS location, or home, or to other suitable

accommodation

If it is safe to do so, turn on lights and power supplies If there has been any damage take photographs and record it in writing

Check to see if the landline phone system is operational

Turn on PCs and test for access to internal network and internet connections

Inform the contacts listed in the cascade list of the current situation

Update people in the other AUKRS locations of the current situation

Call our insurers and notify of the incident, providing whatever details are known at the time and establishing future actions and assistance available

(5)

Staines location Notify first name on staff cascade list Notify other location

Liaise with person in charge of situation Relocate people

Test power

Establish damage Test phone system Test IT system Update cascade list Inform other location

Inform the CO immediately, or next name in cascade list if unavailable

Inform the Chertsey location, and relevant organisations in Business Contact list of current situation and establish best method of future communication

Establish a link with the person in overall charge, inform them of person in charge of AUKRS people If building has been evacuated, allow them back into the building, subject to authorisation from the person in charge. If re-entry not authorised direct people to other AUKRS location, or home, or to other suitable

accommodation

If it is safe to do so, turn on lights and power supplies If there has been any damage take photographs and record it in writing

Check to see if the landline phone system is operational

Turn on PCs and test for access to internal network and internet connections

Inform the contacts listed in the cascade list of the current situation

Update people in the other AUKRS locations of the current situation

(6)

IN THE FIRST 24 HOURS Chertsey location

Notify other location Relocate people

If allowed back into the building after first hour:

Test power

Establish damage Test phone system Test IT system Update cascade list Update other location

Inform the Staines location at end of business day of current situation

If people not allowed back into the building, organise working arrangements for next day and advise everyone, including those not working today

If it is safe to do so, turn on lights and power supplies If there has been any damage take photographs and record it in writing

Check to see if the landline phone system is operational

Turn on PCs and test for access to internal network and internet connections

Inform the contacts listed in the cascade list of the current situation

Update people in the other AUKRS locations of the current situation

Staines location Notify other location Relocate people

If allowed back into the building after first hour:

Test power

Inform the Chertsey location at end of business day of current situation

If people not allowed back into the building, organise working arrangements for next day and advise everyone, including those not working today

(7)

Establish damage Test phone system Test IT system Update cascade list Update other location

If there has been any damage take photographs and record it in writing

Check to see if the landline phone system is operational

Turn on PCs and test for access to internal network and internet connections

Inform the contacts listed in the cascade list of the current situation

Update people in the other AUKRS locations of the current situation

IN THE FIRST 48 HOURS

If we are allowed back into the location follow the same procedure as “in the first 24 hours” If a normal return to work is not expected within the first 48 hours then a plan must be created and implemented to carry on work as best as possible within the given conditions. A small team comprised of the senior management team and trustees would be responsible for this.

If the Chertsey or Staines locations are closed down staff should try to be accommodated within the other office, and other options such as home working, holiday, deferred hours etc considered.

If the Stanwell location is closed down, the business will have to cease for as long as necessary, with staff temporarily allocated other duties within the organisation.

Liaise with our IT Support provider to maximise existing IT communications for all staff

AFTER THE EVENT

Once things have settled down, and after normal business has been resumed, a team comprising staff and trustees should meet to discuss the events and learn lessons from it. This may result is reviewing Polices and/or Procedures, including this Business Continuity Plan

(8)

BUSINESS CONTACT LIST

(The details of important business contacts where it is necessary for personal contact to be made, it will include key customers and key suppliers)

Company Contact Tel. Number(s)

Runnymede Borough Council Suzanne Stronge 01932 425869

07500 984164

Spelthorne Borough Council Liz Borthwick 01784 446376

Individual staff should contact any clients they are seeing and any individuals or organisations using our services during the period of disruption and make alternative arrangements where appropriate

OTHER USEFUL TELEPHONE NUMBERS (For example, utility companies)

Company Contact Tel. Number

Pendle Connections – IT Support Warren Calvert 01483 268936

Premier Choice Telecom Liz (Account Manager) 020 8300 9495

INSURANCE DETAILS

Company Tel. Number Policy Ref.

Towergate MIA 01483 739731 CHMIA1000539

BACK-UP INFORMATION/EQUIPMENT Back-up

Computer

records/data location

Pendle Connections – see above

Critical paper records/information location

Paper records are stored in both the Chertsey and Staines location, sensitive records under lock and key

(9)

KEY EQUIPMENT REQUIREMENTS

(What essential equipment would you need if you had to move to an alternative site) Equipment

In order to carry out our business we are reliant upon our IT system and paper records. The IT system can be accessed from either Chertsey or Staines locations. The Charitylog database is web based and can be accessed from any terminal.

Most of the paper records are held at Chertsey.

(10)

INITIAL RECOVERY LOG

(Maintaining this log at the time of the incident will provide a record of all events, actions/decisions taken, it should include the names of those instructed, timings and actions taken)

(11)
(12)

OTHER NOTES:

After this document has been used it must be given to the Chief Officer. It will provide the basis of a review of the incident and an opportunity to learn any lessons for future use.

References

Related documents

Modeling The Hypothesized Process by which Psychological Need Satisfaction is Related to Unhealthy Weight Control Behaviors + + + - Appearance- contingent self-worth

Since the N = 2 CP (N − 1) model is an effective low-energy theory describing world sheet physics of the non-Abelian string, all consequences of this model ensue, in particular,

The Marketing, Communications and Customer Relations area’s responsibilities include media relations, management of the Airport’s social media channels, web content,

دهد یم ، مک فرصم هک ارچ رت IPTG ًاتبسن تمیق هک( .ددرگ یم دیلوت یاه هنیزه شهاک ثعاب )دراد ییلااب نولک تهج ناریا رد یرگید هعلاطم هک تسا رکذ هب مزلا و

Despite its limitations, the present study is the first to demonstrate the direct and indirect associations between trait emotional intelligence and problematic social media via

To project the impact of climate change on yield, harvested area, and production of sugarcane during 2046–2055 from the baseline during 1992–2016, we obtained future climate

CRISIS MANAGEMENT TEAM: The Crisis Management Team consists of the President, All Vice Presidents, Director of Police Services/Public Safety, Director of Physical Plant, Director

 Chapter 2 reviews the existing research in the related literature which include computer vision, feature detection, colour models, machine learning, human detection,