MEGAPROJECT Case Study

Basic Project Information

Case compiled by:

....Rami Sariola and Miia Martinsuo, Tampere University of Technology...

Contact details:

[email protected]...

Project Title

Oasis Class

Location

Finland, Turku

Purpose

To build two largest and most innovative cruise ships in the

world.

Scope

Construction of Oasis of the Seas and Allure of the Seas. The

project began in February 2006 and finished in October 2010.

Total Project Value

About 2 000 million EUR

Project Status

(i.e.. initiation, planning, construction,

operation, dismantling)

Finished

Contractual Framework

(

e.g. fixed price, cost-plus etc.

)

Fixed price

Relevant Physical Dimensions

(e.g. height, width, volume, length)

225 000 gross register tonnage, 361 meters long, 47 meters

wide, 65 meters high from the water line.

(3)

Stakeholder Category

Case-Study

Comments

In

terna

l

Demand Side

Client

Royal Caribbean International

Financiers

Sponsors

Client’s Customers

Royal Caribbean International sells luxury cruises to individual customers

Client’s Owners

Other internal

supply-side categories ( please

specify)

Category

Case-Study

Supply-Side

Principal Contractor

STX Finland Oy

First Tier Contractors

ABB Oy, Ablemans, Alandia Engineering Marine Ab, Almaco Group Oy, APX-Metalli Oy,

Cisco, Deltamarin, Electroskandia, Elomatic ,Europe Working EW Oy, Europlan Engineering

Oy, Evac Oy, Evraz Vitkovice Steel, Foreship, Huuhka Oy, JaPe-Asennus Oy, Joptek Oy

Composites , Jukova Oy, Kaefer, Koja Oy,Kone, Laivasähkötyö Oy,

Loipart Oy, Marioff Corporation Oy, Merima Oy, Mobimar Oy, Optimakers Oy Ltd, Orsap Oy

Ltd, Oy NIT Naval Interior Team Ltd, Oy Shippax Ltd, Paattimaakarit Oy, Pilkington

Automotive Finland Oy, Rautaruukki Oyj, Riverco Oy, S.A.Svendsen Oy, Schat Harding,

Seaking, SKS-Mechatronics Oy, STX Finland Cabins Oy, TDI, Telakka- ja Rakennustyöt Tejara

Oy, Tino Sana S.r.l., Wärtsilä Finland Oy, YIT

Second Tier

Consultants

Individual companies within Europe

Professional Services

Providers

Other internal

supply-side categories ( please

specify)

Financing

Case-Study

Finnvera, Tekes , individual banks

MEGAPROJECT Internal Stakeholder Identification

(Stakeholders with a direct legally sanctioned relationship with the project)

(4)

Stakeholder Category Case-Study Comments (e.g. maturity, previous experiences of stakeholders, skills, influence on project) Exter n al

Public Regulatory Agencies Local Government National Government Other internal supply-side categories ( please specify)

Category Case-study

Flag authority : Bahama

Private Local residents Local Landowners Environmentalists Conservationists Archaeologists

Other External Private stakeholders (please specify)

Category Case-study

Classification Society : Det Norske Veritas

MEGAPROJECT External Stakeholder Identification

SECTION 2 - PROJECT STAKEHOLDERS

(Stakeholders with a direct interest in the project but with no legal contract)

(5)

SECTION 2 -PROJECT STAKEHOLDERS

MEGAPROJECT Stakeholder Relationship Maps

Name of Actor

Description of relationship

Repeat this map for as many project phases as you require

Key:

- Project Actor

- Project relationship

with a contractual basis

- Non-contractual project

relationship

Description of relationship

(6)

SECTION 2 - PROJECT STAKEHOLDERS

MEGAPROJECT External Stakeholder Attitude Analysis

External Stakeholder

External Stakeholder’s

Attitude to this Project

External Stakeholder’s

Influence on project

Impact of Project on

External Stakeholder

Phase of Project of

Greatest Interest

(

initiation, planning,

construction, operation,

dismantling)

Finnvera

Positive

Financial support

Good reference

Initiation

DNV

Positive

Inspector check

Lots of work and

good reference

All the project

phases

Suppliers

Positive

On-time deliveries

Lots of work and

good reference

to suppliers

Construction

US Coast Guard

Positive

STX had to take

stakeholder’s

demands into

account

All the project

phases

U.S. Public Health

Positive

STX had to take

stakeholder’s

demands into

account

All the project

phases

(7)

MEGAPROJECT Project Management

Project Organisation

Client Project Team Size &

Structure

At the beginning of the project, the team size was 10-15 persons.

The project team size increased to 90-100 persons (due to ship

personnel representation in the team) towards the end of the project.

Contractor Project Team Size

and Structure

Project group was about 12-20 persons (smaller in Allure delivery)

Sub-Contractor Project Team

Involvement

About 1000 contractors

Project Tools and Techniques

Please √ if present, x if absent , leave blank if unknown

Life-Cycle Costing Approaches

Stakeholder Involvement

Building Information Modelling (BIM)

Project Management Software

Relationship Management Tools

Project Knowledge Management Tools

Lessons Learnt Transfers

Team Building Tools

Competency framework

Other Tools and Techniques or More Information:

Project Management Software: Safran

Project Knowledge Management Tool:

Kronodoc

Design

tool: Several tools. For example Napa steel, Aveva and Cadmatic

Materials management: MARS

Issue & project tracking tool: JIRA

(8)

Risk Management Processes Present (describe below) x Own excel macro.

HR Management Processes Present (describe below) x

Internal HR system

Network register that includes every employees competencies and general information

Procurement Management Processes Present (describe below) x

Procurement management process conducted in MARS software.

Integration Management Processes No Information x

Scope Management Processes Present (describe below) x

Project manager conducted scope management process with change management. Process was monitored in meetings.

Time Management Processes Present (describe below) x

Project included about 60 000 tasks. Time management process was conducted by project management software Safran. Philosophy was to create a single, common schedule that everyone can use. Every contractor made ​​their own schedules, which was combined with the overall timetable. Timetable was reported in working site meetings.

Cost Management Processes Present (describe below) x

Overall budget was divided to targets according to WBS. Every project team member was responsible of their own areas budget. Costs were monitored in monthly meetings.

Quality management Processes Present (describe below) x

First contractors made their own quality check. In addition DNV made their check. Finally customer made his own quality check.

Communications Management Processes Present (describe below) x

Communications Management Processes was conducted with meetings. Every week was a project team meeting. Team members share the information to their own responsibility area’s contractors. Team members also relayed information from contractors to project team meetings.

Project Processes

(9)

MEGAPROJECT Project Performance

Aspects of Performance Concerned with Doing the Project Right

Original Targets and changes to

targets

Actual Achievements Against

Targets

Performance relating to

time

The first ship should be ready in

October 2009 and the second ship

should be ready in October 2010.

Targets were achieved; the second

ship Allure of the Seas was finished a

few weeks earlier than scheduled.

Performance relating to

cost

Total target was about 2000

million

euros.

Target was not achieved.

Performance related to

achieving

specification

Performance should be in line with

contract.

Performance was according to the

contract.

(10)

Aspects of Performance Concerned with Doing the Right Project

Stakeholder or

Stakeholder Grouping

Original Aims of Project

Involvement and Changes to these

Aims

Achievement of these Aims

Region of Turku,

Finland

Employment growth.

Employment rate improved

significantly.

(11)

MEGAPROJECT Project Environment

Legal and Regulatory Environment

Legal and Regulatory Project

Environment (regionally,

nationally and Europe wide)

Strict safety and inspection requirements.

Specific Legal and

Regulatory events impacting

on the project

Political Environment

Political Project Environment

Innovation oriented industrial climate.

Funding support to the most significant technological and social innovations

(research).

Specific Political Events

impacting on the project

(12)

MEGAPROJECT Project Environment

Economic Environment

Economic Project

Environment

Market heated up because of the project’s large scope. Close-range capacity is

limited, so suppliers increased their prices. Design capacity was short

in

Europe so prices went up.

Specific Economic Events

impacting on the project

(13)

MEGAPROJECT Project Key Events and Activities Timeline

SECTION 6 - PROJECT TIMELINE

TIME

Contract

2010

2009

2008

2007

2006

EVENTS IN THE OASIS OF THE SEAS SUB-PROJECT (ship 1)

Design

Construction

First sea test Start of production Launching Detail design started Delivery Laying down the

keel

(14)

MEGAPROJECT Project Key Events and Activities Timeline

SECTION 6 - PROJECT TIMELINE

TIME

Contract

2010

2009

2008

2007

2006

EVENTS IN THE ALLURE OF THE SEAS SUB-PROJECT (ship 2)

Design

Construction

Sea test Start of production Launching Detail design started Delivery Laying down the

References

Related documents

the mean differences shown in Table 3 universally favoured students who reported high levels of inquiry-oriented learning activities in their science classes. In summary, the

In vivo MRI of enhanced MNP delivery to PSMA(+) tumors, after PSMA-targeted PDT. B) In vivo MRI of representative male NSG mice bearing human PSMA(+) PC3 PIP tumor xenografts,

The adsorption of copper (ii) ions from aqueous solution by Luffa cylindrica seed shell biomass was carried out with effects of initial metal ion concentration, solution

For all the 12,127 students enrolled in the four years undergraduate pro- gram at Bocconi during period 1992-1999 we received anonymized adminis- trative records containing

On the August 24 60 Minutes program an Internet vendor said, “The Internet is an advertising medium.” In fewer than three decades, the Internet has evolved from a network dedicated

Hybrid Cloud Agent Emctl Dispatcher On-premise EM OMS 12.1.0.5 Hybrid Cloud Gateway HTTPS HTTPS TMClient over HTTPS.. Hybrid Cloud Agent to On-Premise

SDPA 7.3.1 adopts a new storage scheme for the diagonal block matrix structure which allows one to reduce both the memory usage and the computational time. The nonzero elements of

Review of Strategic Plans for development software, systems and Review of Strategic Plans for development software, systems and related data related data?. Review special requests