INTRODUCTION
DINCEL CONSTRUCTION SYSTEM
Economical
Fast
Strong
Safe
2
22,000 SQM DINCEL PLANT
ERSKINE PARK, NSW
3
WHAT IS IT ?
DINCEL is a waterproof polymer formwork for water
tanks and walls/columns. Available in custom lengths
between 1.8m and 8m.
4
DINCEL WALL MAIN PROFILES
200mm
110mm
Up to 30
storey
buildings
Up to 8
storey
buildings
5
CURVED WALLS
OF ANY HEIGHT
AND LENGTH
WITHOUT JOINTS
6
Building Walls
Basements, lift-stair shafts, party-corridor-façade walls.
Retaining Walls
Basement walls below permanent water table, earth retaining, mining, erosion control, river embankment protection, sea walls.
Storage Tanks
Water (detention, retention, stormwater pits), fish farming tanks, waste water, sewerage, sludge, petrol, manure, grain and contaminated soil.
Special Uses
Bushfire Prone Areas, bund walls, coastal protection.
PERMANENT POLYMER-FORMWORK TECHNOLOGY
FOR CONCRETE WALLS AND COLUMNS
7
KEY BENEFITS DISTINGUISHES DINCEL FROM
CONVENTIONAL WALLS
• Waterproof, Airtight.
• Crack and joint-free.
• Avoids water damage, dampness, rot, fungi, voids for vermin/bacteria growth, condensation.
• VOC below detection level.
• Superior fire/smoke properties.
• 100 year life, Durability – Recycling – Sustainability.
• Energy saving (up to 90% less steel and 50% less cement).
• Strength for magnitude 9 earthquakes, hurricanes and cyclones.
• Faster.
• Lighter and safer to install.
8
9
10
DEVELOPER WANTS:
S
uperior
COST
and
TIME
savings.
O
mittance of maintenance issues.
11
27 STOREYS; 396 APARTMENTS;
12
13
14
15
MASTER BUILDERS, QUEENSLAND, EXCELLENCE IN CONSTRUCTION AWARD “RESIDENTIAL BUILDING UP TO $20 MILLION”.
16
ZS CONSTRUCTIONS – OFFICES & APARTMENTS
WALKER STREET, NORTH SYDNEY
17
6 METRE DINCEL WALL
18
7 METRE HIGH DINCEL WALL
19
A W EDWARDS
CHATSWOOD
CIVIC PLACE
20
•
FIRE
•
ACOUSTIC
•
THERMAL PERFORMANCE
•
WATERPROOFING
•
STRUCTURAL
21
LIGHTWEIGHT – MOBILE STRUCTURES
FOR
POLICE/EMERGENCY SERVICES/ENERGY
22
DCS CREDENTIALS
• Supported by highly skilled engineers.
• ISO 9001 – Production Quality.
• University of New South Wales – Structural Certification.
• Swinburne University of Technology – Energy Efficiency.
• CETEC – VOC Free Product.
• CSIRO – Waterproofing and Fire.
• Sydney University of Technology – Earthquake Testing.
• MBA – Construction Industry Recognition.
• AUSTRALIAN TECHNOLOGY SHOWCASE – Government Recognition.
23
WORLD’S FIRST
WATERPROOF
WALL AS TESTED BY
CSIRO
Basement Walls Water Tanks Swimming Pools
Water Damage Free – Damp Proof – Rot Proof
– Termite Proof – Crack and Joint Free
24
DINCEL PANEL JOINTS HAVE BEEN TESTED BY CSIRO, AUSTRALIA FOR WATERPROOFING UNDER 6M HEAD OF WATER PRESSURE
25
26
CSIRO TEST UNDER 6M HEAD OF WATER PRESSURE AT DINCEL PANEL JOINTS CONFIRMED WATERPROOFING
DINCEL-WALL CROSS-SECTION – CSIRO TEST PANEL
AUSTRALIAN WATER/SEWAGE TANKS, BASEMENT WALLS CURRENTLY BEING BUILT WITHOUT ADDITIONAL WATERPROOF MEMBRANE SYSTEMS
CONCRETE SLURRY SHOWN SHADED BETWEEN DINCEL BARBS; FORMS
27
BASEMENT WALLS WITHIN 7 METRES
OF GROUND WATER
28
29
BASEMENT WALLS
DINCEL-WALL ELIMINATES:• Loss of valuable land use
• Waterproofing need for the wall
• Stray Current Corrosion damage
• Excavation behind the wall
• Backfilling the excavation
• Wall joints • Agricultural lines • Conventional footings • Horizontal wall reinforcement • Scaffolding • Painting of the internal wall face
• Cleaning costs
• Wastage
• Builder’s Liability for wall cracking, water damages
DINCEL-WALL ALLOWS:
• Habitable spaces in basements
• Minimum 100 years wall life
• Stronger structural walls in comparison to reinforced masonry walls
30
FISH FARMING
Healthy Trouts are
testimonial to the Dincel
QUALITY. Dincel does not
32
DURABILITY
Dincel-Wall can be used in the following:
• Acid-Sulphate Soils
• Sea Water
• Septic Plants
• Waste Water Treatment
• Chemical Storage
• Biological Attacks – Grain Storage
• Poultry and Piggeries (high uric acid)
• Petroleum Tanks
• Diesel Fuel
NO CRACKS – NO CORROSION
– NO CONCRETE CANCER
33
HOUSING AFTER FLOODING
• Efflorescence and cracking are major issues with masonry construction.
• Long drying time is required before any work takes place.
• Rising damp further increases drying time.
• Fungal growth hard to avoid.
• Very hard to save conventional structures made out of timber/veneer, masonry and concrete.
• Most likely insurance refusals.
• DIFFICULT TO SELL FLOOD AFFECTED HOMES EVEN 10 YEARS AFTER FLOODING.
34
STRUCTURAL SAFETY
IT IS NOW A RECOGNISED FACT THAT THE SAFEST AND MOST ECONOMICAL RESIDENTIAL BUILDING SOLUTION IS LOAD BEARING CONCRETE WALLS
It has been confirmed by the University of Technology Sydney that
35
COLUMN-SLAB SYSTEM
BUILDING CODES REQUIRE ELABORATE AND TIME CONSUMING AND COSTLY DETAILS BETWEEN STRUCTURE AND INFILL WALLS OF
SLAB-COLUMN SYSTEMS
WALL-FLOOR DETAIL
36
IS IT SAFE ?
• Non Toxic, Inert Material.• Heavy Metal Stabiliser/Plasticiser Free.
• Volatile Organic Compounds (VOC) Below Detection Level.
• Group 1 Material, No Fire
Limitation without any protection.
• Much lower than the building authority’s smoke threshold.
• Lighter, No Sharp Edges.
• 100 Years Life; 100% Recyclable.
• Suitable for POTABLE WATER, fish farming.
DINCEL POLYMER HAS NO FIRE RESTRICTIONS TO BE USED IN ANY BUILDING HEIGHT.
37
RECYCLABILITY & WASTE MANAGEMENT
PLANET EARTH MANUFACTURING 100% Recyclability CONSTRUCTION • Construction waste is minimised:
by providing as per order lengths of Dincel-Forms.
off-cuts, if any, can be re-used.
the use of timber and related waste is totally eliminated when Dincel is used.
END OF BUILDING LIFE
95% Recyclability:
• 95% of Dincel-Wall use do not need to
incorporate horizontal reinforcement which allows simple crushing and recycling of Dincel-Polymer, concrete infill and vertical steel (if any)
38
39
AFFORDABILITY – COST EFFICIENCY
• SPEED
Installation speed – workplace safety.
Co-ordination of trades
Not affected by wet weather conditions
Faster than column-slab system having infill walls.
• MATERIAL COST SAVING
Less cement/concrete and steel in typical floor slabs and transfer levels.
Eliminates conventional footings and waterproofing costs.
Reduced waste and cleaning costs.
40
133 APARTMENTS
5 – 11 PYRMONT BRIDGE ROAD – CAMPERDOWN, NSW
41
ECLIPSE – 200 APARTMENTS, BRUCE, ACT
77 WEEKS CONSTRUCTION PROGRAM
REDUCED BY 26 WEEKS
42
CONSTRUCTION SPEED
25m² / 2 man / hour
Lightweight, no cranage
Easy, snap connection
43
SAFE
installation bottom
up by snapping together
Dincel Panels allows
even unskilled local
labour use.
SPEED OF INSTALLATION
UP TO 25m² / 2 man / hour
44
WORKPLACE SAFETY IN CONSTRUCTION
• Light – Man Handleable – No Cranage.
• Minimise the risk of back injury.
• Reduction in the risk of cuts, trip hazards and crushing fingers.
• Eliminates the risk of accidents due to wall formwork stripping.
• Eliminates the risk of electrocution.
• Eliminates the need for scaffolding and falling from heights.
45
SCAFFOLDING ?
46
47
COST EFFECTIVE & BETTER
PERFORMANCE CONCRETE
Eclipse Apartments, Canberra – Holcim Concrete 50% less cement – replaced by fly-ash/sand.
• 18 Mpa strength at 28 days.
• 32 Mpa strength at 120 days and increasing.
Better quality, increased strength, fire resistance, workability, less cement/additives, i.e. cheaper concrete.
Fly-ash creates porous concrete which does not raise any concrete cancer issue when used with WATERPROOF Dincel.
The reason for minimum 20 Mpa structural concrete is
CONCRETE CANCER. WATERPROOF Dincel eliminates
49
COLUMN-SLAB SYSTEM
Frame Structures with AS 3600 - 2009
Minimum slab thickness is 200mm.
Mesh reinforcement cannot be used.
DINCEL load bearing system
allows 150 mm thick slabs and mesh reinforcement.
AS 3600 – 2009
CONCRETE STRUCTURES CODE
Mandatory from May 2011
50
DID YOU KNOW THAT LOAD
BEARING WALLS OFFER:
•
Maximum STRENGTH for Earthquakes and Cyclones•
FASTER Construction•
Maximum ENERGY EFFICIENCY•
Maximum COST EFFICIENCY Up to 43% cost efficiency
Concrete Structures Engineering Codes offer
51
MINIMUM 23%, UP TO 43 % COST SAVINGS
42% More Energy 75 Tonnes More CO2
SLAB-COLUMN FRAME SYSTEM
Concrete In Slab: 36% MORE Steel In Slab: 64% MORE
Total Cost: 43% MORE DINCEL CONSTRUCTION SYSTEM 42% Less Energy 75 Tonnes Less CO2
Concrete In Slab: 36% LESS Steel In Slab: 64% LESS Total Cost: 43% LESS
FLOOR SLABS CARRIED BY LOAD BEARING DINCEL-WALLS WILL ALWAYS RESULT IN LESS CONCRETE AND STEEL
52
SWINBURNE UNIVERSITY
OF TECHNOLOGY
ACKNOWLEDGES
The embodied energy savings by
Dincel Construction System offers:
• 75 tonnes CO2-e savings for each two bedroom apartment at Year 1.
• 89 years of equivalent heating and cooling energy.
53
Transfer slabs
are eliminated if
party walls are
placed in right
angle direction to
the carparking
aisle way below.
DINCEL CAN
ELIMINATE COSTLY
TRANSFER SLABS
54
TYPICAL BUILDING CROSS SECTION
55
DINCEL
56
• Waterproof – No Cracks – No Concrete Cancer – Minimum 100 Years Life.
• Insulation for Cold-Hot Climates.
• Eliminates Condensation, Mould/Mildew Development.
57
BENEFITS – DINCEL LOADBEARING
WALLS IN BUILDINGS
•
Maximum STRENGTH, SAFETY,SIMPLICITY.
•
Up to 50% FASTER Construction.•
Maximum COST EFFICIENCY bothin Walls and Floor Slabs.
•
Maximum RECYCLABILITY andEMBODIED ENERGY SAVING less Steel and Cement.
•
WATERPROOF – Longer Building Life – BETTER AIR QUALITY.58
Dincel Topics
• Housing Affordability
• Costing, Cost Saving
• Compliance – Waterproof – Fire – Floods – Water – Silos – Tanks – Food – Earthquakes
• VOC – Mould –
Condensation, Indoor Air Quality – UV Resistant • Finishes – Acoustic • Energy Efficiency, Cement Minimisation, Fly-Ash Concrete, Construction Sustainable – Safety – Problems • Information for Engineers – Architects
Dincel Web Page