Prepared by Mounif Kilani, ECC Kuwait Page 1/8

PROJECTS IN QATAR

Here are some major projects in Qatar. Some projects have already started, other on the way. It is important to remind that date mentioned in the projects publication is not always respected.

PEOPLE MOVER SYSTEM IN QATAR EDUCATION CITY

Client: Qatar Foundation Consultant:

Contractor: Habtoor Leighton Group Project Value: $124 Million

Project Duration: 3 years Status: Execution

HLG has been awarded responsibility for the design and construction of Qatar’s US$412 million People Mover System in Education City, which is one of the country’s first rail projects.

HLG’s scope of works, valued at US$124 million, incorporates the design and construction of track-work, tram-stops and a depot facility, which includes maintenance workshops and administration buildings. HLG is part of the Siemens Tram Consortium with Siemens WLL Doha and Siemens AG from Germany.

The People Mover System is located in Doha’s Education City. Being built for Qatar Foundation for Education, Science and Community Development, and is intended to reduce the flow of traffic within Education City, by allowing students to park their cars in purpose-built multi-storey car parks and travel free of charge on a battery-powered tram system to their destination within Education City.

LUSAIL DEVELOPMENT FOR PRIMARY INFRASTRUCTURE

Client: Lusail Real Estate Development Company (LREDC) Consultant: QPM

Contractor: MIDMAC YUKSEL JV Project Value:

Project Duration: 3 years Status: Execution

The Project comprises of Engineering, Procurement, Construction and Commissioning of major parts of Road A1, A6, D11 & A10 at Lusail with Junctions 12, 13, and 14, Wadi Underpass, Tunnels T1 & T2, Southern and Marina Interchanges including Underpass, Bridges, Arch, and Tunnel. The total length of the roads is 7.5 km. The scope of works include design and construction of a 4.6 km deep storm water tunnel of 2.4-3 m diameter with 15 shafts. Utilities, irrigation, electrical substations, road lighting, traffic signals, district cooling and gas distribution are also in the scope.

MESSAEEID

Client: Qatar Petroleum Consultant: Iberdrola

Contractor: Seattle Contracting Company Project Value:

Project Duration: Status: Execution

(2)

Prepared by Mounif Kilani, ECC Kuwait Page 2/8

Construction of asphalt access road Car park, boundary walls, temporary and permanent fencing Excavation and installation of electrical cable conduits including electrical power line and supply and erection of perimeter lamp post. Work includes supply of equipment material manpower and supervision.

SOUQ WAQIF UNDERGROUND CAR PARK

Client: Private Engineering Office (PEO)

Consultant: JAIN Sustainable Engineering Solutions & Parsons Contractor: Arabian MEP Contracting

Project Value:

Project Duration: 18 months Status: Execution

Arabian MEP Contacting, secured subcontract award from the project main contractor UrbaCon to carry out full Mechanical, Electrical and Plumbing (MEP) works for 3 levels of underground car park at Souq Waqif – One of Doha’s most popular souqs.

The project overseeing full MEP work on 106,381.73 sqm underground car park and will have the capacity of 2,400 cars. The project is scheduled for completion in 18 Months from award date.

NDIA – EMIRI TERMINAL

Client: NDIA Steering Committee

Consultant: Overseas Bechtel Incorporated Contractor: CDC

Project Value: QR 2.000.000.000 Project Duration:

Status: Execution

The NDIA (New Doha International Airport) Project is a Joint Venture of CDC and Takenaka.

The components included in the works are as follows: - Emiri / V.V.I.P. Terminal Building

- Passenger Terminal Parking Facilities - Mosque and related facilities

The Emiri Terminal – Architecturally elaborated building of reinforced concrete and steel structure of approximately 8,000m² in two levels. It is divided into three main parts:

1. Emiri Terminal to accommodate ceremonial reception and departure of guest of state, private terminal for Emir, His family and selected ministers.

2. Ministers Lounge to serve as a terminal lounge for ministers.

3. V.V.I.P Lounge to accommodate V.V.I.Ps, both those travelling via private aircraft and those travelling by commercial airline flights.

Passenger Terminal Parking Facilities – These facilities include three-level structures to accommodate 50.000 square meters of public vehicle parking, a commercial parking structure with shaded parking on the ground level and two at Grade Parking Lots with a state of the art parking management system.

Mosque – is a three-level circular concrete structure with glass exterior at the upper two levels. The structure is approximately 47 meters in diameter and 13 meters in height above the plaza level. The ground level accommodates storage areas, elevator & mechanical room. The plaza level of the mosque accommodates assembly, circulation, office and storage areas, including the men’s prayer hall. The

(3)

Prepared by Mounif Kilani, ECC Kuwait Page 3/8

upper mezzanine level accommodates assembly and circular areas, including the women’s prayer hall. The mosque also accommodates an Imam’s residence and Muesins residence.

Mosque Plaza and Minaret – paved plaza above the commercial parking structure complete with landscape lighting, planters, pools, walkways and bridges connecting to the Vertical Circulation Node which provides access to the Passenger Terminal Building and Minaret.

NEW DOHA INTERNATIONAL AIRPORT, QATAR

Client: Government of the State of Qatar Consultant:

Contractor: Bechtel Corporation Project Value:

Project Duration: Status: Execution

Bechtel is providing engineering, project management, and construction management services for the New Doha International Airport, now being built in Qatar. It will replace an existing facility, increase passenger and cargo-handling capacity, and accommodate the new Airbus A380 super jumbo jets.

When it opens, the new airport will accommodate 24 million passengers and 750,000 metric tons of cargo annually. It will feature two of the longest commercial runways in the world, an 85 meter high control tower, a 510,000-square-meter passenger terminal with 40 gates, a separate terminal for the Emir of Qatar, a general aviation terminal, a cargo terminal, a 150,000 square meter aircraft maintenance center, one of the world’s largest airport catering facilities, state-of-the art air traffic control equipment and security systems, and other facilities.

LUSAIL ICONIC SOLAR STADIUM – FIFA WORLD CUP STADIUMS

Client: Consultant: Contractor:

Project Value: $662 million Project Duration:

Status: Planning

The project involves construction of a fully retractable cable net roofed stadium with a crowd capacity of 86, 250. The dhow sail styled stadium’s outer skin is a concave structure incorporating louver system for ease and pleasure of the fans and players. The stadium would be surrounded by a pool of water with its roof supported by arching columns. The solar powered stadium which can be accessed by 6 bridges, will have its own metro station and will be linked to highways and bus routes.

DOHA METRO

Client: Ministry of Communications and Transport Consultant: Parsons Brinckerhoff

Contractor:

Project Value: 3bn USD

Project Duration: From Q1 2010 Estimated To Q1 2015 Estimated Status: Bidding

Doha metro is an 85-KM railway network in Qatar. The railway will include an east coast link, a high-speed link, a freight link and a light rail system. The railway will

(4)

Prepared by Mounif Kilani, ECC Kuwait Page 4/8

serve suburb of Doha and developments such as Lusail, Education city and West Bay. Phase 1 of the Doha Metro, which includes a Red Line from the south of Doha through the city toward Lusail.

BARWA FINANCIAL DISTRICT

Client: Barwa Real Estate Consultant:

Contractor: Bouygues Construction Project Value: 1.3bn USD

Project Duration: From Q1 2010 Actual To Q3 2013 Actual Status: Execution

The Barwa Financial District is a giant project conceptualized to serve the global, regional and local financial sector. The Financial District will house facilities attracting regional and international banks seeking specialized infrastructure to benefit from. The Barwa Financial District will be located in the new business city of Doha, West Bay. The site for the Financial District has an approximate square area of 71, 600 plus sq. m and is situated along Majlis Al Taawon Street with secondary roads surrounding the perimeter allowing access to it from multiple sides.

LUSAIL DEVELOPMENT – LIGHT-RAIL-TRANSIT SYSTEM

Client: Diar Real Estate Development Company Consultant:

Contractor:

Project Value: TBC

Project Duration: From: Q4 2011 Estimated To: Q1 2016 Estimated Status: Bidding

The project calls for construction of Light-Rail-Transit System for Lusail Development. The light-rail-transit system will cover 22 kilometres and include with around 35 stations.

BARWA CITY DEVELOPMENT

Client: Barwa Real Estate Company (Barwa) Consultant: Consult Maunsell

Contractor:

Project Value: 1.35bn USD

Project Duration: From Q2 2007 Estimated To Q1 2015 Estimated Status: Execution

Barwa City will cover a 2.7 million square meter land in Musameer, just outside the heart of Doha. The development offers its home owners and investors 128 apartment buildings, 6000 flats, and 1024 studio units. The city will also include schools, a hospital, mosques, parks, shopping complexes, health facilities and all other conceivable amenities. City capacity is 20,000 families. It will have its own district cooling system and total wireless internet coverage.

LUSAIL LIGHT RAIL TRANSIT SYSTEM – PHASE 1

Client: Qatar Railways Company (QRail) Consultant:

Contractor: Qatari Diar Vinci Construction (QDVC) Project Value: 5 b USD

(5)

Prepared by Mounif Kilani, ECC Kuwait Page 5/8

Status: Execution

Pase 1 covers civil engineering works in seven underground stations, construction of a viaduct over the highway between Doha and the northern part of the country and preliminary work for the LRT depot and maintenance workshop.

The Lusail LRT project entails four lines covering a distance of 30km, with ten underground stations and 25 at grade stations, being developed in several phases. The entire project is executed in several engineering study and construction phases, where the next and final phase will include rolling stock and systems.

Integrated into 19 mixed-use districts, the project will transport 200,000 people and around 400,000 visitors a day in the new city of Lusail and is being developed on a 37km² waterfront site 15km north of Doha.

DOHA FESTIVAL CITY

Client: Bawabat Al Shamal Real Estate Company WLL (BASREC) Consultant:

Contractor: Qatar Islamic Bank (QIB), DP Architects, Arab Engineering Bureau (AEB) (Project Architect), Mace International (Project Manager)

Project Value: QAR 6 billion

Project Duration: From Q1 2011 Estimated To Q1 2014 Estimated Status: Execution

The total area of Doha Festival City is 433,847m2 and located 15km north of downtown Doha on Al Shamal Road. The plot will include 260,000sqm gross leasable area of retail space offering over 500 retail units which will include a large number of new brands to Qatar. In addition, the project will boast the first Ikea store in Qatar, and will feature an entertainment and leisure complex, automotive showrooms, international hotels and convention centre.

UMM SALAL STADIUM

Client: Qatar Football Association Consultant: Albert Speer & Partner Contractor: CH2M Hill

Project Value: 251m USD Project Duration: 2012 to 2015 Status: Execution

Umm Slal Stadium will have 45,120 seats. The design is a modern interpretation of traditional Arab forts. After the FIFA World Cup, seating capacity will be reduced to 25,500.

LUSAIL LIGHT RAIL TRANSIT SYSTEM

Client: Qatar Railway Development Company Consultant: Turner and Townsend

Contractor: Qatari Diar, Vinci Construction Project Value: 1.8bn USD

Project Duration: 2011 to 2016 Status: Execution

The network is composed of four main tram lines extending over 30.5 kms underground and over ground and 36 passenger stations.

In the southern part of the city, a 5.5 kilometre underground railway is under construction. Joining various residential districts across the city and serving the Marina, Energy City and Qatar Entertainment City.

(6)

Prepared by Mounif Kilani, ECC Kuwait Page 6/8

The northern sector of Lusail City will have 24 stations at grade to serve the areas of Fox Hills district, the Northern Residential district, the Medical and Educational districts, the Golf district and to Lusail City’s plaza at the heart of the city.

In the near future, the rail network will connect to Doha’s metro network at a network interchange located on Khor highway.

BARAHA MOTOR CITY

Client: Barwa Real Estate Consultant:

Contractor:

Project Value: 533m USD Project Duration: 2012 to 2017

Status: FEED (front end engineering design)

Motor City will be located next to Qatar Racing Club and will cover almost 2mn sqm. Baraha Motor City will create a self-contained integrated community to attract motorists seeking a broad range of automotive related services.

AL KHOR STADIUM

Client: Qatar Football Association

Consultant: Albert Speer & Partner, CH2M Hill Contractor:

Project Value: 250m USD Project Duration: 2015 to 2019 Status: Planning

Al-Khor is a 45,330-capacity stadium with a seashell motif and a flexible roof. The permanent lower tier seats 25,500 and the modular upper tier seats 19,830. The stadium offers spectators a view of the Arabian Gulf from their seats and will be located in a sports and recreation zone.

FOUR STAR HOTEL PROJECT

Client: Qatar Airways Consultant:

Contractor: Gulf Contracting Company Project Value:

Project Duration: Status: Execution

The 4 Star Airport Hotel, is a 400 Room Hotel, is located near the existing Doha Airport. Approximate Gross Built-Up Area is 43,135 M2 and the development consists of Basement, Ground and First Floor plus two 6-Storey towers (B+G+7). Basement (7048 M2) is for Car Park & Plant Room

The Ground Floor to include Front Office, Foyer, Lobby Lounge, Retail, Shops, Restaurants, Administration,Loading Dock & Back of Houses.

The First Floor is to include Restaurant, Lounge, Meeting Rooms, Business Centre, Health Club and Swimming Pool.

Above First Floor there are 6 Floors dedicated to the Guest Rooms (400 Rooms).

MUSHEIREB DEVELOPMENT

Client: Dohaland

Consultant: Adjaye Associates, Allies & Morrison, John McAslan & Partners, Mossessian & Partners,

(7)

Prepared by Mounif Kilani, ECC Kuwait Page 7/8

Contractor: Bauer International, Drake & Skull International Project Value: 5bn USD

Project Duration: From Q1 2010 Estimated To Q1 2016 Estimated Status: Execution

The development covers an area of 750,000 square metres and will be divided into several districts, including a residential and mixed-use quarter, a retail quarter, a heritage quarter and a commercial area called the Headquarters Gateway. It will also include a shopping mall, hotels and entertainment area.

Surgery Hospital Area: Al Sadd Sector: Health Total Cost: 900,000,000 Q.R. Status: In progress Type: Buildings

Start Date: 01 May 2013

Expected completion date: Second quarter of 2015 Construction company: MIDMAC

Consulting company: KEO Consultants

Roads projects

East-West Corridor

Area Industrial Area

Sector Expressway Programme Projects Total Cost 3,900,000,000 Q.R.

Status In progress

Type Roads

Start Date 01 September 2013 Expected completion date Second quarter of 2017 Construction company Contractor:

- East Corridor: China Harbour Engineering Company

- West Corridor: Joannou & Paraskevaides (Overseas) Limited/J&P –Avax S.A. (JV)

Consulting company Design Consultant: Parsons International Supervision Consultant: CH2M Hill Halcrow Ltd

Dukhan Highway East

Area Multiple Areas

Sector Expressway Programme Projects Total Cost 3,700,000,000 Q.R.

Status In progress

Type Roads

Start Date 01 October 2011

Expected completion date Second quarter of 2017 Construction company QD/SBG Group

Consulting company Design Consultant 1: Parsons International Design Consultant 2: Dar Al Handasah Supervision Consultant: Parsons International

(8)

Prepared by Mounif Kilani, ECC Kuwait Page 8/8

Lusail Expressway

Area Multiple Areas

Sector Expressway Programme Projects Total Cost 3,500,000,000 Q.R.

Status In progress

Type Roads

Start Date 17 November 2012 Expected completion date Second quarter of 2017

Construction company Hyundai Engineering and Construction Consulting company Design Consultant: AECOM Middle East Ltd Supervision consultant: CDM Smith

Programme Manager: KBR AlMuntazah Street

Area Multiple Areas

Sector Expressway Programme Projects Total Cost 2,300,000,000 Q.R.

Status In progress

Type Roads

Start Date 01 July 2012

Expected completion date Fourth quarter of 2016

Construction company Al Jaber Transport & General Contracting LLC Consulting company Design Consultant: AECOM Middle East Ltd. Supervision Consultant: Parsons International

References

Related documents

Information Security Problems Recent hacking methods most used in Vietnam Recent hacking methods most used in

Motivates its liabilities in insurance policy number or print my saved quote is available with your life insurance company whose whole business insurance companies set a cost.. We

Open Interactive Illustration 15.x, Acuity Development and Vision for a simulated experience of infant vision.. When the screen comes up, you will see two copies of the

The results of the sensory evaluation of the cookies prepared from the different treatments of the composite flour are according to the findings of Gambus, et al (2003), who

There were no significance difference between the treatments, but 50% supplementation of potato flours showed significant differences at (p<0.05).This is in agreement with

As introduced in Section 1, PHASOR is created from three components: ID, Model, and Sensor, in this sec- tion we describe how to apply PHASOR to recog- nize different types

CATERPILLAR E320C BOOM CYLINDER. CATERPILLAR E320C ARM

Services being undertaken are technical studies, environmental impact assessment, project and construction management, maintenance management, project planning, engineering