• No results found

1 Event Level Floor Plan - HVAC (Area A) M201 SCALE: 1/8" = 1'-0"

N/A
N/A
Protected

Academic year: 2022

Share "1 Event Level Floor Plan - HVAC (Area A) M201 SCALE: 1/8" = 1'-0""

Copied!
8
0
0

Loading.... (view fulltext now)

Full text

(1)

A B C D E F G

5 4 1

2

3

8 7 6 1P

2P

4P

6P

8P

10P

12P

15P 14P

/ 1 M202

1 M700

A B C D E F G

5 4 1

2

3

8 7 6 1P

2P

4P

6P

8P

10P

12P

15P 14P

Stair C 090.15

Stair D 090.16

Court 050

Storage 042

T 2

M700

E-3 600 CFM 16x10NK

S-5 233 CFM 12x8NK S-5

233 CFM 12x8NK S-5

234 CFM 12x8NK

8'

0' 16'

Scale: 1/8" = 1'-0"

PROFESSIONAL SEAL CONSULTANT

PROJECT

KEY PLAN

SHEET TITLE

PROJECT #

SHEET #

© 2018 ROSSETTI

B 8

7 6 5 4 3 2 1

A C D E F G H J K

8 7 6 5 4 3 2 1

30x42

AE-SVR-FILE01\UserFolders\rzora\Documents\74670_WSGL_MECH_v20_rzora.rvt /2020 5:31:43 PM

2018-034

Event Level Floor Plan - HVAC (Area A)

M201

Wayne State University - Basketball Arena

1290 West Warren Avenue Detroit, Michigan 48202

M201 SCALE: 1/8" = 1'-0"

1 Event Level Floor Plan - HVAC (Area A)

THE FOLLOWING GENERAL NOTES APPLY TO ALL HVAC SHEETS INCLUDED WITHIN THIS DOCUMENT SET, EXCEPT WHERE OTHERWISE INDICATED.

1. SHEET METAL OFFSETS AND TRANSITIONS ARE SHOWN TO PROVIDE INDICATION OF PHYSICAL CONDITIONS WITHIN THE SPACE. IT IS NOT THE INTENT OF THE DRAWINGS TO SHOW ALL REQUIRED OFFSETS AND TRANSITIONS. THE CONTRACTOR SHALL FULLY COORDINATE THE MECHANICAL WORK WITHIN ITSELF AND WITH THE WORK OF ALL TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

2. COORDINATE GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

3. ALL NEW DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR SUSPENDED CEILING, UNLESS OTHERWISE NOTED.

4. ALL DUCT PENETRATIONS THROUGH 2-HOUR FIRE-RATED ASSEMBLIES SHALL BE PROVIDED WITH FIRE DAMPERS AND ACCESS DOORS.

5. ALL EXHAUST GRILLES SHALL BE HARD DUCT CONNECTION IN HARD CEILINGS.

6. ALL ROUND DUCT RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL SIZE AS INDICATED BY THE DIFFUSER TAG ON THE DRAWINGS.

7. SUPPLY DUCTWORK PRESSURE CONSTRUCTION SHALL BE 3" W.G. UPSTREAM OF TERMINAL UNITS AND 2" W.G. DOWNSTREAM OF TERMINAL UNITS.

8. MAINTAIN A MINIMUM 10'-0" CLEARANCE FROM EXHAUST FANS, EXHAUST TERMINATIONS AND FLUE GAS VENTS TO ANY SURROUNDING FRESH AIR INTAKES.

9. MAINTAIN REQUIRED CLEARANCES IN FRONT OF ELECTRICAL PANELS/EQUIPMENT. DO NOT ROUTE DUCTWORK ABOVE ELECTRICAL PANELS/EQUIPMENT OR THROUGH ELECTRICAL ROOMS.

10. ACCESS PANELS AND DOORS ARE REQUIRED THROUGHOUT BUILDING CONSTRUCTION ASSEMBLIES SUCH AS WALLS, HARD CEILINGS, PARTITIONS AND FLOORS TO SERVICE AND MAINTAIN TERMINAL UNITS, BALANCING DAMPERS, CONTROL MOTORS, ETC.

ACCESS PANELS AND DOORS SHALL BE PROVIDED AND INSTALLED PER

ARCHITECTURAL SPECIFICATIONS. MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT QUANTITY, SIZE, FIRE-RATING AND LOCATION OF ACCESS PANELS AND DOORS FOLLOWING INSTALLATION OF SYSTEMS AND COMPONENTS REQUIRING ACCESS, BUT PRIOR TO THE CLOSURE OF THE AFFECTED CEILING AND BUILDING ASSEMBLIES.

MINIMUM ACCESS PANEL AND DOOR SIZE SHALL BE 24 INCHES BY 18 INCHES, UNLESS OTHERWISE NOTED.

11. WHERE VOLUME DAMPERS OCCUR ABOVE CEILINGS WITHOUT REMOVABLE TILE OR ACCESS PANEL, PROVIDE A FLUSH-MOUNTED CONCEALED DAMPER REGULATOR TO ALLOW FOR DAMPER ADJUSTMENT BELOW CEILING. UNIT TO BE EQUAL TO VENTLOCK NO. 666 IN 1/2" OR 3/8" ROD SIZE.

12. PROVIDE TRANSFER OPENING IN ALL FULL HEIGHT WALLS SIZED FOR 0.05" OF STATIC PRESSURE PER 100' OF DUCT. PROVIDE FIRE DAMPER IN ALL FIRE RATED

ASSEMBLIES.

13. PROVIDE VANDAL PROOF TEMPERATURE SENSORS IN PUBLIC AREAS.

# DESCRIPTION DATE

1 DESIGN DEVELOPMENT 11.21.2019

CONSTRUCTION DOCUMENT - PACKAGE 2 03.18.2020

(2)

FECFEC

5 4 2

3

8 7 6

40x20

16x1430x1440x2024x2030x20

40x20

40x2030x1620x14

SVAV-1-01 300 CFM

EVAV-1-01 400 CFM EVAV-1-04

450 CFM EVAV-1-03 450 CFM

EVAV-1-02 450 CFM

SVAV-1-06 950 CFM

SVAV-1-07 300 CFM

SVAV-1-08 1050 CFM

SVAV-1-09 2100 CFM EVAV-1-08

1150 CFM EVAV-1-07

200 CFM

EVAV-1-06 500 CFM

EVAV-1-09 2200 CFM

SVAV-1-19 2100 CFM

SVAV-1-11 1500 CFM SVAV-1-12

550 CFM

SVAV-1-14 1500 CFM

SVAV-1-15 1000 CFM

SVAV-1-17 700 CFM

SVAV-1-16 300 CFM

SVAV-1-18 700 CFM EVAV-1-16

400 CFM EVAV-1-15 1200 CFM

EVAV-1-14 1600 CFM EVAV-1-12

675 CFM

20x18 EVAV-1-11 1600 CFM

EVAV-1-19 2200 CFM EVAV-1-05

1600 CFM

AC-1 AC-2

G H J K

5 4 2

3

8 7 6

K.2

AC-3

F F

F F

SF-1 200 CFM

SF-2 200 CFM

SVAV-1-10 450 CFM

10"⌀ DRYER VENTS UP TO LVL 01 10ø

10ø

PROVIDE 10x10

TRANSFER OPENING WITH GRILLES ON BOTH SIDES AND FIRE DAMPER PROVIDE 10x10

TRANSFER OPENING WITH GRILLES ON BOTH SIDES AND FIRE DAMPER

40x20 SUPPLY DUCT UP TO GROUND LEVEL

40x20 EXHAUST DUCT UP TO GROUND LEVEL

40x20 SUPPLY DUCT UP TO GROUND LEVEL 40x20 EXHAUST DUCT UP TO GROUND LEVEL 12x12 EXHAUST DUCT UP TO GROUND LEVEL

AC-6

12x8

Stair B 090.02

Stair A 090.01 Elev. #1

090.03

G League Locker 011

Home Training 009 Training Office

009.4

JC Storage 027

Elec.

010

Hydro 009.3

Recovery/Media 023

IDF 024

WSU/GL Laundry 029

Visiting Training 028

WSU Women Locker

005

WSU Wet 005.1

WSU Men Locker 003

WSU Wet 003.1

WSU/G-L Visiting Locker

002

Visiting Wet 002.1

WSU Visiting Locker

006

Visiting Wet 006.1

Elev. Machine 012 Facility Office

008 GL Storage

025

Visiting Coaches 020 Off. Lockers

016 WSU Coaches

017 WSU Coaches

013

Elec.

021 G League

Conference 015

?

?

L.H.

027.1

Changing Room 020.1

Away Corridor 090.07 Home Corridor

090.06

L.H.

022

G League Wet 011.2

Fam. Toilet 026

Amp Storage 001 IDF

019

Training Storage 009.1 G League Coaches

Locker 011.1

L.H.

025.1

Hydration 007

Off. Lockers 018

Stair A Cooridor 090.05 Away Entry

090.09 Home Entry

090.08

090.04

R-2

14x10 14x10 S-1

500 CFM 12"NK

S-1 500 CFM 12"NK

S-1 500 CFM 12"NK

E-1 400 CFM 10"NK

E-1 400 CFM 10"NK E-1

400 CFM 10"NK

E-1 400 CFM 10"NK

12x10

18x10

18x14 8x14

18x12 24x12

12x14 S-1 250 CFM 8"NK S-1

250 CFM 8"NK

S-1 250 CFM 8"NK

E-1 600 CFM

12"NK E-1 600 CFM 12"NK

S-1 250 CFM 8"NK

10ø

S-1 520 CFM 12"NK E-1 550 CFM 12"NK

E-1 550 CFM 12"NK

E-1 550 CFM 12"NK

E-1 400 CFM 10"NK

E-1 400 CFM

10"NK E-1 400 CFM 10"NK E-1 400 CFM 10"NK

S-1 500 CFM 12"NK S-1

500 CFM 12"NK

S-1 500 CFM 12"NK

E-1 300 CFM 10"NK S-1

250 CFM 8"NK E-2

100 CFM 6"NK S-1

50 CFM 6"NK

10x14

24x14

24x14 40x20

S-1 520 CFM

12"NK E-1 550 CFM 12"NK E-1 550 CFM 12"NK E-1

550 CFM 12"NK

24x14

E-2 75 CFM 6"NK

E-1 300 CFM 10"NK

E-1 300 CFM 10"NK

8x1218x12

S-1 275 CFM 10"NK

S-1 275 CFM 10"NK

14x12

18x12

18x12 24x12

18x14 8x14

14x10

12x10

8x12

12x10

8ø 8x12

16x10

S-1 450 CFM 10"NK

E-1 500 CFM 12"NK E-1

500 CFM 12"NK

16x14

16x14

12ø

24x12

S-1 450 CFM 10"NK 14x14

14x12 8x12

E-1 400 CFM 10"NK

10x6

8x14 EVAV-1-20

1000 CFM

SVAV-1-20 900 CFM E-1

400 CFM 10"NK

S-1 300 CFM 10"NK

10ø

10ø

T C

CO2 SENSOR (TYP.)

T

T

T

T T

T

T

T

T

T T

T T

T T

T

10ø

10ø

12ø

10ø

12x10 10ø 10ø

E-1 450 CFM 10"NK

S-1 350 CFM 10"NK

S-1 500 CFM 12"NK E-1

450 CFM 10"NK

E-1 450 CFM 10"NK

T T

T

T T

SVAV-1-03 500 CFM

T

S-6 8"NK 200 CFM S-5

1400 CFM 24x12NK

E-1 550 CFM 12"NK

S-1 225 CFM 8"NK S-1 225 CFM 8"NK

S-1 525 CFM 12"NK S-1

525 CFM 12"NK

S-1 300 CFM 10"NK

E-1 200 CFM 8"NK

E-3 200 CFM 12x6NK S-1

250 CFM 8"NK 2

M700

T

24x12

10x12

SVAV-1-21 1400 CFM

E-3 400 CFM 14x8NK

RVAV-1-21 400 CFM

12x8

EF-8

800 CFM EF-9

800 CFM

1

1

1

1 1

2 2

2

S-5 500 CFM 16x10NK S-5

100 CFM 12x8NK

S-5 100 CFM 12x8NK

E-1 250 CFM 8"NK

E-3 250 CFM 12x6NK

10x10

16x10

16x10

10x10

12x10

EVAV-1-17 600 CFM

40x20

T-2 T-2

T-2 T-2

T-2 T-2

20x14

T-2 10x10

M BMS

100

100

100

100

100

BMS M

75 100

50

100

200 150

100

100

E-1 575 CFM 12"NK E-1 575 CFM 12"NK

100

100 200

200 200

100

100

E-1 400 CFM 10"NK

E-1 400 CFM 10"NK E-1 400 CFM 10"NK S-1

450 CFM 10"NK S-1

525 CFM 12"NK S-1

525 CFM 12"NK

18x14

SVAV-1-05 1500 CFM 10x14

100

50

100

S-5 300 CFM 12x8NK

S-5 200 CFM 12x8NK

M BMS BMS M

1 M701 BMS USER

WORKSTATION

10x1010x10

12ø

12ø

16ø

14ø

14ø

52x8 16ø

24x14

40x20 30x20

3

4 4

5 5

6 6

3

52x8

16ø 14ø

16ø

4 4

5 5

6 6

12ø

12ø

12ø

12ø

12ø

8'

0' 16'

Scale: 1/8" = 1'-0"

PROFESSIONAL SEAL CONSULTANT

KEY PLAN

SHEET TITLE

PROJECT #

© 2018 ROSSETTI

8 7 6 5 4 3 2

8 7 6 5 4 3 2

cuments\74670_WSGL_MECH_v20_r.zora.rvt 4 AM

2018-034

Event Level Floor Plan - HVAC (Area B)

Wayne State University - Basketball Arena

1290 West Warren Avenue Detroit, Michigan 48202

1 Event Level Floor Plan - HVAC (Area B)

TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

2. COORDINATE GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

3. ALL NEW DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR SUSPENDED CEILING, UNLESS OTHERWISE NOTED.

4. ALL DUCT PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROVIDED WITH FIRE DAMPERS AND ACCESS DOORS.

5. ALL EXHAUST GRILLES SHALL BE HARD DUCT CONNECTION IN HARD CEILINGS.

6. ALL ROUND DUCT RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL SIZE AS INDICATED BY THE DIFFUSER TAG ON THE DRAWINGS.

7. SUPPLY DUCTWORK PRESSURE CONSTRUCTION SHALL BE 3" W.G. UPSTREAM OF TERMINAL UNITS AND 2" W.G. DOWNSTREAM OF TERMINAL UNITS.

8. MAINTAIN A MINIMUM 10'-0" CLEARANCE FROM EXHAUST FANS, EXHAUST TERMINATIONS AND FLUE GAS VENTS TO ANY SURROUNDING FRESH AIR INTAKES.

9. MAINTAIN REQUIRED CLEARANCES IN FRONT OF ELECTRICAL PANELS/EQUIPMENT. DO NOT ROUTE DUCTWORK ABOVE ELECTRICAL PANELS/EQUIPMENT.

10. ACCESS PANELS AND DOORS ARE REQUIRED THROUGHOUT BUILDING CONSTRUCTION ASSEMBLIES SUCH AS WALLS, HARD CEILINGS, PARTITIONS AND FLOORS TO SERVICE AND MAINTAIN TERMINAL UNITS, BALANCING DAMPERS, CONTROL MOTORS, ETC.

ACCESS PANELS AND DOORS SHALL BE PROVIDED AND INSTALLED PER

ARCHITECTURAL SPECIFICATIONS. MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT QUANTITY, SIZE, FIRE-RATING AND LOCATION OF ACCESS PANELS AND DOORS FOLLOWING INSTALLATION OF SYSTEMS AND COMPONENTS REQUIRING ACCESS, BUT PRIOR TO THE CLOSURE OF THE AFFECTED CEILING AND BUILDING ASSEMBLIES.

MINIMUM ACCESS PANEL AND DOOR SIZE SHALL BE 24 INCHES BY 18 INCHES, UNLESS OTHERWISE NOTED.

11. WHERE VOLUME DAMPERS OCCUR ABOVE CEILINGS WITHOUT REMOVABLE TILE OR ACCESS PANEL, PROVIDE A FLUSH-MOUNTED CONCEALED DAMPER REGULATOR TO ALLOW FOR DAMPER ADJUSTMENT BELOW CEILING. UNIT TO BE EQUAL TO VENTLOCK NO. 666 IN 1/2" OR 3/8" ROD SIZE.

12. PROVIDE TRANSFER OPENING IN ALL FULL HEIGHT WALLS SIZED FOR 0.05" OF STATIC PRESSURE PER 100' OF DUCT.

13. PROVIDE VANDAL PROOF TEMPERATURE SENSORS IN PUBLIC AREAS.

HVAC KEY NOTES

SEAL FLOOR PENETRATION AND PACK SPACE BETWEEN DUCT WITH FIRE RATED MATERIAL PER MICHIGAN BUILDING CODE.

PROVIDE FLUSH MOUNTED CLEANOUT PORTS ON DRYER VENT DUCTWORK AT EVERY 20' OF DUCT AND ALL ELBOWS AND TURNS.

12" EXHAUST DUCT DOWN TO 16" EXHAUST OUTLET ABOVE PERFORATED CEILING.

PROVIDE WIREMESH GRILLE ON OPEN ENDED DUCTWORK. BALANCE TO 550 CFM.

PROVIDE 10' CONTINUOUS SLOT DIFFUSER, TITUS MODEL FL-25 JET THROW ONE SLOT AND 2.5" SLOT WIDTH. PROVIDE (2) 12" OVAL TAPS INTO CUSTOM PLENUM.

BALANCE TO 560 CFM.

PROVIDE 2' SLOT DIFFUSER, TITUS MODEL FL-25 JET THROW ONE SLOT AND 2.5"

SLOT WIDTH. PROVIDE 12" OVAL TAP INTO CUSTOM PLENUM. BALANCE TO 115 CFM.

PROVIDE ROUND DUCT IN SEGMENTS TO FIT IN CHASE AS INDICATED.

1

2

# DESCRIPTION DATE

1 DESIGN DEVELOPMENT 11.21.2019

CONSTRUCTION DOCUMENT - PACKAGE 2 03.18.2020

ASI-002 06.03.2020

ASI-006 02.26.2021

3

4

5

6

(3)

A B C D E F G

5 4 1

2

3

8 7 6 1P

2P

4P

6P

8P

10P

12P

15P 14P

137 Premium

Seating

?

? 190.13

Concourse North

022 L.H.

143 North Stadia Seating

142 South Stadia Seating

190.16 Stair D 190.15 Stair C

?

?

190.14 Concourse

South 050

Court

144 Camera 148

Camera

/ 1 M212

1 M700

A B C D E F G

5 4 1

2

3

8 7 6 1P

2P

4P

6P

8P

10P

12P

15P 14P

2 M700

T C

CO2 SENSOR

RTU-2 TEMPERATURE SENSOR ONLY. COORDINATE FINAL LOCATION WITH ARCH TRADES.

RTU-1 TEMPERATURE SENSOR ONLY. COORDINATE FINAL LOCATION WITH ARCH TRADES.

T C

CO2 SENSOR

8'

0' 16'

Scale: 1/8" = 1'-0"

PROFESSIONAL SEAL CONSULTANT

PROJECT

KEY PLAN

SHEET TITLE

PROJECT #

SHEET #

© 2018 ROSSETTI

B 8

7 6 5 4 3 2 1

A C D E F G H J K

8 7 6 5 4 3 2 1

30x42

AE-SVR-FILE01\UserFolders\rzora\Documents\74670_WSGL_MECH_v20_rzora.rvt /2020 5:31:58 PM

2018-034

Ground Level Floor Plan - HVAC (Area A)

M211

Wayne State University - Basketball Arena

1290 West Warren Avenue Detroit, Michigan 48202

M211 SCALE: 1/8" = 1'-0"

1 Ground Level Floor Plan - HVAC (Area A)

# DESCRIPTION DATE

CONSTRUCTION DOCUMENT - PACKAGE 2 03.18.2020 THE FOLLOWING GENERAL NOTES APPLY TO ALL HVAC SHEETS INCLUDED WITHIN THIS

DOCUMENT SET, EXCEPT WHERE OTHERWISE INDICATED.

1. SHEET METAL OFFSETS AND TRANSITIONS ARE SHOWN TO PROVIDE INDICATION OF PHYSICAL CONDITIONS WITHIN THE SPACE. IT IS NOT THE INTENT OF THE DRAWINGS TO SHOW ALL REQUIRED OFFSETS AND TRANSITIONS. THE CONTRACTOR SHALL FULLY COORDINATE THE MECHANICAL WORK WITHIN ITSELF AND WITH THE WORK OF ALL TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

2. COORDINATE GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

3. ALL NEW DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR SUSPENDED CEILING, UNLESS OTHERWISE NOTED.

4. ALL DUCT PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROVIDED WITH FIRE DAMPERS AND ACCESS DOORS.

5. ALL EXHAUST GRILLES SHALL BE HARD DUCT CONNECTION IN HARD CEILINGS.

6. ALL ROUND DUCT RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL SIZE AS INDICATED BY THE DIFFUSER TAG ON THE DRAWINGS.

7. SUPPLY DUCTWORK PRESSURE CONSTRUCTION SHALL BE 3" W.G. UPSTREAM OF TERMINAL UNITS AND 2" W.G. DOWNSTREAM OF TERMINAL UNITS.

8. MAINTAIN A MINIMUM 10'-0" CLEARANCE FROM EXHAUST FANS, EXHAUST TERMINATIONS AND FLUE GAS VENTS TO ANY SURROUNDING FRESH AIR INTAKES.

9. MAINTAIN REQUIRED CLEARANCES IN FRONT OF ELECTRICAL PANELS/EQUIPMENT. DO NOT ROUTE DUCTWORK ABOVE ELECTRICAL PANELS/EQUIPMENT.

10. ACCESS PANELS AND DOORS ARE REQUIRED THROUGHOUT BUILDING CONSTRUCTION ASSEMBLIES SUCH AS WALLS, HARD CEILINGS, PARTITIONS AND FLOORS TO SERVICE AND MAINTAIN TERMINAL UNITS, BALANCING DAMPERS, CONTROL MOTORS, ETC.

ACCESS PANELS AND DOORS SHALL BE PROVIDED AND INSTALLED PER

ARCHITECTURAL SPECIFICATIONS. MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT QUANTITY, SIZE, FIRE-RATING AND LOCATION OF ACCESS PANELS AND DOORS FOLLOWING INSTALLATION OF SYSTEMS AND COMPONENTS REQUIRING ACCESS, BUT PRIOR TO THE CLOSURE OF THE AFFECTED CEILING AND BUILDING ASSEMBLIES.

MINIMUM ACCESS PANEL AND DOOR SIZE SHALL BE 24 INCHES BY 18 INCHES, UNLESS OTHERWISE NOTED.

11. WHERE VOLUME DAMPERS OCCUR ABOVE CEILINGS WITHOUT REMOVABLE TILE OR ACCESS PANEL, PROVIDE A FLUSH-MOUNTED CONCEALED DAMPER REGULATOR TO ALLOW FOR DAMPER ADJUSTMENT BELOW CEILING. UNIT TO BE EQUAL TO VENTLOCK NO. 666 IN 1/2" OR 3/8" ROD SIZE.

12. PROVIDE TRANSFER OPENING IN ALL FULL HEIGHT WALLS SIZED FOR 0.05" OF STATIC PRESSURE PER 100' OF DUCT.

13. PROVIDE VANDAL PROOF TEMPERATURE SENSORS IN PUBLIC AREAS.

(4)

FEC FEC

FEC

FEC FEC

D D

CD D

C - -

- --

- --

--- -

5 4 2

3

8 7 6

117 Conference

119 WSU

Film

112 Main Elec.

114 MDF

118 Trash/

Sorting

111 Head Coach

113 Ast.

Coach

109 Head Coach

105 Ast.

Coach 107

Ast.

Coach 127

Concession

125 Family

Toilet

128 Concession

103 Open Office

118.1 Boiler Room 120

Broadcast Control

101 Retail

116 Building Command 104

First Aid

110.1 Staff Lockers 129

Elec.

Closet

129.1 IDF

108 Ticketing 190.08

Atrium

100 Ticket Queuing 137

Premium Seating

190.06 Vestibule

136 Premium

Seating 027.1

L.H.

110 BOH Hallway 022

L.H.

190.07 Concourse

Ticket Queue 190.11

Concourse Concession

North

190.01 Stair A 190.03

Elev. #1

190.02 Stair B

190.05 Concourse

Stair Access 130

East Stadia Seating

190.04 Stair Access

190.10 Concourse

East

190.12 Concourse Concession

South 132 High Camera

190.09 BOH Vestibule 123

Men

126 Supply

124 Men

122 Women

106 Storage

102 Guest Services 121.1

Supply

108.1 Ticket Office 121

Women

123.1 Supply

124.1 Supply

122.1 Supply

66x30

66x30

40x20

30x26

30x2024x1616x12

40x20

66x30

24x12

40x30

24x16 24x20

66x30

66x30 40x20

20x14

VAV-2-01 500 CFM VAV-2-02

650 CFM

VAV-2-03 450 CFM

VAV-2-04 450 CFM

VAV-2-05 800 CFM

VAV-2-06 600 CFM

VAV-2-08 500 CFM

VAV-2-12 800 CFM VAV-2-13 500 CFM

VAV-2-09 300 CFM

CUH-2 AC-5

AC-4

12x12

24x12

G H J K L

5 4 2

3

8 7 6

K.2 K.6

F

F

F SF-3

200 CFM

EUH-1

EUH-2

EUH-3

M

M CUH-4

CUH-3 190.08

Atrium

24x18 INTAKE LOUVER BY ARCH TRADES SIZED FOR 50% FREE AREA

18x12 INTAKE LOUVER BY ARCH TRADES SIZED FOR 50% FREE AREA

PROVIDE 16x10 TRANSFER OPENING WITH GRILLES ON BOTH SIDES AND FIRE DAMPER PROVIDE 16x10

TRANSFER DUCT WITH ACOUSTIC BOOT AND FIRE DAMPER

24x20 RETURN DUCT UP TO RTU-4 ON RTU WELL SOUTH 24x20 RETURN DUCT UP. PROVIDE 1/2"x1/2"

WIRE MESH GRILLE ON OPEN ENDED DUCT (OED)

30x40 SUPPLY DUCT UP TO RTU-4 ON RTU WELL SOUTH PROVIDE 10x10

TRANSFER OPENING WITH GRILLES ON BOTH SIDES AND FIRE DAMPER

30x24 RETURN DUCT UP TO RTU-3 ON RTU WELL NORTH 30x24 RETURN DUCT UP. PROVIDE 1/2"x1/2"

WIRE MESH GRILLE ON OPEN ENDED DUCT (OED)

30x40 SUPPLY DUCT UP TO RTU-3 ON RTU WELL NORTH

66x30 SUPPLY DUCT UP TO RTU-1 ON RTU WELL NORTH

66x30 RETURN DUCT UP TO RTU-1 ON RTU WELL NORTH

66x30 SUPPLY DUCT UP TO RTU-2 ON RTU WELL SOUTH

66x30 RETURN DUCT UP TO RTU-2 ON RTU WELL SOUTH F

VAV-2-11 650 CFM 66x30 SUPPLY

DUCT UP THROUGH SHAFT TO MEZZANINE LEVEL

40x20 SUPPLY DUCT DOWN TO EVENT LEVEL

40x20 EXHAUST DUCT DOWN TO EVENT LEVEL

60x32 SUPPLY DUCT UP THROUGH SHAFT TO MEZZANINE LEVEL

40x20 SUPPLY DUCT DOWN TO EVENT LEVEL 40x20 EXHAUST DUCT DOWN TO EVENT LEVEL

10"⌀ DRYER VENTS UP THRU ROOF 10"⌀ DRYER

VENTS DN TO EVENT LEVEL

(2)10"⌀

STACKED

40x20 EXHAUST

DUCT UP 20x14

EXHAUST DUCT UP 12x12 EXHAUST DUCT DOWN TO EVENT LEVEL

12x12 EXHAUST DUCT UP TO EF-3 ON RTU WELL NORTH 26x26 EXHAUST DUCT UP TO EF-2 ON RTU WELL NORTH

26x26 EXHAUST DUCT UP TO EF-1 ON RTU WELL NORTH

VAV-2-15 1800 CFM

VAV-2-14 1800 CFM

FCU-1 FCU-2

FCU-3

R-2

14x12

12ø20x10

R-2 VAV-2-10

600 CFM

R-1 R-1

10x12 8x12

8x12

10x12

12x10

12x128x12 12ø

8x1012x10

10x12

10ø

E-1 320 CFM 10"NK

E-1 320 CFM 10"NK

E-1 310 CFM 10"NK

E-1 275 CFM 10"NK E-1 275 CFM 10"NK E-1

100 CFM 6"NK

10x12

R-2 R-2

8x8

24x14

24x14

24x14 24x16

24x16

24x16

10ø 10ø

VAV-2-07 750 CFM

E-1 475 CFM 12"NK E-1 475 CFM 12"NK E-1

275 CFM 10"NK

E-1 275 CFM 10"NK

T T

T C CO2

SENSOR (TYP.)

T

T

T C

T T

T

T

T

T T

T

T T T

T

24x12

12x12 14x12

12x12 14x12

24x12

S-3 18x6NK 450 CFM S-3

18x6NK 450 CFM S-3

18x6NK 450 CFM S-3

18x6NK 450 CFM

S-3 18x6NK 450 CFM

S-3 18x6NK 450 CFM

S-3 18x6NK 450 CFM

S-3 18x6NK 450 CFM

S-6 10"NK 350 CFM

S-6 10"NK 350 CFM

S-6 10"NK 350 CFM S-6

10"NK 350 CFM S-6

6"NK 150 CFM

S-6 6"NK 150 CFM

S-6 12"NK 500 CFM S-6

12"NK 500 CFM

S-6 8"NK 200 CFM

S-6 10"NK 400 CFM S-6

10"NK 400 CFM

S-6 12"NK 450 CFM

S-6 8"NK 200 CFM S-6

8"NK 200 CFM

S-2

12"OVAL NK 1130 CFM

14x12

S-6 10"NK 450 CFM S-6 6"NK 100 CFM

S-6 8"NK 250 CFM 8"NK 250 CFM S-6

10"NK 275 CFM

R-3 24x20NK 2260 CFM

R-3 24x20NK 2260 CFM

R-3 24x20NK 2260 CFM 2

M700

72x128

S-2

12"OVAL NK 1130 CFM

S-2

12"OVAL NK 1130 CFM

S-2

12"OVAL NK 1130 CFM

S-2

12"OVAL NK 1130 CFM

S-2

12"OVAL NK 1130 CFM T

T

PROVIDE 1/2"x1/2"

WIRE MESH GRILLE ON OPEN ENDED DUCT (OED)

12x10

S-5 300 CFM 12x8NK E-2

100 CFM 6"NK

E-2 100 CFM 6"NK E-2

100 CFM 6"NK

14x14 EXHAUST DUCT.

PROVIDE 1/2"x1/2"

WIRE MESH GRILLE ON OPEN ENDED DUCT (OED)

14x8 EXHAUST DUCT.

PROVIDE 1/2"x1/2"

WIRE MESH GRILLE ON OPEN ENDED DUCT (OED)

RATED CEILING ENCLOSURE

PROVIDED BY ARCH.

TRADES TO CONCEAL RETURN DUCT

S-1 50 CFM 6"NK

S-5 650 CFM 16x10NK 12x10

VAV-2-16 650 CFM

T-1 T-1

T-1 R-4

72x128NK 24000 CFM

R-4 72x128NK 24000 CFM

72x128

14x14

14x8

14x14 EXHAUST DUCT UP TO EF-10 ON RTU WELL SOUTH

14x8 EXHAUST DUCT UP TO EF-7 ON RTU WELL SOUTH

T T-2

T-2 T-2

14x10 SUPPLY DUCT UP

14x10 RETURN DUCT UP

(3)S-7 10"OVAL NK 250 CFM

T-3

T-3

M

T T

T T PROVIDE 16x10

TRANSFER DUCT WITH ACOUSTIC BOOTS ON BOTH SIDES

16x10 20x20

PROVIDE 20x20 TRANSFER DUCT WITH ACOUSTIC BOOTS ON BOTH SIDES

M

BMS

M

BMS

EF-10 EUH-2 R-5

R-5 R-5 R-5 R-5

R-5

R-5

R-6

3 3

4 4

4

4 4

3

4 4

4

3 3

3

1 M701 M701

3 M701

EUH-5 T

EUH-3 EF-7 EF-12

325 CFM

SF-4 1400 CFM

R-8 1400 CFM 24x24NK

S-1 350 CFM 10"NK

E-1 325 CFM 10"NK

S-1 350 CFM 10"NK S-1 350 CFM 10"NK S-1

350 CFM

10"NK 12x1220x12 12x10

SF-5 1400 CFM

R-8 1400 CFM 24x24NK

S-1 350 CFM 10"NK

S-1 350 CFM 10"NK S-1 350 CFM 10"NK S-1

350 CFM 10"NK

20x1212x12

16"x12" EXHAUST LOUVER BY ARCH TRADES BASED ON 50% FREE AREA EF-13

325 CFM E-1 325 CFM 10"NK

12x10

22x22 22x22

T T

8'

0' 16'

Scale: 1/8" = 1'-0"

PROFESSIONAL SEAL CONSULTANT

KEY PLAN

SHEET TITLE

PROJECT #

© 2018 ROSSETTI

8 7 6 5 4 3 2

8 7 6 5 4 3 2

cuments\74670_WSGL_MECH_v20_r.zora.rvt 7 PM

2018-034

Ground Level Floor Plan - HVAC (Area B)

Wayne State University - Basketball Arena

1290 West Warren Avenue Detroit, Michigan 48202

1 Ground Level Floor Plan - HVAC (Area B)

TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

2. COORDINATE GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

3. ALL NEW DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR SUSPENDED CEILING, UNLESS OTHERWISE NOTED.

4. ALL DUCT PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROVIDED WITH FIRE DAMPERS AND ACCESS DOORS.

5. ALL EXHAUST GRILLES SHALL BE HARD DUCT CONNECTION IN HARD CEILINGS.

6. ALL ROUND DUCT RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL SIZE AS INDICATED BY THE DIFFUSER TAG ON THE DRAWINGS.

7. SUPPLY DUCTWORK PRESSURE CONSTRUCTION SHALL BE 3" W.G. UPSTREAM OF TERMINAL UNITS AND 2" W.G. DOWNSTREAM OF TERMINAL UNITS.

8. MAINTAIN A MINIMUM 10'-0" CLEARANCE FROM EXHAUST FANS, EXHAUST TERMINATIONS AND FLUE GAS VENTS TO ANY SURROUNDING FRESH AIR INTAKES.

9. MAINTAIN REQUIRED CLEARANCES IN FRONT OF ELECTRICAL PANELS/EQUIPMENT. DO NOT ROUTE DUCTWORK ABOVE ELECTRICAL PANELS/EQUIPMENT.

10. ACCESS PANELS AND DOORS ARE REQUIRED THROUGHOUT BUILDING CONSTRUCTION ASSEMBLIES SUCH AS WALLS, HARD CEILINGS, PARTITIONS AND FLOORS TO SERVICE AND MAINTAIN TERMINAL UNITS, BALANCING DAMPERS, CONTROL MOTORS, ETC.

ACCESS PANELS AND DOORS SHALL BE PROVIDED AND INSTALLED PER

ARCHITECTURAL SPECIFICATIONS. MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT QUANTITY, SIZE, FIRE-RATING AND LOCATION OF ACCESS PANELS AND DOORS FOLLOWING INSTALLATION OF SYSTEMS AND COMPONENTS REQUIRING ACCESS, BUT PRIOR TO THE CLOSURE OF THE AFFECTED CEILING AND BUILDING ASSEMBLIES.

MINIMUM ACCESS PANEL AND DOOR SIZE SHALL BE 24 INCHES BY 18 INCHES, UNLESS OTHERWISE NOTED.

11. WHERE VOLUME DAMPERS OCCUR ABOVE CEILINGS WITHOUT REMOVABLE TILE OR ACCESS PANEL, PROVIDE A FLUSH-MOUNTED CONCEALED DAMPER REGULATOR TO ALLOW FOR DAMPER ADJUSTMENT BELOW CEILING. UNIT TO BE EQUAL TO VENTLOCK NO. 666 IN 1/2" OR 3/8" ROD SIZE.

12. PROVIDE TRANSFER OPENING IN ALL FULL HEIGHT WALLS SIZED FOR 0.05" OF STATIC PRESSURE PER 100' OF DUCT.

13. PROVIDE VANDAL PROOF TEMPERATURE SENSORS IN PUBLIC AREAS.

1

2

HVAC KEY NOTES

SEAL FLOOR PENETRATION AND PACK SPACE BETWEEN DUCT WITH FIRE RATED MATERIAL PER MICHIGAN BUILDING CODE.

PROVIDE FLUSH MOUNTED CLEANOUT PORTS ON DRYER VENT DUCTWORK AT EVERY 20' OF DUCT AND ALL ELBOWS AND TURNS.

PROVIDE 1" ARMAFLEX DUCT LINER FOR FIRST 20' OF DUCT FROM ROOF TOP UNIT (RTU) FOR SUPPLY AND RETURN DUCTS.

PROVIDE 1" ARMAFLEX DUCT LINER AND DUCT GAGE 2 EVEN SIZES THICKER THAN REQUIRED ON SUPPLY AND EXHAUST DUCTS FROM RTU/FAN TO ABOVE TOILET ROOMS.

# DESCRIPTION DATE

1 DESIGN DEVELOPMENT 11.21.2019

CONSTRUCTION DOCUMENT - PACKAGE 2 03.18.2020

ASI-002 06.03.2020

ASI-004 09.29.2020

3

4

(5)

A B C D E F G

5 4 1

2

3

8 7 6 1P

2P

4P

6P

8P

10P

12P

15P 14P

/ 1 M222

1 M700

A B C D E F G

5 4 1

2

3

8 7 6 1P

2P

4P

6P

8P

10P

12P

15P 14P

48ø CABLE SUPPORTED

FABRIC DUCT 2

M700

CABLE SUPPORTED FABRIC DUCT

48ø

8'

0' 16'

Scale: 1/8" = 1'-0"

PROFESSIONAL SEAL CONSULTANT

PROJECT

KEY PLAN

SHEET TITLE

PROJECT #

SHEET #

© 2018 ROSSETTI

B 8

7 6 5 4 3 2 1

A C D E F G H J K

8 7 6 5 4 3 2 1

30x42

AE-SVR-FILE01\UserFolders\rzora\Documents\74670_WSGL_MECH_v20_rzora.rvt /2020 5:32:12 PM

2018-034

Mezzanine Level Floor Plan - HVAC (Area A)

M221

Wayne State University - Basketball Arena

1290 West Warren Avenue Detroit, Michigan 48202

M221 SCALE: 1/8" = 1'-0"

1 Mezzanine Level Floor Plan - HVAC (Area A)

THE FOLLOWING GENERAL NOTES APPLY TO ALL HVAC SHEETS INCLUDED WITHIN THIS DOCUMENT SET, EXCEPT WHERE OTHERWISE INDICATED.

1. SHEET METAL OFFSETS AND TRANSITIONS ARE SHOWN TO PROVIDE INDICATION OF PHYSICAL CONDITIONS WITHIN THE SPACE. IT IS NOT THE INTENT OF THE DRAWINGS TO SHOW ALL REQUIRED OFFSETS AND TRANSITIONS. THE CONTRACTOR SHALL FULLY COORDINATE THE MECHANICAL WORK WITHIN ITSELF AND WITH THE WORK OF ALL TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

2. COORDINATE GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

3. ALL NEW DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR SUSPENDED CEILING, UNLESS OTHERWISE NOTED.

4. ALL DUCT PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROVIDED WITH FIRE DAMPERS AND ACCESS DOORS.

5. ALL EXHAUST GRILLES SHALL BE HARD DUCT CONNECTION IN HARD CEILINGS.

6. ALL ROUND DUCT RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL SIZE AS INDICATED BY THE DIFFUSER TAG ON THE DRAWINGS.

7. SUPPLY DUCTWORK PRESSURE CONSTRUCTION SHALL BE 3" W.G. UPSTREAM OF TERMINAL UNITS AND 2" W.G. DOWNSTREAM OF TERMINAL UNITS.

8. MAINTAIN A MINIMUM 10'-0" CLEARANCE FROM EXHAUST FANS, EXHAUST TERMINATIONS AND FLUE GAS VENTS TO ANY SURROUNDING FRESH AIR INTAKES.

9. MAINTAIN REQUIRED CLEARANCES IN FRONT OF ELECTRICAL PANELS/EQUIPMENT. DO NOT ROUTE DUCTWORK ABOVE ELECTRICAL PANELS/EQUIPMENT.

10. ACCESS PANELS AND DOORS ARE REQUIRED THROUGHOUT BUILDING CONSTRUCTION ASSEMBLIES SUCH AS WALLS, HARD CEILINGS, PARTITIONS AND FLOORS TO SERVICE AND MAINTAIN TERMINAL UNITS, BALANCING DAMPERS, CONTROL MOTORS, ETC.

ACCESS PANELS AND DOORS SHALL BE PROVIDED AND INSTALLED PER

ARCHITECTURAL SPECIFICATIONS. MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT QUANTITY, SIZE, FIRE-RATING AND LOCATION OF ACCESS PANELS AND DOORS FOLLOWING INSTALLATION OF SYSTEMS AND COMPONENTS REQUIRING ACCESS, BUT PRIOR TO THE CLOSURE OF THE AFFECTED CEILING AND BUILDING ASSEMBLIES.

MINIMUM ACCESS PANEL AND DOOR SIZE SHALL BE 24 INCHES BY 18 INCHES, UNLESS OTHERWISE NOTED.

11. WHERE VOLUME DAMPERS OCCUR ABOVE CEILINGS WITHOUT REMOVABLE TILE OR ACCESS PANEL, PROVIDE A FLUSH-MOUNTED CONCEALED DAMPER REGULATOR TO ALLOW FOR DAMPER ADJUSTMENT BELOW CEILING. UNIT TO BE EQUAL TO VENTLOCK NO. 666 IN 1/2" OR 3/8" ROD SIZE.

12. PROVIDE TRANSFER OPENING IN ALL FULL HEIGHT WALLS SIZED FOR 0.05" OF STATIC PRESSURE PER 100' OF DUCT.

# DESCRIPTION DATE

1 DESIGN DEVELOPMENT 11.21.2019

CONSTRUCTION DOCUMENT - PACKAGE 2 03.18.2020

(6)

TV TV

5 4 2

3

8 7 6

201 RTU Well South 290.04

Mezz.

Bridge

200 RTU Well North

224 Toilet

222 Suite Pantry 220

Donor Suite

290.05 Vestibule

48ø 66x30

RTU-1

RTU-2

RTU-3

RTU-4 VAV-3-01

850 CFM

60x32

14x10 14x10

EF-2 1700 CFM

EF-1 7000 CFM

ACCU-1

ACCU-2

ACCU-3

ACCU-4 EF-3 600 CFM

VAV-3-02 200 CFM

G H J K L

5 4 2

3

8 7 6

K.2 K.6

ACCU-5 EF-4

1700 CFM EF-5

6350 CFM

EF-6 100 CFM

30x18 EXHAUST LOUVER PROVIDED BY ARCH TRADES SIZED FOR 50%

FREE AREA 48x30 EXHAUST LOUVER

PROVIDED BY ARCH TRADES SIZED FOR 50%

FREE AREA

66x30 SUPPLY DUCT DOWN THROUGH SHAFT TO GROUND LEVEL

66x30 SUPPLY DUCT DOWN THROUGH SHAFT TO GROUND LEVEL

10"⌀ GOOSENECK DRYER VENT TERMINATION MIN 36" ABOVE ROOF.

PROVIDE CURB.

12"x12" EXHAUST LOUVER BY ARCH TRADES BASED ON 50% FREE AREA

ACCU-6 223

Storage 226

Donor Suite Bacony

12x12

10x8

R-2 T

T S-7

10"NK 375 CFM S-7 10"NK 375 CFM

S-6 6"NK 50 CFM

S-6 10"NK 150 CFM 2

M700

EF-10 1000 CFM

EF-7 500 CFM CABLE SUPPORTED

FABRIC DUCT

PROVIDE MIN.

10' OF SPIRAL DUCT

M M

20x14

40x20

40x20 EXHAUST DUCT DOWN TO GROUND LEVEL

20x14 EXHAUST DUCT DOWN TO GROUND LEVEL

14x10 SUPPLY DUCT DOWN TO GROUND LEVEL

14x10 RETURN DUCT DOWN TO GROUND LEVEL CABLE SUPPORTED

FABRIC DUCT

CUH-5

S-6 6"NK 100 CFM

EUH-4

6" BOILER/WATER HEATER INTAKE (TYP. 5)

6" BOILER/WATER HEATER VENT (TYP. 5) METAL DUCT

FABRIC DUCT

PROVIDE MIN.

10' OF SPIRAL DUCT

METAL DUCT FABRIC DUCT

48ø

BD

REFER TO DETAIL 5 ON M-502 FOR ADDITIONAL DETAILS REFER TO DETAIL 5 ON M-502 FOR ADDITIONAL DETAILS

1 M701 M701

3 M701

2

2

2

2 EF-11

200 CFM

12"x12" EXHAUST LOUVER BY ARCH TRADES BASED ON 50% FREE AREA 8ø

8ø E-4

8"NK 200 CFM

R-7

8'

0' 16'

Scale: 1/8" = 1'-0"

PROFESSIONAL SEAL CONSULTANT

KEY PLAN

SHEET TITLE

PROJECT #

© 2018 ROSSETTI

8 7 6 5 4 3 2

8 7 6 5 4 3 2

cuments\74670_WSGL_MECH_v20_r.zora.rvt 4 PM

2018-034

Mezzanine Level Floor Plan - HVAC (Area B)

Wayne State University - Basketball Arena

1290 West Warren Avenue Detroit, Michigan 48202

1 Mezzanine Level Floor Plan -HVAC (Area B)

TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

2. COORDINATE GRILLE, REGISTER AND DIFFUSER LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLAN.

3. ALL NEW DUCTWORK IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR SUSPENDED CEILING, UNLESS OTHERWISE NOTED.

4. ALL DUCT PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROVIDED WITH FIRE DAMPERS AND ACCESS DOORS.

5. ALL EXHAUST GRILLES SHALL BE HARD DUCT CONNECTION IN HARD CEILINGS.

6. ALL ROUND DUCT RUNOUTS AND DROPS TO DIFFUSERS SHALL BE THE SAME NOMINAL SIZE AS INDICATED BY THE DIFFUSER TAG ON THE DRAWINGS.

7. SUPPLY DUCTWORK PRESSURE CONSTRUCTION SHALL BE 3" W.G. UPSTREAM OF TERMINAL UNITS AND 2" W.G. DOWNSTREAM OF TERMINAL UNITS.

8. MAINTAIN A MINIMUM 10'-0" CLEARANCE FROM EXHAUST FANS, EXHAUST TERMINATIONS AND FLUE GAS VENTS TO ANY SURROUNDING FRESH AIR INTAKES.

9. MAINTAIN REQUIRED CLEARANCES IN FRONT OF ELECTRICAL PANELS/EQUIPMENT. DO NOT ROUTE DUCTWORK ABOVE ELECTRICAL PANELS/EQUIPMENT.

10. ACCESS PANELS AND DOORS ARE REQUIRED THROUGHOUT BUILDING CONSTRUCTION ASSEMBLIES SUCH AS WALLS, HARD CEILINGS, PARTITIONS AND FLOORS TO SERVICE AND MAINTAIN TERMINAL UNITS, BALANCING DAMPERS, CONTROL MOTORS, ETC.

ACCESS PANELS AND DOORS SHALL BE PROVIDED AND INSTALLED PER

ARCHITECTURAL SPECIFICATIONS. MECHANICAL CONTRACTOR SHALL VERIFY THE EXACT QUANTITY, SIZE, FIRE-RATING AND LOCATION OF ACCESS PANELS AND DOORS FOLLOWING INSTALLATION OF SYSTEMS AND COMPONENTS REQUIRING ACCESS, BUT PRIOR TO THE CLOSURE OF THE AFFECTED CEILING AND BUILDING ASSEMBLIES.

MINIMUM ACCESS PANEL AND DOOR SIZE SHALL BE 24 INCHES BY 18 INCHES, UNLESS OTHERWISE NOTED.

11. WHERE VOLUME DAMPERS OCCUR ABOVE CEILINGS WITHOUT REMOVABLE TILE OR ACCESS PANEL, PROVIDE A FLUSH-MOUNTED CONCEALED DAMPER REGULATOR TO ALLOW FOR DAMPER ADJUSTMENT BELOW CEILING. UNIT TO BE EQUAL TO VENTLOCK NO. 666 IN 1/2" OR 3/8" ROD SIZE.

12. PROVIDE TRANSFER OPENING IN ALL FULL HEIGHT WALLS SIZED FOR 0.05" OF STATIC PRESSURE PER 100' OF DUCT.

HVAC KEY NOTES

SEAL FLOOR PENETRATION AND PACK SPACE BETWEEN DUCT WITH FIRE RATED MATERIAL PER MICHIGAN BUILDING CODE.

RTU IS MOUNTED ON STRUCTURAL STEEL APPROXIMATELY 36" ABOVE THE ROOF.

PROVIDE CONTINUOUS NEOPRENE PAD ON STRUCTURAL STEEL TO MOUNT UNIT ON.

PROVIDE FLEXIBLE CONNECTOR OFF OF BOTTOM OF UNITS. EXTEND DUCTWORK OUTSIDE BELOW UNIT TO CURBED DUCT OPENINGS IN ROOF. INSULATE DUCTS ON ROOF AND PROVIDE WITH ALUMINUM JACKET. PROVIDE FLASHING AROUND JACKET TO CURB EDGE FOR A WATER TIGHT INSTALLATION.

1

# DESCRIPTION DATE

1 DESIGN DEVELOPMENT 11.21.2019

CONSTRUCTION DOCUMENT - PACKAGE 2 03.18.2020

ASI-003 09.16.2020

2

(7)

GAS FIRED HOT WATER HEATER SCHEDULE GAS FIRED BOILER SCHEDULE

PACKAGED SPLIT SYSTEM AC UNIT SCHEDULE

DOMESTIC WATER BOOSTER PUMP SCHEDULE EXHAUST FAN SCHEDULE

SUMP PUMP SCHEDULE RECIRCULATION PUMP SCHEDULE

HOT WATER UNIT HEATER SCHEDULE ELECTRIC UNIT HEATER SCHEDULE

FAN COIL UNIT SCHEDULE

GRILLE, REGISTER AND DIFFUSER SCHEDULE

NOTES/

ACCESS MCA

4.3 ESP

"WC

277/1/60 VOLT/PH/HZ

ELECTRICAL

GPM WPD LWT FT EWT

HEATING

MBH

MOUNTING KEY HR - HORIZONTAL RECESSED LVC - LOW VERTICAL CONCEALED CFM

2260 MOUNTING

TITUS HHP-20

& MODEL No.

MANUFACTURER

VESTIBULE ENTRY SERVE AREA

FCU-1 TAG

VC - VERTICAL CONCEALED VCT - VERTICAL CABINET TYPE

HE - HORIZONTAL EXPOSED VE - VERTICAL EXPOSED HCT - HORIZONTAL CABINET TYPE

VR - VERTICAL RECESSED

LVCT - LOW VERTICAL CABINET TYPE HC - HORIZONTAL CONCEALED

HC

LAT EAT

0.41

NOTES AND ACCESSORIES DESIGNATION

70 115 125.8 140 120 12.0 8.3 A B C D

ROWS

6 MAX.

(2) PSC MOTORS

A B CONTROLS CONTRACTOR PROVIDE CONTROL C D HEATING ONLY

HP

(2) 1/3

UNIT MOUNTED DISCONNECT

4.3 277/1/60

TITUS 2260

HHP-20 VESTIBULE

ENTRY

FCU-2 HC 70 115 125.8 140 120 12.0 8.3 6 0.41 (2) 1/3 A B C D

4.3 277/1/60

TITUS 2260

HHP-20 VESTIBULE

ENTRY

FCU-3 HC 70 115 125.8 140 120 12.0 8.3 6 0.41 (2) 1/3 A B C D

MOP

15

15

15

RC - RECESSED CEILING MOUNTING KEY

RW - RECESSED WALL

VOLT ELECTRICAL DATA

KW INPUT AREA CFM

SERVED

MOUNTING MBH

TAG MANUFACTURER

& MODEL No. NOTES/

SW - SURFACE WALL

EUH-1 SUS 350 17.1 5.0 480/3 A B C

HUHAABERKO

112 MAIN ELEC

SUS - SUSPENDED

EUH-2 SUS 350 17.1 5.0 480/3 A B C

HUHAABERKO

118.1 BOILER ROOM

EUH-3 SUS 350 17.1 5.0 480/3 A B C

HUHAABERKO

118 TRASH/SORTING

EUH-4 SUS 250 10.2 3.0 480/3 A B C

HUHAA BERKO

223 STORAGE

EUH-5 SUS 350 17.1 5.0 480/3 A B C

HUHAA BERKO

118.1 BOILER ROOM

GAS DATA MANUFACTURER

& MODEL NO.

TAG

CAPACITIES

FLOW GPM

RECOVERY

GPH TYPE INPUT

MBH

NOTES/ACCESSORIES SERVICE

DOMESTIC HOT WATER

NATURAL GAS

OUTPUT MBH

ELECTRICAL DATA

VOLTAGE FLA

120/1/60 11 LOCATION

GWH-2

29.1 1,746 1,350 27:1

TURNDOWN

NOTES AND ACCESSORIES DESIGNATION A. PROVIDE EXPANSION TANK B. NOT USED

C. POLYPROPYLENE VENT AND CPVC INTAKE D. T & P RELIEF VALVE, PIPE TO FLOOR DRAIN

E. CONDENSATE NEUTRALIZATION KIT F. MODULATING BURNER

G. PROVIDE DEDICATED ELECTRICAL CIRCUIT H. BACNET IP CONNECTION

GWH-1

NATURAL

GAS 120/1/60 11

AERCO INN 1350

AERCO INN 1350

LWT °F EWT °F

45 135

1,350 27:1 TURNDOWN RTU-1

& MODEL NO. TOTAL

CFM DAIKIN

RPS110D

RTU WELL

NORTH (200) 24,000

EAT DB/WB °F

82.0/70.5

COIL LAT DB/WB °F TOTAL

MBH

SENS.

MBH

1,230.8 717.2 54.7/54.7

TYPE

DX R410A RPM

1227

BHP (EACH)

25.72 ESP

IN. W.C.

1.25 QTY.

1

TOTAL CFM

O.A.

CFM

24,000 12,000 (50%) HP

(EACH)

30

AMBIENT DB °F

95 SEE PLAN

RTU-2

RTU-3

TOTAL CFM

20,000

RPM

671

BHP (EACH)

5.56 ESP

IN. W.C.

0.80 QTY.

1

HP (EACH)

7.50

GWH-3 NATURAL

GAS 120/1/60 11

AERCO

INN 1350 1,350 27:1

TURNDOWN DOMESTIC

HOT WATER DOMESTIC HOT WATER MANUFACTURER

& MODEL NO.

TAG

B-1

NOTES/ACCESSORIES LOCATION TYPE

COND.

BOILER 1,000

GAS DATA

NAT. GAS

TYPE INPUT MBH

OUTPUT MBH

ELECTRICAL DATA

VOLTAGE AMPS BOILER

HP (MAX)

120/1/60 13 27.0

NOTES AND ACCESSORIES DESIGNATION A. POLYPROPYLENE VENT AND CPVC INTAKE B. T & P RELIEF VALVE, PIPE TO FLOOR DRAIN C. CONDENSATE NEUTRALIZATION KIT

D. MODULATING BURNER

E. PROVIDE DEDICATED ELECTRICAL CIRCUIT

F. 140°F DISCHARGE, 120°F RETURN G. 91.5% EFFICIENCY @ MIN. INPUT H. 90.5% EFFICIENCY @ MAX. INPUT I. AUTO SEQUENCING VALVE

B-2 COND.

BOILER AERCO

BMK 1000 27.0 NAT. GAS 1,000 120/1/60 13 A B C D E F G H I

AERCO BMK 1000

BOILER ROOM

(118.1) 905 A B C D E F G H I

905 RTU-4

RTU WELL SOUTH (201)

UNIT LAT DB/WB °F

57.5/55.6

SIZE (IN.) L x W x H

WEIGHT (LBS.) MCA MOCP

VOLTAGE

234.5 250

460/3/60 451.0 x 99.0 x 97.0 18,500

10.1 13.5

NOTES AND ACCESSORIES DESIGNATION

A. UNIT SHALL COMPLY WITH ANSI/ASHRAE/IES STANDARD 90.1-2013 B. DOUBLE WALL CONSTRUCTION

C. HINGED DOUBLE WALL ACCESS DOORS

D. UNIT MOUNTED ON STRUCTURAL STEEL DUNNAGE ABOVE THE ROOF.

PROVIDE COMPLETE DOUBLE WALL CLOSURE OF BOTTOM OF UNIT AND DESIGN UNIT TO BE MOUNTED ON CONTINUOUS NEOPRENE PAD ON STEEL DUNNAGE.

E. BOTTOM DISCHARGE/BOTTOM RETURN

F. MODULATING GAS HEAT WITH STAINLESS STEEL HEAT EXCHANGER G. DISCHARGE AIR TEMPERATURE AND HUMIDITY CONTROL

H. FACTORY MOUNTED AND WIRED DISCONNECT SWITCH I. VARIABLE FREQUENCY DRIVE (VFD) SUPPLY & EXHAUST FAN J. FAN SPEED PRESSURE CONTROL

K. VARIABLE SPEED COMPRESSORS

L. 0-100% MODULATING ENTHALPY ECONOMIZER M. LOW LEAK OUTDOOR AIR/RETURN AIR DAMPERS N. MODULATING HOT GAS REHEAT HUMIDITY CONTROL O. UNIT POWERED 120V CONVENIENCE OUTLET

P. SLOPED STAINLESS STEEL DRAIN PAN Q. 2" MERV 8 PRE-FILTERS

R. 12" MERV 14 SECONDARY FILTERS

S. DIGITAL CONTROLS WITH FACTORY INSTALLED BACNET IP CARD T. SMOKE DETECTOR IN RETURN DUCT AND SUPPLY DUCT

U. SINGLE ZONE VAV OPERATION V. MULTI-ZONE VAV OPERATION W. SPACE CO2 O.A. CONTROL EAT

DB °F

54.7 INPUT

MBH

OUTPUT MBH

1,875.0 1,500.0

TYPE TOTAL

CFM

O.A.

CFM

24,000 12,000 (50%) O.A.

DB °F

-10.0 NATURAL

GAS

LAT DB °F

70.0 A B C D E F G H I J L M N O

P Q R S T U W

DAIKIN MPS050F

RTU WELL

NORTH (200) SEE PLAN 15,000 DX 582.7 425.5 84.2/69.5 58.3/57.6

R410A

1,415 14.9

2.25

1 15,000 7,500

(50%)

20 3 14,000 0.50 - 1 - 95 60.8/58.5 15,000 7,500 800.0 640.0 30.0 10.1 13.9 460/3/60 124.0 125 245.5 x 97.5 x 73.2 7,300

(50%) -10.0

NATURAL

GAS 69.3 A B C D E F G H I J K L M O

P Q R S T V

MANUFACTURER

& MODEL NO.

TAG

NOTES/ACCESSORIES AREA

SERVED

INDOOR UNIT FAN

ESP IN. WG

CFM WATTS

ELECTRICAL DATA

VOLTAGE MCA MOCP

PHYSICAL DATA

SIZE (IN.) WEIGHT (LBS) REFRIGERANT

MANUFACTURER TYPE

& MODEL NO.

TAG SIZE (IN.) WEIGHT (LBS)

INDOOR UNIT OUTDOOR UNIT

OUTDOOR UNIT INDOOR UNIT

AC-1 IDF

(026) 920 N/A 56 NOTE B 14.88 H x 46.06 W 46 A B C D E F G H

x 11.63 D R410A

ACCU-1 52.69 H x 41.31 W 211

x 14.19 D

NOTES AND ACCESSORIES DESIGNATION

A. FACTORY MOUNTED AND WIRED DISCONNECT SWITCH

B. INDOOR UNIT TO RECEIVE FIELD-WIRED POWER FROM OUTDOOR UNIT, WIRING PROVIDED BY MECH. & INSTALLED BY ELEC.

C. PROVIDE LINE SET FOR EXTENDED LENGTH OF PIPING (FIELD VERIFY LENGTH OF PIPING REQUIRED)

D. WIRED REMOTE THERMOSTAT

E. OUTDOOR UNIT MOUNTED ON ROOF EQUIPMENT RAILS PROVIDED BY MECHANICAL CONTRACTOR

F. LOW AMBIENT COOLING WIND BAFFLE KIT G. INDEPENDENTLY POWERED CONDENSATE PUMP H. PROVIDE WALL BRACKET FOR INDOOR UNIT I. ULTRA LOW AMBIENT TO -13° F

INDOOR UNIT COOLING

TOTAL MBH

EAT °F DB/WB SENSIBLE

MBH

36.0 25.2 80.0/67.0

AMBIENT

°F DB

MITSUBISHI 95.0 PKA-A36KA7

SEER EER

18.8 10.8

INDOOR UNIT TYPE

MITSUBISHI PUY-A36NKA7

AC-2 920 N/A 56 14.88 H x 46.06 W 46

x 11.63 D R410A

ACCU-2 52.69 H x 41.31 W 211

x 14.19 D

36.0 25.2 95.0 80.0/67.0

MITSUBISHI

PKA-A36KA7 MITSUBISHI 18.8 10.8

PUY-A36NKA7

HUMIDIFIER (LB/HR)

N/A ELECTRIC REHEAT (KW)

N/A N/A

N/A

WALL MOUNTED WALL MOUNTED

A B C D E F G H INDOOR EVAPORTOR OUTDOOR CONDENSER

208/1/60 25.0 30

208/1/60 25.0 30

NOTE B NOTE B

NOTE B NOTE B NOTE B

VOLTAGE MCA MOCP

IDF (013)

IDF (129)

775 N/A 56 NOTE B 14.88 H x 46.06 W 46 A B C D E F G H

x 11.63 D R410A

ACCU-3 37.13 H x 37.41 W 151

x 14.19 D

24.0 18.5 95.0 80.0/67.0 21.4 12.2

MITSUBISHI PUY-A24NHA7

920 N/A 56 14.88 H x 46.06 W 46

x 11.63 D R410A

ACCU-4 52.69 H x 41.31 W 211

x 14.19 D

36.0 25.2 95.0 80.0/67.0 18.8 10.8

MITSUBISHI PUY-A36NKA7

N/A

N/A N/A

N/A

WALL MOUNTED WALL MOUNTED

A B C D E F G H

208/1/60 19.0 25

208/1/60 25.0 30

NOTE B NOTE B

NOTE B NOTE B NOTE B ELEV MACHINE

(012) AC-3 MITSUBISHI

PKA-A24KA7

AC-4 MITSUBISHI PKA-A36KA7

TAG LOCATION SERVICE PUMP

TYPE GPM BOOST

(PSI)

VOLTAGE MOTOR

NOTES/ACCESSORIES

DWBP-1 DUPLEX

BOOSTER

210 34 460/3/60

HP

10

FLA

DOMESTIC WATER

INDIVIDUAL PUMP MANUFACTURER

& MODEL NO.

210 34 460/3/60

PUMP PACKAGE MANUFACTURER

& MODEL NO.

BELL & GOSSETT V2VHE6J10D1GCK

BELL & GOSSETT

46SV10NJ4F60 29

NOTES AND ACCESSORIES DESIGNATION A. PACKAGED PUMPING SYSTEM

B. VARIABLE FREQUENCY DRIVE FOR EACH PUMP C. REMOTE EXPANSION TANK

D. MOUNT ON NEOPRENE ISOLATION PAD E. PROVIDE FLEXIBLE CONNECTIONS F. PROVIDE CHECK VALVE ON DISCHARGE

G. PROVIDE DIELECTRIC FLANGES ON INLET AND DISCHARGE

H. SINGLE POINT POWER SUPPLY WITH DISCONNECT I. BACNET IP CONNECTION

J. 100% + STANDBY PUMP CONFIGURATION K. FULL SIZED VALVED BYPASS

A B C D E F G H I J K MANUFACTURER

& MODEL NO.

TAG LOCATION SERVICE

CFM ESP

IN. W.C.

MOTOR

NOTES/ACCESSORIES VOLTAGE

FAN

TYPE RPM HP

FAN

BHP DRIVE

TYPE

EF-1 ROOF NORTH LOCKER 7,000 2.5

ROOMS EXH 460/3/60

LOREN COOK

365 ACRUB-XP UPBLAST 948 4.78 7.5

CENTRIFUGAL

NOTES AND ACCESSORIES DESIGNATION A. 18" TALL INSULATED ROOF CURB

B. FACTORY MOUNTED AND WIRED DISCONNECT SWITCH

C. MOTORIZED DAMPER D. BIRDSCREEN

E. PROVIDE VFD FOR FAN

F. STAINLESS STEEL HOUSING & IMPELLER G. EC MOTOR - 0-10V VARIABLE SPEED H. LORENIZED COATING

I. INDUCTION DUTY RATED MOTOR WITH AEGIS GROUNDING RINGS

EF-2 1,700 1.5 1,115 0.721 1

EF-3 LOREN COOK BELT 750 0.75

120 ACRUB OR91 1,530

ROOF

ROOF UPBLAST

CENTRIFUGAL

460/3/60

120/1/60 0.271 1/3

A B C D E I

UPBLAST

CENTRIFUGAL A B C D

A B C D

MANUFACTURER

& MODEL NO.

TAG LOCATION SERVICE PUMP

TYPE GPM HEAD

(FT) VOLTAGE HP RPM

MOTOR

NOTES/ACCESSORIES

3/4 460/3/60 ELEVATOR #1

(E-1)

SUBMERSIBLE EFFLUENT GOULDS

WE0734H

ELEVATOR SUMP PUMP

SP-1 50 25 3,500

NOTES AND ACCESSORIES DESIGNATION A. 2" INLET AND DISCHARGE

B. PROVIDE CHECK VALVE ON DISCHARGE C. PACKAGED EQUIPMENT

D. ALARM PANEL WITH 3 FLOAT CONTROL SYSTEM E. HIGH LEVEL ALARM TO DDC

F. SINGLE POINT ELECTRICAL CONNECTION WITH FACTORY INSTALLED DISCONNECT

G. DUPLEX PUMP SYSTEM

H. PROVIDE 48" DIA. x 108" H BASIN I. PROVIDE 48" DIA. x 144" H BASIN

A B C D E F

MANUFACTURER

& MODEL NO.

TAG LOCATION SERVICE PUMP

TYPE GPM HEAD

(FT) VOLTAGE HP RPM

MOTOR

NOTES/ACCESSORIES

RCP-1 DOMESTIC

HOT WATER BELL & GOSSETT

ECOCIRC XL N 36-45 IN-LINE 10 20 120/1/60 1/6 3,377

NOTES AND ACCESSORIES DESIGNATION

A. STAINLESS STEEL LEAD-FREE CONSTRUCTION B. VARIABLE SPEED EC MOTOR

C. PRESSURE TAPS

D. VARIABLE FREQUENCY DRIVE (VFD) E. NON-OVERLOADING BRAKE HORSEPOWER F. NEOPRENE PAD

A B

HHWP-1 HEATING

HOT WATER BELL & GOSSETT

e-1510 1.5BC

BASE MOUNTED

CENTRIFUGAL 100 60 460/3/60

FLA

2.7

EF-4 MEN 124 &

WOMEN 122 LOREN COOK

225 SQN-HP CEILING INLINE BELT 1,700 1.50 1,033 460/3/60 0.955 1.5 B D H

5 460/3/60 JC STORAGE

(027)

SUBMERSIBLE GRINDER GOULDS

2GA81J4ED

EVENT LEVEL SANITARY

SP-2A 50 30 7.6 3,450 A B C D E F G H

SP-2B

SP-3A

SP-3B

BOILER ROOM (118.1)

BOILER ROOM (118.1) BOILER ROOM

(118.1) BOILER ROOM

(118.1)

HOT WATER COIL

LAT DB °F

MBH EAT

DB °F EWT °F GPM WPD

FT. H2O ROWS MANUFACTURER

& MODEL NO.

TAG AREA MOUNTING

SERVED

MOTOR

VOLTAGE TOTAL

FLA HP

(EACH) QTY.

NOTES/ACCESSORIES

LWT °F SIZE (IN.)

L x W x D

WEIGHT (LBS.) PHYSICAL DATA

CFM ESP

IN. W.C.

FAN

NOTES AND ACCESSORIES DESIGNATION A. FACTORY DISCONNECT

B. DIGITAL CONTROLS 5

460/3/60 SUBMERSIBLE

GRINDER GOULDS

2GA81J4ED

EVENT LEVEL

SANITARY 50 30 7.6 3,450 A B C D E F G H

HHWP-2 1

460/3/60 GOULDS

WS1034BHF

SUBSURFACE

DRAINAGE 50 30 3.8 3,500 A B C D E F G I

1 460/3/60 GOULDS

WS1034BHF

SUBSURFACE

DRAINAGE 50 30 3.8 3,500 A B C D E F G I

JC STORAGE (027) JC STORAGE

(027) JC STORAGE

(027)

SUBMERSIBLE EFFLUENT SUBMERSIBLE

EFFLUENT

BOILER ROOM (118.1) BOILER ROOM

(118.1) BOILER ROOM

(118.1)

IMPELLER SIZE (IN.)

HEATING HOT WATER

BASE MOUNTED

CENTRIFUGAL 9.0 100 60 460/3/60 5 1,466

-

BHP

0.15

2.37 BELL & GOSSETT

e-1510 1.5BC 9.0 5 2.37 1,466 C D E F

C D E F

BOILER ROOM (118.1)

CUH-1 TRANE RECESSED 72.9 70.0 120.8 140.0 7.3 10.43 4

WALL STAIR B

169 120.0 1200 0.17 2 120/1/60 0.22 7.0 78 x 30 x 10 275 A B

FFHB1201K

CUH-2 TRANE RECESSED 30.8 70.0 125 140.0 3.1 5.38 4

CEILING VESTIBULE

M136 120.0 385 - 1 120/1/60 0.22 3.88 51 x 30 x 10 150 A B

FFCB0601K

CUH-3 TRANE RECESSED 72.9 70.0 120.8 140.0 7.3 10.43 4

WALL CONCOURSE

134 120.0 1200 0.17 2 120/1/60 0.22 7.0 78 x 30 x 10 275 A B

FFHB1201K

CUH-4 TRANE RECESSED 72.9 70.0 120.8 140.0 7.3 10.43 4

STAIR A WALL 120.0 1200 0.17 2 120/1/60 0.22 7.0 78 x 30 x 10 275 A B

FFHB1201K MDF

(114)

ACCU-5 WALL MOUNTED

AC-5

INDOOR UNIT HEATING

TOTAL MBH

- - - - BELT

LOREN COOK

225 ACRUB-XP BELT

EF-5 SOUTH LOCKER

ROOMS EXH LOREN COOK

300 SQN-HP CEILING INLINE BELT 6,350 2.50 1,047 460/3/60 5.12 7.5 B C D E H I

EF-7 TRASH/SORTING

ROOF 118

SF-1 LOREN COOK ELEC 013.1

100SQN12D CEILING INLINE DIRECT 500 0.50 1,500 120/1/60 1/4 B G

SF-2 CEILING ELEC 010 INLINE 500 0.50 1,500 120/1/60 1/4 B G

SF-3 ELEC CLOSET

129.1

CEILING INLINE 500 0.50 1,500 120/1/60 1/4 B G

EF-6 LOREN COOK TOILET 224

GC-148 CEILING INLINE DIRECT 100 0.30 1,075 120/1/60 45 WATT - B C D

MEN 123 &

WOMEN 121

BELL & GOSSETT 10

46SV10NJ4F60 29

ACCESSORIES

NOTES AND ACCESSORIES DESIGNATION A. FACTORY DISCONNECT

B. REMOTE THERMOSTAT C. MOUNTING BRACKET

A B C D E F G H A B C D E F G H

A B C D E F G H EF-8

EF-9

DRYER BOOSTER FAN ENERVEX

BEF300

WSU/GL LAUNDRY (029)

BOX VENTILATOR

DIRECT

EC MOTOR 800 1.80 2,000 460/3/60 2.2 F

AMPS 1

DRYER BOOSTER FAN ENERVEX

BEF300

WSU/GL LAUNDRY (029)

BOX VENTILATOR

DIRECT

EC MOTOR 800 1.80 2,000 460/3/60 2.2 F

AMPS 1

AC-6 AMP STORAGE

(001) 920 N/A 56 NOTE B 14.88 H x 46.06 W 46 A B C D E F G H

x 11.63 D R410A

ACCU-6 52.69 H x 41.31 W 211

x 14.19 D

36.0 25.2 95.0 80.0/67.0

MITSUBISHI

PKA-A36KA7 MITSUBISHI 18.8 10.8

PUY-A36NKA7 WALL MOUNTED - N/A N/A NOTE B NOTE B 208/1/60 25.0 30

NOTES AND ACCESSORIES DESIGNATION TAG MANUFACTURER

& MODEL NO. SERVICE TYPE MOUNTING NECK SIZE OVERALL

SIZE CFM

48"L, 1-SLOT, 2.5"SLOT WIDTH 48"L, 1-SLOT, 3"SLOT WIDTH

26" x 22" 2260

R-3 TITUS GRILLE SURFACE 24" x 20"

350RL RETURN

12" OVAL LAY-IN

TITUS SLOT

FL-30JT SUPPLY

S-2

24" x 24" SEE PLAN SEE PLANS

LAY-IN DIFFUSER

TITUS

OMNI-AA SUPPLY

S-3 TITUS DIFFUSER SURFACE 18" x 6"

DL SUPPLY

S-1

STANDARD WHITE FINISH

ALL ALUMINUM CONSTRUCTION

JET THROW C

B A

20" x 8"

SUPPLY TITUS

DL DIFFUSER SURFACE 40" x 12" 42" x 14"

S-4

SUPPLY TITUS

300RL

12" x 8"

SURFACE DIFFUSER

14" x 10"

S-5

NOTES/ACCESSORIES

A A B

A C

A A

A SEE PLAN

SEE PLAN

SEE PLAN

0-300 16" x 10" 18" x 12" 301-700

S-6 TITUS SUPPLY

OMNI DIFFUSER LAY-IN SEE PLANS 24" x 24" SEE PLAN A

S-7 TITUS SUPPLY

FL-25 SLOT LAY-IN 10" OVAL SEE PLAN A F

RETURN TITUS

50F GRILLE LAY-IN 22" x 22"

R-1 24" x 24" - A B

RETURN TITUS

50F GRILLE LAY-IN 22" x 10"

R-2 24" x 12" - A B

EXHAUST TITUS

50F GRILLE LAY-IN SEE PLAN

E-1 24" x 24" - A B

EXHAUST TITUS

50F GRILLE LAY-IN SEE PLAN

E-2 12" x 12" - A B

920 N/A 56 14.88 H x 46.06 W 46

x 11.63 D

R410A 52.69 H x 41.31 W 211

x 14.19 D

36.0 25.2 95.0 80.0/67.0 18.8 10.8

MITSUBISHI

PUY-A36NKA7 N/A N/A NOTE B NOTE B NOTE B 208/1/60 25.0 30 A B C D E F G H

MITSUBISHI

PKA-A36KA7 -

EXHAUST TITUS

350RL GRILLE SURFACE 14" x 8"

E-3 16" x 10" 201-400 A

12" x 6" 14" x 8" 0-200

16" x 10" 18" x 12" 401-600 LOREN COOK

100 ACRUB OR80

UPBLAST

CENTRIFUGAL BELT 500 0.75 1,727 120/1/60 0.216 1/4 A B C D

EF-10 BOILER ROOM

118.1 LOREN COOK ROOF

120 ACRUB

UPBLAST

CENTRIFUGAL BELT 1000 0.75 1,725 120/1/60 0.264 1/3 A B C D

24,000 DX 1,230.8 717.2 82.0/70.5 54.7/54.7

R410A

1227 25.72

1.25

1 24,000 12,000

(50%)

30 95

SEE PLAN 1 20,000 0.80 671 7.50 5.56 57.5/55.6 24,000 12,000 1,875.0 1,500.0 54.7 10.1 13.5 460/3/60 234.5 250 451.0 x 99.0 x 97.0 18,500

(50%) -10.0

NATURAL

GAS 70.0 A B C D E F G H I J L M N O

P Q R S T U W

DAIKIN

MPS050F SEE PLAN 15,000 DX 582.7 425.5 84.2/69.5 58.3/57.6

R410A

1,415 14.9

2.25

1 15,000 7,500

(50%)

20 3 14,000 0.50 - 1 - 95 60.8/58.5 15,000 7,500 800.0 640.0 30.0 10.1 13.9 460/3/60 124.0 125 245.5 x 97.5 x 73.2 7,300

(50%) -10.0

NATURAL

GAS 69.3 A B C D E F G H I J K L M O

P Q R S T V RTU WELL

SOUTH (201) DAIKIN

RPS110D

24" x 12" 26" x 14" 1400

TITUS

350RL GRILLE SURFACE

T-1 16" x 10" 18" x 12" - A

RETURN TITUS

33RS GRILLE SURFACE 72" x 128"

R-4 74" x 130" 24000 D

D MATCH WALL COLOR. REFER TO ARCH. DRAWINGS FOR DETAILS TITUS

350RL GRILLE SURFACE

T-2 10" x 10" 12" x 12" - A

CUH-5 TRANE RECESSED 63.5 70.0 120.8 140.0 8.0 10.43 4

WALL 120.0 1200 0.17 2 120/1/60 0.22 7.0 61 x 30 x 10 275 A B

FFHB0801K VESTIBULE 290.05

TRANSFER TITUS

350RL GRILLE SURFACE

T-3 24" x 20" 26" x 22" - A

TRANSFER TRANSFER DIRECT

DIRECT

145 WATT

TURNDOWN

20:1 TURNDOWN

20:1 TURNDOWN FLOW

GPM

100

100 LOREN COOK

100SQN12D LOREN COOK

100SQN12D

145 WATT

145 WATT

29.1 1,746 45 135

29.1 1,746 45 135

RETURN TITUS

50F GRILLE LAY-IN 22" x 10"

R-5 24" x 12" - A B E

RETURN GRILLE LAY-IN 22" x 22"

R-6 TITUS 24" x 24" -

50F A B E

E PROVIDE ACOUSTIC BOOT

F HIGH THROW STORAGE 009.1

HYDRO 009.3

EF-11 DONOR SUITE

220 LOREN COOK

GC-422 CEILING INLINE DIRECT 200 0.50 1,355 120/1/60 85 WATT - B C D

48"L, 1-SLOT, 2.5"SLOT WIDTH

R-7 TITUS RETURN

FL-25 SLOT LAY-IN - SEE PLAN A

48"L, 1-SLOT, 2.5"SLOT WIDTH

E-4 TITUS EXHAUST

FL-25 SLOT LAY-IN 8" OVAL SEE PLAN A

EF-12 LOREN COOK CONCESSION 127

100SQN17DH CEILING INLINE DIRECT 325 0.75 1,708 120/1/60 0.105 1/4 B G

EF-13

SF-4

SF-5

CONCESSION 128 LOREN COOK

100SQN17DH CEILING INLINE DIRECT 325 0.75 1,708 120/1/60 0.105 1/4 B G

CONCESSION

CEILING 127 INLINE DIRECT 1400 1.00 1,519 120/1/60 3/4 B G

LOREN COOK

135SQN17DEC 0.49

CONCESSION

CEILING 128 INLINE DIRECT 1400 1.00 1,519 120/1/60 0.49 3/4 B G

RETURN TITUS

350RLF1 GRILLE SURFACE 24" x 24"

R-8 26" x 26" 1400 D G

G FILTERED RETURN.

RCP-2 DOMESTIC

HOT WATER BELL & GOSSETT

ECOCIRC 19-16 SUPPLY IN-LINE 5 10 120/1/60 60 WATTS 3,377 A B

(123.1) - -

RCP-3 DOMESTIC

HOT WATER BELL & GOSSETT

ECOCIRC 19-16 SUPPLY IN-LINE 5 10 120/1/60 60 WATTS 3,377 A B

(126) - -

PROVIDE 1" MERV 8 FILTER LOREN COOK

135SQN17DEC

16'

0' 32'

Scale: 1/16" = 1'-0"

PROFESSIONAL SEAL CONSULTANT

PROJECT

KEY PLAN

SHEET TITLE

PROJECT #

SHEET #

© 2018 ROSSETTI

B 8

7 6 5 4 3 2 1

A C D E F G H J K

8 7 6 5 4 3 2 1

30x42

:\Users\rzora\Documents\74670_WSGL_MECH_v20_r.zora.rvt 0/2020 12:06:48 PM

2018-034

Mechanical Schedules

M400

Wayne State University - Basketball Arena

1290 West Warren Avenue Detroit, Michigan 48202

# DESCRIPTION DATE

1 DESIGN DEVELOPMENT 11.21.2019

CONSTRUCTION DOCUMENT - PACKAGE 2 03.18.2020

ASI-002 06.03.2020

ASI-003 09.16.2020

ASI-004 09.29.2020

References

Related documents

Silicon Valley San Francisco San Francisco Peninsula Austin Seattle Raleigh-Durham Salt Lake City Denver Boston Baltimore New York Washington DC San Diego Pittsburgh

The quality of both of these business outcomes relies directly on the quality (predictive accu- racy) of network analysis results provided, most notably, by the state estimation

 Transportation  activities  include  personnel  and   freight  movements  and  mobile  plant  activities..  Intertwined  with  these  BMPs  are  enforceable

6 the distribution of possible food security outcomes for pastoralist regions based on this combination of rainfall and forecast is noticeably different for forecasts of

[3] NEST’s primary goals are to read in ESA and third part SAR data products, provide tools for calibration, orthorectification, co-registration, interferometry,

— Sutural angle of elytra without small tooth; head, antennae, scutellum, legs, and venter (except abdominal sterna laterally) black; pronotum yellow with disc black from base to

Make measurements on timeslot 0 [FREQUENCY] {Timeslot Off} [Enter] Activate the ORFS measurement (figure 25) [MEASURE] {GMSK Output RF The default setting measures spectrum

This study aims to provide a category-based account of CF-reduplications by means of a prototype category, dynamic prototypes and contrastive focus effects.. In 2.1, we revisit