STATE OF CALIFORNIA ARNOLD SCHWARZENEGGER, Governor PUBLIC UTILITIES COMMISSION

SAN FRANCISCO, CA 94102-3298

September 22, 2008 Advice Letter 2224-E

Akbar Jazayeri

Vice President, Regulatory Operations

Southern California Edison Company

P O Box 800

Rosemead, CA 91770

Subject: Modification to CCA Notification and Open Season

Requirements and CCA Liability for Forecasting Errors

Dear Mr. Jazayeri:

Advice Letter 2224-E is effective April 9, 2008

Sincerely,

(2)

P.O. Box 800 2244 Walnut Grove Ave. Rosemead, California 91770 (626) 302-3630 Fax (626) 302-4829

Akbar Jazayeri

Vice President of Regulatory Operations

March 10, 2008

ADVICE 2224-E

(U 338-E)

PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

ENERGY DIVISION

SUBJECT:

Modification to CCA Notification and Open Season

Requirements and CCA Liability for Forecasting Errors

In compliance with California Public Utilities Commission (Commission) Decision

(D.) 08-02-013, Southern California Edison Company (SCE) hereby submits for filing

the following changes to its tariff schedules. The revised tariff sheets are listed on

Attachment A and are attached hereto.

PURPOSE

As directed in D.08-02-013, SCE submits tariff changes to: 1) remove the requirement

that customer notifications by Community Choice Aggregators (CCAs) be reviewed and

approved by the Commission’s Public Advisor; 2) modify the Commencement Date

provisions of SCE’s Open Season tariff (i.e. Rule 23.2); and 3) remove any references

to a requirement that a CCA provide evidence of insurance, self-insurance, or a bond

for forecasting errors.

BACKGROUND

Assembly Bill (AB) 117 enacted in 2002 authorizes cities and counties located within the

service territory of an investor owned utility (IOU) the option of procuring power on

behalf of citizens and businesses located within their municipal boundaries. This is

known as Community Choice Aggregation.

The Commission initiated Rulemaking (R.) 03-10-003 to implement AB 117.

D.05-12-041, as modified by D.06-02-006, had adopted certain procedures and rules to

facilitate the creation and implementation of CCAs according to the provisions of

(3)

ADVICE 2224-E

(U 338-E) - 2 - March 10, 2008

Following D.06-02-006, the Commission staff became aware of differing interpretations

of the Commission orders dealing with Community Choice Aggregation. One dealt with

whether the CCAs were required to submit the customer notifications required before

the commencement of Community Choice Aggregation to the Commission’s Public

Advisor for review and approval. The second dealt with whether a CCA, which had

provided a binding notice of intent (BNI), could modify its service commencement date

once or multiple times.

The assigned Administrative Law Judge (ALJ) issued a ruling on August 3, 2007,

proposing changes to the IOUs’ tariffs to ensure consistency with Commission policy.

Comments were received from San Joaquin Valley Power Authority (SJVPA) and jointly

by San Diego Gas & Electric Company (SG&E), SCE, and Pacific Gas and Electric

Company (PG&E) (together as “Joint Utilities”).

Subsequently, due to conflicting provisions within D.05-12-041, the assigned ALJ issued

a ruling on December 4, 2007, proposing the elimination of references to bond,

insurance, and self-insurance for forecasting errors. Comments were received from

City and County of San Francisco, SJVPA, SCE, PG&E, and Local Sustainable Energy

Coalition.

The Commission, in D.08-02-013 adopted February 28, 2008, ordered SCE, within

ten days of the effective date of the order, to revise its tariffs to reflect the modifications

required by the Decision. The SCE tariffs affected by D.08-02-013 are:

• Rule 23 – Community Choice Aggregation

• Rule 23.2 – Community Choice Aggregation Open Season

PROPOSED CHANGES

The following changes to SCE’s attached tariffs are made pursuant to D.08-02-013:

1. Removal of tariff provision requiring CCAs to submit customer notices to the

Commission for review or approval.

2. Requiring that a new commencement date must not be more than three months

after the date specified in the original BNI.

3. Requiring updates to a commencement date later than that stated in the original

BNI to be made during SCE’s Open Season process at least a year in advance

of the original commencement date specified in the BNI.

4. Adding that a BNI date can be changed, at any time, to an earlier date.

5. Removing a provision that CCAs must satisfy credit worthiness standards related

to forecasting.

(4)

ADVICE 2224-E

(U 338-E) - 3 - March 10, 2008

This advice filing will not increase any rate or charge, cause the withdrawal of service,

or conflict with any other schedule or rule.

TIER DESIGNATION

Pursuant to D.07-01-024, Energy Industry Rule 5.1(1), this advice letter is submitted

with a Tier 1 designation.

EFFECTIVE DATE

This advice filing will become effective on April 9, 2008, the 30

th

calendar day after the

date filed.

NOTICE

Anyone wishing to protest this advice filing may do so by letter via U.S. Mail, facsimile,

or electronically, any of which must be received no later than 20 days after the date of

this advice filing. Protests should be mailed to:

CPUC, Energy Division

Attention: Tariff Unit

505 Van Ness Avenue

San Francisco, California 94102

E-mail:

[email protected]

and

[email protected]

Copies should also be mailed to the attention of the Director, Energy Division,

Room 4004 (same address above).

In addition, protests and all other correspondence regarding this advice letter should

also be sent by letter and transmitted via facsimile or electronically to the attention of:

Akbar Jazayeri

Vice President of Regulatory Operations

Southern California Edison Company

2244 Walnut Grove Avenue

Rosemead, California 91770

Facsimile: (626) 302-4829

(5)

ADVICE 2224-E

(U 338-E) - 4 - March 10, 2008

Bruce Foster

Senior Vice President, Regulatory Affairs

c/o Karyn Gansecki

Southern California Edison Company

601 Van Ness Avenue, Suite 2040

San Francisco, California 94102

Facsimile: (415) 673-1116

E-mail:

[email protected]

There are no restrictions on who may file a protest, but the protest shall set forth

specifically the grounds upon which it is based and shall be submitted expeditiously.

In accordance with Section 4 of General Order No. (GO) 96-B, SCE is serving copies of

this advice filing to the interested parties shown on the attached GO 96-B and

R.03-10-003 service lists. Address change requests to the GO 96-B service list should

be directed by electronic mail to

[email protected]

or at (626) 302-2930.

For changes to all other service lists, please contact the Commission’s Process Office

at (415) 703-2021 or by electronic mail at

[email protected]

.

Further, in accordance with Public Utilities Code Section 491, notice to the public is

hereby given by filing and keeping the advice filing at SCE’s corporate headquarters.

To view other SCE advice letters filed with the Commission, log on to SCE’s web site at

http://www.sce.com/AboutSCE/Regulatory/adviceletters

.

For questions, please contact Thomas Diaz at (626) 302-4823 or by electronic mail at

[email protected]

.

Southern California Edison Company

Akbar Jazayeri

AJ:td:sq

(6)

CALIFORNIA PUBLIC UTILITIES COMMISSION

ADVICE LETTER FILING SUMMARY

ENERGY UTILITY

MUST BE COMPLETED BY UTILITY (Attach additional pages as needed)

Company name/CPUC Utility No.: Southern California Edison Company (U 338-E)

Utility type: Contact Person: James Yee

! ELC " GAS Phone #: (626) 302-2509

" PLC " HEAT " WATER E-mail: [email protected]

E-mail Disposition Notice to: [email protected]

EXPLANATION OF UTILITY TYPE

ELC = Electric GAS = Gas

PLC = Pipeline HEAT = Heat WATER = Water

(Date Filed/ Received Stamp by CPUC)

Advice Letter (AL) #: 2224-E Tier Designation: 1

Subject of AL: Modification to CCA Notification and Open Season Requirements and CCA Liability for

Forecasting Errors

Keywords (choose from CPUC listing): Compliance

AL filing type: " Monthly " Quarterly " Annual ! One-Time " Other

If AL filed in compliance with a Commission order, indicate relevant Decision/Resolution #: D.08-02-013

Does AL replace a withdrawn or rejected AL? If so, identify the prior AL:

Summarize differences between the AL and the prior withdrawn or rejected AL1:

Confidential treatment requested? " Yes ! No If yes, specification of confidential information:

Confidential information will be made available to appropriate parties who execute a nondisclosure agreement. Name and contact information to request nondisclosure agreement/access to confidential information:

Resolution Required? " Yes ! No

Requested effective date: 4/9/08 No. of tariff sheets: -5-

Estimated system annual revenue effect: (%): Estimated system average rate effect (%):

When rates are affected by AL, include attachment in AL showing average rate effects on customer classes (residential, small commercial, large C/I, agricultural, lighting).

Tariff schedules affected: Rule 23, Rule 23.2, and Table of Contents

Service affected and changes proposed1:

Pending advice letters that revise the same tariff sheets:

(7)

Protests and all other correspondence regarding this AL are due no later than 20 days after the date of this filing, unless otherwise authorized by the Commission, and shall be sent to:

CPUC, Energy Division Attention: Tariff Unit 505 Van Ness Ave., San Francisco, CA 94102

[email protected] and [email protected]

Akbar Jazayeri

Vice President of Regulatory Operations Southern California Edison Company 2244 Walnut Grove Avenue

Rosemead, California 91770 Facsimile: (626) 302-4829

E-mail: [email protected]

Bruce Foster

Senior Vice President, Regulatory Affairs c/o Karyn Gansecki

Southern California Edison Company 601 Van Ness Avenue, Suite 2040 San Francisco, California 94102 Facsimile: (415) 673-1116

(8)

Public Utilities Commission 2224-E Attachment A Cal. P.U.C.

Sheet No. Title of Sheet

Cancelling Cal. P.U.C. Sheet No.

1

Revised 43670-E Rules 23 Original 40038-E

Revised 43671-E Rules 23.2 Original 40064-E

Revised 43672-E** Rules 23.2 Original 40064-E

Original 40065-E

Revised 43673-E Table of Contents Revised 43557-E

(9)

Southern California Edison Revised Cal. PUC Sheet No. 43670-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 40038-E

Rule 23 Sheet 15

COMMUNITY CHOICE AGGREGATION (Continued)

(Continued)

(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2224-E Akbar Jazayeri Date Filed Mar 10, 2008 Decision 08-02-013 Vice President Effective Apr 9, 2008

15H10 Resolution

H. CCA CUSTOMER NOTIFICATION PROCESSES (Continued)

3. The following additional provisions apply to CCA Customer Notifications:

a. The CCA and SCE must mutually agree on the date before the CCA’s Customer Notification process can begin.

b. CCA Customer Notifications may be sent concurrently with SCE’s billing cycles.

c. Neither CCAs nor SCE shall use the other party’s logo on CCA Customer Notifications or other materials absent express written consent to do so. Neither party shall express nor imply that the other party is affiliated with, is a sponsor of, or endorses their services or other programs.

d. If a CCA’s Automatic Enrollment process is suspended by the CCA, the Commission or any other State agency, the CCA shall be responsible for all SCE costs, including, but not limited to, customer communications associated with the suspension.

I. CCA CUSTOMER OPT-OUT PROCESSES

Pursuant to PU Code 366.2(13)(A)(i), all CCA Customer Notifications required for automatic enrollments shall include the opportunity for customers to opt-out of CCA Service and continue to receive their existing service. The CCA shall use SCE’s opt-out process. All CCA Customer Notifications shall include information necessary for a customer to utilize SCE’s opt-out process, as set forth below. CCAs using notification channels other than those provided by SCE will coordinate such notices with SCE. The following opt-out procedures apply to all participating customers:

1. SCE shall provide an opt-out process to be used by all CCAs. SCE shall offer at least two (2) of the following options as a part of its opt-out process:

a. Reply letter or postcard (postage paid) enclosed in CCA Customer Notifications

b. Automated phone service c. Internet service

d. Customer Call Center contact

2. Customers eligible for Automatic Enrollment in CCA Service must be notified twice during the Initial Notification period. If SCE is aware that a customer or group of customers has not received the required notifications, SCE shall immediately inform the CCA. If the CCA is aware that a customer or group of customers has not received the required notifications the CCA shall immediately inform SCE to remove the customer from Automatic Enrollment.

(D) (T)

(10)

Southern California Edison Revised Cal. PUC Sheet No. 43671-E Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 40064-E

Rule 23.2 Sheet 3

Community Choice Aggregation Open Season (Continued)

(Continued)

(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2224-E Akbar Jazayeri Date Filed Mar 10, 2008 Decision 08-02-013 Vice President Effective Apr 9, 2008

3C9 Resolution

A. CCA Open Season (Continued)

3. CCA Default on Binding Notice of Intent

If the CCA fails to commence service on the date stated in the BNI, or fails to offer service in good faith to all classes of customers stated in that Notice, the CCA will be required to reimburse SCE, upon demonstration in a filing with the Commission, for any incremental costs associated with utility procurement, as described in Section 4 below, resource adequacy penalties, or any other utility costs that are incurred as a result of CCA’s default. However, the CCA or its customers will not be subject to any costs incurred by SCE as a result of the CCA's failure to commence service on the date specified if the reason for that non-performance relates to a failure of SCE to meet its commitments to the CCA.

4. Potential Penalties for Deviating From CCA Binding Notice of Intent

If the CCA fails to meet its commencement of service date or fails to offer service in good faith to all customer classes stated in the Notice of Intent, SCE shall make a filing with the Commission detailing the incremental costs it incurred as a result of the CCA’s failure to fulfill its commitment, for Commission determination of a CCA penalty. The potential penalty to the CCA shall not exceed the would-be transferred load that SCE must continue to serve times the difference between SCE’s incremental per kWh cost of acquiring the energy and capacity to serve the load not served by the CCA, and the average cost of SCE’s procurement portfolio. This penalty will be calculated on a per day basis for every day that the CCA deviates from the date provided in its BNI. The CCA shall not be entitled to a credit if SCE’s per/kWh cost of serving the load not served by the CCA is below the average cost of SCE’s procurement portfolio.

B. Adjustments to Forecasts

In a subsequent Open Season that takes place prior to the CCA commencing service to its customers, the Participating CCA may update its service commencement date, subject to the following conditions:

• The new commencement date specified in the update BNI must not be more than three (3) months after the date specified in the original BNI.

• Updates that provide for service through the CCA to commence later than stated in the original BNI must be made during the serving SCE’s Open Season process that is held at least a year in advance of the original commencement date in the BNI.

• A CCA can change its BNI date, at any time, to an earlier date. The change of a BNI to an earlier date does not need to occur during SCE’s Open Season process. Any additional costs incurred by the serving utility resulting from this change will be recovered from CCA Service customers and may be allocated to the CCA’s CRS.

(11)

Southern California Edison Revised Cal. PUC Sheet No. 43672-E** Rosemead, California (U 338-E) Cancelling Original Cal. PUC Sheet No. 40064-E

40065-E

Rule 23.2 Sheet 4

Community Choice Aggregation Open Season (Continued)

(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2224-E Akbar Jazayeri Date Filed Mar 10, 2008 Decision 08-02-013 Vice President Effective Apr 9, 2008

4C13 Resolution

B. Adjustments to Forecasts (Continued):

To the extent the CCA and SCE have collaborated on the load forecast as described above, the CCA and SCE shall provide updates to load forecasting data, such as projected rate or service changes, as they become available in advance of the CCA commencement date. This data shall be used solely to refine the collaborative load forecast when necessary. The CEC may also make adjustments to the CCA’s Forecast as part of its review of all Load Serving Entity forecasts in the resource adequacy process. The CCA must satisfy SCE credit worthiness standards (which may include provision of adequate security or other assurance) to cover the amount of any potential penalties.

As part of the collaborative forecast process, the parties should explore options for mitigating risks associated with forecasts. Such options could include, but are not limited to, agreeing in advance that the party who has excess power will sell power to the party that is short on power. A CCA does not need to provide evidence of insurance, self-insurance or a bond to cover the costs associated with SCE forecasting errors.

C. Open Season Phase-In Requirements

In the event a CCA elects to phase-in its service and participate in the Open Season, the CCA shall provide in its BNI the schedule by which it intends to phase-in service which shall include the number of customers for each class to be served per the schedule provided. The CCA shall be required to accept the transfer of customers on the dates provided for each phase of its implementation unless it provides an adjustment in a subsequent Open Season period per Section B above. The CCA load forecast shall reflect the incremental changes in CCA load as a result of phasing implementation. All other provisions of the Open Season tariff, including penalties for default and confidentiality, apply to participating CCAs that elect to phase-in implementation.

D. CCA Open Season Participation Confidentiality

(12)

Southern California Edison Revised Cal. PUC Sheet No. 43673-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 43557-E

TABLE OF CONTENTS Sheet 1

(Continued)

(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2224-E Akbar Jazayeri Date Filed Mar 10, 2008 Decision 08-02-013 Vice President Effective Apr 9, 2008

1H8 Resolution

Cal. P.U.C. Sheet No.

TITLE PAGE ...11431-E TABLE OF CONTENTS - RATE SCHEDULES ... 43673-43355-43558-43559-43560-43561-43562-E TABLE OF CONTENTS - LIST OF CONTRACTS AND DEVIATIONS ...43562-E TABLE OF CONTENTS - RULES ...43674-E TABLE OF CONTENTS - BASELINE REGIONS ...41372-E TABLE OF CONTENTS - SAMPLE FORMS ...43046-40644-37804-40593-42988-40645-E ...43047-E PRELIMINARY STATEMENT:

A. Territory Served ...22909-E B. Description of Service ...22909-E C. Procedure to Obtain Service ...22909-E D. Establishment of Credit and Deposits ...22909-E E. General...22909-27629-38292-37165-37166-37167-E F. Symbols ...37168-E G. Gross Revenue Sharing Mechanism ... 26584-26585-26586-26587-27195-27196-27197-E ...27198-27199-27200-27201-E H. Baseline Service ... 11457-43058-11880-11881-31679-E I. Advanced Metering Infrastructure Balancing Account (AMIBA) ... 42811-42812-E J. NOT IN USE...-E K. Nuclear Decommissioning Adjustment Mechanism ... 36582-36583-E M. Income Tax Component of Contributions ... 37202-27632-E N. Memorandum Accounts... 21344-41773-43032-42035-42036-41775-42837-42838-42839-E ... 42840-42841-42842-42843-42844-42845-42846-42847-42848-42849-42850-42851-E ... 42852-42853-42854-42855-42856-42857-42858-42859-42860-42861-42862-42863-E ... 42864-42865-42866-42867-42868-42869-42870-42871-42872-42873-42874-42875-E ... 42876-42877-42878-42879-42880-42881-42882-42883-42884-42885-42886-42887-E ... 42888-42889-42890-42891-42892-E

O. California Alternative Rates for Energy (CARE) Adjustment Clause

... 34705-41902-36472-38847-43495-E P. Optional Pricing Adjustment Clause (OPAC)... 27670-27671-27672-27673-27674-E

(T) (T)

(13)

Southern California Edison Revised Cal. PUC Sheet No. 43674-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 43174-E

TABLE OF CONTENTS Sheet 8

(Continued)

(Continued)

(To be inserted by utility) Issued by (To be inserted by Cal. PUC) Advice 2224-E Akbar Jazayeri Date Filed Mar 10, 2008 Decision 08-02-013 Vice President Effective Apr 9, 2008

8H7 Resolution

RULES

Rule Cal. P.U.C.

No. Title of Sheet Sheet No.

1 Definitions ... 40017-40018-40019-36435-29491-24681-24283-28655-22920-E ... 22921-38153-27741-22924-22925-E 2 Description of Service ... 22926-22927-22928-25264-22930-22931-22932-E ... 22933-22934-43165-43166-22937-22938-22939-36743-22941-E 3 Application for Service ... 22942-22943-E 4 Contracts ... 38154-39859-E 5 Special Information Required on Forms ...27742-27743-27744-31052-E 6 Establishment and Re-establishment of Credit ... 22950-22951-E 7 Deposits ... 22952-22953-E 8 Notices ... 27746-27747-E 9 Rendering and Payment of Bills ...29956-40633-36745-40767-E 10 Disputed Bills ... 27748-27749-E 11 Discontinuance and Restoration of Service ... 22964-22965-22966-22967-22968-E ...22969-22970-22971-40768-E 12 Rates and Optional Rates ... 40634-35618-E 13 Temporary Service ...24683-E 14 Shortage of Supply and Interruption of Delivery ... 22976-26339-E 15 Distribution Line Extensions ... 24684-24685-24686-43167-27026-27027-27028-E ...43168-28091-33598-33599-33600-33601-43169-43170-37283-33605-E 16 Service Extensions... 24700-24701-27143-24703-24704-24705-27144-E ...24707-24708-24709-24710-24711-33962-33963-24714-24715-24716-24717-E 17 Adjustment of Bills and Meter Tests ... 19616-19617-19618-19619-19620-E 18 Supply to Separate Premises and Use by Others ... 40769-24436-E 20 Replacement of Overhead With Underground Electric Facilities

...31867-23019-23020-31868-26177-31869-E 21 Generating Facility Interconnections ... 36865-36866-39415-36868-40112-36870-39416-E ... 36872-36873-38752-38753-36876-36877-40113-40114-40115-40116-40117-40118-E ...40119-40120-40121-40122-40123-40124-40125-40126-40127-40128-40129-E ...40130-40131-40132-40133-40134-40135-40136-40137-40138-40139-40140-E ... 40141-40142-40143-40144-40145-40146-40147-40148-40149-E 22 Direct Access...40020-24285-24286-24287-31056-27752-31057-30002-30003-24293-E ... 24294-25943-25114-24297-25944-24299-25818-25819-25820-25821-25822-25823-E ... 24306-24307-25824-25825-24310-24311-24312-24313-31058-24315-24316-24317-E ... 24318-24319-24320-24852-24322-24853-24324-40021-24326-24327-24328-24329-E ...24330-24331-24332-24333-E 22.1 Switching Exemption Guidelines...40956-35620-40957-40958-40959-35624-E 22.2 Direct Access Service for Qualified Nonprofit Charitable Organizations...41804-E 23 Community Choice Aggregation ...40024-40025-40026-40027-40028-40029-E ... 40030-40031-40032-40033-40034-40035-40036-40037-43670-40039-40040-40041-E ... 40042-40043-40044-40045-40046-40047-40048-40049-40050-40051-40052-40053--E ...40054-40055-40056-40057-40058-40059-40060-40061-E 23.2 Community Choice Aggregation Open Season ... 40062-40063-43671-43672-E

(T)

(14)

References

Related documents

Should a member of staff fail to complete a course/training/programme of study or leave Viking Academy Trust with a set time period, repayment of all costs incurred up to and

a) Bundled Service Customer: A customer who takes bundled services from SCE including all its power requirements purchased by SCE. b) Community Choice Aggregation Customer

The measurement is accomplished by (1) visualizing sinusoidal test patterns with different frequency; (2) capturing the visible output by a camera; (3) analyzing the

The acquisition based on circular correlation FFT, parallel frequency space search and parallel code space search acquisition are performed for various Doppler carrier

Figure 1 illustrates the proposed hybrid adaptive flight control. The control architecture com- prises: 1) a reference model that translates a rate command into a desired

The new draft legislation will introduce some radical pensions changes from 6 April 2011 such as the removal of the age 75 ceiling, drawdown of the entire pension fund after income

Same theory using this line on the ball to line where I want to putt the ball, just going to aim right side, right lip of, just a few practice strokes look at the hole to get the

The following sections demonstrate how these principals easily align to IBM ® OpenPages ® Operational Risk Management, a comprehensive software solution that enables organizations