• No results found

Refurbishment Mas Thibert / Arles

N/A
N/A
Protected

Academic year: 2021

Share "Refurbishment Mas Thibert / Arles"

Copied!
10
0
0

Loading.... (view fulltext now)

Full text

(1)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Refurbishment Mas Thibert / Arles

10th october 2012, Steering Committee, Malaga Gonzague Descoqs 13 Habitat

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF 2

13 Habitat, short presentation

¾ Social housing organisation,  based in Marseille ¾ Around 32000 dwellings in  the “Bouches du Rhône” province ¾ Context : 13 Habitat  launched last year a  program of energy  renovation on our buildings

(2)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF 3

Short description of the pilot

¾ The building is situated in a small village, Mas Thibert, 18  km from the city centre of Arles, in the region Provence‐ Alpes‐Côte d'Azur, South of France Mas Thibert

Short description of the pilot

¾ Contracting authority responsible for the payment of  the retrofitting financed by ELIH‐Med : 13 Habitat ¾ Number of dwellings : 30 ¾ Apartment building, in a rural area ¾ Low income housing compatibility :  as a social  housing organisation, to get a dwelling, our residents  have an income below a level defined by the french  law.

(3)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Context and objective 

Context : ► Too much domestic oil consumption every winter ► More and more difficult for our tenants to pay for it ► More and more difficult for us to find new tenants  due to a high level of energy cost Our objective :The main objective of our project is to save energy,  not for us as an owner, but for the occupants ► Provide our tenants low energy consumption dwellings 5

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Short description of the pilot

¾ Date of construction : 1970

Pictures of Mas Thibert in 1971 

(4)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Pictures of the building

(5)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Pictures of the building

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Retrofitting workings / Methodology

► On‐site  energy audit in order to evaluate  the different  parts of the building (Insulation ?  Windows ? Heating   system?...) ► Energy simulation based on the collected informations,  using a french national software (Thc E Ex method) and  dynamic simulation Objective below 48 Kwh d’Ep/m².year (fixed by Ademe,  french energy agency) ► Identification of the preferred solution 10

(6)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Retrofitting workings

1. External insulation in  EPS (floor, wall, roof)  4. Heating system : installation  of a ground heat pump source 5. Domestic Hot  Water Solar  Heating (one tank  / dwelling) 2. Windows  replacement: new units  with double‐Glazed  insulating panes and  insulating frame 3. Installation of shading  systems for summer comfort 

Energy consumption

Before : 211 Kwh Ep/m².an After : 47 Kwh Ep/m².an  Heating consumption From 54% to 4% of the  overall consumption Domestic Hot water  consumption From 28% to 62%

(7)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Image of the project

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Financial plan

► Planned cost of energy‐saving measures : 1 061 000€ ► Planned cost of the overall pilot (energy audit, smart  monitoring/ metering, evaluation…) : to be defined ► Rental agreement before launching the refurbishment ► Increase of the rents for all the tenants who have not reached  the rent treshold defined by the french law.  Won't exceed 12% of the current rent.  14

(8)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Financial plan

The refurbishment will be financed by : ► Elih‐Med ► Grants from the French energy agency (called Ademe) ► Local authorities  (province and region) ► An Eco loan from the national Bank Caisse des Dépôts et  Consignations ► A contribution of the tenants (increase of the rents) ► Self financial resources from 13 Habitat ► More detailed overall cost and financial plan at the next  meeting 15

Providers selection for the 

retrofitting workings

► We don't know yet who will undertakes the works.  ► Call for tender in the respect of the french public market law.  beginning of next year ► Cost, experience and technical criterias will be evaluated. ► Qualified specialists.

(9)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Smart metering 

(for non Italian partners)

►Not yet defined

17

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

TMG and PPCG

► TMG : No meeting until now ► PPCG :  The tenants are advised since the beginning of the  project. We have organised meetings to present them this  refurbishment. An agreement will be signed with them  before launching the works. This step is mandatory.  18

(10)

Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF

Expected time frame

► Schedule of each step till the end of the project :

ƒ

Building permit before the end of the year

ƒ

Call for tender : 1st quarter 2013

ƒ

Start of works : 2nd quarter 2013

ƒ

End of the works : 2nd quarter 2014 ►Implementation of the smart metering during the works 19

References

Related documents

Large accumulations of light oil and liquid-rich gas are found within the sands and carbonates in these zones and Taylor Hill sees a number of good opportunities on its

The decline of seep gas measured in the tents correlates with production decline at Platform Holly and corresponding decrease in reservoir pressure.. The seep tents provide a

Research of the religious context of Pentecostalism in Costa Rica, which is primarily characterized by the official Catholic Church and the Catholic lay

“Benchmarking of parental control tools for the online protection of children” SIP-Bench II SMART 2009/0047 Tools for PCs 1st cycle best tool: 3,3 worst tool: 2,0 2nd cycle best

Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co- financed by European Regional Development Fund - ERDF.. 24 January

Projet co-financé par le Fonds Européen de Développement Régional - FEDER Project co- financed by European Regional Development Fund - ERDF.. Context : 13 Habitat launched last year a

files, such operations for accessing and modifying the data in files and for creating and deleting. To perform these primitive file operations correctly and efficiently, typical