Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Refurbishment Mas Thibert / Arles
10th october 2012, Steering Committee, Malaga Gonzague Descoqs 13 HabitatProjet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF 2
13 Habitat, short presentation
¾ Social housing organisation, based in Marseille ¾ Around 32000 dwellings in the “Bouches du Rhône” province ¾ Context : 13 Habitat launched last year a program of energy renovation on our buildingsProjet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF 3
Short description of the pilot
¾ The building is situated in a small village, Mas Thibert, 18 km from the city centre of Arles, in the region Provence‐ Alpes‐Côte d'Azur, South of France Mas ThibertShort description of the pilot
¾ Contracting authority responsible for the payment of the retrofitting financed by ELIH‐Med : 13 Habitat ¾ Number of dwellings : 30 ¾ Apartment building, in a rural area ¾ Low income housing compatibility : as a social housing organisation, to get a dwelling, our residents have an income below a level defined by the french law.Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Context and objective
Context : ► Too much domestic oil consumption every winter ► More and more difficult for our tenants to pay for it ► More and more difficult for us to find new tenants due to a high level of energy cost Our objective : ► The main objective of our project is to save energy, not for us as an owner, but for the occupants ► Provide our tenants low energy consumption dwellings 5Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Short description of the pilot
¾ Date of construction : 1970
Pictures of Mas Thibert in 1971
Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Pictures of the building
Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Pictures of the building
Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Retrofitting workings / Methodology
► On‐site energy audit in order to evaluate the different parts of the building (Insulation ? Windows ? Heating system?...) ► Energy simulation based on the collected informations, using a french national software (Thc E Ex method) and dynamic simulation Objective below 48 Kwh d’Ep/m².year (fixed by Ademe, french energy agency) ► Identification of the preferred solution 10Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Retrofitting workings
1. External insulation in EPS (floor, wall, roof) 4. Heating system : installation of a ground heat pump source 5. Domestic Hot Water Solar Heating (one tank / dwelling) 2. Windows replacement: new units with double‐Glazed insulating panes and insulating frame 3. Installation of shading systems for summer comfortEnergy consumption
Before : 211 Kwh Ep/m².an After : 47 Kwh Ep/m².an Heating consumption From 54% to 4% of the overall consumption Domestic Hot water consumption From 28% to 62%Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Image of the project
Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Financial plan
► Planned cost of energy‐saving measures : 1 061 000€ ► Planned cost of the overall pilot (energy audit, smart monitoring/ metering, evaluation…) : to be defined ► Rental agreement before launching the refurbishment ► Increase of the rents for all the tenants who have not reached the rent treshold defined by the french law. Won't exceed 12% of the current rent. 14Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Financial plan
The refurbishment will be financed by : ► Elih‐Med ► Grants from the French energy agency (called Ademe) ► Local authorities (province and region) ► An Eco loan from the national Bank Caisse des Dépôts et Consignations ► A contribution of the tenants (increase of the rents) ► Self financial resources from 13 Habitat ► More detailed overall cost and financial plan at the next meeting 15Providers selection for the
retrofitting workings
► We don't know yet who will undertakes the works. ► Call for tender in the respect of the french public market law. beginning of next year ► Cost, experience and technical criterias will be evaluated. ► Qualified specialists.Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
Smart metering
(for non Italian partners)►Not yet defined
17
Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF
TMG and PPCG
► TMG : No meeting until now ► PPCG : The tenants are advised since the beginning of the project. We have organised meetings to present them this refurbishment. An agreement will be signed with them before launching the works. This step is mandatory. 18Projet co‐financé par le Fonds Européen de Développement Régional ‐ FEDER Project co‐ financed by European Regional Development Fund ‐ ERDF