Release User Group Agenda

September 20, 2011 10:00 a.m. – 10:55 a.m. (Pacific Time)

Web Conference Information Conference Call Information

URL: https://www.connectmeeting.att.com

Meeting Number: 8665282256

Access Code: 4914267

Domestic Call In: (866) 528-2256 International Call In: (216) 706-7052

(2)

Page 2

Release User Group Agenda

September 20, 2011 10:00 a.m. – 10:55 a.m. (Pacific Time)

Time Topic Facilitator

10:00 – 10:05 Agenda & ISO Roll call Janet Morris

10:05 – 10:15 DST SIBR-Lite Testing Jami Herguth

10:15 – 10:20 OASIS October Release Eureka Cullado

10:15 – 10:40 Release Plan Janet Morris

Cici Wang Adrian Chiosea Kelly Latimer Chris Mcintosh Scott Engquist John Williams

(3)
(4)

Contingency Dispatch Resource Schedules

(5)
(6)

Contingency Dispatch Nomogram/Branch Shadow Prices

(7)
(8)

OASIS API Specifications

Page 8

• OASISReport.xsd – adding the 4 new report names, no new data elements  Only need to download if output file (new reports) is validated against the schema file, otherwise existing schema file will still work with all of the current/pre-existing production reports

• Post market notices with information regarding:  API Specs document & XSD file

 Release Notes

(9)

Release Plan - 2011

• Fall 2011 release – 10/1/11 http://www.caiso.com/informed/Pages/ReleasePlanning/Default.aspx

– RDRP

– FERC Order 741 Credit Reform / Settlements Timeline Improvements – Seasonal rating change

– Convergence Bidding limit changes – Dynamic Transfer – interim solution

– Grouping Constraints: http://www.caiso.com/Documents/Implementation_GroupConstraintsPhase1.pdf

– SIBR Interface Specification for Bidding Services: http://www.caiso.com/2bac/2bacc65bec30.pdf

• October monthly release – 10/11/11

– RDRP DRS 1.6 deployment

– OMS Phase 2 (deployment date moved to 10/18/11 to accommodate DB 56 promotion)

• Daylight Savings Time Change – 11/06/11

• Removal of Convergence Bidding on the Interties - TDB

• December monthly release – 12/13/11

– Generation of bids for NRS-RA – GMC rate structure change – Flexible Ramping

– MSG Enhancements – 72 Hour RUC

(10)

Release Plan - 2012

• Spring 2012 release

– Regulation Energy Management – LMPM Enhancements

– O&M Default Adder Values

• Fall 2012 Release

– Data Release Phase 3

– Enterprise Model Management (tentative) – Outage Management System (tentative)

(11)
(12)

October 2011 Monthly Release

(13)
(14)

Fall 2011 Release - Reliability Demand Response Product

(RDRP) Release Milestones

Milestone Date

Publish business requirements

http://www.caiso.com/2b51/2b519218728d0.pdf March 29

Publish draft BPM June 30

Technical specifications http://www.caiso.com/27ab/27ab6e875c2e0.html June 30 Implementation Plan http://www.caiso.com/Documents/ReliabilityDemandRespo nseProductImplementationPlan.pdf July 22 Market Simulation Plan

http://www.caiso.com/Documents/Fall2011Release_Octob erMonthlyReleaseMarketSimulationPlan.pdf

July 29 Market Simulation

(Registration & Settlement simulation delayed & expanded due

to environment issues. Additional details in Market Sim meeting)

Aug 23 – Sept 9 (Bidding)

Sept 20 – Sept 29 (Settlement)

Production Deployment October 1 (Bidding) On Track

October 11 (DRS)

Production Activation April 1, 2012 On Track

(15)

Fall 2011 Release - Credit Reform and Settlements Process

Timeline Change - Release Milestones

Milestone Date

Post final implementation proposal April 8, 2011

Credit Reform board approval May 15, 2011

Tariff stakeholders’ process May 18 – June 29

Credit Reform FERC filing June 30

Configuration guides (draft BPMs)

http://www.caiso.com/23ad/23ade49d4790.html July 8

Settlements timeline change board approval July 14

Market simulation August 15 – Sept 2

(16)

Fall 2011 Release – Dynamic Transfers Interim Solution

Interim Solution Using existing functionality (with limited modification) to support Dynamic Transfers

on interim basis:

1. Transmission reservations: ISO will continue existing market scheduling and settlement of transmission usage.

2. Congestion management: ISO will use most recent available telemetry as DOT for next dispatch interval. (New Feature )

3. Dynamic exports: system impact and modification will be identified as ISO receives specific project proposals.

4. Non-firm transmission: ISO will need to document tagging procedures and related systems and processes.

5. Coordination with neighboring BAAs: Supporting Dynamic Scheduling System (DSS) through Joint Initiatives project.

Application Software Changes

Master File: Define the Eligible Resources

Real Time Dispatch: Echo back the most recent telemetry as the DOT, unless

there are constraints such as congestion or over-generation that would prevent the persistent dispatch at the most recent telemetry.

Interface Specification

http://www.caiso.com/2bad/2bad7e4f72b60.pdf

Tariff filed 7/29/11 requesting effective date of 11/1/11.

Production

Deployment October 1, 2011 (activation based on FERC order) On Track Page 16

(17)

Fall 2011 Release – Grouping Constraints

Milestone Date Technical specifications http://www.caiso.com/Documents/InterfaceSpecification_Master FileDataExchangeServices_Clean.pdf June 30 Implementation Plan http://www.caiso.com/Documents/ReliabilityDemandRespo nseProductImplementationPlan.pdf July 22 Market Simulation Plan

http://www.caiso.com/Documents/Fall2011Release_Octob erMonthlyReleaseMarketSimulationPlan.pdf July 29 Publish Draft BPM http://www.caiso.com/Documents/BPMChangeManagementPro posedRevisionRequestsStatusAug_22_2011.htm August 22

Market Simulation Aug 23 – Sept 23 On Track

Production Deployment Sept 29 On Track

(18)

Fall 2011 Release – Clean Bid & Bid Results Updates

• Clean Bid & Bid Results will be updated to include the new Open Tie Status flag element

• Adds a new “HourlyParameter” element that allows for retrieval of the Open Tie Status

• Discussed during Technical Users Group on 7/19/11 • Will be implemented with Fall Release

• Please see the following documents on the Release Planning page for additional detail:

– SIBR Interface Specification for Bidding Services – BidResults Web Service Artifacts

– CleanBidSet Web Service Artifacts • Deployment date is 9/29/11

• The deprecated services are the 20090801 name space versions (20091101 is still good)

(19)

December Monthly Release - Generation of Bids for NRS-RA

Milestone Date Status

Frequently Asked Questions

http://www.caiso.com/informed/Pages/StakeholderProcesses/GeneratedBidsOutage ReportingResourceSpecificRAResources.aspx

Aug 18, 2011

IRR Implementation Workshop Aug 31, 2011

RA Template Availability http://www.caiso.com/Documents/December%202011%20release%7CPlan%20temp lates/ProposedISOSupplyPlanTemplate.xls http://www.caiso.com/Documents/December%202011%20release%7CPlan%20temp lates/ProposedISOResourceAdequacyPlanTemplate.xls Sep 9, 2011 Technical specifications SIBR Rules http://www.caiso.com/Documents/December%202011%20release/ReleaseNotes- SchedulingInfrastructureBusinessRulesBusinessRulesforBidding-Version4.7.2_DecemberRelease.pdf Master File http://www.caiso.com/Documents/December%202011%20release/TechnicalInterface SpecificationforMasterFileDataExchangeServices.pdf

SIBR Rules – Aug 25, 2011 Master File – Aug 19, 2011

BPM change management submittal date

Settlements-https://bpm.caiso.com/bpm/prr/show/PRR000000000484

Reliability Requirements - Sep 30 2011 Settlements– Sep 12, 2011

Market Instruments - Sept 21, 2011

On Track

IRR User Guide

Configuration guides Sep 30, 2011 On Track

(20)

December Monthly Release - GMC Rate Structure

Milestone Date

Application Software Changes • Congestion Revenue Rights (CRR)

• Settlements

BPM Changes • Congestion Revenue Rights (CRR)

• Settlements & Billing • Definitions & Acronyms

Business Process Changes • Manage Billing & Settlements

Board Approval May 2011

Configuration Guides September 26 On Track

FERC ruling September 30 On Track

Statement Publication

(3 daily statements +1 monthly statement +1 invoice)

Nov 1 – Nov 3 On Track

Production Activation January 1, 2012 On Track

(21)

December Monthly Release – Flexible Ramping

Milestone Date

Application Software Changes • DAM/RTM

• CMRI • OASIS

• Settlements

BPM Changes • Settlements & Billing

• Market Operations, Market Instruments Business Process Changes • Manage Billing & Settlements

• Manage Real Time Market

Board Approval August 2011

Configuration Guides September 26, 2011 On Track

Technical Specifications September 26, 2011 On Track

(22)

December Monthly Release – MSG Enhancements (Phase 1)

Milestone Date

Application Software Changes Master File

Changes in DAM and RTM for:

• Terminal condition logic for MSG configurations • Ramp-rate segment limit for MSG configurations • Ability to self-schedule into Real-Time for different configurations that have Day-Ahead energy or Ancillary Service awards

BPM Changes • Market Operations

Business Process Changes • TBD

Board Approval October 2011

Configuration Guides N/A

Technical Specifications N/A

Market Simulation Nov 8, 2011 – Nov 23, 2011

Production Deployment December 13, 2011

Production Activation Upon FERC order

(23)

December Monthly Release - 72 hours RUC Milestones

Milestone Date Status

Publish business requirements September 23, 2010

BPM process July 15 – Sept 30 On Track

Revised BRS – sync-up with BPM

http://www.caiso.com/Documents/72-HourResidualUnitCommitmentBusinessRequirementsSpecification.pdf

September 1, 2011

Market Simulation Plan September 16, 2011

Market Simulation October 17-21, 2011

(tentative) Rescheduled

Production Deployment December 13, 2011

(24)

Milestone Date

Application Software Changes Phase I & II Phase III

DAM/HASP RTM

Master File (MF) CMRI

OASIS OASIS

BPM Changes Market Operations

Market Instruments Settlements & Billing Definitions & Acronyms

Business Process Changes Manage Operations Support & Settlements

Manage Market & Reliability Data & Modeling Manage Entity and Resources

Manage Market Setup & Execution Manage Day Ahead Market Real Time Market & Grid

Manage Real Time Market- After Close of Market Manage Real Time Operations- Generation Dispatch

Board Approval July 14, 2011

Tariff Filing October 2011

Technical Specifications (MF, OASIS) November 2011

Market Simulation January 2012

Production Activation Phase I, April 2012 Phase II, May 2012

Phase III, Q4 2012

Spring 2012 Release – LMPM Enhancements

(25)

Milestone Date

Application Software Changes SIBR

DAM/RTM Settlements

Master File (MF) RIMS

OASIS SLIC

BPM Changes Manage Full Network Model

Market Operations Market Instruments Outage Management Reliability Requirements Settlements & Billing Compliance Monitoring

Business Process Changes TBD

Board Approval February 3, 2011

Tariff Filing August 22, 2011

Technical Specifications TBD

Market Simulation February 2012

Production Activation Spring 2012

References

Related documents

Stock Change General Movement Type Internal – This is used for putaway and the sales picking transactions.. Stock Entry Method Print =

Later os does not functional requirements mobile shop management software helps scale the application is user needs of the requirements that are different.. Approval workflow to

Avoiding the split between occurrence and amount process makes the mod- el more parsimonious than other models devised for multisite rain- fall simulation preserving a

1.2.1 Asymmetric Synthesis of Ethylene-bridged Phosphines 3 1.2.2 Asymmetric Synthesis of Methylene-bridged Phosphines 10 1.2.3 Asymmetric Synthesis of

If originating department or division of circular differs from person approving/signing the circular, type his/her name and title two lines below the body of the circular, beginning

Prepared by: CDIA Advisor: Project Name: Team Lead: Creative Team: Technical Team:. Projected Release Date: Actual

Diamond-cutter tools production and renovation, services and sales of small building mechanization in operation since

NCE based training provides an alternative solution to estimate normalized statistical models when the exact computation of the re- quired normalization term is either