CASINO PROJECT | Supplementary Information Report | Mar 2015 Volume A.ii: Project introduction & oVerView Volume A.iii: BioPhysicAl VAlued comPonents Volume A.V: AdditionAl yesAA reQuirements Volume A.iV: socio-economic VAlued comPonents
Introduction Employment and
Income Employability Community Vitality Community Infrastructure and Services Economic Development and Business Sector Cultural Continuity Land Use and Tenure First Nations and
Community Consultation
A.4 Project Description A.3 Project Location
A.5 Effects Assessment Methodology
A.1A Concordance Table to the Executive Committee’s Request for Supplementary Information
A.4A Tailings Management Facility Construction Material Alternatives A.2A Traditional Knowledge
Bibliography
A.4B Information on Alternative Access Road Alignments
A.4c Feasibility Design of the Heap Leach Facility
A.4d Report on the Feasibility Design of the Tailings Management Facility
A.4F Waste Storage Area and Stockpiles Feasibility Design
A.4e Results of Additional Lab Testing of Leach Ore
A.4G Updated Hydrometeorology Report
A.4h Cold Climate Passive Treatment Systems Literature Review A.4i Open Pit Geotechnical Design
A.4l Revised Tailings Management Facility Seepage Assessment A.4m Processing Flow Sheets A.4n Scoping Level Assessment
of Casino Property A.4o Advanced Metallurgical
Assessment of the Casino Copper Gold Project A.4P Production of Environmental
Tailings Samples for the Casino Deposit
A.4Q Mine Site Borrow Materials Assessment Report
A.4r Report on Laboratory Geotechnical Testing of Tailings Materials A.4j Laboratory Evaluation of the
SO2/Air and Peroxide Process
A.4K Metal Uptake in Northern Constructed Wetlands Effects of the Environment on the Project Accidents and Malfunctions Environmental Management Environmental Monitoring Plans Conclusions References
Waste and Hazardous Materials Management Plan Spill Contingency Management Plan Sediment and Erosion Control Management Plan Invasive Species Management Plan ML/ARD Management Plan Liquid Natural Gas Management Plan Socio-Economic Management Plan Road Use Plan Economic Impacts of the
Casino Mine Project
Heritage Resources Assessment Areas Heritage Sites Summary
Terrain Features Water Quality
Air Quality
Noise
Fish and Aquatic Resources
Wildlife
Rare Plants and Vegetation Health
Variability Water Balance Model Report
Water Quality Predictions Report Potential Effects of Climate Change on the Variability Water Balance Updated Appendix B5 to Appendix 7A 2008 Environmental
Studies Report: Final
Casino Mine Site Borrow Sites ML/ARD Potential
2013-2014 Groundwater Data Report
Emissions Inventory for Construction and Operations Casino Geochemical Source Term Development: Appendix B
Extension of Numerical
Groundwater Modelling to include Dip Creek Watershed
The Effect of Acid Rock Drainage on Casino Creek
Casino Kinetic Testwork 2014 Update for Ore, Waste Rock and Tailings Preliminary Risk Assessment Metal Leaching and Acid Rock Drainage Toxicity Testing Reports Appendix A2 to Casino Waste Rock and Ore Geochemical Static Test As-sessment Report: Cross-Sections
Updated Fish Habitat Offsetting Plan
Wildlife Mitigation and Monitoring Plan V.1.2.
Moose Late Winter Habitat Fish Habitat Evaluation: Instream Flow and Habitat Evaluation Procedure Study
Wildlife Baseline Report V.2
A.1 A.2 A.6 A.7 A.13 A.20 A.21 A.22 A.23 A.24 A.25 A.14 A.16 A.17 A.15 A.18 A.19 A.7A A.22A A.22B A.22c A.22d A.22h A.22G A.22F A.22e A.7B A.7c A.13A A.18A A.18B A.7d A.7e A.7K A.7m A.8A A.7l A.7n A.7F A.7i A.7j A.7G A.7h A.8 A.9 A.10 A.12 A.11 A.10A A.12A A.12c A.10B A.12B Volume A.i: PREFACE Volume A.ii: Project introduction & oVerView Volume A.iii: BioPhysicAl VAlued comPonents Volume A.V: AdditionAl yesAA reQuirements Volume A.iV: socio-economic VAlued comPonents
Introduction Employment and
Income Employability Community Vitality Community Infrastructure and Services Economic Development and Business Sector Cultural Continuity Land Use and Tenure First Nations and
Community Consultation
A.4 Project Description A.3 Project Location
A.5 Effects Assessment Methodology
A.1A Concordance Table to the Executive Committee’s Request for Supplementary Information
A.4A Tailings Management Facility Construction Material Alternatives A.2A Traditional Knowledge
Bibliography
A.4B Information on Alternative Access Road Alignments
A.4c Feasibility Design of the Heap Leach Facility
A.4d Report on the Feasibility Design of the Tailings Management Facility
A.4F Waste Storage Area and Stockpiles Feasibility Design
A.4e Results of Additional Lab Testing of Leach Ore
A.4G Updated Hydrometeorology Report
A.4h Cold Climate Passive Treatment Systems Literature Review A.4i Open Pit Geotechnical Design
A.4l Revised Tailings Management Facility Seepage Assessment A.4m Processing Flow Sheets A.4n Scoping Level Assessment
of Casino Property A.4o Advanced Metallurgical
Assessment of the Casino Copper Gold Project A.4P Production of Environmental
Tailings Samples for the Casino Deposit
A.4Q Mine Site Borrow Materials Assessment Report
A.4r Report on Laboratory Geotechnical Testing of Tailings Materials A.4j Laboratory Evaluation of the
SO2/Air and Peroxide Process
A.4K Metal Uptake in Northern Constructed Wetlands Effects of the Environment on the Project Accidents and Malfunctions Environmental Management Environmental Monitoring Plans Conclusions References
Waste and Hazardous Materials Management Plan Spill Contingency Management Plan Sediment and Erosion Control Management Plan Invasive Species Management Plan ML/ARD Management Plan Liquid Natural Gas Management Plan Socio-Economic Management Plan Road Use Plan Economic Impacts of the
Casino Mine Project
Heritage Resources Assessment Areas Heritage Sites Summary
Terrain Features Water Quality
Air Quality
Noise
Fish and Aquatic Resources
Wildlife
Rare Plants and Vegetation Health
Variability Water Balance Model Report
Water Quality Predictions Report Potential Effects of Climate Change on the Variability Water Balance Updated Appendix B5 to Appendix 7A 2008 Environmental
Studies Report: Final
Casino Mine Site Borrow Sites ML/ARD Potential
2013-2014 Groundwater Data Report
Emissions Inventory for Construction and Operations Casino Geochemical Source Term Development: Appendix B
Extension of Numerical
Groundwater Modelling to include Dip Creek Watershed
The Effect of Acid Rock Drainage on Casino Creek
Casino Kinetic Testwork 2014 Update for Ore, Waste Rock and Tailings Preliminary Risk Assessment Metal Leaching and Acid Rock Drainage Toxicity Testing Reports Appendix A2 to Casino Waste Rock and Ore Geochemical Static Test As-sessment Report: Cross-Sections
Updated Fish Habitat Offsetting Plan
Wildlife Mitigation and Monitoring Plan V.1.2.
Moose Late Winter Habitat Suitability Report
Fish Habitat Evaluation: Instream Flow and Habitat Evaluation Procedure Study
Wildlife Baseline Report V.2
A.1 A.2 A.6 A.7 A.13 A.20 A.21 A.22 A.23 A.24 A.25 A.14 A.16 A.17 A.15 A.18 A.19 A.7A A.22A A.22B A.22c A.22d A.22h A.22G A.22F A.22e A.7B A.7c A.13A A.18A A.18B A.7d A.7e A.7K A.7m A.8A A.7l A.7n A.7F A.7i A.7j A.7G A.7h A.8 A.9 A.10 A.12 A.11 A.10A A.12A A.12c A.10B A.12B Volume A.i: PREFACE VOLUME A.II: PROJECT INTRODUCTION & OVERVIEW
PRELIMINARY
NOT FOR CONSTRUCTIONWESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
HEAP
HEAP LEACH
COPPER - MOLYBDENUM FLOTATION
SULFIDE ORE
PRIMARY
CRUSHING
PEBBLE
CRUSHING
SAG
MILL
BALL
MILL
COPPER/MOLYBDENITE
FLOTATION
TAILING
DEWATERING
TAILINGS
POND
LOADOUT
MOLYBDENITE FLOTATION
MOLYBDENITE
CLEANER
FLOTATION
BARREN
PREGNANT
CYCLONE
CIC
SART
COPPER PRODUCTS
TO MARKET
GYPSUM
TO
TAILINGS
REFINING
ELECTROWINNING
ELUTION
GOLD DORE
TO MARKET
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
OVERALL PROCESS
000-FS-001
SULFIDES SLIMES SANDSMOLYBDENITE
CONCENTRATE
TO MARKET
MOLYBDENITE
CONCENTRATE
DEWATERING
COPPER
CONCENTRATE
DEWATERING
COPPER CONCENTRATE
TO MARKET
OXIDE ORE
PRIMARY
CRUSHING
SECONDARY
CRUSHING
SCREEN
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING CONSTRUCTION MANAGEMENT CRUSHER PRIMARY DISCHARGE FEEDER FEEDER BREAKER ROCK FEEDER
SAG MILL FEED CONVEYOR BELT SCALE MAGNET CONVEYOR CRUSHER DUMP HOPPER DISCHARGE HOPPER CRUSHER
PRELIMINARY
NOT FOR CONSTRUCTION BALL LOADING SYSTEM SAG MILL FEEDER FEEDER LEGEND: METAL DETECTOR STOCKPILE BUILDING STOCKPILE ROM STOCKPILE AREA SUMP PUMPDUST COLLECTOR DUST COLLECTOR
DUST COLLECTOR BELT SCALE CRUSHER AREA OVERHEAD CRANE CRUSHER CRUSHER RECLAIM RECLAIM RECLAIM RECLAIM STOCKPILE FEED RECLAIM TUNNEL
CASINO PROJECT
GENERAL
FLOW SHEET
000-FS-002
CRUSHING AREA SUMP PUMP STOCKPILE FEED CONTROL ROOM RECLAIM ELECTRICAL BUILDING CRUSHING AREA AIR RECEIVER CRUSHER BUILDING CRUSHING AREA AIR COMPRESSOR INSTRUMENT AIR DRYER ECCENTRIC REMOVAL CART LUBE PACKAGE VENTILATION FAN MAGNET TOTE BOXWESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING CONSTRUCTION MANAGEMENT SAG MILL CRANE CONTROL ROOM LEGEND: SAG MILL LINER HANDLER AIR RECEIVER AIR RECEIVER AIR COMPRESSOR TOTE BOX INSTRUMENT MAGNET BELT SCALE JACKING CRADLE SAG MILL JACKING SYSTEM HYDRAULIC SAG MILL PLANT AIR DRYER INSTRUMENT BALL MILL REMOVAL TOOL LINER BOLT LINER HANDLER SAG MILL FEED PUMP SUMP PUMP BALL MILL CLUSTER SAMPLER BALL MILL GRINDING AREA CYCLONE CYCLONE SAMPLER PRIMARY SECONDARY SYSTEM BALL LOADING BALL MILL PSM SIZE MONITOR PARTICLE LUBE PACKAGE BALL MILL JACKING CRADLE BALL MILL LUBE PACKAGE SAG MILL SAG MILL REMOVAL TOOL LINER BOLT BALL MILL DETECTOR METAL GATE DIVERTER CONVEYOR CYCLONE O/F PSM CHILLERS TOOL KIT LINER HANDLER CYCLONE CRANE BALL MILL CRANE
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
GRINDING & CLASSIFICATION
000-FS-003
TROMMEL SCREEN SAG AREA SUMP PUMP PEBBLE CRUSHER AREA SUMP PUMPPARTICLE SIZE MONITOR SAMPLER FEED TANK SECONDARY SAMPLER SAMPLER FEED TANK PRIMARY SAMPLER CYCLONE CLUSTER BOX CYCLONE O/F BOX PEBBLE CRUSHER FEEDER PEBBLE CRUSHER SAG OVERSIZE SURGE BIN PEBBLE WASH SCREEN PEBBLE CONVEYOR No. 1 MAGNET MAGNET PEBBLE CONVEYOR No. 2 CYCLONE FEED SUMP
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING CONSTRUCTION MANAGEMENT FEED TANK SAMPLER SAMPLER SECONDARY
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO PROJECT
GENERAL
FLOW SHEET
Cu ROUGHER FLOTATION
000-FS-004
ROUGHER FLOTATION CELL PYRITE SCAVENGER CELLS PYRITE SCAVENGER CELLS (FUTURE) PYRITE SCAVENGER CELLS ROUGHER FLOTATION CELL ROUGHER AREA SUMP PUMP PRIMARY SAMPLER ROUGHER AREA SUMP PUMP ROUGHER CONCENTRATE SAMPLER COPPER 1st CLEANER DISTRIBUTOR COPPER 1st CLEANER CELLS CLEANER AREA SUMP PUMP COPPER 1st CLEANER CELLS PRIMARY SAMPLER SECONDARY SAMPLER SAMPLER FEED TANK ROUGHER CONCENTRATE SAMPLER ROUGHER CONCENTRATE SUMP ROUGHER CONCENTRATE PUMP Cu 1st CLEANER TAILING SAMPLER Cu 1st CLEANER TAILING SAMPLER PYRITE SCAVENGER CELLS (FUTURE)WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING CONSTRUCTION MANAGEMENT AIR DRYER AIR COMPRESSOR AIR RECEIVER INSTRUMENT LEGEND: AIR RECEIVER INSTRUMENT BLOWER
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
Cu CLEANER FLOTATION
000-FS-005
COPPER COLUMN TAILS SUMP COPPER COLUMN TAILING PUMP COPPER 3rdCLEANER FEED PUMP COPPER 3rd CLEANER FEED SUMP BLOWER (COLUMN CELLS) COPPER 3rd CLEANER COLUMN CELLS COPPER CLEANER AREA SUMP PUMP COPPER 3rd CLEANER DISTRIBUTOR REGRIND CYCLONE FEED PUMP REGRIND MILL REGRIND CYCLONE FEED SUMP REGRIND AREA SUMP PUMP COPPER REGRIND CYCLONE CLUSTER BRIDGE CRANE COPPER 2nd CLEANER FLOTATION CELLS COPPER 2nd CLEANER TAILING SUMP COPPER 2nd
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING CONSTRUCTION MANAGEMENT TAILING THICKENER AREA SUMP PUMP TAILING THICKENER RECIRCULATE PUMPS TAILING THICKENER OVERFLOW SUMP PUMP SEEPAGE PUMPS D8 DOZER
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO PROJECT
GENERAL
FLOW SHEET
TAILING DEWATERING
000-FS-006
TAILING THICKENER OVERFLOW PUMPS TAILING THICKENERS TAILING RECLAIM BARGE PUMP PYRITE THICKENER AREA SUMP PUMPPYRITE THICKENER UNDERFLOW PUMPS PYRITE THICKENER TAILING CYCLONE CLUSTER TAILING CYCLONE FEED SUMP RECLAIM WATER BARGE TAILING CYCLONE PLANT HEAD WATER TANK TAILING CYCLONE OVERFLOW PUMP (FUTURE) TAILING CYCLONE OVERFLOW SUMP TAILING CYCLONE UNDERFLOW PUMP (FUTURE) TAILING CYCLONE UNDERFLOW SUMP WATER BUFFER TANK SEAL WATER
TANK SEAL WATER PUMP
(FUTURE) SEAL WATER
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT CuMo CONCENTRATE
THICKENER AREA SUMP PUMP
CuMo CONCENTRATE THICKENER UNDERFLOW PUMP CuMo CONCENTRATE THICKENER CuMo CONCENTRATE THICKENER OVERFLOW SUMP LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
Mo ROUGHER FLOTATION
000-FS-007
CuMo CONCENTRATE OVERFLOW PUMP MOLY REGRIND MILL MOLY 1st CLEANER TAILS SAMPLER MOLY ROUGHER TAILS SAMPLER MOLY 1st CLEANER FLOTATION CELLS MOLY 1st CLEANER CONCENTRATE SAMPLER MOLY ROUGHER CONCENTRATE SAMPLER MULTI-STREAM ANALYZER MOLY ROUGHER FLOTATION CELLS MOLY 1st CLEANER FEED PUMP MOLY ROUGHER CONDITIONING TANK No. 1 AGITATOR MOLY ROUGHER CONDITIONING TANK No. 2 AGITATOR MOLY REGRIND SUMP MOLY REGRIND PUMP MOLY ROUGHER AREA SUMP PUMPLEGEND:
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
Mo CLEANER FLOTATION
000-FS-008
MOLY CLEANER AREASUMP PUMP MOLY 2nd CLEANER TAILS PUMP MOLY 2nd CLEANER TAILS SUMP MOLY 3rd CLEANER FEED SUMP
MOLY FINAL CLEANER CONCENTRATE SAMPLER MOLY 3rd CLEANER COLUMN CELL MOLY 3rd CLEANER FEED PUMP MOLY 2nd CLEANER FEED SUMP MOLY 2nd CLEANER COLUMN CELL MOLY 2nd CLEANER FEED PUMP MOLY 4th CLEANER COLUMN CELL MOLY 3rd CLEANER CONCENTRATE SUMP MOLY 4th CLEANER FEED PUMPS
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
CONVEYOR BELT SCALE
LEGEND:
SUMP PUMP
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
000-FS-009
FILTER AREA SUMP PUMP COPPER THICKENER OVERFLOW PUMP COPPER THICKENER OVERFLOW PUMP SUMP FILTRATE PUMP FILTER BUILDING CRANE MOLY SEPARATION TAILING SAMPLER COPPER CONCENTRATE THICKENER COPPER THICKENER UNDERFLOW PUMP COPPER THICKENER AREA SUMP PUMP Cu CONCENTRATE CONCENTRATE AREA MOLY SEPARATION TAILING SAMPLE TANK DISTRIBUTOR COPPER FILTER FEED TANK FILTRATE TANK COPPER FILTER FEED PUMP COPPER CONCENTRATE FILTER PRESSURE FILTRATION AIR COMPRESSOR PRESSURE FILTRATION AIR RECEIVERWESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT LEGEND:
FILTER FEED TANK
FORKLIFT AGITATOR MOLY FILTER FAN MOLY FILTER PACKAGING SYSTEM
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
000-FS-010
FILTRATE PUMP MOLY CONCENTRATE DRYER OIL HEATER CLEANUP PUMP MOLYBDENITE CONCENTRATE BIN ROTARY VALVE MOLY DUST COLLECTOR PLATFORM SCALE AND PRINTER FEEED PUMP MOLY FILTRATE TANK PRESSURE FILTRATION AIR COMPRESSOR PRESSURE FILTRATION AIR RECEIVER BIN ACTIVATOR Mo SCREW CONVEYORWESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
MOLY COLLECTOR (No. 2 DIESEL FUEL) SYSTEM
MIBC (FROTHER) SYSTEM
LIME SYSTEM
LEGEND:SCREW CONVEYOR
OVERHEAD CRANE
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
REAGENTS SHEET 1
000-FS-011
LIME AREA SUMP PUMP MILK OF LIME TANK MILK OF LIME TANK AGITATOR M.O.L. DISTRIBUTION PUMP GENERAL REAGENT AREA SUMP PUMP MIBC DISTRIBUTION PUMP MIBC STORAGE TANK DISTRIBUTION PUMP DISTRIBUTION TANK LIME VERTICAL MILLXANTHATE SYSTEM (PAX 350)
DISTRIBUTION TANK AGITATOR XANTHATE TRANSFER PUMP XANTHATE MIX TANKNITROGEN PACKAGE 800-RE-003
XANTHATE DISTRIBUTION PUMP XANTHATE AGITATOR VENDOR PACKAGE METERING PUMPS METERING PUMPS SCREW CONVEYOR FRONT END LOADER
WESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT LEGEND:
PROMOTER No. 1 (AEROPHINE 3418A) SYSTEM
FLOCCULANT SYSTEM
SODIUM HYDROSULFIDE (NaHS)
MIX TANK AGITATORMIX TANK
PROMOTER No. 2 (AERO FLOAT 208) SYSTEM
AGITATORAGITATOR
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
REAGENTS SHEET 2
000-FS-012
DISTRIBUTION PUMP PROMOTER MIX TANK PROMOTER DISTRIBUTION PUMP DISTRIBUTION PUMP DISTRIBUTION TANK TRANSFER PUMP METERING PUMPS METERING PUMPS METERING PUMPS STORAGE TANK IN-LINE MIXER TOTES TOTESWESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO SITE
FLOW SHEET
GENERAL
PROCESS WATER
000-FS-013
PROCESS WATER POND RECLAIM WATER SUMPCASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO PROJECT
GENERAL
FLOW SHEET
PROCESS WATER
000-FS-013
PROCESS WATER POND RECLAIM BOOSTER PUMP RECLAIM BOOSTER TANK RECLAIM BOOSTER TANK RECLAIM BOOSTER PUMPCASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT LEGEND:
PRELIMINARY
NOT FOR CONSTRUCTIONCASINO PROJECT
GENERAL
FLOW SHEET
FRESH WATER
000-FS-014
FRESH/FIRE WATER POND HIGH PRESSURE GLAND SEAL WATER PUMP GLAND SEAL WATER TANK GLAND SEAL WATER PUMP MINE WATER TANK POTABLE WATER TANK CHLORINATOR PACKAGE WITH FILTER FRESH WATER INTAKE PUMPS FRESH WATER BOOSTER PUMPS FRESH WATER BOOSTER TANK FRESH WATER BOOSTER PUMPS FRESH WATER BOOSTER TANK FRESH WATER BOOSTER PUMPS FRESH WATER BOOSTER TANK FRESH WATER BOOSTER PUMPS FRESH WATER BOOSTER TANK FRESH WATER INTAKE TANKWESTERN COPPER
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING CONSTRUCTION MANAGEMENT
CASINO SITE
FLOW SHEET
GENERAL
PYRITE LEACH / CIL
000-FS-015
PRELIMINARY
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
050-FS-001
BIN VIBRATOR LIME BIN METAL DETECTOR SECONDARY SCREEN FEED CONVEYOR BELT SCALE PRIMARY CRUSHER SECONDARY SCREEN FINE ORE TRANSFER CONVEYOR SECONDARY CRUSHER MAGNET DUST COLLECTOR FAN SECONDARY CRUSHER FEED BIN MINE TRUCK ROM STOCKPILE PRIMARY CRUSHER APRON FEEDER ROCK BREAKER BELT SCALE SECONDARY CRUSHER BELT FEEDER OXIDE CRUSHING BUILDING SCREW CONVEYOR ROCK BOX ROTARY VALVE MOBILE CRANE OXIDE CRUSHING AIR RECEIVER SECONDARY SCREEN DISCHARGE CONVEYOR ECCENTRIC REMOVAL CARTCASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING CONSTRUCTION MANAGEMENT
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
OVERLAND CONVEYANCE
050-FS-002
INTERMEDIATE TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR LEGEND: OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYOR OVERLAND TRANSFER CONVEYORPRELIMINARY
NOT FOR CONSTRUCTIONCASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
HEAP LEACH
050-FS-003
EVENTS PONDEVENTS POND PUMP HEAP LEACH PAD
OVERFLOW DITCH
PUMP CASING DRIP LINE CART
CRAWLER DOZER PREGNANT SOLUTION PUMP LEAK DETECTION PUMP EMERGENCY SHOWER EYEWASH LEACH PILE STACKING CONVEYOR TELESCOPING STACKER FEED CONVEYOR
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
GOLD ADSORPTION
050-FS-004
BARREN SOLUTION FILTER BARREN SOLUTION SAMPLER BARREN SOLUTION TANK BARREN SOLUTION PUMP, VFD LEGEND: PREGNANT LEACH SOLUTION SAMPLER CARBON SAFETY SCREEN CARBON SIZING SCREEN CARBON SIZING SCREEN BARREN COLUMN SAMPLER SART FEED PUMP ADR FEED PUMP PREGNANT SOLUTION DISTRIBUTION TANK TRASH SCREEN CARBON ADSORPTION AREA PUMP ADSORPTION COLUMN CARBON TRANSFER PUMPADSORPTION COLUMN CARBON TRANSFER PUMP
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
CARBON WASH / STRIP
050-FS-005
SAFETY STN SHOWER &EYEWASH/ACID AREA BARREN STRIP
SOLUTION PUMP KILN FEED DEWATERING SCREEN CARBON DISTRIBUTOR TANK STRIP COLUMN No. 2 STRIP COLUMN No. 1 CARBON STRIP TRANSFER PUMP ACID WASH VENT FAN ACID WASH COLUMN
CONC. ACID AREA
SUMP PUMP DILUTE ACID TANK
ACID WASH CARBON TRANSFER PUMP ACID WASH PUMP BARREN STRIP SOLUTION TANK STRIP SOLUTION HEATER NO. 2 STRIP SOLUTION HEATER NO.1 RECOVERY HEAT EXCHANGER E/W BARREN RETURN TANK BARREN RETURN PUMP STRIP AREA SUMP PUMP CARBON FINES PUMP CARBON FINES FILTER REGENERATION AREA SPILLAGE PUMP CARBON FINES TANK CARBON FINES AGITATOR TRIM HEAT EXCHANGER SAFETY STN CARBON STRIP AREA
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR. PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
050-FS-006
CARBON SUPERSACS HANDLING HOIST HANDLING CART SLAG JAW CRUSHER E/W SLUDGE FILTERPRESS BULLION FURNACE HOIST E/W SLUDGE, DIAPHRAGM PUMP CARBON QUENCH TANK CATHODE HANDLING HOIST CARBON REGENERATION KILN KILN EXHAUST FAN ACTIVATED CARBON STORAGE TANK BULLION FURNACE EW CELL EXHAUST FAN ELECTROWINNING CELLS e/w RECTIFIER
SAFETY STN SHOWER & EYEWASH/SMELT AREA
E/W WASH/SLUDGE TANK
E/W AREA SUMP PUMP CARBON TRANSFER PUMP (ACTIVE) BULLION FURNACE VENT FAN BAGHOUSE DUST COLLECTOR CARBON ATTRITION TANK CARBON ATTRITION AGITATOR KILN SCREW FEEDER HIGH PRESSURE SPRAYER VAULT DOOR SLAG POT SLAG MOLD SET
FLUX MIXER TO ATMOS. SLAG ROLL CRUSHER DORE BALANCE SLAG PRILL SCREEN PLATFORM SCALE CARBON TRANSFER PUMP TANK KILN FEED
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
SART PROCESS
050-FS-007
2 SART FEED FILTER NaHS IN-LINE MIXER SULFURIC ACID IN-LINE MIXER AGITATOR PRECIPITATION REACTOR 2 Cu S UNDERFLOW RECIRCULATION PUMP 2 Cu S UNDERFLOW ADVANCE PUMP NEUTRALIZATION FEED TANK AGITATOR Cu S UNDERFLOW NEUTRALIZATION TANK AGITATOR Cu S HOLDING TANK 2 NEUTRALIZATION FEED PUMP GYPSUM SLURRY PUMP TREATED SOLUTION PUMP AGITATOR NEUTRALIZATION REACTOR No. 1 AGITATOR NEUTRALIZATION REACTOR No. 2 GYPSUM UNDERFLOW RECIRCULATION PUMP GYPSUM UNDERFLOW ADVANCE PUMP GYPSUM THICKENER Cu S THICKENER TREATED SOLUTION TANK AGITATOR GYPSUM HOLDING TANK Cu S FILTER CAKE CONVEYOR Cu S FILTER PRESS DRYER FEED BIN DRIED Cu S STORAGE BIN Cu S DRYER DISAGGREGATOR BRIDGE CRANE BAG ROLLING CONVEYOR 2 2 2 2 2 Cu S HOLDING TANK PUMP 2 TREATED SOLUTION FILTER PLANT AIR RECEIVER PLANT AIR COMPRESSOR INSTRUMENT AIR RECEIVER EYEWASH / SAFETY SHOWER INSTRUMENT AIR DRYERCASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
REAGENTS SHEET 1
050-FS-008
NaOH MAKEUP SYSTEM
CYANIDE MAKEUP SYSTEM
AIR SYSTEM
LIME SYSTEM
CAUSTIC TRANSFER PUMP
AIR RECEIVER AIR COMPRESSOR
HCI SUPPLY
NaHS SYSTEM
(SPARE) CYANIDE MIX TANK
CYANIDE DISTRIBUTION PUMP CYANIDE AREA SUMP PUMP CYANIDE STORAGE TANK CYANIDE SOLUTION TRANSFER PUMP BIN VENT BIN VENT CAUSTIC STORAGE TANK CAUSTIC SOLUTION DISTRIBUTION PUMP HCL ACID METERING PUMP REAGENTS HOIST CYANIDE AREA SAFETY STATION NaHS UNLOADING PUMP NaHS STORAGE TANK NaHS DISTRIBUTION PUMP NaHS AREA SUMP PUMP NaOH STORAGE TANK NaOH DISTRIBUTION PUMP NaOH AREA SUMP PUMP NaOH DISTRIBUTION PUMP - SCRUBBER BRIDGE CRANE LIME AREA SUMP PUMP LIME DISTRIBUTION PUMP LIME STORAGE & SLAKING PACKAGE LIME TRANSFER PUMP
LIME SLURRY TANK LIME GRIT SCREW
CONVEYOR LIME GRIT REMOVAL SCREEN SLAKER FEEDER LIME SLAKER LIME SILO LIME SILO VENT
AGITATOR
LIME DIST. TANK AGITATOR AGITATOR
CAUSTIC MIX TANK AGITATOR
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
050-FS-009
NOTE:
MINE YARD FRESH/FIRE WATER
FRESH/FIRE WATER
SEWAGE/WASTE WATER
MINE YARD FRESH/FIRE WATER IMMERSION HEATER
ADR FIRE WATER DISTRIBUTION PUMP MINE YARD FRESH WATER DISTRIBUTION PUMP MINE YARD FRESH WATER TRANSFER PUMP
ADR FIRE WATER RECIRCULATION PUMP ADR FRESH/
FIRE WATER TANK
FRESH/FIRE WATER TANK IMMERSION HEATER
LAB. SUMP WASTE WATER PUMP
MINE YARD FRESH/FIRE WATER TANK
CASINO MINING
CORPORATION
CASINO FEASIBILITY STUDY
DESCRIPTION DWG. NO.
R E F E R E N C E S
TITLE DWG. NO.
R E F E R E N C E S
TITLE NO. NO. CLIENT
R E V I S I O N S
DATE
BY APP'D CLIENT
R E V I S I O N S
DESCRIPTION BY APP'D DATE
CLIENT APPR. PROJECT MGR CHECKED BY DRAWN BY DESIGNED BY SCALE: DATE DATE REV NO. DWG NO. PROJECT NO. M3-PN 120001 DO NOT SCALE 11x17 DRAWINGS
ARCHITECTURE
ENGINEERING
CONSTRUCTION MANAGEMENT
PRELIMINARY
NOT FOR CONSTRUCTION LEGEND:
CASINO PROJECT
OXIDE CIRCUIT
FLOW SHEET
REAGENTS SHEET 2
050-FS-010
FLOCCULANT SYSTEM
VENDOR PACKAGEANTI-SCALANT SUPPLY & DISTRIBUTION
SULFURIC ACID SYSTEM
FLOCCULANT FEED SYSTEM FLOCCULANT MIX TANK AGITATOR FLOCCULANT MIX TANK FLOCCULANT TRANSFER PUMP FLOCCULANT DAY TANK FLOCCULANT DISTRIBUTION PUMP ANTISCALANT METERING PUMP ANTISCALANT TANK SULFURIC ACID UNLOADING PUMP SULFURIC ACID STORAGE TANK SULFURIC ACID DISTRIBUTION PUMP SULFURIC ACID AREA SUMP PUMP ANTISCALANT METERING PUMP ANTISCALANT ISOTANK SCRUBBER PACKAGE -SART PLANT