7
0
0

Loading.... (view fulltext now)

Full text

(1)

Engineer for technical commissioning and warranty in the combined-cycle power plant

Az Zour South Extension (Kuwait)

since 12/2010 C, P, D Siemens AG

Energy Sector Simulator training documents for brown coal fired

Power Plant 600 MW for the Kraftwerksschule E.V. Essen (Germany)

since 09/2010 D, P, C

KRAFTWERKS-SCHULE E.V. Engineer for O&M-Support and Training-on-the-job

to Owner MEW in the combined-cycle power plant Az Zour South (Kuwait)

08/2010 – 11/2010 C, P, T, D Siemens Electrical and Electronic Services K.S.C.C. Kuwait Handling of documents of training Manuals for

combined-cycle power plant (jebel Ali L 2, Shoaiba Stage 3)

03/2010 D

Alstom Power

Systems GmbH

Quality control (management) of retrofitting techniques in nuclear engineering

(Biblis power plant in Germany)

since 01/2010 C, P, D RWE Power AG

Personal dosimetric monitoring occupationally exposed to radiation during employment in external plants or facilities according to paragraph 15 StrlSchV (Radiation Protection Ordinance)

since 07/2008 P, D HGW

Ingenieurgesellschaft mbH

Implementation of approval process in external plants or facilities according to paragraph 15 StrlSchV (Radiation Protection Ordinance)

04/2008 – 07/2008 P, D HGW Ingenieurgesellschaft mbH

Handling of documents of training Manuals for combined-cycle power plant

(Texas City, Sandow V, Öresund, Afam VI, El Kureimat III, Neurath)

05/2008 – 06/2008

D

Alstom Power

Systems GmbH

New construction of a function building for the battle practice center of the German Federal Armed Forces Altmark/Germany

superstructure

Performance phases 5 - 9 HOAI

2008 – 2009

P, D Rheinmetall Defence

New construction of a office building 800 m2 in

Greifswald/Germany

Project Management/Performance phases 1 - 9 HOAI

2008 – 2009

P, D private

New construction of a residential building 1,200 m2

with 16 residential units in Strasburg/Germany Project Management/Performance phases 1 - 9 HOAI

2008 – 2009

P, D private

Liaison manager for the electrical as well as

mechanical parts as well as the instrumentation and control and regulation of the steam cycle in the Combined cycle power plant (CCPP) Az Zour South (Kuwait) 01/2008 – 06/2009 P, C, D Siemens AG Power Generation

(2)

Preparation of documentations, inventory and balance of the existing documentations, valuation and

combination of alternatives for reconstruction, applications for revision, attendance of the licensing procedures during the coordination and inspection of the bracing dowels in Nuclear power plant Brunsbüttel (Germany)

since 09/2007 D, C, P Evonik Services

GmbH Evonik Industries

Commissioning engineer and shift supervisor at the Combined cycle power plant in Hamm Uentrop (Germany) 06/2007 – 12/2007 I, D, P Siemens AG Power Generation Group Mechanical commissioning and production of

operating documentation in the CCPP at Knapsack (Germany) 01/2007 – 12/2007 I, D Siemens AG Power Generation Group Support to the production of commissioning

programmes for Siemens MED PT

11/2006 – 03/2007 C, D Siemens Medical Solutions MED PT SCM Technical editor for the production of operating

manuals for power plants

10/2006 – 12/2009

C, D Siemens AG Power

Generation

Personnel training at Gas turbine station Geregu

(Nigeria), Topic: Gas turbine 04/2006 –

06/2006

T, D Siemens AG Power

Generation

Reconstruction/renovation and building installations

von 20 residential units 1,300 m2 (Change of use of

blocks of flats) in Greifswald/Germany

Project Management/Performance phases 1 - 9 HOAI

2006 – 2007

P, D DRK Ostvorpommern

Commissioning manager at the Combined cycle

power plant Dzerzhinsk (Russia) 10/2005 –

09/2006

I, D, P Siemens AG Power Generation

First preparation for the installation of two CCPPs in Germany 08/2005 – 12/2006 D, P, C IBERDROLA Generación S.A.U.

Consulting service for efficient energy utilisation and use of renewable energy sources for plant

Baruth/Mark (Germany) 04/2005 – 12/2005 D, C IBOS Ingenieurbüro für Tiefbau, Wasserwirtschaft und Umweltfragen, Ostsachsen GmbH

Commissioning and operation of CCPP Tahaddart

(Morocco) 03/2005 –

05/2007

I, D, T, P Siemens AG Power Generation

Construction supervision/Project Management of new construction of the oil mill in Anklam/Germany in co-operation with Ingenieurbüro Wulff Wolgast

2005 – 2007

P, D private

New construction of a production hall for

manufacturing of boats in mass-produce 10,000 m2 in

Greifswald/Germany

Project Management/Performance phases 5 - 8 HOAI

2005 – 2006

(3)

Tacis Programme: Nuclear Safety of Chernobyl NPP

(Germany, Ukraine) 05/2004 –

05/2005

C, D MVV Consultants and

Engineers Commissioning and operation of GTPS Az Zour

(Kuwait) 03/2004 –

12/2007

I, T, D, P Siemens AG Power

Generation Revision of training materials for CCPP Santa Rita

(Philippines) 11/2003 –

03/2004

T, D Siemens Power

Operations, Inc. Production of operating manuals for several CCPPs

(Germany) 11/2003 – 12/2004 D Siemens AG Power Generation

Commissioning of steam power plant Smijev (Ukraine) 10/2003 – 12/2004

I, D, P Siemens AG Power

Generation Analysis and commenting of documents for

development of nuclear energy in Ukraine (Germany, Ukraine) 09/2003 – 11/2003 C, D SSEC CSER State scientific -engineering center of

control systems and emergency response

Commissioning of CCPPs Phu My 3 (Vietnam) and

Arrubal (Spain) 06/2003 –

03/2005

I, D Siemens AG Power

Generation

Commissioning manager for water steam cycle and turbine at steam power plant Waigaoquiao (China) and commissioning of Waigaoquiao Project 2

06/2003 – 12/2004

P, I, D Siemens AG Power

Generation

Commissioning of steam power plant Iskenderun

(Turkey) 02/2003 –

10/2003

I, T, D Siemens AG Power

Generation

New construction of a residential building 1,100 m2

with 20 residential units in Bansin/Germany

Project Management/Performance phases 1 - 9 HOAI

2003 – 2005

P, D DRK Ostvorpommern

Compilation and interpretation of data for the energy

sector within the IKARUS project (Germany) 07/2002 – 08/2002

C, D Fichtner GmbH & Co.

KG

SIP05 "Shelter Implementation Plan", Chernobyl NPP Unit 4, Development of training programs and

instructor training in Slavutich (Ukraine)

06/2002 – 07/2005

P, T, D, C Chernobyl NPP

SIP01 “Shelter Provisional Emergency Plan“, Production and licensing preparation of the

emergency plan for Chernobyl NPP Unit 4 (Ukraine)

04/2002 – 07/2002

D, C EWN GmbH

Overhaul of a old boiler house for use as workshops and storage included rerouting of the heating system in Federal Research Institute for Animal Health in Riems/Germany

Performance phases 1 - 9 HOAI

2002 – 2004

P, D Betrieb für Bau und

Liegenschaften bbl Mecklenburg Vorpommern

(4)

Consulting to/Supervision of preparation for

installation of electrical and mechanical equipment of the interim spent fuel storages at NPPs Unterweser, Brokdorf and Grohnde (Germany)

01/2002 – 06/2002 P, C, D E.ON Kernkraft GmbH; Kernkraftwerk Brokdorf GmbH; Gemeinschaftskern-kraftwerk Grohnde GmbH Development of a plan on industrial safety including

radiation protection for safety induction of plant personnel at Chernobyl NPP (Ukraine)

11/2001 – 12/2001

D, C EWN GmbH

Technical assistance to the production of operating procedures for Novovoronesh NPP (Russia), units 3 and 4 10/2001 – 12/2002 C, D Kernkraftwerke Grundremmingen Betriebsgesellschaft mbH Revision of documentation for software of fire fighting

systems Version 3000 at NPP Unterweser (Germany) 03/2001 – 12/2001

D, C E.ON Kernkraft

GmbH Revision of documentation for steel constructions in

accordance with legal rules (KTA rules) at NPP Würgassen (Germany) 02/2001 – 07/2001 D Compra Gesellschaft für Qualitätssicherung und Umweltschutz mbH

New construction of a bank building 2,250 m2 in

Greifswald/Germany

Project Management/Performance phases 1 - 9 HOAI

2001 – 2003

P, D Sparkasse

Vorpommern Reconstruction, rehabilitation and extension of the

former school for marine in Greifswald-Wieck/Germany in a maritime youth village

Project Management/Performance phases 1 - 8 HOAI

2001 – 2003

P, D Maritimes Jugenddorf

GbR

Quality assurance of software for fire prevention equipment at NPP Unterweser (Germany)

06/2000 – 10/2000

D, C NPP Unterweser

Tacis 96B (U1.02) Revision of normal and emergency

procedures for the South-Ukraine NPP (Ukraine) 05/2000 – 07/2001

D, C Siemens AG

Development of a spare part management system for

CCPP Cottam (Great Britain) 03/2000 –

12/2000

C, D Siemens AG

Updating and archiving of documentation of computer based recurrent tests at NPP Unterweser (Germany)

03/2000 – 04/2000

D NPP Unterweser

Draft of a Safety Report for Decommissioning the Kozloduy NPP (Bulgaria)

06/1999 – 10/1999

C, D EWN GmbH

Production of documentation for NPP Emsland

(Germany) 05/1999 –

07/1999

(5)

Tacis 95 (R4.02 SAT - Systematic Approach to Training for radioactive waste and fuel cycle personnel), Development of a QA system and personnel training (Russia)

03/1999 – 11/1999

T, D, C Siemens AG

Development of system descriptions for Periodical Risk Analysis of the NPP Stade (Germany)

02/1999 – 06/1999

D NPP Stade

Support to the development of normal operation procedures for the NPPs Kola, Novovoronesh, Kalinin (Russia); Rovno and Khmelnitzky (Ukraine)

in 1998 D, C Federal Ministry for

the Environment, Nature Conservation

and Nuclear Safety Development of a radiation protection concept for

Chernobyl (Ukraine), Shelter Implementation Project Package C - EBRD

12/1998 – 04/2000

C, D EWN GmbH

Commissioning of the Angra-2 NPP (Brazil) 10/1998 – 12/2000

I, D, P Siemens AG

Commissioning of Fuzhou Power Plant (China) 08/1998 – 01/1999

I, D Siemens AG

Data base updating and translation for Siemens power

plant simulator (Germany) 04/1998 –

05/1998

D, C Siemens AG

Commissioning of CCPP Lujan de Cuyo (Argentina) 01/1998 – 07/1998

I, D Siemens AG

Support to the development of accident procedures for

Kola NPP Units 3 and 4 (Russia) 1997 – 1998 D, C EC

Development of technical specifications for the installation of ISKAMATIC-Stands for NPP Emsland (Germany)

in 1997 P, D NPP Emsland

Commissioning of the Buggenum power plant

(Netherlands) 07/1997 –

09/1998

I, D Siemens AG

Production of Acceptance and test procedures (ATPs) for the simulator of power plant Schwarze Pumpe (Germany)

06/1997 – 07/1997

D Siemens AG (KWU)

Tacis 94 (R2.13): Development of simulator training programmes and documentation for training at Kalinin NPP simulator (Russia)

1996 – 1998 T, D, C Siemens AG

Revision of parts of the operating manual of Borssele NPP (Netherlands)

1996 – 1997 D Siemens AG (KWU)

Development of maintenance procedures for

Zaporozhye NPP (Ukraine) in 1996 D

(6)

Development of the Technical Terms of Reference for

rehabilitation of Power Plant Gardabani (Georgia) 09/1996 – 04/1997

D, C IfK Vetschau

Processing of system documentation, determination of scope of simulation, development of technical

specifications for the simulator of VEAG power plant Schwarze Pumpe (Germany)

04/1996 – 09/1997

D, C Siemens AG (KWU)

Development of procedures and training

documentation for NPPs Kola (Russia), Khmelnitzky and Rovno (Ukraine) as well as training

documentation for NPPs Kalinin and Novovoronesh (Russia)

02/1996 – 10/1997

D, T, P Siemens AG

TACIS 93/94 (R1.01): On-Site Assistance at Kola NPP

(Russia) 1995 – 1998 D, C Siemens AG

TACIS 93 and 94 (U2.02): "Development Plan for the

Sevastopol Navy Institute" (Ukraine) 1995 – 1998 C, T, D Siemens AG

TACIS 93 and 94 (U2.02): "Development Plan for Creation of a National Training System for Ukrainian NPP Personnel" (Ukraine)

1995 – 1998 C, T, D Siemens AG

TACIS 93 and 94 (U2.02): "Creation of a Regional Training Centre for Maintenance" (NPP personnel, Ukraine)

1995 – 1998 C, T, D Siemens AG

Production of Acceptance and Test Procedures (ATP) and test implementation of the PWR simulator for NPP Philippsburg (Germany)

1995 – 1997 D, P Siemens AG

Production of Acceptance and Test Procedures (ATP) for simulators of NPPs Obrigheim and

Neckarwestheim (Germany)

1995 – 1996 D, P FICHTNER

Consulting & IT GmbH Production of Acceptance and Test Procedures (ATP)

for the TACIS Project EVVEREST – Simulators for 8 Eastern European NPPs, VVER plants (Germany, France)

1995 – 1996 D, P Siemens AG

Development of the "Man Machine Interface" for the TACIS Project EVVEREST – Simulators for 8 Eastern European NPPs, VVER plants (Germany, France)

1995 – 1996 P, D, C Siemens AG (KWU)

Support to the development of the German standard "Authorised Catalogue of Requirements for NPP Training Simulators" (Germany)

in 1995 C, D Gesellschaft für

Anlagen- und Reaktorsicherheit

(GRS) Production of Acceptance and Test Procedures (ATP)

for PWR simulators of German Konvoi NPPs and of NPP Brokdorf (Germany)

in 1995 D, P Siemens AG (KWU)

Automation of recurrent tests at NPP Unterweser

(Germany) in 1995

(7)

Production of test procedures for down-cooling system of EWN GmbH units 1 – 4 (former NPP

North/Greifswald, Germany)

in 04/1995 D EWN GmbH

Development of Normal Operation Procedures for the

system and the components of Kola NPP (Russia) 1994 – 1997 D, C Federal Ministry for the Environment, Nature Conservation

and Nuclear Safety Revision of manuals for post operation and

decommissioning including system diagrams and test procedures for the interim spent fuel storage of EWN GmbH (former NPP North/Greifswald, Germany)

1994 – 1995 D, C EWN GmbH

Revision of manuals for post operation and

decommissioning including system diagrams and test procedures for EWN GmbH Units 1 - 5 (former NPP North/Greifswald, Germany)

1994 – 1995 D, C EWN GmbH

Production of training documents and normal operation procedures for the NPPs at Rovno and Chmelnitzky (Ukraine), Novovoronesh and Kalinin (Russia)

1993 – 1998 T, D, C Federal Ministry for

the Environment, Nature Conservation

and Nuclear Safety Production of Acceptance and Test Procedures (ATP)

for the BWR-Simulator at NPP Krümmel (Germany) 1993 – 1995 D, P Electricitäts-Werke Hamburgische AG (HEW) Production of training session documentation for the

NPP simulator in Greifswald (VVER 440/V 213), Training of Russian and Ukrainian control room personnel (Germany)

1993 – 1995 T, D Siemens AG

Implementation of NPP simulator courses (PWR typ) and production of training session documentation (Germany)

1992 – 1995 T, D Siemens AG

Development of the Technical Specifications and tender documentation for the installation of PWR simulators at KSG/GfS in Essen (Germany)

in 1992 D, P

Kraftwerks-Simulator-Gesellschaft mbH (KSG)

References

Related documents

MalwarebPool Detection via Formal Verification Dynamic Monitoring Data Collection Static Extraction Expert System Heuristics State Machines Matching Algorithm Model checking

In the third case, the EMF exposure will have an overlapping horizontal radiation pattern and hence the building will receive the exposure from both 1 st and 2 nd sectors.(In

In our opinion, the accompanying consolidated balance sheets and the related consolidated statements of operations and comprehensive (loss) income, shareholders’ equity (deficit)

Wastewater treatment plant operators are exposed to a variety of hazardous chemical agents, contained within the effluents and the reagents used in the water processing, or

Under the primary procedure, the holder of an intellectual property right may lodge an application with the relevant customs authority to alert them about the transit of

Text Book and Chapter  Biodesign: TBD Case Study  Final presentation example and template  Final papers Tasks.  Finalize manufacturing and assembly 

Institution de formation continue Type d'organisation: Site Internet: Personne de contact Nom: Adresse: Salzburg Ville: AT-Autriche Pays: +43/662/883081-0 Téléphone: Fax: E-mail:

Note: Alternative phrasings of the correct answer are acceptable. The letter H written in any correct place is acceptable. Putting the letter S into the correct place. The length