Red Alert Program In Drilling Rigs:

N/A
N/A
Protected

Academic year: 2021

Share "Red Alert Program In Drilling Rigs:"

Copied!
23
0
0

Loading.... (view fulltext now)

Full text

(1)

Red Alert Program In Drilling Rigs:

A Strong Decision To Show Leadership And To Involve Work Force

Towards Zero Serious Or Fatal Incidents

PETROBRAS

J. M. Cabral, F. M. Pinheiro and W. F. Marozzi, PETROBRAS;

L.C. Marchi - STRATAGEO SOLUÇÕES TECNOLÓGICAS.

(2)

Accessing the problem:

- Increasing number of floating drilling rigs in Brazil;

- Attract, Hire and Train skilled workers to operate a fast growing

rig fleet;

- Lack of qualified personnel and training facilities;

- Unskilled “rookies” were hired to fulfill the demand for jobs;

- Increasing number of serious accidents from 2006;

- In 2008 the number of serious accidents exceeded the

(3)
(4)

Lost Time Injury (LTI) for 1 million man worked hours.

1.95 2.35 2 1.7 2.12 2.07 2.22 2002 20 03 2004 2005 2006 2007 2008

(5)

Solution found by Petrobras and Contractors’ leadership:

Actions:

- Create a strong movement to engage the workforce towards

accident prevention;

-

"RED ALERT”

Program - stop all rigs to get workers involved;

- 24 hours to think about safety, risk perception, management of

(6)

Workshops and meetings were held with each rig crew to:

- Explain the reasons to stop;

(7)

- Around 43 drilling rigs working for Petrobras - deep water;

- 7,500 people were involved;

- Cost of US$ 7 million;

(8)

Leadership and workforce on board:

Workshops and hazard hunting.

(9)
(10)

Hazard Hunt results:

- 18,032 identified hazards in 34 drilling rigs;

- 530 hazards per rig (average);

- Most hazards were found on main deck, storage and cargo

handling areas, 2,896 hazards - 16% of the total hazards found.

(11)
(12)

1,537 hazards related to “Inadequate housekeeping”, representing

9% of the total hazards found.

(13)
(14)

58 73 80 97 102 107 115 138 161 212

MUD PUMP ROOM SACK ROOM HELIDECK MOON POOL PAINT SHOP DRILL FLOOR WINCH ANCHOR WELDER SHOP RISER DECK MAIN DECK

Harzadous places identified on the drilling rig with 1,358 hazards

reported. 8% of the total harzards found. 212 hazards on the

main deck - 16% of the hazards found in this rig and 14% of the

total hazards reported for all rigs.

(15)

45 50 51 53 54 70 73 73 81 84

Contact with hazardous materials Equipment: others Risk of pinch point Inadequate ladder maintenance Tools: Poorly maintained Risk of falling (people and objects) Inadequate maintenance Inadequate maintenance Poorly maintained equipment Risk of slipping or stumbling

(16)

Number of incidents in 2008 and 2009 in deep water drilling rigs.

2 3 1 4 5 2 3 2 4 3 3 3 0 3 2 4 2 1 2 0 3 3 2 0

JAN FEV MAR ABR MAI JUN JUL AGO SET OUT NOV DEZ

(17)

Lost Time Injury Frequency Rate Accumulated from January to

December 2009 was 1.27.

17 Million Man-hours of Risk Exposition.

1.29 0.00 2.35 1.47 3.07 1.44 0.70 1.39 0.00 1.99 2.01 0.00

(18)

1.27 1.95 2.35 2 1.7 2.12 2.07 2.22 2002 2003 2004 2005 2006 2007 2008 2009

(19)

Severity Rate In 2008 topped 1,318 (three fatalities) - the highest

numbers since 2002. In 2009 the severity rate dropped to 134.

174 705 198 567 95 1318 134 2003 2004 2005 2006 2007 2008 2009

(20)

CONCLUSIONS:

- Lost time incidents dropped from 35 in 2008 to 22 in 2009 (a

37% drop);

- 1, 27 - Lost Time Incident Frequency Rate in 2009;

(21)

0 0,5 1 1,5 2 2,5 3 () OGP 1,09 1,16 1,09 0,97 0,99 0,66 0,55 PETROBRAS 1,77 1,23 1,04 0,97 0,77 0,76 0,59 0,48 PETROBRAS - E&P 1,28 1,2 1,05 0,89 0,66 0,7 0,72 0,56 PETROBRAS - L.A. 1,50 1,05 0,89 0,81 0,73 0,68 0,59 0,50 0,50 0,50 0,49 0,46 0,45 PETROBRAS - US-SS 2,35 1,95 2 1,7 2,12 2,07 2,2 1,27 EUA - M ar (IADC) 2,52 2,57 2,11 1,44 1,54 1,41 0,73 1,02 Europa - M ar (IADC) 2,47 2,24 1,87 2,25 1,98 2,06 1,34 1,48 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015

2015).

(22)
(23)

References

Related documents

In case of low concurrency application programs, in other words very small c(P)/N case, usually the systems manager wants to use high speed single processor server to keep good

…dixo que sabe que el dicho Diego Gonçález sabe escriuir e hazer algunos con- tratos pero queste testigo no lo tiene por ábill ni por capaz para thener el dicho ofiçio, asý por

This study focuses on the relationship between job insecurity and individual-level outcomes (in-role performance and organizational deviance) and examines if a) job insecurity

We combined two different somatic variant callers with different algo- rithms, Strelka and VarScan 2, and evaluated performance using whole exome sequencing data obtained from

6.4 Distributions of counts in the histograms over keywords, queries, clicks, and query pairs in the original search log and its sanitized versions created by 10 -anonymity and

In the second phase, similar types of information are coalesced into information sub categories, which are then grouped into seven broader categories of information such as

it pays $1 at the start of each year until (20) goes back to work or five years, whichever is longer.) The payments from this annuity are exactly the same as the payments from

The pattern of inclusive growth of the economy projected for the Eleventh Plan, with GDP growth averaging 9 per cent per year can be achieved only if this infrastructure deficit