Basic Project Information

Case compiled by: .Anna Maksymiuk-Dziuban/ Kazimierz Banasik

Contact details: [email protected] / [email protected]

Project Title

Flood protection project in Poland; “Raciborz

reservoir”

Location

on the Odra River in Silesia Province, southern Poland

Purpose

Racibórz Dolny flood control reservoir (polder) shall improve the flood control conditions of the town of Racibórz and the Oder river valley (including the towns of Kędzierzyn Koźle and Opole) and shall decrease flood hazard for the areas below (including the towns of Brzeg, Oława and Wrocław). The

Racibórz Dolny flood control reservoir will enable the reduction of flood waves through the combined overflow and bottom outlets structure. The effect of reducing flood waves by the reservoir will be significant and felt throughout the Central Odra. Reduction will affect only the flood waves with peaks higher than permitted flow rate of Q = 1,210 m3/s, determined in the environmental impact report for the section of the Odra below Racibórz.

(2)

MEGAPROJECT Case Study

Basic Project Information

Case compiled by: ... Contact details: ...

SECTION 1 - BASIC PROJECT INFORMATION

Scope

Object No. 1 Head dam with appurtenant structures. Object No. 2 Left side dam with appurtenant structures. Object No. 3 Right side dam with appurtenant structures. Object No. 4 Reservoir operating back-up facilities.

Object No. 5 Reservoir bowl.

Total Project Value

1.337 bilion PLN (i.e. ca 330 000 000 Euro)

Project Status

(i.e.. initiation, planning, construction, operation, dismantling)

in the process of obtaining building permits

Contractual Framework

(

e.g. fixed price, cost-plus etc.

)

2% of total project value

Relevant Physical

Dimensions

(e.g. height, width, volume, length)

The total length of dirt dams will be 21.8 km Max. dam height will be 11.10 m.

Water volume with max. level will be 185.0 mln m3 water surface area with max. level will be 24.5 km2

(3)

MEGAPROJECT Internal Stakeholder Identification

(Stakeholders with a direct legally sanctioned relationship with the project)

SECTION 2 - PROJECT STAKEHOLDERS

Stakeholder Category Case-Study Comments

(e.g. maturity, previous experiences of stakeholders, skills, influence on project)

Client Regional Water Management Authority in Gliwice

Financiers State budget, World Bank Sponsors This information is at the client

Client's Customers This information is at the client Client's Owners This information is at the client

Category Case-Study

- -

- -

Supply-Side

Other internal supply- side categories (please specify)

- -

Principal Contractor DesignHydroprojekt, contractor not yet Not yet

First Tier Contractors

Second Tier Consultants Not yet Professional Services Providers Not yet Category Case-Study Int ernal Demand Side

Other internal supply- side categories (please specify)

(4)

MEGAPROJECT External Stakeholder Identification

SECTION 2 - PROJECT STAKEHOLDERS

(Stakeholders with a direct interest in the project but with no legal contract)

Stakeholder Category Case-Study Comments (e.g.

maturity, previous experiences of stakeholders, skills, influence on project)

Regulatory Agencies This information is at the client

Local Government This information is at the client National Government This information is at the client

Category Case-study

Public

Other internal supply-side

categories (please specify) - -

Local residents This information is at the client Local Landowners This information is at the client Environmentalists This information is at the client Conservationists This information is at the client Archaeologists This information is at the client

Category Case study

- - - - - - - - E xt erna l Private

Other External Private

stakeholders (please specify)

(5)

SECTION 2 -PROJECT STAKEHOLDERS

MEGAPROJECT Stakeholder Relationship Maps

Name of Actor Description of

relationship

Repeat this map for as many project phases as you require

Key:

- Project Actor

- Project relationship

with a contractual basis

- Non-contractual project

relationship

Description of relationship

(6)

SECTION 2 - PROJECT STAKEHOLDERS

MEGAPROJECT External Stakeholder Attitude Analysis

External Stakeholder External Stakeholder’s

Attitude to this Project

External Stakeholder’s Influence on project Impact of Project on External Stakeholder Phase of Project of Greatest Interest (initiation, planning, construction, operation, dismantling)

(7)

MEGAPROJECT Project Management

Project Organisation

Client Project Team Size & Structure

This information is at the Regional Water Management Authority in Gliwice

Contractor Project Team Size and Structure

Sub-Contractor Project Team Involvement

Project Tools and Techniques

Please √ if present, x if absent , leave blank if unknown

Life-Cycle Costing Approaches

Stakeholder Involvement

Building Information Modelling (BIM)

Project Management Software

Relationship Management Tools

Project Knowledge Management Tools

Lessons Learnt Transfers

Team Building Tools

Competency framework

Other Tools and Techniques or More Information
(8)

Risk Management Processes Present (describe below) Not Present No Information

HR Management Processes Present (describe below) Not Present No Information

Procurement Management Processes Present (describe below) Not Present No Information

Integration Management Processes Present (describe below) Not Present No Information

Scope Management Processes Present (describe below) Not Present No Information

Time Management Processes Present (describe below) Not Present No Information

Cost Management Processes Present (describe below) Not Present No Information

Quality management Processes Present (describe below) Not Present No Information

Communications Management Processes

Present (describe below) Not Present No Information

Project Processes

(9)

MEGAPROJECT Project Performance

Aspects of Performance Concerned with Doing the Project Right

Original Targets and changes to

targets

Actual Achievements Against Targets

Performance relating to time

Performance relating to cost

Performance related to

achieving specification

(10)

Aspects of Performance Concerned with Doing the Right Project

Stakeholder or Stakeholder Grouping

Original Aims of Project

Involvement and Changes to these Aims

Achievement of these Aims

(11)

MEGAPROJECT Project Environment

Legal and Regulatory Environment

Legal and Regulatory Project Environment (regionally, nationally and Europe wide)

The project was designed on the basis of a environmental decision issued by the

Regional Director of Environmental Protection in Katowice, Katowice, 7 September 2010

Specific Legal and

Regulatory events impacting on the project

The environmental decision

Political Environment

Political Project Environment -

Specific Political Events

impacting on the project Flooding in 1997 and 2010

(12)

MEGAPROJECT Project Environment

Economic Environment

Economic Project Environment

Specific Economic Events impacting on the project

(13)

Events and activities relating to project

stakeholders

Events and activities relating to project

management

Events and activities relating to project

performance

Events and activities relating to project

environment

MEGAPROJECT Project Key Events and Activities Timeline

TIME

References

Related documents

Regression analysis showed that only attitudes help to predict intention towards lecture attendance behaviour where subjective norms, perceived behavioural control and

To meet this dual objective, an increasing number of countries have introduced specific tax legislation implementing the arm’s length principle, in the belief that this approach

Finally, for the southbound route (involving lane closure work zone operations), recall scores for the audio only and audio-visual condition was better than the PCMS control

Hybrid Cloud Agent Emctl Dispatcher On-premise EM OMS 12.1.0.5 Hybrid Cloud Gateway HTTPS HTTPS TMClient over HTTPS.. Hybrid Cloud Agent to On-Premise

Full time N/A Postgraduate Programme in Counselling Psychology University of East London (formerly Polytechnic of East London / North East London Polytechnic). 2004

Under Canada Gas Tax, municipalities can spend the grant as it choses as long as it is spent on infrastructure improvements (AMO, 2017). Councils and management are closer to needs

With large chunks of that money being invested in top global real estate, their wealth, already changing the shape of the best homes in top cities such as London, New York,

Instead, they calculate replacement ratios for successive cohorts that compare (adult-equivalent adjusted) family total income at later ages with income at prime age, using