MDU cable network channel S parameter measurements - Tested in Wuxi city, Jiangsu province

N/A
N/A
Protected

Academic year: 2021

Share "MDU cable network channel S parameter measurements - Tested in Wuxi city, Jiangsu province"

Copied!
11
0
0

Loading.... (view fulltext now)

Full text

(1)

MDU cable network channel S

parameter measurements

- Tested in Wuxi city, Jiangsu province

Zhao Cui - Cable TV technology research institute,

ABS, SARFT

Gao Xiaojun – Jiangsu Cable Network

1 IEEE P802.3bn> EPoC – October 2012

(2)

Contents

Test items

Test program

Test topology and environment

Test results

2 IEEE P802.3bn> EPoC – October 2012

(3)

Test items

Scenario: Node+0 passive cable network at MDU

Test items: channel S parameters

Test equipment: Network analyzer ( Agilent E5070B )

Selected 3 sites in Wuxi, and tested on 2012.10.18-10.19

Test site 1 --

畅舜苑小区

Test site 2 --

广丰二村

Test site 3 --

金河湾家园

Considerations on test sites selection:

– mainly according to upstream CNR measured on the CMTS side. Dividing

the network transmission performance into excellent/good/bad 3 classes.

– Tall building (32 floors) and multi-floor building (5-6 floors)

– Mainly test passive tree topology network (with cascaded tap/splitter)

3 IEEE P802.3bn> EPoC – October 2012

(4)

Test program

Full spectrum bandwidth test & multi- trunk test (divide

whole spectrum into several segments)

Full spectrum test:

1MHz~2GHz; 1601 sampling points

multi- trunk test

1MHz ~1.5GHz

64MHz segment, 1601 points/per 64MHz

Network analyzer calibration

Network analyzer First stage tap/splitter Last stage tap/splitter Distribution network Passive cable network at MDU Calibration plane 电子 校准件 Short cable Long cable

Note: Test results described herein can only be used for the analysis of coaxial network characteristics trends, does not apply to the channel modeling system design

4 IEEE P802.3bn> EPoC – October 2012

(5)

Topology - test site1 ( building 11#)

Building infos

11# is a 6-floors building,

4households per floor

N31

°

33'40",E120

°

17'30

Altitude of 11m

Test time/environment

2012.10.18 morning

Start time - 10:35

End time - 12:50

environment

Temperature: 15

°

C

Humidity : 42%

220 218 216 212 210 206 Open 2F 1F 4F 3F 6F 5F 601 602 Cut off VNA (E5070B) -5 501 502 401 402 201 202 301 302 101 102 220 218 216 212 210 206 604 603 -5 504 503 404 403 204 203 304 303 104 103 open Cut off 108 -5 -5 -5 -5 -5 -5 -5 -5 -5 -5 Notes:

1. all coaxial cable are 75-5 cable; 2. Imperial F -type connectors -5 -5 5 IEEE P802.3bn> EPoC – October 2012

(6)

Topology - test site2 (building 22#)

Building infos

22# is a 5-floor building , 4

households per floor

N31

°

35'56",E120

°

19'3"

Altitude: 9m

Only one subscriber connects

with network, other ports are all

open.

Test time/environment

2012.10.18 afternoon

• Start time: 14:20 • End time: 16:33

environment

• Temperature: 16°C • Humidity : 28% Cut off 2F 1F 4F 3F 5F open open open Impe dance matc hed open 204 818 814 414 open open open -5 -5 -5 21# open VNA (E5070B) Notes:

1. all coaxial cables are 75-5 cable

2. Imperial F-type connector

6 IEEE P802.3bn> EPoC – October 2012

(7)

Topology - test site2 (building 31#)

Building infos

31# is 32-floor building, 3households per floor

N31

°

36'4",E120

°

18'24"

Altitude 5m

Test time/environment

2012.10.19 morning

Start time: 10:25

End time: 12:00

environment

Temperature: 14

°

C

Humidity : 52%

19F用户 18F用户 20F用户 21F用户 23F用户 22F用户 26F用户 25F用户 106 620 618 616 614 Load 18F 28F用户 27F用户 29F用户 30F用户 33F用户 31F用户 35F用户 33F用户 620 618 616 614 Load 17F用户 16F用户 13F用户 15F用户 12F用户 11F用户 10F用户 9F用户 620 618 616 614 Load 8F用户 7F用户 5F用户 6F用户 4F用户 3F用户 2F用户 Load 620 618 616 814 Load Load Cut off VNA (E5070B) Notes:

1. all coaxial cables are 75-5 cable 2. imperial F-type connectors 106

75ohm

7 IEEE P802.3bn> EPoC – October 2012

(8)

Test results - S21 & S12

S21 S12

8 IEEE P802.3bn> EPoC – October 2012

(9)

Test results – micro-reflection1

0 0.5 1 1.5 2 2.5 3 x 10-6 -120 -100 -80 -60 -40 -20 0 X: 1.735e-007 Y: -33.11 Time(s) A m p lit u d e (d B ) 0 0.5 1 1.5 2 2.5 3 x 10-6 -120 -100 -80 -60 -40 -20 0 X: 1.262e-007 Y: -25.27 Time(s) A m p li tu d e (d B ) Test site 2

769~833MHz

1601 points

Blackman windows

+IFFT

Test site 3 Test site 1 9 0 0.5 1 1.5 2 2.5 3 x 10-6 -90 -80 -70 -60 -50 -40 -30 -20 -10 0 X: 8.008e-008 Y: -27.96 Time(s) A m p lit u d e (d B )
(10)

Test results – micro-reflection2

961~1025MHz

1601 points

Blackman window

+IFFT

0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2 x 10-6 -120 -100 -80 -60 -40 -20 0 Time(s) A m p lit u d e (d B ) 0 0.5 1 1.5 2 x 10-6 -120 -100 -80 -60 -40 -20 0 Time(s) A m p li tu d e (d B ) X: 7.886e-008 Y: -15.64 0 0.5 1 1.5 2 x 10-6 -80 -70 -60 -50 -40 -30 -20 -10 0 X: 6.406e-008 Y: -17.15 Time(s) A m p lit u d e (d B ) Test site 2 Test site 3 Test site 1 10
(11)

Some conclusions

• Bi-directional characteristics of passive coax networks are basically the same (S21=S12)

• Channel transmission loss is gradually stepping down under 1.5GHz, and

decreased rapidly at 1.5G ~ 1.8GHz according to the test results at test site 2.

• The channel response is quite flatten below 1GHz spectrum. But above 1GHz, the channel response has significant fluctuations.

• Parts of network exist strong micro-reflections

• According to test results , some views on passive coaxial cable network channel characteristics

– Multi path (micro reflection) do exist in passive cable network

• Poor connections between cable/splitter/tap can cause serious reflections.

• Splitter/tap port impedance unmatch/poor connections will cause frequency selective fading.

• Poor network consistency: channel performances differ significantly on different spectrum

• Cable channel changes slowly over time.

11 IEEE P802.3bn> EPoC – October 2012

References

Related documents

1 Using a cable splitter (if cable outlet is already in use) Disconnect your existing coaxial cable from the cable outlet and connect it to one of the output ports on your

The foundation for this plan is based upon Goal #2 of the Franklin County Board of Education’s Long Range Planning Goals, a 2013 Teacher Technology Survey, a 2014 telephone survey

Vshaped cable - Green cable (lifeline) and Gray cable (DSL) note: you need to use double adapter to connect to phone socket with a fi lter on the green cable.. Network Card

In this architecture, the feeder cable from the central office is connected to a closure at the fiber distribution point of the network.. The closure performs as the

With these radio-bright list of objects, plus a comparison sample of RL non-BAL QSOs, we planned and performed observations in the radio band, both at medium (kpc-scale) and

ice-cream seller should start a new outlet near your college. The questions you ask your interviewer will help shape the final answer to your case. If you base your questions around

S-parameter measurements were taken using a HP8751A network analyzer connected to a HP4380A cable analyzer and includes S11 and S22, attenuation and phase response for S12 and

• Check to ensure that the cable from the tv splitter or the wall plate between the Cable Modem is firmly attached to the splitter or the wall plate.. • Also ensure that the