TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
ALACHUA COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Highways: Interstate
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4230713 I-75(SR93) @ SR121 INTERCHANGE - ADD LANES 1.380 5,464 ROW
Highways: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4135171 D2-ALACHUA COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM .000 1,103 OPS 1,157 OPS
4358891 SR120(NW 23 AVE) & SR25(US441)(NW 13 ST) TRAFFIC SIGNAL UPDATE .005 94 ROW 214 ROW 165 ROW
762 CST
4437011 SR20 EAST ON-RAMP IN HAWTHORNE RR CROSSING #625010J RAILROAD CROSSING .146 432 RRU
4395331 SR20 FROM: EAST OF US301 TO: PUTNAM C/L LANDSCAPING 1.399 85 PE
1,229 CST
4436951 SR20 W ON-RAMP IN HAWTHORNE RR CROSSING NUMBER 927690S RAILROAD CROSSING .118 362 RRU
4432581 SR20(SE HAWTHORN ROAD) FROM: CR325 TO: WEST OF US301 RESURFACING 5.340 8,528 CST
4355641 SR200(US301) @SR24 CSXRR BR.NO260001 & SR25(US441) PED OVRPS BR.260003 BRIDGE - PAINTING .097 919 CST
4470321 SR222 (39TH AVE) FROM NW 92ND CT TO NW 95TH BLVD RESURFACING 3.293 719 PE
6,995 CST
4373771 SR226(SW 16TH AVE) AT SW 10TH TERRACE PEDESTRIAN SAFETY IMPROVEMENT .004 354 CST
4479641 SR24 FROM SR222 TO SR200(US301) RESURFACING 10.706 2,414 PE
16,633 CST
4358911 SR25(US441) @ SR24(SW ARCHER RD) TRAFFIC SIGNAL UPDATE .006 552 PE
37 ROW 261 ROW
848 CST
4344001 SR25(US441) @ SW 14TH DRIVE TRAFFIC SIGNAL UPDATE .037 1,037 CST
4470331 SR25(US441) FROM SR331(WILLISTON ROAD) TO SR24(ARCHER ROAD) RESURFACING 2.032 4,377 CST
2078502 SR26 CORRIDOR FROM GILCHRIST C/L TO CR26A E OF NEWBERRY ADD LANES & RECONSTRUCT 4.031 1,167 ROW 4,259 ROW 1,418 ROW
4391751 SR26 FROM NEWBERRY TO JONESVILLE BIKE PATH/TRAIL 3.640 775 PE
4358901 SR331 AT SE 4TH AVE, SE 2ND AVE, SR26, NE 16TH AVE, SR120 TRAFFIC SIGNAL UPDATE 1.998 3,206 CST
4479621 SR331 FROM SR25(US441) TO SR26 RESURFACING 3.296 1,017 PE
6,993 CST
4393001 SR45 @ SW 15TH AVENUE ADD RIGHT TURN LANE(S) .098 517 CST
4391771 SR45(US41) FROM END OF SIDEWALK TO NW 9TH ROAD SIDEWALK .520 49 PE
373 CST
4391761 SR45(US41) FROM SW 15TH AVE TO SOUTH OF SR26 SIDEWALK .470 46 PE
321 CST
Highways: Local Roads
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4412191 NE 53RD AVE @ ANIMAL SERVICES DRIVE INTERSECTION IMPROVEMENT .100 851 CST
4432521 NEWBERRY LN AT CR235 INTERSECTION IMPROVEMENT .100 228 CST
4411601 NW 42ND AVENUE FROM NW 18TH ST. TO NW 6TH ST. SIDEWALK .300 41 PE
183 CST
4474751 NW39TH AVE AND NW97TH BLVD INTERSECTION IMPROVEMENT .151 123 PE
671 CST
4411551 SE 65TH AVE FROM: SE 215TH TO: SE 210TH SIDEWALK .140 212 CST
2113656 SW 62ND BLVD ARTERIAL CONNECTOR TRAFFIC OPS IMPROVEMENT 1.516 15,155 CST
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
ALACHUA COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Highways: Off State Hwy Sys/Off Fed Sys
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4472331 CITY OF GAINESVILLE; MULTIPLE LOCATIONS SIDEWALK 1.000 677 CST
4455731 NW 45TH DR FROM BLACK FOREST WAY TO C.W. NORTON ELEM SCHOOL. PEDESTRIAN SAFETY IMPROVEMENT .260 65 PE
360 CST
Transportation Planning: Non-System Specific
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4393183 GAINESVILLE MPO FY 2020/2021-2021/2022 UPWP TRANSPORTATION PLANNING .000 484 PLN
4393184 GAINESVILLE MPO FY 2022/2023-2023/2024 UPWP TRANSPORTATION PLANNING .000 482 PLN 482 PLN
4393185 GAINESVILLE MPO FY 2024/2025-2025/2026 UPWP TRANSPORTATION PLANNING .000 482 PLN 482 PLN
Maintenance: Interstate
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
2149384 ALACHUA ROUTINE ROUTINE MAINTENANCE .000 250 MNT 250 MNT
Maintenance: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4464891 GAINESVILLE MAINTENANCE PRIMARY ROUTINE MAINTENANCE .000 145 MNT 145 MNT
4464901 GAINESVILLE MAINTENANCE PRIMARY ROUTINE MAINTENANCE .000 100 MNT 100 MNT
4144031 LIGHTING AGREEMENTS ALACHUA COUNTY LIGHTING .000 1,060 MNT 1,085 MNT
4448962 TREE TRIMMING GAINESVILLE MAINTENANCE ALACHUA ROUTINE MAINTENANCE .000 75 MNT
Freight, Logistic And Passenger Operation: Intermodal
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4451341 GAINESVILLE REGIONAL APT DESIGN & CONSTRUCT PARKING AND INTERMODAL TRA AVIATION REVENUE/OPERATIONAL .000 2,600 CAP 3,836 CAP
Freight, Logistic And Passenger Operation: Aviation
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4400371 GAINESVILLE REG APT ACQUIRE INDEX 'B' FIRE FIGHTING VEHICLE PFL009102 AVIATION SAFETY PROJECT .000 1,000 CAP
4387392 GAINESVILLE REG APT DESIGN & CONSTRUCT TXWY E EXTENSION PFL0012567 AVIATION CAPACITY PROJECT .000 4,100 CAP
4444081 GAINESVILLE REG APT GA APRON STRENGTHENING AVIATION PRESERVATION PROJECT .000 1,000 CAP 4,500 CAP 1,000 CAP
4365942 GAINESVILLE REG APT LAND ACQ TO FACILITATE OBSTACLE REMOVAL PFL0012818 AVIATION SAFETY PROJECT .000 4,000 CAP
4400651 GAINESVILLE REG APT TWY "A' PAVEMENT REHAB PHASE II PFL0009324 AVIATION PRESERVATION PROJECT .000 3,847 CAP
4288301 GAINESVILLE REGIONAL AIRPORT FUEL FACILITY PFL0008725 AVIATION REVENUE/OPERATIONAL .000 500 CAP 500 CAP
4437991 GAINESVILLE REGIONAL APT AIRFIELD MARKINGS PFL08655 AVIATION PRESERVATION PROJECT .000 75 CAP 29 CAP
4400381 GAINESVILLE REGIONAL APT DESIGN & REHAB GA ACCESS ROAD PFL0010658 AVIATION PRESERVATION PROJECT .000 345 CAP 4420461 GAINESVILLE REGIONAL APT INSTALL IN LINE BAGGAGE SYSTEM PFL0011987 AVIATION CAPACITY PROJECT .000 4,900 CAP
4438011 GAINESVILLE REGIONAL APT INTERNAL SERVICE RD EXPANSION AVIATION PRESERVATION PROJECT .000 290 CAP
4438031 GAINESVILLE REGIONAL APT MAINTENANCE FACILITY PH 1 AVIATION REVENUE/OPERATIONAL .000 500 CAP
4438001 GAINESVILLE REGIONAL APT PURCHASE & INSTALL EMERGENCY GENERATOR @ ATCT AVIATION SAFETY PROJECT .000 120 CAP
4288321 GAINESVILLE REGIONAL APT TAXIWAY A DRAINAGE/ RETENTION PFL008733 AVIATION PRESERVATION PROJECT .000 700 CAP
4438021 GAINESVILLE REGIONAL APT TWY C REHAB LIGHTING & SIGNAGE AVIATION PRESERVATION PROJECT .000 6,108 CAP 4400491 GAINSVILLE REG APT PURCHASE EQUIP FOR MAINT & WILDLIFE MGMT PFL11297 AVIATION REVENUE/OPERATIONAL .000 350 CAP
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
ALACHUA COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Freight, Logistic And Passenger Operation: Transit
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4415201 ALACHUA CO 5339 RTS TRANSIT IMPROVEMENT OPERATING/ADMIN. ASSISTANCE .000 455 CAP 455 CAP 455 CAP 455 CAP 455 CAP 4272501 ALACHUA COUNTY FED SEC 5311 RURAL TRANSIT FUNDING OPERATING/ADMIN. ASSISTANCE .000 771 OPS 810 OPS 850 OPS 893 OPS 937 OPS 4117623 GAINESVILLE MTPO FED SECT 5303 PLANNING FUNDS TRANSPORTATION PLANNING .000 264 PLN 271 PLN 280 PLN 288 PLN 297 PLN 4040261 GAINESVILLE RTS SEC 5307 FORMULA GRANT MISC CAPITAL PURCHASES CAPITAL FOR FIXED ROUTE .000 5,250 CAP 5,250 CAP 5,250 CAP 5,250 CAP 5,250 CAP 2155462 GAINESVILLE RTS SECTION 5307 FORMULA GRANT OPERATING ASSISTANCE OPERATING FOR FIXED ROUTE .000 3,600 OPS 3,600 OPS 3,600 OPS 3,600 OPS 3,600 OPS 4117571 GAINESVILLE RTS STATE BLOCK GRANT OPERATING FUNDS OPERATING FOR FIXED ROUTE .000 4,744 OPS 4,886 OPS 5,032 OPS 5,183 OPS 5,339 OPS
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
CLAY COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Highways: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4135301 D2 CLAY COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM .000 380 OPS 397 OPS
4461541 SR15(US17) FROM BALL ROAD TO BLACK CREEK TRAIL BIKE PATH/TRAIL .719 3,048 CST
4471801 SR15(US17) FROM EAGLE HARBOR PARKWAY TO CREIGHTON ROAD RESURFACING 2.523 9,233 CST
4433021 SR15(US17) FROM WATER OAK LANE TO EAGLE HARBOR PARKWAY RESURFACING 1.789 5,717 CST
4435691 SR15(US17) FROM WATER OAK LANE TO NORTH OF EAGLE HARBOR PARKWAY INTERSECTION IMPROVEMENT .911 128 ROW 68 ROW
2,222 CST
4427791 SR16/S FORK OF BLACK CREEK BRIDGE NO. 710022 BRIDGE-REPAIR/REHABILITATION .062 680 CST
4471761 SR21 FROM CR215 TO CR218 RESURFACING 1.772 4,254 CST
4287951 SR21 FROM: BROOKLYN BAY ROAD TO: CARGO WAY DRAINAGE IMPROVEMENTS .942 271 PE
4433051 SR21 FROM: COMMERICIAL CIRCLE TO: SR16 RESURFACING 16.258 12,094 CST
4453421 SR224 FROM SR21 TO US17 RESURFACING 2.781 50 RRU
6,168 CST
4229385 SR23 FROM EAST OF CR209 TO NORTH OF SR16 NEW ROAD CONSTRUCTION 9.698 421 CST 5,375 CST
4229386 SR23 FROM NORTH OF SR16 TO NORTH OF SR21(BLANDING BLVD) NEW ROAD CONSTRUCTION 11.105 6,450 CST
Highways: Local Roads
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4455621 CR220 FROM WEST OF LAKESHORE DRIVE WEST TO EAST OF OLD HARD ROAD INTERSECTION IMPROVEMENT .517 2,113 CST 4307192 CR220 FROM: CR209(HENLEY RD) TO: CR220B(KNIGHT BOXX ROAD) ADD LANES & RECONSTRUCT 1.090 4,675 ROW 1,364 ROW
4307193 CR220 FROM: CR209(HENLEY RD) TO: CR220B(KNIGHT BOXX ROAD) ADD LANES & RECONSTRUCT 1.090 12,893 CST
Highways: Off State Hwy Sys/Off Fed Sys
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4455711 EVERGREEN LN FROM CR220B TO LISA DAWN DR; EVERGREEN LN TO SCHOOL PEDESTRIAN SAFETY IMPROVEMENT 1.703 148 PE
818 CST
4356771 PALMETTO AVE MLK NATURE PRESERVE (US17) & VF HALL PRK SIDEWALK 2.266 1,943 CST
Maintenance: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
2143881 CLAY ROUTINE MAINTENANCE ROUTINE MAINTENANCE .000 300 MNT 300 MNT
4144161 LIGHTING AGREEMENTS CLAY COUNTY LIGHTING .000 258 MNT 266 MNT
Freight, Logistic And Passenger Operation: Aviation
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4459591 KEYSTONE APT DESIGN & CONSTRUCT T/W E AND TAXILANES AVIATION PRESERVATION PROJECT .000 1,000 CAP
4461491 KEYSTONE AIRPARK DESIGN & CONSTRUCT HANGAR AVIATION REVENUE/OPERATIONAL .000 150 CAP
4400611 KEYSTONE AIRPARK PURCHASE EQUIP TRACTOR OR MOWER PFL0011449 AVIATION REVENUE/OPERATIONAL .000 100 CAP
4461501 KEYSTONE AIRPORT MASTER PLAN UPDATE AVIATION CAPACITY PROJECT .000 650 CAP
4420351 KEYSTONE APK INSTALL WEATHER SYSTEM PFL0010612 AVIATION SAFETY PROJECT .000 300 CAP
4403521 KEYSTONE APT DESIGN & CONSTRUCT 10 UNIT T-HANGER PFL0011450 AVIATION REVENUE/OPERATIONAL .000 350 CAP 350 CAP
4115728 KEYSTONE APT DESIGN & REHAB RW 11-29 PFL13229 AVIATION PRESERVATION PROJECT .000 1,500 CAP
4459821 KEYSTONE APT FUEL FARM EXPANSION AVIATION REVENUE/OPERATIONAL .000 300 CAP
4312882 KEYSTONE APT UPGRADE LIGHTING FOR RW 11-29 PFL13228 AVIATION PRESERVATION PROJECT .000 380 CAP
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
CLAY COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Freight, Logistic And Passenger Operation: Transit
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
DUVAL COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Highways: Interstate
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4391001 I-10 FROM: I-295 TO: I-95 ADD LANES & RECONSTRUCT 5.441 1,061 RRU
4319751 I-10(SR8) & SR200(US301) INTERCHANGE ON & OFF RAMPS LANDSCAPING .368 1,353 CST
4475571 I-10(SR8) FROM CHAFFEE ROAD TO I-295(SR9A) RESURFACING 4.673 1,817 PE
16,786 CST
4424081 I-10(SR8) FROM I-295 TO I-95 LANDSCAPING 4.749 500 PE
2,693 CST 4475591 I-10(SR8) FROM NASSAU COUNTY LINE TO SR23(FIRST COAST EXPRESSWAY) RESURFACING 8.787 1,781 PE
14,023 CST
2133457 I-295 (SR 9A) FROM BUCKMAN BRIDGE TO I-95 MANAGED LANES ADD LANES & RECONSTRUCT 4.299 285 OPS 285 OPS 285 OPS 285 OPS 250 OPS 175 CAP
2093013 I-295 (SR 9A) FROM SR 202 JTB BLVD TO SR 9B (MANAGED LANES) ADD LANES & RECONSTRUCT 4.988 360 OPS 360 OPS 360 OPS 360 OPS 325 OPS 4358441 I-295(SR9A) @ SR228(NORMANDY BLVD) OPERATIONAL IMPROVEMENTS INTERCHANGE - ADD LANES .231 2,854 CST
4436371 I-295(SR9A) @ US17(SR5) INTERCHANGE LANDSCAPING .340 355 PE
2,040 CST 4377282 I-295(SR9A) FM: W OF OLD ST AUG RD INTERCHANGE TO: BUCKMAN BRIDGE LANDSCAPING 2.339 1,905 CST
4434201 I-295(SR9A) FR NEW BERLIN ROAD TO THE SOUTH END OF DAMES POINT BRIDGE RESURFACING 3.960 9,150 CST
4456431 I-295(SR9A) FROM MORSE AVE TO US90 RESURFACING 6.861 23,835 CST
2132611 I-295(SR9A) FROM N OF COMMONWEALTH TO N OF NEW KINGS RD ADD LANES & RECONSTRUCT 5.537 1,050 PDE
2132601 I-295(SR9A) FROM N OF NEW KINGS RD TO S OF I-95 N INTERCHANGE ADD LANES & RECONSTRUCT 6.712 50 PDE
2133459 I-295(SR9A) FROM SOUTH OF US17 TO SR21(BLANDING BLVD) ADD LANES & RECONSTRUCT 3.113 3,048 ROW 1,073 ROW
2093014 I-295(SR9A) FROM SOUTHSIDE CONNECTOR(SR113) TO SR202 JTB ADD LANES & RECONSTRUCT 8.391 2,883 ROW 13,180 ROW 2,870 ROW
4460441 I-295(SR9A) FROM: BUCKMAN BRIDGE TO: US17 RESURFACING 1.114 4,462 CST
4460791 I-295(SR9A) FROM: DAME POINT BRIDGE TO: MONUMENT ROAD RESURFACING 2.041 6,560 CST
2096584 I-295(SR9A) FROM: DAME POINT BRIDGE TO: NORTH OF PULASKI ADD LANES & REHABILITATE PVMNT 6.075 3,219 ROW 4,744 ROW
4460461 I-295(SR9A) FROM: PULASKI ROAD TO: NEW BERLIN ROAD RESURFACING 3.455 8,489 CST
4460471 I-295(SR9A) FROM: ST. JOHNS BLUFF TO: BEACH BOULEVARD RESURFACING 2.454 8,385 CST
4376531 I-295(SR9A) FROM: UNF INTERCHANGE TO: SR9B LANDSCAPING 6.075 2,470 CST 123 CST
4376511 I-95(SR9) @ NORTH I-295 INTERCHANGE LANDSCAPING 2.780 2,365 CST
4338992 I-95(SR9) @ SR115(US1)/ML KING/20TH STREET INTERCHANGE - ADD LANES 1.922 300 RRU 2,000 RRU
41,953 CST 609 CST
4436351 I-95(SR9) FROM I-295(SR9A) TO AIRPORT ROAD LANDSCAPING .930 355 PE
2,025 CST 4355772 I-95(SR9) FROM I-295(SR9A) TO SR152(BAYMEADOWS RD) ADD LANES & RECONSTRUCT 3.425 1,699 ROW
108,715 CST
4322592 I-95(SR9) FROM SR202(JT BUTLER) TO ATLANTIC BLVD ADD LANES & RECONSTRUCT 5.928 2,515 PE
18,696 ROW 2,460 ROW 3,000 RRU
282,368 DSB 4,095 DSB
4460491 I-95(SR9) FROM: AIRPORT ROAD TO: OWENS ROAD RESURFACING .838 746 PE
7,101 CST
4460481 I-95(SR9) FROM: FOREST STREET BRIDGE TO: RAILROAD BRIDGE RESURFACING .610 375 PE
3,729 CST
4240265 I-95(SR9) FROM: ST JOHNS C/L TO: I-295(SR9A) ADD LANES & RECONSTRUCT 5.548 1,300 RRU
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
DUVAL COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4427781 I-95(SR9) MYRTLE AVENUE/I-95/I-10 RAMP BRIDGE NO. 720163 BRIDGE-REPAIR/REHABILITATION .270 6,159 PE 978 PE
808 ROW
550 RRU 2,000 RRU 140,452 DSB 4392011 I-95(SR9) OVER NASSAU RIVER BRIDGES NO720218 & NO720336 BRIDGE-REPAIR/REHABILITATION .118 6,393 CST
4461531 I-95(SR9) WIDENING FROM: BAYMEADOWS ROAD TO: S OF JTB(SR202) ADD LANES & RECONSTRUCT 2.088 445 PE 39,365 DSB
Highways: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4357581 ARLINGTON EXPWAY FROM ATLANTIC BLVD TO ML KING ITS COMMUNICATION SYSTEM 6.000 635 PE
50 RRU 4135311 D2-DUVAL COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM .000 3,291 OPS 3,455 OPS
4352531 I-295 EXPRESS LANES BUCKMAN BRIDGE TO I-95 TOLL OPERATIONS TOLL COLLECTION .000 203 OPS 211 OPS 220 OPS 220 OPS 220 OPS 4352532 I-295 EXPRESS TOLL OPERATIONS JOHN TURNER BUTLER BLVD TO SR 9B TOLL COLLECTION .000 490 OPS 535 OPS 575 OPS 575 OPS 575 OPS
4260011 ITS SYSTEM MANAGER CONSULTANT TRAFFIC CONTROL DEVICES/SYSTEM .000 100 PE 100 PE 100 PE 100 PE 100 PE
4373201 SR 115 FROM SOUTEL DRIVE TO NASSAU C/L RESURFACING 9.467 15,087 CST
4454301 SR10 FROM KERNAN OVERPASS TO MAYPORT ROAD RESURFACING 4.013 1,265 PE
11,789 CST
4343981 SR10(ATLANTIC BLVD) @ CR101A(SAN PABLO RD) TRAFFIC SIGNAL UPDATE .007 761 CST
4436281 SR10(ATLANTIC BLVD) FROM SAN MATEO AVE TO UNIVERSITY BLVD LANDSCAPING 2.160 426 PE
2,562 CST
4393021 SR10(ATLANTIC BLVD)EAST OF LAURINA ST TO SILVERSMITH CREEK BRIDGE SIDEWALK .187 396 PE
743 CST
4453541 SR10(US90) FROM MCCARGO STREET TO EDGEWOOD AVE RESURFACING 3.090 875 PE
5,572 CST
4432591 SR10(US90) FROM: NASSAU CL TO: DEL MONTE STREET RESURFACING 2.718 6,952 CST
4373731 SR10(US90)(BEAVER ST)AT CHAFFEE RD TRAFFIC SIGNALS .001 457 ROW 182 ROW
100 RRU
3,331 CST 4392941 SR10/MILLER CREEK BR NO720940 & LITTLE POTTSBURG CREEK BR NO720941 BRIDGE-REPAIR/REHABILITATION 1.261 731 CST
4432941 SR101(MAYPORT RD) FROM: SR10(ATLANTIC BLVD) TO: NAVAL BASE SAFETY PROJECT 3.509 1,877 CST
4455761 SR104(DUNN AVE) FROM N CAMPUS BLVD TO MONACO DRIVE LIGHTING .000 468 CST
4380821 SR105 FROM: I-95 TO: MAIN ST ITS COMMUNICATION SYSTEM .625 50 RRU
1,584 CST 4360701 SR105(HECKSCHER DR) FROM: BROWN'S CREEK BRIDGE TO: CLAPBOARD CREEK BR. DRAINAGE IMPROVEMENTS 1.440 251 PE
4461231 SR105(HECKSHER DR) @ I-295(SR9A) TURN LANE ADD RIGHT TURN LANE(S) .361 3,774 CST
4454271 SR109 FROM CRUZ ROAD TO WATEREDGE LANE RESURFACING 2.107 853 PE
5,167 CST 4471241 SR109(N. UNIVERSITY BLVD) FROM TANGLEWOOD TO BAYWOOD TERRACE RESURFACING 1.688 731 PE
4,497 CST
4471251 SR109(UNIVERSITY BLVD) FROM SR13(SAN JOSE BLVD) TO I-95 RESURFACING 2.127 732 PE
4,649 CST 4324011 SR109(UNIVERSITY BLVD) FROM: LOS SANTOS WAY TO: MERRILL RD. TRAFFIC SIGNAL UPDATE 1.546 20 RRU 60 RRU
2,523 CST
4359521 SR109A(CESERY BLVD) TRAFFIC SIGNALS .032 824 CST
4345141 SR10A(MATHEWS BR) @ ST JOHNS RIVER BR N0720076 STEEL REPAIR BRIDGE-REPAIR/REHABILITATION 1.398 4,087 CST
4451461 SR111(CASSAT AVENUE) FROM: BLANDING BLVD TO: I-10 EB RAMP TRAFFIC SIGNAL UPDATE 2.815 108 ROW 54 ROW
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
DUVAL COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4454291 SR111(EDGEWOOD AVE) FROM US90(BEAVER STREET) TO OLD KINGS ROAD RESURFACING 2.360 685 PE
50 RRU
6,229 CST 4454252 SR111(EDGEWOOD AVE) NEAR BEAVER ST CROSSING 621275X RRMP:SP 637.85 RAILROAD CROSSING .200 877 RRU
4428481 SR111(EDGEWOOD AVENUE) LIGHTING 7.006 150 RRU
7,031 CST
4433101 SR115 FROM SOUTHSIDE BLVD TO MATHEWS BRIDGE RESURFACING 3.537 850 RRU
16,648 CST
4453401 SR115 FROM US1 TO SR202 (BUTLER BLVD.) RESURFACING 4.668 200 RRU 1,050 RRU
12,370 CST
4374372 SR115(LEM TURNER ROAD) TROUT RIVER BRIDGE #720033 BRIDGE REPLACEMENT .160 3,790 PE
4,796 ROW
4394681 SR115(SOUTHSIDE BLVD) AT DEERWOOD PARK INTERSECTION IMPROVEMENT .465 9,092 CST
4357561 SR115(US1) MLK EXPY FROM: I-95 TO: HART EXPRESSWAY ITS COMMUNICATION SYSTEM 11.216 2,687 CST
4287963 SR116(WONDERWOOD) FROM: JANE STREET TO SAND CASTLE LANE RESURFACING 7.429 17,888 CST
4453431 SR126 FROM US1 TO SPRING PARK ROAD RESURFACING .564 299 RRU
14 DSB 2,315 DSB
4434351 SR126/EMERSON STREET RR CROSSING #271819A RAILROAD CROSSING .200 517 RRU
4260781 SR13 @ ACOSTA BRIDGE & CONNECTOR BRIDGE NO720570 TO BRIDGE NO720584 BRIDGE - PAINTING 1.986 250 RRU
17,043 CST
4454261 SR13 FROM I-295 TO SUNBEAM ROAD RESURFACING 2.195 1,072 PE
8,956 CST
4484951 SR13(SAN JOSE BLVD) FROM JULINGTON CREEK ROAD TO I-295 LANDSCAPING 3.112 2,578 CST
4373751 SR13(SAN JOSE BLVD) FROM: ST AUGUSTINE RD TO: VIA DE LA REINA ST TRAFFIC CONTROL DEVICES/SYSTEM .270 289 CST 4392961 SR13(SAN JOSE BLVD)GOODBYS LAKE BRIDGES NO720027 & NO720271 BRIDGE-REPAIR/REHABILITATION .067 2,459 CST 4410501 SR134(103RD ST) FROM: HILLMAN DR/MCMANUS DR TO: READSTONE DR INTERSECTION IMPROVEMENT .812 2,724 CST
4376141 SR134(103RD ST/TIMUQUANA RD) FROM: SHINDLER DR TO: FIRESTONE DR RESURFACING 2.055 1,174 RRU
7,071 CST
4432611 SR134(TIMUQUANA ROAD) FROM: WESCONNETT BLVD TO: US17 RESURFACING 2.478 1,313 RRU
5,398 CST 4471231 SR152(BAYMEADOWS RD) FROM BAYBERRY RD TO SR115(SOUTHSIDE BLVD) RESURFACING 1.844 139 PE
5,978 CST 4403892 SR152(BAYMEADOWS ROAD) FROM I-95 TO BAYMEADOWS CIRCLE EAST ADD TURN LANE(S) .317 339 ROW
4288652 SR200(US301) @ I-10 IMPROVEMENTS INTERCHANGE RAMP (NEW) .585 6,037 ROW
4,533 CST
4462331 SR200(US301) URBAN AREA RAIL DIVERSION PLAN OTHER ITS 11.100 800 PE
4471491 SR202(J TURNER BUTLER BLVD) AT KERNAN BLVD INTERCHANGE IMPROVEMENT .636 14,901 CST
4471281 SR202(JT BUTLER BLVD) FROM INTERCOASTAL WATERWAY BRIDGE TO SRA1A RESURFACING 1.794 178 PE
7,359 CST
4389282 SR202(JTB) FM EAST OF I-95 TO US1 & US1 FM S OF JTB TO N OF MUSTANG RD ADD LANES & RECONSTRUCT .880 26,651 CST
4427801 SR202(JTB/INTERCOASTAL WATERWAY) BRIDGE NUMBERS 720442 & 720509 BRIDGE-REPAIR/REHABILITATION .871 5,070 CST
4471291 SR208(WILSON BLVD) FROM DEBRA DRIVE TO LANE AVE RESURFACING .840 373 PE
2,255 CST
4471271 SR21(BLANDING BLVD) FROM WILSON BLVD TO ROOSEVELT RESURFACING 2.283 845 PE
5,971 CST
4454311 SR211 FROM SAN JUAN AVE TO I-95 RESURFACING 3.723 1,487 PE
8,836 CST 4412081 SR212(BEACH BLVD) FM: SAN MATEO/WALTON ST TO: LINDEN AVE/SCHUMACER AVE INTERSECTION IMPROVEMENT .358 933 CST
4473591 SR212(BEACH BLVD) FROM BEACH PLAZA TO SRA1A(3RD ST) INTERSECTION IMPROVEMENT .611 159 PE
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
DUVAL COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4328491 SR212(BEACH BLVD) FROM: CEDAR SWAMP CREEK TO: BROUGHAM AVE DRAINAGE IMPROVEMENTS 1.400 3,246 DSB
4454201 SR212(US90) FROM 12TH STREET TO SRA1A RESURFACING .621 362 PE
1,931 CST
4324031 SR212(US90/BEACH BLVD) FROM: LINDEN AVENUE TO MARION ROAD TRAFFIC SIGNAL UPDATE 2.685 55 RRU
4,793 CST 4455611 SR22(GOLFAIR BLVD) FROM: W OF WALGREEN RD/STUART ST TO: E OF DAVIS ST PEDESTRIAN SAFETY IMPROVEMENT .252 376 CST
4453521 SR228 FROM LAMPLIGHTER TO I-295 RESURFACING 3.286 4,805 CST
4455401 SR228 FROM: YELLOW WATER ROAD TO: NORTH OF SOLOMON ROAD ADD LEFT TURN LANE(S) .360 1,400 CST
2096487 SR228(NORMANDY BLVD) FROM: NEW WORLD AVE TO: SR111(CASSAT AVE) TRAFFIC CONTROL DEVICES/SYSTEM 10.281 55 RRU
5,829 CST
4432601 SR243(INTRNTL AIRPORT BLVD) FROM: CEDAR CREEK TO: SR102 RESURFACING 1.685 2,485 CST
4389281 SR5(US1) @ JTB INTERSECTION RIGHT OF WAY ACTIVITIES .372 832 ROW
4433041 SR5(US1) FROM E 15TH STREET TO W 17TH STREET TRAFFIC SIGNAL UPDATE .104 274 CST
4283591 SR5(US1/MAIN ST) @ ST. JOHNS RIVER BRIDGE NO720022 BRIDGE-REPAIR/REHABILITATION .318 3,522 PE
4393561 SR5(US1/PHILIPS HWY) FROM: SR152(BAYMEADOWS RD) TO: SR109(UNIV BLVD) RESURFACING 3.717 604 RRU 12,975 CST
4454171 SR5(US17) FROM STATE STREET TO TROUT RIVER RESURFACING 4.096 275 RRU 2,625 RRU
12,531 CST
4405221 SR5(US17) JACKSONVILLE REPLACEMENT CROSSING SURFACE CROSSING NO620878S RAILROAD CROSSING .200 750 RRU
4393071 SR5(US17)MAIN ST @ S OF NEW BERLIN RD INTERSECTION TO OCEANWAY ADD RIGHT TURN LANE(S) .451 3 ROW
50 RRU
1,504 CST
4343901 SR5(US17/MAIN ST) @ NEW BERLIN ROAD TRAFFIC SIGNAL UPDATE .008 450 RRU
592 CST
4359321 SR9B FROM: I-295 TO: I-95 LANDSCAPING .772 3,092 CST 32 CST
4435021 SRA1A (MAYPORT ROAD) BIKE LANE/SIDEWALK 1.213 1,366 PE
4432981 SRA1A @ TIMUCUAN TRAIL CROSSING & SAWPIT CREEK BOAT RAMP TRAFFIC SIGNAL UPDATE .033 1 ROW
717 CST
4411942 SRA1A AT 2ND AVE NORTH PEDESTRIAN SAFETY IMPROVEMENT .100 659 CST
4331641 SRA1A(HECKSCHER DR) FROM HUGUENOT PARK TO GEORGE RIVER BRIDGE BIKE PATH/TRAIL .971 5,161 CST
Highways: Local Roads
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4442381 BAY STREET FROM I-95 TO FESTIVAL PARK DRIVE TRAFFIC SIGNAL UPDATE 2.214 810 CST
4433931 PARK STREET/MARGARET STREET FROM RIVERSIDE AVE TO I-95 RAMPS PEDESTRIAN SAFETY IMPROVEMENT .475 272 CST
4411961 VARIOUS STREETS NEAR ANDREW ROBINSON ELEMENTRY SIDEWALK 1.000 191 PE
952 CST
Highways: Off State Hwy Sys/Off Fed Sys
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4474661 NATHAN DRIVE, RENEE TERRACE AND RYAR ROAD SIDEWALK .894 153 PE
Transportation Planning: Non-System Specific
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4393193 NORTH FLORIDA TPO FY 2020/2021-2021/2022 UPWP TRANSPORTATION PLANNING .000 2,122 PLN
4393194 NORTH FLORIDA TPO FY 2022/2023-2023/2024 UPWP TRANSPORTATION PLANNING .000 2,868 PLN 1,868 PLN
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
DUVAL COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Maintenance: Interstate
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
2151171 DUVAL COUNTY ROUTINE MAINTENANCE ROUTINE MAINTENANCE 38.460 750 MNT 750 MNT
2133457 I-295 (SR 9A) FROM BUCKMAN BRIDGE TO I-95 MANAGED LANES ADD LANES & RECONSTRUCT 4.299 150 MNT 150 MNT 150 MNT 150 MNT 150 MNT 2093013 I-295 (SR 9A) FROM SR 202 JTB BLVD TO SR 9B (MANAGED LANES) ADD LANES & RECONSTRUCT 4.988 210 MNT 210 MNT 210 MNT 160 MNT 160 MNT
4440971 JACKSONVILLE MAINT CONTRACTS PRIMARY ROUTINE MAINTENANCE .000 487 MNT 63 MNT
4087242 SERVICE PATROL DUVAL COUNTY ROAD RANGER ITS FREEWAY MANAGEMENT .000 250 MNT 250 MNT 250 MNT 250 MNT 250 MNT
Maintenance: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
2144531 DUVAL COUNTY ROUTINE MAINTENANCE ROUTINE MAINTENANCE .000 6,000 MNT 6,000 MNT
4144171 LIGHTING AGREEMENTS DUVAL COUNTY LIGHTING .000 2,755 MNT 2,838 MNT
Maintenance: Non-System Specific
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4087241 SERVICE PATROL DUVAL COUNTY ROUTINE MAINTENANCE .000 849 MNT
Freight, Logistic And Passenger Operation: Intermodal
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4109698 CONST & REHAB OF DOCK/RAMP IMPROVEMENTS FOR JAX ST JOHNS FERRY MAYPORT SEAPORT PRESERVATION PROJECT .000 368 CAP 368 CAP
Freight, Logistic And Passenger Operation: Aviation
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4476731 CECIL AIRPORT DESIGN & CONSTRUCT HANGAR 1025 PFL0013206 AVIATION REVENUE/OPERATIONAL .000 3,290 CAP
4440721 CECIL APT DESIGN & CONSTRUCT HANGAR 1015 AVIATION REVENUE/OPERATIONAL .000 500 CAP 4,000 CAP 5,000 CAP 4440661 CECIL APT REHAB RW 18R/36L PFL0012334 AVIATION PRESERVATION PROJECT .000 5,313 CAP
4440731 CECIL APT STEEL TRUSS REHAB AVIATION REVENUE/OPERATIONAL .000 3,300 CAP
2170137 HERLONG AIRPORT DESIGN & CONSTRUCT BULK HANGARS PFL0013214 AVIATION REVENUE/OPERATIONAL .000 3,400 CAP
4440741 HERLONG APT DESIGN & INSTALLATION OF SECURITY FENCING AVIATION SAFETY PROJECT .000 600 CAP
4476591 JACKSONVILLE INTL AIRPORT DESIGN & REHAB TXWY F PFL0012540 AVIATION PRESERVATION PROJECT .000 1,000 CAP
2169784 JACKSONVILLE INTL AIRRPORT DESIGN & RECONST CONCOURSE B MOD PFL000175 AVIATION SECURITY PROJECT .000 5,000 CAP 500 CAP 21,997 CAP 20,000 CAP 4440751 JAX EX AT CRAIG APT AIRFIELD LIGHTING REHAB RW 5/23 & TAXIWAYS AVIATION PRESERVATION PROJECT .000 1,600 CAP
4440752 JAX EX AT CRAIG APT DESIGN AND REHAB TXWY A PFL0012554 AVIATION PRESERVATION PROJECT .000 1,550 CAP
4440753 JAX EX AT CRAIG APT DESIGN AND REHAB TXWY B PFL0012754 AVIATION PRESERVATION PROJECT .000 1,550 CAP
Freight, Logistic And Passenger Operation: Rail
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4422501 FEC BOWDEN YARD TRACK CAPACITY IMPROVEMENTS RAIL CAPACITY PROJECT .000 2,000 CAP
4449761 FEC JACKSONVILLE BRIDGE IMPROVEMENTS & TRACK UPGRADE RAIL CAPACITY PROJECT .000 4,000 CAP
Freight, Logistic And Passenger Operation: Seaport
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4402641 BLOUNT ISLAND BERTH IMPROVEMENTS SEAPORT CAPACITY PROJECT .000 15,600 CAP 17,500 CAP 13,100 CAP
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
DUVAL COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4373562 DISTRICT 2 - SEAPORT INFRASTRUCTURE IMPROVEMENTS SEAPORT CAPACITY PROJECT .000 10,362 RPY 8,272 RPY
4373561 JAXPORT CHANNEL DEEPENING & WIDENING SEAPORT CAPACITY PROJECT .000 49,414 CAP
4468191 JAXPORT MAINTENANCE DREDGING SEAPORT CAPACITY PROJECT .000 6,000 CAP
4468201 JAXPORT TALLEYRAND TERMINAL CARGO IMPROVEMENTS SEAPORT CAPACITY PROJECT .000 1,700 CAP
Freight, Logistic And Passenger Operation: Transit
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4272561 DUVAL COUNTY FED SECT 5311 RURAL TRANSIT FUNDING OPERATING/ADMIN. ASSISTANCE .000 337 OPS 354 OPS 372 OPS 391 OPS 410 OPS 4040201 JACKSONVILLE JTA SECT 5307 FORMULA GRANT CAPITAL PURCHASES CAPITAL FOR FIXED ROUTE .000 12,134 CAP 13,769 CAP 15,000 CAP 15,000 CAP 15,000 CAP 4068441 JACKSONVILLE JTA SECT 5307 FORMULA GRANT CAPITAL PURCHASES CAPITAL FOR FIXED ROUTE .000 4,629 CAP 4,629 CAP 4,629 CAP 4,629 CAP 4,629 CAP 4117601 JACKSONVILLE JTA SECT 5307 FORMULA GRANT CAPITAL PURCHASES CAPITAL FOR FIXED ROUTE .000 2,709 CAP 3,130 CAP 3,130 CAP 3,130 CAP 3,130 CAP 4089671 JACKSONVILLE JTA SECT 5307 FORMULA GRANT TRANSIT PLANNING TASKS CAPITAL FOR FIXED ROUTE .000 1,761 CAP 1,843 CAP 1,843 CAP 1,843 CAP 1,843 CAP 4117591 JACKSONVILLE JTA STATE BLOCK GRANT OPERATING FUNDS OPERATING FOR FIXED ROUTE .000 10,243 OPS 10,550 OPS 10,866 OPS 11,192 OPS 11,528 OPS 2159233 JTA / STP FUNDS DUVAL COUNTY PURCHASE BUSES/EQUIPMENT PURCHASE VEHICLES/EQUIPMENT .000 1,250 CAP 1,250 CAP 1,250 CAP 1,250 CAP 1,250 CAP
4453331 JTA BLUE LINE FLEX ROUTE - OPERATIONS URBAN CORRIDOR IMPROVEMENTS .000 140 OPS
4449171 JTA BRT EAST - OPERATING TRANSIT SERVICE DEMONSTRATION .000 300 OPS
4453332 JTA RED LINE FLEX ROUTE - OPERATIONS URBAN CORRIDOR IMPROVEMENTS .000 85 OPS
4117633 NORTH FLORIDA TPO FE D SECT 5303 PLANNING FUNDS TRANSPORTATION PLANNING .000 712 PLN 734 PLN 756 PLN 779 PLN 802 PLN
4337161 SECTION 5337 JTA STATE OF GOOD REPAIR TRANSIT IMPROVEMENT .000 901 OPS 901 OPS 901 OPS 901 OPS
4337151 SECTION 5339 JTA BUS AND BUS FACILITIES TRANSIT IMPROVEMENT .000 2,260 CAP 2,260 CAP 2,260 CAP 2,260 CAP 2,260 CAP
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
ST. JOHNS COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Highways: Interstate
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4240264 I-95(SR9) FROM NORTH OF THE FCE INTERCHANGE TO THE DUVAL COUNTY LINE ADD LANES & RECONSTRUCT 4.682 2,134 PE
4,305 ROW
5,750 RRU 177,535 DSB 4229389 I-95(SR9) FROM S OF INTERNATIONAL GOLF PKWY TO S OF SR23 INTERCHANGE ADD LANES & RECONSTRUCT 3.001 954 PE
109,917 DSB
4386101 I-95(SR9) ST JOHNS NORTHBOUND REST AREA REST AREA (DUAL) .759 1,883 PE
23,531 CST 50 ENV
4386102 I-95(SR9) ST JOHNS SOUTHBOUND REST AREA REST AREA (DUAL) .383 1,922 PE
Highways: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4135341 D2-ST JOHNS COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT TRAFFIC CONTROL DEVICES/SYSTEM .000 535 OPS 560 OPS 4486531 SMART ST. AUGUSTINE CONNECTED VEHICLE SYSTEM IN CITY OF ST. AUGUSTINE ITS COMMUNICATION SYSTEM 4.819 968 CST
4434881 SR16 FROM CR13 TO CR16A LIGHTING 1.656 1,883 CST
4345621 SR16 FROM WEST OF TOMS ROAD TO EAST OF CR208 INTERSECTION IMPROVEMENT .364 587 ROW 83 ROW
3,608 CST 4304493 SR206 @ MANTANZA RIVER ICWW CRESCENT BEACH BRIDGE #780090 BRIDGE-REPAIR/REHABILITATION .564 786 CST
4432731 SR206 FROM I-95 TO ICWW BRIDGE RESURFACING 5.415 5,836 CST
4453531 SR206 FROM SR207 TO I-95 RESURFACING 8.428 6,238 CST
4455461 SR207 FROM I-95 TO SR312 RESURFACING 4.000 8,063 CST
4229388 SR23(FIRST COAST XWAY) FROM I-95(SR9) TO EAST OF CR16A SPUR NEW ROAD CONSTRUCTION 7.654 2,591 PE 3,500 RRU
346,169 DSB 5,920 DSB 4,675 DSB 4470261 SR312 @ MATANZAS RIVER ICWW BRIDGE NO. 780089 BRIDGE-REPAIR/REHABILITATION 1.677 57 PDE
2102304 SR313 FROM: SR207 TO: S HOLMES BLVD NEW ROAD CONSTRUCTION .000 11,694 CST
4338432 SR5(US1) @ OYSTER CREEK BRIDGE NO780103 REPLACE OR WIDEN BR CULVERT .016 4,314 CST
4479131 SR5(US1) FROM MARION AVENUE TO FORT MOSS TRAIL LANDSCAPING 3.301 613 CST
4471721 SR5(US1) FROM SR206 TO MOULTRIE CREEK RESURFACING 4.519 11,534 CST
4282712 SR5A(A1A)(KINGS ST) FROM: BRIDGE OF LIONS TO: CHARLOTTE ST DRAINAGE IMPROVEMENTS .571 1,800 PE
4308971 SR5A(KING ST) FROM: MALAGA ST TO:AVENIDA MENENDEZ (A1A) DRAINAGE IMPROVEMENTS .599 400 RRU
11,100 CST 4374281 SR5A(US1/KING ST.) OVER SAN SEBASTIAN RIVER BRIDGE NO780003 BRIDGE REPLACEMENT .111 1,125 ROW 356 ROW
7,366 CST 4373741 SRA1A @ MARY STREET ADDING LEFT TURN LANE FROM: A1A TO: MARY STREET ADD LEFT TURN LANE(S) .210 824 CST
4477361 SRA1A FROM SAN MARCO TO NORTH OF PARK ENTRANCE BIKE PATH/TRAIL 7.500 307 PDE
4299311 SRA1A FROM: PALMETO AVE TO: SAND CASTLE LANE DRAINAGE IMPROVEMENTS 2.698 8,062 CST
4435541 SRA1A(AVENIDA MENENDEZ) FROM KING ST TO CASTILLO SAN MARCOS PEDESTRIAN SAFETY IMPROVEMENT .421 1,187 CST
Highways: Off State Hwy Sys/Off Fed Sys
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
TENTATIVE FY 2022 - 2026 (12/18/2020 11.42.22)
ST. JOHNS COUNTY
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
Maintenance: Interstate
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
2151481 ST. JOHNS ROUTINE MAINTENANCE 34.855 250 MNT 250 MNT
Maintenance: State Highways
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4102148 ST AUGUSTINE MAINT ROUNTINE MAINTENANCE CONTRACTS PRIMARY ROUTINE MAINTENANCE .000 189 MNT
4442251 CONCRETE SIDEWALK REPAIR IN ST. JOHNS COUNTY ROUTINE MAINTENANCE .000 146 MNT
4144201 LIGHTING AGREEMENTS ST. JOHNS COUNTY MISCELLANEOUS CONSTRUCTION .000 228 MNT 232 MNT
4442241 ROADSIDE DITCH CLEANING IN ST. JOHNS COUNTY ROUTINE MAINTENANCE .000 51 MNT
4420742 ST. AUGUSTINE MAINTENANCE - ST. JOHNS - EDGE & SWEEP ROUTINE MAINTENANCE .000 100 MNT 100 MNT 100 MNT
2146191 ST. JOHNS ROUTINE MAINTENANCE .000 4,000 MNT 4,000 MNT
Freight, Logistic And Passenger Operation: Intermodal
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4419241 NFRA DESIGN & CONSTRUCT EAST TERMINAL ACCESS ROAD PFL11882 AVIATION CAPACITY PROJECT .000 1,000 CAP
Freight, Logistic And Passenger Operation: Aviation
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4350261 NE FL REG APT DESIGN & REHAB TAXIWAY "F" & "G" PFL0010201 AVIATION PRESERVATION PROJECT .000 200 CAP 2,000 CAP 4350262 NE FL REG APT DESIGN AND CONST ACCESS RD US1 TO CONF CENTER PFL0013096 AVIATION PRESERVATION PROJECT .000 1,000 CAP
4331262 NE FL REG APT DESIGN AND CONSTRUCT HANGAR PFL0013097 AVIATION REVENUE/OPERATIONAL .000 2,000 CAP
4399681 NE FLA REG APT ACQUISITION OF INDEX B ARFF VEH REQ PART 139 PFL10688 AVIATION SAFETY PROJECT .000 1,000 CAP
4380481 NE FLA REG APT LAND ACQ FOR DEV PFL0010969 AVIATION REVENUE/OPERATIONAL .000 500 CAP
4452882 NEFL REG APT SECURITY FENCING, GATE & ACCESS CONTROL SYSTEM PFL0012368 AVIATION SECURITY PROJECT .000 1,500 CAP
4380471 NORTHEAST FL REG APT DESIGN & CONSTRUCT FUEL FARM PFL0010970 AVIATION REVENUE/OPERATIONAL .000 1,300 CAP 4440691 NORTHEAST FL REGIONAL APT DESIGN & CONSTRUCT CORPORATE HANGAR AVIATION REVENUE/OPERATIONAL .000 250 CAP 2,250 CAP 4440771 NORTHEAST FL REGIONAL APT GA APRON REHAB IN T-HANGAR AREA AVIATION CAPACITY PROJECT .000 270 CAP
4399671 NORTHEAST FLA REG APT DESIGN & CONST ARFF BUILDING PART 139 PFL0007619 AVIATION SAFETY PROJECT .000 1,817 CAP
Freight, Logistic And Passenger Operation: Transit
Item No Project Description Work Description Length 2022 2023 2024 2025 2026
4292031 ST JOHNS CNTY FED 5307 CAPITAL GRANT CAPITAL FOR FIXED ROUTE .000 978 CAP 1,076 CAP 1,183 CAP 1,183 CAP 1,183 CAP 4272651 ST JOHNS CNTY FED SECT 5311 RURAL TRANSIT FUNDING OPERATING/ADMIN. ASSISTANCE .000 791 OPS 831 OPS 872 OPS 916 OPS 962 OPS 4415221 ST. JOHNS COUNTY 5339 TRANSIT IMPROVEMENT OPERATING/ADMIN. ASSISTANCE .000 209 CAP 209 CAP 209 CAP 209 CAP 209 CAP 4184411 ST. JOHNS COUNTY BLOCK GRANT OPERATING FUNDS OPERATING FOR FIXED ROUTE .000 1,162 OPS 1,197 OPS 1,233 OPS 1,270 OPS 1,308 OPS 4067899 ST.JOHNS CNTY BCC STP FUNDS PURCHASE BUSES/EQUIPMENT PURCHASE VEHICLES/EQUIPMENT .000 500 CAP 500 CAP 500 CAP 500 CAP 500 CAP 4067898 ST.JOHNS CNTY FED 5307 OPERATING GRANT OPERATING FOR FIXED ROUTE .000 3,200 CAP 3,600 CAP 4,000 CAP 4,000 CAP 4,000 CAP
Report Element Requested Value Report Description: Styled PDF Detail Report: By Local Name
Component Groups: Highways=Yes; FLP=Yes; Turnpike=Yes; Maintenance=Yes;
Planning=Yes; FCO=Yes; Research and Testing=No; Fl Rail Enterprise=Yes; Transportation Disadvantaged=Yes; Miscellaneous=No;
Version: G1
Fiscal Year: 2022
Number of Years: 5
District: Geographic District 02
County: N/A
Snapshot: Live (12/18/2020)
Allocation Type: J
Report Format: PDF
Transportation System: Not specified (Select All)
Contract Class: B
Work Mix: Not specified (Select All)
Phase Group: Not specified (Select All)
Phase Type: Not specified (Select All)
Program Number: Not specified (Select All)
Fund Group: Not specified (Select All)
Item Status - from: Not specified
Item Status - to: Not specified
Item Group: Not specified (Select All)
Phase Phase
Phase Description Group Type Exceptions
ADM Administration A Any Excl pgm 52;Ph A8 w/pgm 39 CAP Capital 9 Any
CST Construction 5,6 Any Excl Ph 5A,5D,56,57; Cnclss 9 DSB Design Build 5,6 Any With Conclass 9 only ENV Environmental C Any
INC Contract Incentives 5 A
LAR Local Advance Reimburse A 8 With Program 39 only MNT Brdg/Rdwy/Contract Maint 7 Any Excl Phase 76 and 77 OPS Operations 8 Any
PDE P D & E 2 Any
PE Preliminary Engineering 3 Any Excl Phase 36 and 37 PLN Planning 1 Any
RES Research B Any
RPY Repayments 5 D Also incl Ph A8 w/pgm 61,78,SB ROW Right of Way 4 Any Excl Phase 46 and 47
RRU Railroad & Utilities Any 6,7 Excl Phase Group 1 and 2 MSC Miscellaneous Other Other
Trans Phase Phase Budget Component Description System Group Type Dist
Highways 01,03-07,16 Any Any Any Turnpike 02 Any Any Any Fixed Capital Outlay 12 Any Any Any Research & Testing Any B Any Any Transportation Planning 13 1 Any Any Maintenance Any 7 Any Any F, L and PO 08-11,15 Any Any Any Transportation Disadvantaged 14 Any Any Any Florida Rail Enterprise Any any Any 31
Trans
System Group System Program Exceptions
Interstate 01 Any Excl pgm 90 State Highways 03,04,05 Any Excl pgm 90 Local Roads 06,07 Any Excl pgm 90 Intermodal 08-11,15 Any Excl pgm 90 High Speed Rail Development Any 90