Republic of the Philippines

Province of Cebu

Municipality of San Francisco

The 5-Year Municipal Disaster Risk Reduction and Management (MDRRM) Plan is developed by the Municipal Government of San Francisco and its constituents, with technical assistance from Plan Philippines Camotes Program Unit and the United

Nation International Strategy for Disaster Reduction (UNISDR)

San Francisco 5 - Year

Municipal Disaster Risk

Reduction and

Management (MDRRM)

Plan (2011-2015)

(2)

TABLE OF CONTENTS

PAGES

LIST OF ANNEXES iii

LIST OF TABLES iii

LIST OF FIGURES iii

ACKNOWLEDGMENT iv LIST OF ACRONYMS v EXECUTIVE SUMMARY vi CHAPTERS CONTENTS PAGES CHAPTER I INTRODUCTION 1 Rationale Planning Process Scope and Duration

CHAPTER II DISASTERS AND HAZARD PROFILE 4

Description of Municipality of San Francisco Type of hazards that frequently visited Community Risk Assessments results

CHAPTER III THE FIVE- YEAR MUNICIPAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN

4

The Disaster Prevention Program The Disaster Mitigation Program

Disaster Preparedness and Response Program

CHAPTER IV GENERAL IMPLEMENTING ARRANGEMENT 4

Organizational Structure

Institutional Working Arrangement

General Monitoring and Evaluation Framework

CHAPTER

V THE LOCAL DISASTER RISK REDUCTION & MANAGEMENT OFFICE REFERENCES

(3)

ACKNOWLEDGMENT

We would like to give you a glimpse behind the scenes to acknowledge the many individuals who played indispensable roles in the successful completion of the Municipal Disaster Risk Reduction and Management Plan of San Francisco:

To Honorable Mayor Aly A. Arquillano for his guidance, logistics and moral support; To the Honorable Sangguniang Bayan Members headed by Honorable Vice Mayor Alfredo A. Arquillano Jr. for their guidance and support in legitimizing this plan; To the Plan Philippines Camotes Program Unit and United Nation International Strategy for Disaster Reduction (UNISDR) for thier invaluable contribution to the San Franciscohanons in providing technical assistance in the formulation of this Plan;

To the Municipal and Barangay Officials and to all LGU employees for their cooperation, coordination and unwavering support, who helped us, realize our goals;

To the staff Municipal Disaster Risk Reduction and Management Office (MDRRMO) for providing the necessary information and data that helped us realizes the MDRRM Plan;

And above all, to the Constituents of the Municipality of San Francisco who are in the frontlines of vulnerabilities when a hazards strikes; to whom this document is dedicated, for sharing to us their lives and shortcomings for the formulation of this Municipal Disaster Risk Reduction and Management Plans.

(4)

LIST OF ACRONYMS

ACDV Accredited Community Disaster Volunteer CP Contingency Plan

CPU Camotes Program Unit

UNISDR United Nation International Strategy for Disaster Reduction LDRRMF Local Disaster Risk Reduction and Management Fund LDRRMO Local Disaster Risk Reduction and Management Office LDRRMC Local Disaster Risk Reduction and Management Council

RA Republic Act

BDRRMC Barangay Disaster Risk Reduction and Management Office MDRRMP Municipal Disaster Risk Reduction and Management Plan DP-CRM Disaster Prevention –Coastal Resource Management HFA Hyogo Framework of Action

NGO Non-Government Organization PO People’s Organization

LGU Local Government Unit

MDRRMO Municipal Disaster Risk Reduction and Management Office MDRRMC Municipal Disaster Risk Reduction and Management Council MSWDO Municipal Social Welfare and Development Office

RAFI Ramon Aboitiz Foundation Incorporated ECOGOV Philippine Environmental Governance

(5)

EXECUTIVE SUMMARY

The municipality of San Francisco, like many islands in the Philippines, is naturally gifted with very rich coastal resources. Its beautiful coral reefs symbolize as one of the earth’s most productive and diverse ecosystems. Its thick, abundant, verdant mangrove forest, a multi-use and multi-user resource, stretches throughout the coastal areas of barangays Southern Poblacion, Unidos, Consuelo and Northern Poblacion. A large area of mangrove swamp lies between the municipalities of Poro and San Francisco, which has provided shelter and habitat to a variety of birds and food organisms; and provided a sustainable supply of building materials, charcoal, fuel wood and other uses of people. The fisherfolk have been enjoying bountiful harvest from their municipal waters even just after three to four hours of fishing. The municipality is also known for their “Soli-Soli Festival”. During the Pasigarbo sa Sugbo festival last August 15, 2009 Soli-soli Festival won the 5th place. Became the 1st EGWEN grand champion of the Province of Cebu. Another land mark of San Francisco is the Lake Danao, known to be the largest lake in the Visayas and Mindanao. The total size of the lake is 680 hectares. This place used to be ful of crocodiles until they were all hunted down ad their hides were sold to Mindanao to produce bags shoes and belts out of crocodile skins. It contains fresh water and still is abundant with fresh water fishes.

But these living wonders, rich resources have been under severe stress and the community is always facing the challenges of natural hazards such typhoons and monsoon winds, which frequently affects not only the Municipality of San Francisco but the whole Camotes Islands.

The two types of Monsoon winds that regularly hits San Francisco are the North-East Monsoon during the Month of December –February and the South-West Monsoon during the month of June – September. While the two most significant Typhoons that visited Camotes Island are Typhoon Ruping (Tropical Storm Mike) on November 1990 and Typhoon Bising (Tropical Storm Nelson) on March 1982. These two super typhoons devastated the agriculture and fishery resources of the municipality as well as the houses and other infrastructure and lifeline services of the municipality. Aside from the direct effect of strong winds of the typhoon and big waves of the monsoon winds, it produces also ample amount of rainfalls sea waters that causes floods and landslide to low lying areas of the municipality.

The continued occurrences of these natural hazards increases the vulnerabilities of the communities that put them into an endless poverty situation due to damages of properties and devastation to their livelihoods, and sometime leads to loss of life. Taking the opportunity that Disaster Risk Reduction is nowadays a global concerns particularly to the small islands like Camotes, the municipality started the process of conducting barangay based community risk assessment, barangay contingency planning and community drill and series of community awareness seminars on disaster risk reduction and climate change adaptation to generate supports and encouragement among village officials and communities to formulate a 5-Year Comprehensive Municipal Disaster Risk Reduction and Management Plan.

The San Francisco Municipal Disaster Risk Reduction and Management Plan will serve as a guide in the implementation a proactive Disaster risk reduction programs that emphasize the five pillars called: 1) Governance by making disaster risk reduction a priority agenda for sustainable development; 2) Risk Assessment by improving risk information and early warning; 3) Knowledge

(6)

and Education through building culture of safety and resiliency among vulnerable communities; 4) Vulnerability Reduction by reducing the risks of Key sectors; and 5) Disaster Preparedness and Response for timely and effective response mechanism. These Five Pillars of Disaster Risk Reduction of San Francisco aim to have a “Zero Casualty and No Injury every time hazard occurred.

The 5-Year MDRRM Plan entails a total budget of PhP 11.680 Million with total funding requirements of Php 2.457 Million for the year 1; Php 2.395 Million for the year 2 and 3; Php 2.115 Million for Year 4 and Php. 2.115 Million for Year 5. (See Table 1: Total Budgetary Requirements).

Table 1: Total Budgetary Requirements

Year 5%LDRRM

Fund Prevention Mitigation Preparedeness

Year Total budget 1 3,336,811.00 1,361,365 631,000 370,000 2,362,365 2 3,336,811.00 463,770 1,565,000 407,000 2,435,770 3 3,336,811.00 463,770 1,565,000 307,000 2,335,770 4 3,336,811.00 463,770 1,470,000 277,000 2,210,770 5 3,336,811.00 363,770 1,470,000 277,000 2,110,770 TOTAL 3,116,445 6,701,000 1,638,000 11,455,445

This amount needed for five years will be sourced out from the 5% Local Disaster Risk Reduction and Management Fund (LDRRMF) of the Municipality. And for the fiscal Year of 2011 the Municipality has total LDRRM Fund amounting Php 3.336 Million pesos.

(7)

THE COMPREHENSIVE MUNICIPAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN OF SAN FRANCISCO (CAMOTES ISLAND), CEBU

I. INTRODUCTION: A. RATIONALE

The municipality of San Francisco has a total land area of 10,596.8753 hectares which occupy 2.08% of Cebu Province’s (508,839 ha) total land area [CLUP Document, 1998]. It is located between geographical coordinates 1240 14’ 04’’ to 124o 30’ 37’’ longitude and 100 26’ 15’’ to 100 32’ 48’’ latitude. It is one of the four municipalities comprising the Camotes Group which is composed of Pilar, Poro, Tudela, and San Francisco. It is presently classified as a fourth class municipality with a total of fifteen barangays, twelve (12) of which are coastal. According to 2007 census, it has a total population of 44,588 people.

Last May 27, 2011 Former President Gloria Macapagal Arroyo sign into law the Disaster Risk Reduction and Management Act of 2010 to amend the three decade Presidential Decree 1566 the old disaster management law of the Philippines. The RA 10121 institutionalizes the disaster risk reduction and management system not only in the National Government but also to all local government units in the country. One of the important features of this new law is the comprehensive utilization of 5% calamity fund and now the disaster risk reduction and management fund (DRRMF). It is very clear to us to all government units that 5% calamity fund before can only be used if there is a declaration of one area under the state of calamity. Based on the Section 21 of RA 10121, the 70% of LDRRM Fund can be used for pre disaster activities that can make the LGU’s more proactive in Disaster risk reduction.

In order for the LGU to be efficient and effective in the Utilization of the LDRRM Fund the law requires them to formulate a comprehensive DRRM Plan as basis for the disbursement of the fund (Par. 1 of Sec. 21 of RA 10121)

It is also important to note that the Municipal Vice Mayor of San Francisco, Honorable Alfredo A. Arquillano Jr. Has been awarded by The UNISDR being the Asia Pacific Regional Champion for Disaster Risk Reduction for 2011, during the Region VII Launching of DRR Campaign last January 13, 2011 at the Social Hall of Cebu Provincial Capitol. Vice Mayor Arquillano is the third person in the Philippines awarded such prestigious awards by UNISDR (Sen. Loren Legarda in 2009 and Gov. Joey Salceda of Albay in 2010) and the only vice Mayor in the international community received such awards.

B. PLANNING PROCESS

The primary goal of the MDRRM Plan is to improve the existing practices of the LGU on the disaster risk reduction and management through better partnership and working relationship among the departments within the local government unit, civil society organization private sectors and community disaster volunteers (CDV’s).

In the formulation of MDRRM plan, there are four specific objectives has been agreed upon by the participants in order to attain a better quality results and guidelines in the formulation of the plan. And these are as follows:

(8)

1. To Consolidate the contingency plans of the BLGU as component of Comprehensive Municipal DRRM Plan

2. To conduct Participatory Capacity and Vulnerability Assessment (PCVA) to be more objectives in the budget prioritization for the 70% of Local Disaster Risk Reduction and Management Fund. 3. To consolidate the programs and project of the every department of the LGU related to DRR

and allocate funds from LDRRM Fund.

4. To formulate the comprehensive DRRM Plan of the Municipality

The 3-day MDRRM Planning and workshop is also a product of various strategies, activities and processes that have been undertaken by the LGU through its Municipal Disaster Risk Reduction and Management Council (MDRRMC).

Below are the governance-driven strategies and evolutionary planning processes and activities, to wit:

Barangay level:

1. Through the Disaster Prevention – Coastal Resource Management (DP-CRM) Program of Plan Philippines-Camotes Program Unit (CPU) provided technical assistance to the fifteen Barangays of San Francisco in terms of the formulation of Barangay Contingency Plan and the re-structuring of their Barangay Disaster Risk Reduction and Management Committee (previously known as Barangay Disaster Coordinating Council). As of December 2010, thirteen contingency plan has been formulated and 13 BDRRMC Structure has been reorganize

2. Community Emergency Drill has been regularized in the thirteen communities using the guidelines that have been written in their contingency plan.

Municipal Level:

Three-day planning process has been agreed upon by the MDRRMC to draft the municipal disaster risk reduction and management plan. On the first day, discussion on the salient provision of RA 10121 and Basic Concept of DRR has been provided, followed by the presentation of the result of community risk assessments made by the barangays who undergone comntingency planning to Plan Philippines. Consolidation of Municipal wide Risk Assessment and finalization of MDRRMO Structure, review of financial capability of the LGU to fund MDRRM plan and the 5 year MDRRM planning process on the second day. And for the third day, continuation of planning process and final financial projection for five year budgetary requirements has been done to ensure the feasibility and efficiency that the plan is implementable by the LGU. (See Figure 1: MDRRM Planning and Workshop Road Map)

Figure 1: MDRRM Planning and Workshop Road Map

INPUT: Salient Provision of RA 10121 and DRRM

Models

Participatory Capacity and Vulnerability Assessment

(MDRRMC Perspective)

Presentation of Community Risk Assessment and its Local

Risk Patterns Review of MDRRMC Structures Comprehensive DRRM Planning Legislation

(9)

C. SCOPE AND DURATION

The 5-year MDRRM Plan (2011 – 2015) focuses on the5 core program namely; 1) Disaster Prevention Program which focuses on the physical and structural component of disaster risk reduction, 2) Disaster Mitigation Program which discuss the knowledge management, social protection, sustainable livelihood, public health, agriculture resiliency, early warning system, barangay digitized hazard mapping, renewable energy, networking and linkaging and the monitoring and evaluation of DRR plan and its implementation. And 3) the Disaster Preparedness and Response Program – the highlights of this program is the organizing and accreditation of community disaster volunteers, relief stockpiling, emergency drills, and purchase of emergency response related equipments.

(10)

II. DISASTERS AND HAZARD PROFILE: Table 2: Risk Assessment/Ranking

TYPY OF HAZARDS

LEVEL OF RISKS

UNDERLYING FACTORS

LOW MEDIUM HIGH

Typhoon X Located in Typhoon belt areas

Island Municipality located in an open sea and low land

Insufficient food supplies coming from the mailand during typhoon

Mode of transportation is dependent to small passenger vessels/boat that dependent on fair weather conditions

Most of the houses are made of light materials All 15 barangays are affected during typhoons 12 Barangays are located t the at the coastal areas that are dependent to fishing activities as major source of livelihood

Strong typhoons as effect of Climate change El Nino X Farmers are dependent to rain for their crops

No available irrigation facilities Lack of water supply

Water source cannot sustain during prolong dry season

No available forest

All 15 barangays are affected during El nino phenomenon

Severe El Nino Phenomenon as effect of Climate change

Monsoon Winds

X 12 Barangays are located t the at the coastal areas that are dependent to fishing activities as major source of livelihood

Residents are dependent on the transportation of prime commodities from the mainland

More than 50% of the populations reside in the coastal areas.

Prolong Monsoon winds as effect of Climate change Flooding/ Flash

Flood

X Lack of trees due to illegal cutting Kaingin system as means of livelihood Low lying area

Poor drainage

Heavy Rain fall as effect of Climate change

Landslide X Loss Soil

Steep slope Denuded forest Lightning and

Tornado

X Lack of precautionary measures

Fire X Octopus electrical connection which resulted to over load of electricity

Houses are made of light materials and their places in the 15 barangays that houses are congested

(11)

Table 3: Vulnerability and Capacity Analysis

HAZARDS ASPECTS VULNERABILITIES CAPACITIES

1. TYPHOON (Bagyo)

Physical/Materia l (Typhoon, El Nino, Heavy Rain fall, Flooding, Monsoon Winds)

Presence of Illegal Fishing Activities Destruction of Marine Life and its habitat Scarcity of catch

Lack of awareness on marine life conservation

Poor/ insufficient coastal law enforcement Lack of sustainable income among fishers Presence of dengue

Presence of mosquito breeding areas Occurrence of diarrhrea

Water source contamination during rainy days and typhoons

Proper nutrition is not a priority among parents

No standby power source to augment during prolong brownouts

Inconsistent availability of communication Inability to provide updated report during disasters

Isolation of Island to the mainland during occurrence of monsoon winds and typhoons that may cause insufficiency of supplies of food

Devastated farm products during typhoons and el nino

Illegal cutting of trees

Lack of adequate health facilities/personnel Hospital have no trained staff in major operations

No Consultants available

No clear guidelines for cave tourism

Organized fishermen’s association Established Marine Sanctuary Existence of CRM Plan

Systematic IEC Campaign and Monitoring of breeding grounds of dengue carrying mosquito

Existence of chlorination

Regular conduct of PABASA sa Nutrition Supplemental Feeding

Consumers are good payor of electrical bill

Landline, cell sites and internet connections

Tree planting aas one of priority of the LGU (2 Million tree Project)

Organized chainsaw operator

Availability of district hospital and health centers, general consultations and managements, basic laboratory (CBC, V/A, S/E) and birthing capacity for normal delivery.

Social/

Organizational (Typhoon, El Nino, Heavy Rain fall, Flooding, Monsoon Winds)

Adunay pipila nga Magsalig lang guihapon sa tabang

Fatalistics attitude towards health hazard and other hazards heallth hazard and other hazards

Kakulangan sa pagpangandam sa panahon sa katalagman

Kakulangan sa pagpangandam sa pagresponde sa mga panginahanglan Disaster as consequene of fate Neglegence on safety measures

Ang kasagaran maningkamot mobarog sa iyang kaugalingon human sa katalagman. Mangita ug alternatibong panginabuhian, panahon sa bagyo ug kulyada

Bayanihan system

Magtinabangay panahon sa katalagman Lig-ong determinasyon pagpahiuli sa guikan sa kadaut

Hugot nga pagtuo sa Dios Proper Waste Management Environment to get things done Motivational/

Attitudinal (Typhoon, El Nino, Heavy Rain fall, Flooding, Monsoon Winds)

Low income (limited due to access to resources)

Big Family Size

Some parents are irresponsible Failing Healing Belief

Children in conflict with the Law Possible Social Impact of Tourism

LGU Officials with strong Political Well Responsive & Supportive Leaders Organized & Active BDRRMC/MDRRMC Very Cooperative & Supportive NGO's specially the Plan Philippines, ECOGOV & RAFI

(12)
(13)

III. THE FIVE- YEAR MUNICIPAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN:

Programs Project/Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15

DISASTER PREVENTION:

Physical

Infrastructure - Establishment/ Equipping the San Francisco Operation Center 100,000 200,000 200,000 200,000 200,000  Equipments for LDDRRMO / Operation Center Purchased 900,000 LDRRM Fund MDRRMO - Building Assessment/Imple mentation of building Code (schools, business establishments, houses, hospital buildings) 10,000 10,000 10,000 10,000 10,000  Building Assessment implemented/ safe building structures 50,000 LDRRM

Fund Municipal Engineering

- Formulation of Municipal Drainage Master Plans/Designs 400,000  Municipal Drainage Master Plan Formulated 400,000 LDRRM

Fund Municipal Engineering - Assessments of Roads, Bridges, Rivers/Creeks 10,000 10,000 10,000 10,000 10,000  Yearly Assessment Report on the status of roads, bridges, rivers/creeks 50,000 LDRRM

Fund Municipal Engineering

- Conduct Soil Stability Assessment & Analysis 100,000  Soil Stability Assessment & Analysis conducted 100,000 LDRRM

Fund Municipal Engineering - Financial support to

the formulation of plan for Water

50,000  Water sources

assessed & plans and design for

50,000 LDRRM

(14)

Programs Project/Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15

Sources distribution

lines and design water distribution lines formulated - Assessment and monitoring of resorts to the compliance on standard Waste Water Treatment Facility 5,000 5,000 5,000 5,000 5,000  100% Compliance ensured 25,000 LDRRM Fund MENRO - Establishment/Rain water Catchment in all public buildings

100,000 100,000 100,000 100,000  Rainwater catchment installed

400,000 LDRRM

Fund Municipal Engineering CRM

Sustainability

- Support

Maintenance of marker bouys and Annual MPA Assessment/ Monitoring 10,000 10,000 10,000 10,000 10,000  CRM activities sustained 50,000 LDRRM Fund - Fisherlfok Organizational Support 10,000 10,000 10,000 10,000 10,000  Fisherfolk Organization Sustained 50,000 LDRRM Fund Environmental

Protection - 2 Million Tree project A. Orientation (i.e., project implementation ) B. Operatonalizati on (i.e., mapping, installation of IEC materials, consultancy) C. Social Marketing 766,365 18,770 18,770 18,770 18,770  2M trees planted, maintained and sustained 841,445 LDRRM Fund

(15)

Programs Project/Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15

- Purchase of 4 shredder for solid waste management 100,000 100,000  4 shredder purchased for solid waste management 200.000 Total 1,361,365 463,770 463,770 463,770 363,770 3,116,445 -

Programs Project/ Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15

DISASTER MITIGATION PROGRAMS

Knowledge

Management - Orientation of Teachers/PTA/ Purok on DRR

15,000 12,000 12,000 12,000 12,000  Oriented & aware Teachers & Purok Officials

63,000 DRRM

Fund DepEd & Purok Coor. - Integration in the

DepEd Lessons (production of materials)

20,000 30,000 30,000 30,000 30,000  Students

awareness 140,000 LDRRM Fund DepEd - Conduct DRR

Related Contests (Quiz Bee, Poster Making, Slogan, Jingle, Role Playing & etc.)

10,000 50,000 50,000 50,000 50,000  Increased awareness on DRR concepts

210,000 LDRRM

Fund DepEd & LDRRMO

- Integration of DRR Concepts during Celebrations (DRR/CCA Advocacy thru dances) 15,000 15,000 15,000 15,000 15,000  Increased awareness on DRR concepts 75,000 LDRRM Fund MDRRMO - Production and

(16)

Programs Project/ Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15

Materials on strategic places like in the Brgy. Hall, Church, Purok Center, Schools & Market

DRR concepts

- Orientation on Personal Safety Lessons in OSY and Puroks. 5,000 5,000 5,000 5,000 5,000  Awareness of the PSL Concept 25,000 LDRRM Fund DSWD Social Protection - 50% Assistance on Membership on 11k school children red cross accident insurance Develop scheme/ orientation 203,000 203,000 203,000 203,000  Insured school children and identified 300 indigent parents 812,000 LDRRM Fund DSWD, DepEd - Philhealth (dili grant) Membership Assistance (300 indigent) Develop scheme/ orientation 225,000 225,000 225,000 225,000  900,000 LDRRM Fund - Strengthening the structure of MIACAT/BIACAT 5,000 5,000  Strengthened & active MIACAT/BIACAT 10,000 LDRRM Fund MSWD - DRR Orientation on PWD’s Senior Citizen. 5,000 5,000 5,000 5,000 5,000  Strengthened & active Bantay Banay/ Senior Citizen & Senior Citizen

25,000 LDRRM

Fund MCPC

Sustainable

Livelihood - Provide Trainings of Small & Medium Scale Entrepreneurship (handicrafts, food processing, soap 15,000 15,000 15,000 15,000 15,000 Trained skilled entrepreneurs 75,000 LDRRM Fund DSWD

(17)

Programs Project/ Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15 making, backyard gardening, livestock raising) - Provide Loans Financial Assistance thru micro finance and small scale green livelihood Develop scheme/ orientation 150,000 150,000 150,000 150,000 Increase family income 600,000 LDRRM Fund DSWD Public Health

Project - 100% Household Sanitary Latrine Program

40,000 45,000 45,000 45,000 45,000  Clean, sanitary & healthy environment 220,000 LDRRM Fund MHO - Establish Mobile Clinic with laboratory & equipment to serve the 15 Brgys. (Medical & Dental)

400,000 400,000 300,000 300,000  Indigents availed medical and dental services for free 1,400,000 LDRRM Fund MHO Agriculture

Resiliency - Provide climate resistant crops or seeds Networking / inventory of existing crops and practices 20,000 20,000 20,000 20,000  Increase agricultural production 80,000 LDRRM Fund MAO - Support to the establishment of rain water harvesting system and small water impounding to farms during drought 25,000 25,000 25,000 25,000 25,000  Increase agricultural production 125,000 LDRRM Fund MAO - Revitalization of scientific methods of farming (organic farming, vermi culture, multi 5,000 5,000 5,000 5,000 5,000  Increase agricultural production 25,000 LDRRM Fund MAO

(18)

Programs Project/ Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15 cropping, etc) Early Warning System - Maintenance of Rain Gauge 5,000 5,000 5,000 5,000 5,000  Functional rain gauge 25,000 LDRRM Fund LDRRMO - Establishment and maintenance of two-way Radio repeater

150,000 20,000 20,000 20,000 20,000  Fast & accurate information dissemination 230,000 LDRRM Fund LDRRMO Barangay-based Digitized Hazard Mapping - Survey of the Hazard prone areas per brgy

1,000  Identified hazard

prone areas 1,000 LDRRM Fund LDRRMO - Production of

digitized hazard maps

5,000  Enhance

awareness 5,000 LDRRM Fund LDRRMO - Tarpaulin

printing/posting of the digitized hazard maps

20,000  Well informed

communities 20,000 LDRRM Fund LDRRMO Renewable

Energy Program

- Establish/repair of power house and other equipment for solar energy

80,000 20,000 20,000 20,000 20,000  Reduced dependence on fossil fuel

160,000 LDRRM

Fund Engineering Dept. - Maintenance and

expansion of the renewable energy program

100,000 100,000 100,000 100,000  Functional supply

of energy 400,000 LDRRM Fund Engineering Dept. Networking

and Linkaging

- Submit project proposal to possible Foreign Donors who are advocates on DRR (proposals like assistance on the establishment of solar energy) 5,000 5,000 5,000 5,000 5,000  Established linkages and generate funds for DRR Projects 25,000 LDRRM Fund LDRRMO

(19)

Programs Project/ Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15 - Resource Mobilization through Climate Change Mitigation, Renewable Energy and Green Resources Protection & Management 100,000 100,000 100,000 100,000  ---do--- 400,000 LDRRM Fund LDRRMO DRR Planning, Monitoring & Evaluations Workshops and

meetings 200,000 100,000 100,000 100,000 100,000  600,000 LDRRM Fund LDRRMO Total Budget 631,000 1,565,000 1,565,000 1,470,000 1,470,000  6,701,000 LDRRMF

Programs Project/Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15

DISASTER PREPAREDNESS AND RESPONSE PROGRAM

Organizing of Community Disaster Volunteers (CDVs) - Orientation of community disaster volunteers 50,000 50,000 50,000 50,000 50,000  150 Volunteers oriented and accredited as disaster volunteers Quarterly meeting conducted 250,000 LDRRMF LDRRMO - Conduct Quarterly meetings with the ACDV’s 20,000 20,000 20,000 20,000 20,000 100,000 LDRRMF LDRRMO Creation of San Francisco Emergency Response (SAFER) - Organize/create

SAFER 10,000 10,000 10,000 10,000 10,000  Local Emergency Response team organized

(20)

Programs Project/Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15

Capability

Building - Trainings: Rescue group And other committees 60,000 60,000 30,000 30,000  Training conducted to 50 volunteers every year 180,000 LDRRMF LDRRMO - Training on GIS

and Application 100,000 100,000 LDRRMF LDRRMO

Relief

Stockpiling Purchase of Evacuation Center Materials:

 Banig, habul, foam  Kaldero, stove,

plates/spoon & fork  Drinking jar 50,000 2,000 10,000 20,000 10,000 10,000 10,000  Material needed for evacuation center purchased 90,000 20,000 2,000 LDRRMF LDRRMO Disaster Emergency Drills  Conduct of inter barangay disaster emergency drill contestdrills contest (2 drill/yr) 100,000 100,000 100,000 100,000  Disaster emergency drills conducted yearly starting year 2  400,000 LDRRMF LDRRMO

(21)

Programs Project/Activities Time Frame Expected Output Total Budget

Required Sources Budget Responsible Department

11 12 13 14 15 Purchase of Disaster Response Supplies/ Equipments  Emenrgency health kit/ jump kit  Rescue pulley

(moton)

 Heavy duty bolt cutter  Hydraulic jack  Life buoy/ring  Utility/Static Ropes  Rain Coat  Boots  Hard hat  Tactical gloves  Spine backboard  Search light  Locking carabineer  Ascender (Left) 50,000 20,000 15,000 2,500 4,500 3,000 2,000 4,000 2,000 6,000 4,000 10,000 50,000 20,000 2,000 2,000 2,000 2,000  Supplies and equipments purchased/acquir ed 50,000 10,000 50,000 20,000 20,000 15,000 10,500 4,500 3,000 2,000 4,000 2,000 6,000 4,000 LDRRMF LDRRMO Maintenance of Emergency Transportation Facilities  Purchase of fuel and lubricants 25,000 25,000 25,000 25,000 25,000  Rescue vehicle maintained 125,000 LDRRMF LDRRMO  Maintenance of disaster response equipments 30,000 30,000 30,000 30,000  Rescue equipments maintained 120,000 LDRRMF LDRRMO TOTAL 370,000 407,000 307,000 277,000 277,000 1,638,000 LDRRMF

(22)

OVER-ALL SUMMARY OF BUDGET

PROGRAMS BUDGETARY REQUIREMENTS/SOURCES TOTAL BUDGET

REQUIRED

INTERNAL EXTERNAL

1. Disaster Prevention Program

 Physical Infrastructure Project 1,975,000.00 - Php 1,975,000.00

 CRM Sustainability Project 100,000.00 - Php 100,000.00

 Environmental Protection Project 1,041,445.00 - Php 1,041,445.00

SUB-TOTAL Php 3,116,445.00

2. Disaster Mitigation Program

 Knowledge Management Project 563,000.00 - Php 563,000.00

 Social Protection Project 1,747,000.00 - Php 1,747,000.00

 Sustainable Livelihood 675,000.00 - Php 675,000.00

 Public Health Project 1,620,000.00 - Php 1,620,000.00

 Agriculture Resiliency project 230,000.00 - Php 230,000.00

 Early Warning System Project 255,000.00 - Php 255,000.00

 Barangay-based Digitized Hazard Mapping Project 26,000.00 - Php 26,000.00

 Renewable Energy Program 560,000.00 - Php 560,000.00

 Networking and Linkaging Project 425,000.00 - Php 425,000.00

 DRR Planning, Monitoring & Evaluations 600,000.00 - Php 600,000.00

SUB-TOTAL Php 6,701,000.00

3. Disaster Preparedness and Response Program

 Organizing of Community Disaster Volunteers (CDVs) 350,000.00 - Php 350,000.00

 Creation of San Francisco Emergency Response (SAFER) 50,000.00 - Php 50,000.00

 Capability Building 280,000.00 - Php 280,000.00

 Relief Stockpiling 112,000.00 - Php 112,000.00

 Disaster Emergency Drills 400,000.00 - Php 400,000.00

 Purchase of Disaster Response Equipments 201,000.00 - Php 201,000.00

 Maintenance of Emergency Transportation Facilities 245,000.00 - Php 245,000.00

SUB-TOTAL Php 1,638,000.00

(23)

IV. GENERAL IMPLEMENTING ARRANGEMENT: A. ORGANIZATIONAL STRUCTURE: MDRRMC (Chairperson Municipal Mayor) MDRRM Officer Administrative and Training Research and Planning Operation and Warning Early Warning Service Damage Assessment and Needs Analysis Rescue and Evacuation Service Relief and Rehabilitation Service Medical and Health Service Security and Police Service Camp Management Service

(24)

B. INSTITUTIONAL WORKING ARRANGEMENT

- There shall be mutual cooperation among and between LDRRMO, other municipal department such MSWDO, MAO, Municipal Engineering Office, Municipal Health Office (MHO) MPDC, MENRO and among others, DepED, BDRRMC and Accredited Community Disaster Volunteers in the implementation of MDRRM Plan

- Quarterly Plans and monthly progress of MDRRM activities shall likewise be reported to the Municipal Council and other funding partners for information, technical and management guidance

- The MDRRMC shall actively participate in/support local policy proposals including discussions and decisions relative to formulation, amendment and/or modifications of local policies pertinent to local disaster risk reduction especially in three core programs namely; disaster prevention, mitigation and preparedness

Accountability for the regular reporting systems to the public and concerned officials belongs to the MDRRMO

C. GENERAL MONITORING AND EVALUATION FRAMEWORK

Monitoring and evaluation is the process of gathering, filing, accessing and analyzing information that will enable the Municipal Mayor as Disaster Risk Reduction and Management Council Head to determine the progress of the implementation of the MDRRM Plan, and make timely decisions to ensure that progress is maintained according to schedules and targets.

The public dissemination of the outputs of monitoring and evaluation activities enhances transparency in management.

The MDRRMO shall be primarily responsible in carrying out monitoring and evaluation activities but whose work shall be reviewed by the Municipal Disaster Risk reduction and Management as the overseeing body of the municipality for disaster risk reduction and management

The MDRRMO shall submit a monthly, quarterly and an annual report to the MDRRMC and to the Municipal Mayor informing them of the state of the implementation of the approved MDRRM program/projects for the period.

(25)

CHAPTER

V THE LOCAL DISASTER RISK REDUCTION & MANAGEMENT OFFICE Municipality of San Francisco

Local Disaster Risk Reduction Management Office San Francisco, Cebu, Philippines

Vision:

Resilient municipality founded on political, economic and empowered community of marginalized rural sectors that have a responsive local government that can manage own resources towards sustainable development and a well prepare family in response to emergency.

Missions:

1. Zero casualty and no injury in times of disaster.

2. To strengthen different stakeholders of San Francisco to become knowledgeable to all forms of hazards in the municipality

3. Vigorously work towards the safety of families located in the various organization to make disaster risk management become priority in their barangay

4. To empower barangay officials and leaders in the various organization to make disaster risk management become priority in their barangay

5. To train per purok member households on the environmental protection and sustainability of resources.

Goals :

1. Develop a strong economy for every vulnerable sectors in the society 2. Achieve food security by promoting sustainable farming & fishing 3. Establish and equip and full of supply Camotes Operation Center 4. Train knowledgeable families in response to disaster management 5. A well manage and protected San Francisco environment

Functions and Responsibilities of the Local Disaster Risk Reduction and Management Officer and Staff

Local Disaster Risk Reduction & Management Officer

Set the direction, development, implementation and coordination of

disaster risk management programs within their territorial jurisdiction.

Design, program, and coordinate disaster risk reduction and

management activities consistent with the National Council’s Standards

and guidelines.

(26)

Formulate and implement a compressive and integrated LDRRMP in

accordance in accordance with the National, Regional and provincial

framework, and policies on disaster risk reduction in close coordination

with the Local Development Councils (LDC’s).

Prepare and submit to the local sanggunian through the LDRRMP and

the LDC the annual LDRRMO Plan and budget, the proposed

programming of the LDRRMF, other dedicated disaster risk reduction

and management resources, and other regular funding sources and

budgeting support of the LDRRMO/BDRRMC.

Recommend through the LDRRMC the enactment of local ordinances

consistent with the requirement of the Act.

Implement policies, approved plans and programs of the LDRRMC

consistent with the policies and guidelines laid down in the Act.

Establish a Municipal Disaster Risk Reduction and Management

Operation Center.

Act on other matters that may be authorized by the LDRRMC.

Prepare and submit, through the LDRRMC and the LDC, the report on

the utilization of the LDRRMF and other dedicated disaster risk reduction

and management resources for internal audit, copy furnished the

regional director of the OCD and the Local Government Operation

Officer of the DILG.

RESEARCH AND PLANNING FUNCTION OFFICER

Consolidate local disaster risk information which includes natural

hazards, vulnerabilities, and climate change risks, and maintain a local

risk map.

Identify access and manage the hazards vulnerabilities and risks that

may occur in their locality.

Identify and implement cost-effective risk reduction

measures/strategies.

Develop, strengthen and operationalize mechanisms for partnership or

net working with private sector, CSOs, International NGO and volunteers

group.

(27)

Facilitate and Support Risk Assessment and Contingency Planning

Activities at the Local Level

ADMINISTRATION AND TRAINING FUNCTIONS OFFICER

Organize and conduct training, orientation and knowledge management

activities on disaster risk reduction and management at the local level.

Disseminate information and raise public awareness about those

hazards; vulnerabilities and risks, their nature, effects, early warning

signs and counter-measures.

Maintain a database of human resources, equipment, directories, and

location of critical infrastructures and their capacities such as hospitals

and evacuation centers.

Take all necessary steps on a continuing basis to maintain, provide, or

arrange the provision of or to otherwise make available, suitably-trained

and competent personnel for effective civil defense disaster risk

reduction and management in its area.

Organize, train equip and supervise the local emergency response

teams and the ACDVs, ensuring that humanitarian aid workers are

equipped with basic skills to assist mothers to be breastfeed.

Within its area, promote and raise public awareness of a compliance

with the Act legislative provisions relevant to the purpose of the Act.

Establish linkage/network with other LGU’s for Disaster risk reduction

emergency response purposes.

Served as the secretariat and executive arm of the LDRRMC.

OPERATION AND WARNING FUNCTIONS

Operation a multi-hazard early warning system, linked to disaster risk

reduction to provide accurate and timely advice to national or local

emergency response organizations and to the general public, through

diverse mass media, particularly radio, landline communications, and

technologies for communication within rural communities.

(28)

Conduct continuous disaster monitoring and mobilize instrumentalities

and entities of the LGU’s, CSOs, private groups and organized volunteers,

to utilize their facilities and resources for the protection and

preservation of life and properties during emergencies in accordance

with existing policies and procedures.

Respond to and manage the adverse effects of emergencies and carry

out recovery activities in the affected area, ensuring that there is an

efficient mechanism for immediate delivery of food. Shelter and medical

supplies for women and children, endeavor to create a special place

where internally-displaced mothers and children can find help with

breastfeeding, feed and care their babies and give support to each

other.

(29)

Local Disaster Risk Reduction & Management Office

Local Disaster Risk Reduction

Management Officer

Administration & Training

Research & Planning

References

Related documents

"Draft: Historic Resources Study Area— Pier 45 to Pier 48." San Francisco: Unpublished study conducted by Port of San Francisco and the San Francisco Planning Department, December

San Diego State University San Diego California. San Francisco State University San Francisco

This study implements the four core variables (reader rights, reuse rights, copyrights, author posting rights) of the recently published Open Access Spectrum (OAS) to measure the

Most current systems for remote and (synchronous) collaborative work fall into the following categories or can be considered a combination of: ◦ ) e-Collaboration platforms

At the time of filing nomination documents, candidates for City and County of San Francisco, San Francisco Unified School District, and San Francisco Community College District

For the San Francisco Countywide Plan equity analysis, the Transportation Authority considered many different types of communities within San Francisco based on vehicle

EXHIBITOR SERVICES & PAYMENT DETAILS It is Hotel Grand Chancellor Hobart (HGCH) policy that all exhibitor services are paid prior to commencement of an event. Services will not

metaphors in tourism discourse, they are either limited to a small sample (Mattiello 2012) or do not offer a systematic account of metaphors and their conceptual mappings