OUR ADMINISTRATORS...8

TURKISH ELECTRICITY TRANSMISSION SYSTEM...10

1. TURKISH ELECTRICITY SYSTEM ...12

1.1. Installed Capacity of Turkish Power System as of 2012 ...12

1.2. Electrical Energy Production and Consumption of Turkey in 2012 ...13

2. INVESTMENT ACTIVITIES...14

2.1. Investment Program for 2012 ...14

2.2. Remarkable Transmission Facility Projects in 2012 Investment Program ...16

2.2.1. 380 kV Energy Transmission Line Projects...16

2.2.2. 154 kV Energy Transmission Line Projects...18

2.3. Transformer Substation Projects in 2012...22

2.3.1. Transmission Facility Projects taking part in 2012 investment program and awarded ...22

2.3.2. Facility Projects Awarded in Previous Years and Completed in 2012 ...24

2.3.3. Facility Project Awarded in Previous Years and Continued in 2012 ...28

2.4. Environmental Impact Assessment, Expropriation, Master Plans And VODB Studies ...30

2.5. Control And Automation Projects...33

2.5.1. National Load Dispatch SCADA/EMS System ...33

2.5.2. Studies for Developing and Updating of National Load Dispatch SCADA/EMS System ...33

2.5.3. Seyhan, Erzurum and Kepez Regions SCADA Projects ...34

2.5.4. Upgrade of National Load Dispatch Center...34

2.5.5. Addition of 160 units of new RTUs to National Load Dispatch Center ...34

2.5.6. Secondary Frequency Control Tests ...34

2.5.7. Studies for Interconnections of Eight Countries (EIJLLPST) ...35

2.5.8. Parallel Connection Studies to Continental Europe Electricity System (ENTSO-E) ...35

2.5.9. Smart Grid Feasibility Project ...35

2.5.10. Project Proposal within the Scope of the European Union IPA Program ...35

2.6. Communication System Studies And Projects ...36

2.6.1. Communication System Planning Studies...36

2.6.2. Communication System Project Designing Studies ...36

2.6.3. Fiber Optic Projects ...37

2.6.4. Fiber Optic Terminal Equipments and Numeric Multiplexers ...37

2.6.5. Special Telephone System (PAX System) and Telephone Swtichboards ...38

2.6.6. Power Line Carrier (PLC) Systems ...38

2.6.7. Wireless and Other Equipment ...38

2.6.8. Other Applications Regarding Communication ...39

2.6.9. Communication İnfrastructure of Automated Meter Reading (AMR) Project ...40

2.6.10. International Connection Lines Communication System Studies ...40

2.6.11. Communication System Operating Activities...41

2.6.12. Research and Development, Production and Repair Activities...42

2.7. Information Systems Projects ...44

2.7.1. Project Of Enterprise Resource Planning (ERP)...44

2.7.2.Studies Performed At Local Area Network (Central) ...44

(7)

5 2.7.4. Procurements Of Computer, Supporting Units And Consumables And

Maintenance and Repair Studies ...45

2.7.5. Software Provision And Maintenance ...46

2.8. Opening Fiber Optic Infrastructure For Commercial Usage ...47

3. OPERATIONAL ACTIVITIES...48

3.1 Transformer Substations ...48

3.1.1. Transformers Replaced in 2012 ...49

3.1.2. Transformers Added to Transformer Substations under operation ...50

3.1.3. Transformer Substations Operated by Service Procurement Method...50

3.1.4. New Transformer Subtations ...50

3.1.5. Permanent Transformer Malfunctions in 2012...51

3.1.6. Percentages of Transformer Substation Maintenance Realized by the end of 2012 ...51

3.2. Transmission Lines ...52

3.2.1. TEİAŞ Transmission Lines...52

3.2.2. Cumulative Realization Percentages of January – December 2012 Maintenance Program for Energy Transmission Lines under the Responsibility of Transmission Installation and Operation Group Directorates ...52

3.3. Energy Transmission Lines Malfunction Indexes, Tests Performed at Transformer Substations and the Materials Purchased...52

3.3.1. System Malfunction Index in 2012 ...52

3.3.2. Number of Tests Performed in 2012 ...54

3.3.3. Materials Purchased in 2012 ...58

3.4. Load Curve Of Turkish Electrical System ...59

3.5. 2012 Frequency Report ...61

3.6. Construction Work Tenders Realized in 2012 ...62

3.7. Material Procurement Tenders Realized in 2012 ...66

3.8. Service Procurement Tenders Realized in 2012 ...67

3.9. The Transactions Including the Guarantee of the Assets that are in Possession of the Central and Provincial Organization of TEİAŞ by Self Insurance in 2012...70

3.10. Activities for Users ...70

4. ELECTRICITY MARKET AND FINANCIAL SETTLEMENT...80

4.1. Day Ahead Planning (DBF) Activities ...80

4.2. Financial Settlement Results Of Balancing And Settlement Market For 2012 ...88

4.3. Information Systems and Infrastructure Development Activities in 2012 ...89

4.4. Financial Issues During the Operation of the Electricity Market ...89

5. INTERNATIONAL RELATIONS...91

6. HUMAN RESOURCES ...96

7. INSERVICE TRAINING ACTIVITIES...102

(8)

This in turn leads the countries to focus

on the energy issue and carry out more

research in this area. Communities are now

exerting efforts to supply more reliable, less

expensive, and environment-friendly energy

with minimized risk.

Türkiye Elektrik İletim A.Ş. (TEİAŞ), which

continues its efforts according to the needs

and policies of our country in electricity

production, transmission and distribution

areas, is in the managing position of the

Turkish electricity system and the Turkish

electricity market.

Meeting the demand for electric energy in a

timely manner and acting as a high-quality,

reliable and economic transmission operator

is the basic mission of TEİAŞ and TEİAŞ

carries on with this mission in the best

possible way.

I, therefore wish to submit my appreciation

and thanks to all the employees of TEİAŞ

who perform the role of electric transmission,

load dispatch and market operation every

day with higher quality and greater reliability.

urbanization and globalization phenomena and growing trade possibilities related to the

above are gradually increasing the demand for natural sources and energy.

Taner YILDIZ

(9)

Therefore, while operating with the technical

r u l e s o f t h e i n t e r c o n n e c t e d s y s t e m ,

our Corporation, has also undertaken a

commercial mission and taken part in the

electricity market with its balancing and

settlement dimension.

TEİAŞ, as the 5

th

biggest power of European

Interconnected System (ENTSO-E) with its

242 billion kwh consumption capacity per

year and 112.846 MVA installed transformer

capacity and 50.418,4 km length of Energy

Transmission Line, has been working in

synchronous parallel with ENTSO-E since

September 18, 2010.

TEİAŞ, has the endeavor of maintaining the

electricity provided from production system

for 24 hours and every second. Our mission

is not our leave our country without electricity,

not even a second. Being aware of this

mission, in order to develop Turkish

transmission system and improve the system

performance to international standards, our

Corporation, bears the aim of carrying out its

activities throughout Turkey successfully with

its 15 Departments, 22 Directorates and 10

Load Dispatch Operation Directorates.

In this report, the summary of the activities of

TEİAŞ in 2012 is presented.

I would like to thank to my colleagues who

bear the effort and endeavor of performing

their duties, as it always has been and

always will be, at the most difficult conditions

more and more devotedly and of good

quality every passing day, with the purpose

ensuring that it ends up with a successful

facility and a successful operating logic,

following the planning and designing of the

interconnected system to operate at the

highest performance.

Kemal YILDIR

Chairman of the Board

General Manager

and expansion of Transmission System, managing Electricity System, conducting the

operation and maintenance of Transmission System, preparing Generation Capacity

Projection and carrying out International Interconnection studies and alongside these

operating the mainly financial “Electrical Energy Market”, since 2001.

(10)

8

Kemal YILDIR

Chairman of the Board

General Manager

(11)

9

M. Sinan YILDIRIM

Deputy General Manager Member of the Board

Metin KORÇAK

Member of the Board

Mustafa Odelli AKÜZÜM

Deputy General Manager

Necmeddin KILIÇ

Member of the Board

Hayrettin DEMİRCAN

Member of the Board

İbrahim BALANUYE

Deputy General Manager (Vice)
(12)

10

In total 644 units of transformer centers of which 85 units at 380 kV, 1 unit at 220 kV, 544 units at 154

kV, 14 units at 66 kV voltage level, total power 112.846 MVA.

(13)

11

In total 50.418,4 km overhead lines of which 16.343,7 km at 380 kV, 84,5 km at 220 kV, 33.480,8 at 154 kV,

509,4 km at 66 kV voltage levels and 42,7 km at 380 kV, 213,8 km at 154 kV, 3,2 km at 66 kV underground

cable line.

(14)

12

BREAKDOWN OF INSTALLED POWER IN TURKEY BY

PRODUCERS IN 2012

BREAKDOWN OF INSTALLED POWER AND PRODUCTION OF

ELECTRICAL ENERGY IN TURKEY BY PRODUCERS

2012

INSTITUTIONS INSTALLED POWER (MW) PRODUCTION (GWh)

EÜAŞ 20.904,8 70.423,5 EÜAŞ AFFILIATIONS 3.870,0 20.151,5 OTOP 3.201,8 13.254,2 BO+BOT+IPP+TOOR 29.082,8 135.667,6 TOTAL OF TURKEY 57.059,4 239.496,8 BO+BOT+IPP+TOOR 51,0% EÜAŞ 36,6% EÜAŞ AFFILIATIONS 6,8% OTOP 5,6%

1. TURKISH POWER SYSTEM

1.1 Installed Capacity of Turkish Power System as of 2012

A

t the end of 2012, the installed capacity of Turkish Power System has increased at a rate of %

7,8 corresponding to 4148,3 MW according to the previous year and has been realized as 57.059,4 MW. 1096,1 MW increase at thermal power plants, 2472,3 MW at hydraulic power plants and 579,9 MW at geothermal and wind power plants have been provided.

(15)

13

1.2

Electrical Energy Production and Consumption of

Turkey in 2012

E

lectrical Energy Production in 2012 has been decreased by % 4,4 (10.101,7 milli-on kWh) as compared with the previous year and has been 239.496,8 millimilli-on kWh and consumption has been decreased by % 5,2 (12.063,6 million kWh) and has been 242.369,9 million kWh.

PRODUCTION AND CONSUMPTION OF ELECTRICAL ENERGY IN

TURKEY 2011–2012

2011 2012 Increase GWh % GWh % % Thermal 171.638,3 74,8% 174.871,7 73,0% 1,9% Hydraulic 52.338,6 22,8% 57.865,0 24,2% 10,6% Geo+Wind 5.418,2 2,4% 6.760,1 2,8% 24,8% GROSS PRODUCTION 229.395,1 100,0% 239.496,8 100,0% 4,4% IMPORTATION 4.555,8 5.826,7 EXPORTATION 3.644,6 2.953,6 GROSS CONSUMPTION 230.306,3 242.369,9 5,2%

BREAKDOWN OF ELECTRICAL ENERGY PRODUCED IN TURKEY BY PRIMARY ENERGY RESOURCES 2011–2012 2011 2012 Increase GWh % GWh % % Coal 66.217,9 28,9% 68.013,1 28,4% 2,7% Liqued Fuels 903,6 0,4% 1.638,6 0,7% 81,3% Natural Gas 104.047,6 45,4% 104.505,5 43,6% 0,4% Renewable + Waste 469,2 0,2% 714,5 0,3% 52,3% Hydraulic 52.338,6 22,8% 57.865,0 24,2% 10,6% Geo+Wind 5.418,2 2,4% 6.760,1 2,8% 24,8% TOTAL 229.395,1 100,0% 239.496,8 100,0% 4,4% BO+BOT+IPP+TOOR 56,6%

BREAKDOWN OF ELECTRICAL ENERGY PRODUCTION IN TURKEY IN

2012 BY PRODUCERS

EÜAŞ 29,4% EÜAŞ AFFILIATIONS 8,4% OTOP 5,5%
(16)

14

2. INVESTMENT ACTIVITIES

2.1 Investment Program for 2012

The aim of the Investment Program for 2012 is to amend, renew and develop the electrical energy which is an essential and integral part of civilized life and to constitute a high quality electricity transmission infras-tructure and to meet the future energy demand.

Maximum allowance for Revised Investment Program of our Corporation for 2012 is 650.000 Thousand . Total of 510 nos. projects have been involved to the Investment Program for 2012.

569.125 Thousand of 650.000 Thousand assigned in 2012 has been allocated to the transmission system investments and the rest 80.875 Thousand has been allocated to the investments of Surveys, Operation, Machinery – Equipments and Vehicles group.

Breakdown of Investment Program for 2012 per groups and information related with these distributions have been specified below;

(17)

15

SUMMARY OF THE INVESTMENT PROGRAM OF 2012

( X Thousand )

NUMBER OF PROJECT ALLOWANCE

PROJECTS AMOUNT OF THE YEAR

TRANSMISSION FACILITIES 475 4.712.039 569.125

MANAGEMENT GROUP 14 158.690 46.542

MACHINERY AND EQUIPMENTS 15 100.260 33.663

VEHICLES 1 20 20

SURVEYS 5 3.200 650

SUM TOTAL 510 4.974.209 650.000

Transmission facility projects involved in Investment Program for 2012 are: • 55 nos. 400 kV energy transmission line, 4.387 km • 139 nos. 154 kV energy transmission line, 4.684 km • 61 nos. 400 kV transformer center, 24.325 MVA • 220 nos. 154 kV transformer center, 10.770 MVA

Allowances for Revised Investment Program of 2012 per groups and realization information related with these allowances have been specified below.

REALIZATION TABLE OF THE YEAR 2012

( X Thousand )

ALLOWANCE EXPENSE REALIZATION %

TRANSMISSION FACILITIES 569.125 645.121 113,4

MANAGEMENT GROUP 46.542 52.363 112,5

MACHINERY AND EQUIPMENTS 33.663 32.402 96,3

VEHICLES 20 3 15

SURVEYS 650 -78 -12

SUM TOTAL 650.000 729.811 112,3

An expenditure of 61.784 Thousand has been made for the new transmission facilities which has not being included in TEİAŞ Investment Program and which are installed and constructed by the private sector and trans-fered to our Corporation and submitted to the fixed assets of TEİAŞ as per Electricity Market License Regulation Article No. 38 in cases that an expansion investment or new investment is required to be made.

TRANSMISSION FACILITIES 88,4% VEHICLES AND SURVEYS 0,0% MACHINERY AND EQUIPMENTS 4,4% MANAGEMENT GROUP 7,2%

(18)

16

2.2. Remarkable Transmission

Facility Projects in 2012

Investment Program

2.2.1 380 kV Energy Transmission Line Projects

Project No. 99.D03.0070, Borçka HPP - Deriner HPP - Yusufeli HPP ETL:The contract for 380 kV 3B 954 MCM line (H.182.A), which is 75 km in length, was signed on 07.11.2008. The tender price is 11.964.070 . The contractor firm is FEYZ A.Ş. The installation period is 390 days. The installation activities are completed. The Provisional Acceptance was performed except 4 km section of the 154 kV line which has the same project number. It is finan-ced by the equity capital.

Project No. 04.D03.0030, GercüşIlısuCizre -Border ETL:The contract (H.256) for 380 kV 2 x 3B 954 MCM +3B 954 MCM line, which is 50 + 81 km in length, was signed on 23.12.2011. The tender price is 38.834.000 . The contractor firm is UFUK ATAÇ-ELTEM MÜH. The installation period is 660 days. The installation activities are going on as such: Sub Assembly: 98 %, Upper Assembly: 20 %, Wire: 0 %. It is financed by the equity capital.

Project No. 05.D03.0040, Mersin - İskenderun ICPP (Imported Coal Power Plant) ETL:The con-tract (H.228) for 380 kV, 3B 1272 MCM line, which is 107,5 km in length, was signed on 18.01.2011. The tender price is 21.459.377 . The contractor firm is ŞA-RA A.Ş. The installation period is 720 days. The line is completed, 2H studies are going on. It is finan-ced by the equity capital.

Project No. 05.D03.0070, İsdemir 380 TM - Hatay 380 TM ETL:The contract (H.226) for 380 kV, 2x 3B 954 + 3B 954 MCM line, which is 61,5 +7 km in length, was signed on 22.11.2010. The tender price

is 12.987.276.-USD + 5.913.010 . The contractor firm is FEYZ A.Ş. The installation period is 480 days. The installation stopped: Sub Assembly: 97 %, Upper Assembly: 84 %, Wire: 0 %. It is financed by the equity capital.

Project No. 06.D03.0110, Mersin - Ermenek HPP ETL: The contract (H.232) for 380 kV, 3B 1272 MCM line, which is 174 km length, was signed on 04.03.2011. The tender price is 37.887.770 . The contractor firm is ŞA-RA A.Ş. The installation period is 840 days. The installation activities are going on as such: Sub Assembly: 43 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital. • Project No. 06.D03.0130, Ağrı - Van ETL:The

con-tract (H.230) for 380 kV, 3B 954 MCM line, which is 185 km in length, was signed on 25.02.2011. The tender price is 31.616.789 . The contractor firm is ŞA-RA A.Ş. The installation period is 720 days. The installation activities are going on as such: Sub Assembly: 86 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 06.D03.0160, Van-Siirt TM till Branch Point ETL:The contract (H.234) for 380 kV, 3B 1272 MCM line, which is 221 km in length, was signed on 01.07.2011. The tender price is 56.373.000 . The contractor firm is UFUK ATAÇ-ELTEM MÜH. The ins-tallation period is 840 days. The insins-tallation activities are going on as such: Sub Assembly: 90 %, Upper Assembly: 8 %, Wire: 0 %. It is financed by the equity capital.

Project No. 08.D03.0110, Batman - Siirt ETL till Branch Point:The contract (H.236) for 380 kV, 3B 1272 MCM line, which is 50 km in length, was signed on 01.07.2011. The tender price is 10.884.000 . The contractor firm is KAR-PA. The installation peri-od is 480 days. The installation activities are going on as such: Sub Assembly: 98 %, Upper Assembly: 61 %, Wire: 0 %. It is financed by the equity capital.

(19)

17

Project No. 08.D03.0180, Borçka - Border (Georgia) ETL:The contract (H.248) for 380 kV, 3B 954 MCM line, which is 120 km in length, was signed on 05.09.2011. The tender price is 32.600.000 . The contractor firm is ŞA-RA A.Ş. The installation period is 330 days. The installation activities are going on as such: Sub Assembly: 92 %, Upper Assembly: 91 %, Wire: 80 %. It is financed by the equity capital. • Project No. 08.D03.0100, Viranşehir 380 TM

Connections ETL:The contract (H.343) for 154 kV section of the line consisting of 380 kV, 2x3B 954 line which is 1,5 + 0,3 km in length and 154 kV 2 x 1272 MCM line, which is 0,5 + 11 km in length, was signed on 10.03.2011. The tender price is 1.923.000 . The contractor firm is ÖZAŞ LTD. ŞTİ. The facility is com-pleted. The provisional acceptance date is 16.01.2012. The contract (H.405) for 380 kV section of the line which is 1,8 km in length was signed on 30.10.2012. The contractor firm is VAM LTD. ŞTİ.. The installation period is 120 days. The installation activities are going on as such: Sub Assembly: 100 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 10.D03.0020, Varsak - Kepez ETL (Instead of the Existing Line):The contract (H.359) for 154 kV section of the line 380 kV, 3B 954 MCM 7,4 km+380+154 kV 3B 954 MCM+2x1272 MCM 3km+2x1272 MCM 7,4km, which is in total 17,8 km in length, was signed on 20.10.2011. The tender price is 1.968.430 . The contractor firm is KAR-PA LTD. ŞTİ. The facility is completed. The provisional acceptance date is 01.11.2012. The contract (H.264) for 380 kV section of the line was signed on 05.09.2012. The tender price is 4.849.944,50 . The contractor firm is ENMON A.Ş.. The installation peri-od is 150 days. The installation activities are going on as such: Sub Assembly: 93 %, Upper Assembly: 3 %, Wire: 0 %. It is financed by the equity capital. • Project No. 06.D03.0030, Karakaya - Diyarbakır

380 ETL: The contract (H.258) for 380+154 kV, 3B 1272 MCM line, which is 95 km in length, was signed on 03.04.2012. The tender price is 23.684.000 . The contractor firm is ENMON A.Ş. The installation

peri-od is 540 days. The installation activities are going on as such: Sub Assembly: 32 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital. • Project No. 08.D03.0050, Soma - Manisa ETL: The

contract (H.262) for 380 kV, 3B 1272 MCM line, which is 89 km in length, was signed on 01.06.2012. The tender price is 22.337.000 . The contractor firm is ANADOLU A.Ş. The installation period is 360 days. The installation activities are going on as such: Sub Assembly: 94 %, Upper Assembly: 45 %, Wire: 0 %. It is financed by the equity capital.

Project No. 09.D03.0040, Sütlüce (INTERFACE) – Gelibolu - Unimar ETL: The contract (H.262) for North circuit of the line 380 kV, 2x3B 954 MCM 13,92km+2x3B 1272 MCM 142, 8km+3B 1272 MCM 142,78km, which is in total 142,78 km in length, was signed on 26.09.2012. The tender price is 47.422.000 . The contractor firm is UFUK ATAÇ-ELTEM MÜH. The installation period is 600 days. The installation activities are going on. It is financed by the equity capital.

Project No. 06.D03.0180, Boyabat - Altınkaya 380 ETL:The contract (H.240) for 380 kV, 3B 1272 MCM line, which is 66,5 km in length, was signed on 20.09.2012. The tender price is 18.489.010 . The contractor firm is KAR-PA LTD. ŞTİ. The installation period is 300 days. The installation activities are going on as such: Sub Assembly: 27 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 10.D03.0150, Samsun NGCCPP -Kayabaşı ETL: The contract (H.238.T) for 380 kV, 3B 1272 MCM line, which is 149,5 km in length, was signed on 03.12.2012. The tender price is 43.825.000 . The contractor firm is ŞA-RA A.Ş. The installation period is 510 days. The installation activi-ties are going on. It is financed by the equity capital. • Project No. 09.D03.0050, Bandırma NGCCPP -İÇDAŞ 2 - Lapseki (INTERFACE) ETL:The contract (H.244) for 3B 1272 MCM+2x3B 954 MCM 2,5+72+36 km line, which is in total 110,5 km in length, was signed on 28.09.2012. The tender price

(20)

18

is 39.127.000 . The contractor firm is ŞA-RA A.Ş. The installati-on period is 480 days. The installatiinstallati-on activities are going installati-on as such: Sub Assembly: 8 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 09.D03.0230, Kayabaşı - Reşadiye ETL:The con-tract (H.242) for 380 kV, 3B 1272 MCM line, which is 136,28 km in length, was signed on 01.06.2012. The tender price is 36.767.000 . The contractor firm is ŞA-RA A.Ş. The installation period is 480 days. The installation activities are going on. It is financed by the equity capital.

Project No. 09.D03.0250, Eren TES – Ereğli - Osmanca ETL:

The tender bids (H.266) for the installation of 380 kV, 2 x 3B 1272 MCM line, which is 104 km in length, are received on 21.11.2012 and being evaluated. It will be financed by the equity capital. • Project No. 11.D03.0060, Ada 2 - Paşaköy ETL:The survey

stu-dies for the installation of 380 kV, 2x3B 1272 MCM line, which is 105 km in length are completed. Environmental Impact Assessment (EIA) studies are going on. It will be financed by the equity capital.

2.2.2 154 kV Energy Transmission Line Projects

Project No. 99.D03.0070, Borçka – Artvin - Yusufeli ETL:The contract (H.225) for 154 kV, 2 x 1272 MCM line, which is 82 km in length was signed on 07.11.2008. The tender price is 21.975.627.70 . The contractor firm is FEYZ A.Ş. The installati-on activities are going installati-on as such: Sub Assembly: 100 %, Upper Assembly: 100 %, Wire: 94 %. The Provisional Acceptance was performed except 4,4 km section of the line which has Environmental Impact Assessment problem. It is financed by the equity capital.

Project No. 10.D03.0650, Karasu – Kaynarca ETL:The contract (H.347) for the installation of 154 kV, 2 x 1272 + 1272 MCM line, which is 1,7+46 km in length, was signed on 25.10.2011. The ten-der price is 5.000.000 . The contractor firm is MONTEL LTD. ŞTİ.. The installation period is 300 days. The installation activities are going on as such: Sub Assembly: 5 %, Upper Assembly: 5 %, Wire: 5 %. It is financed by the equity capital.

Project No. 04.D03.0300, Erzurum 1 – Horasan ETL Renewal:

The contract (H.361) for the installation of 154 kV, 2 x 1272 + 1272 MCM line, which is 9+70 km in length, was signed on 09.01.2012. The tender price is 7.696.484 . The contractor firm is BARAN-LAR LTD. ŞTİ.. The installation period is 420 days. The installati-on stopped: Sub Assembly: 45 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 06.D03.0510, Antakya 3 – Reyhanlı ETL Renewal:

The contract (H.363) for the installation of 154 kV, 2 x 1272 MCM line, which is 57 km in length, was signed on 09.01.2012. The ten-der price is 11.465.000 . The contractor firm is MONTEL + BARANLAR LTD. ŞTİ. The installation period is 420 days. The ins-tallation activities are going on as such: Sub Assembly: 58 %, Upper Assembly: 0 %, Wire: 0 %. The contract is terminated on 28.01.2013 due to the contractor's defect. It is financed by the equity capital.

Project No. 11.D03.0900, Tuna HPP – Niksar - Köklüce ETL Renewal: The contract (H.369) for the installation of 154 kV, 2 x 1272 + 1272 + 1272 MCM line, which is 42+2+3 km in length, was signed on 24.01.2012. The tender price is 9.217.000 . The con-tractor firm is UFUK ATAÇ - ELTEM MÜH. The installation period is 300 days. The installation activities are going on as such: Sub

(21)

19

Assembly: 67 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 11.D03.0310, Arslanbey – Ford - Karamürsel ETL Renewal:The contract (H.365) for the installation of 154 kV, 2 x 1272 MCM line, which is 38 km renewal and 1,3 km new line in length, was signed on 14.02.2012. The tender price is 9.831.672 . The contractor firm is EMTA A.Ş. The installation period is 300 days. The facility is completed. The Provisional Acceptance Date is 28.01.2013. It is financed by the equity capital.

Project No. 07.D03.0460, Belkıs - Kilis ETL: The contract (H.375) for the installation of 154 kV, 1272 MCM line, which is 69 km in length, was signed on 22.02.2012. The tender price is 6.849.000 . The contractor firm is ARDA LTD. ŞTİ. The installa-tion period is 360 days. The installainstalla-tion activities are going on as such: Sub Assembly: 100 %, Upper Assembly: 100 %, Wire: 73 %. It is financed by the equity capital.

Project No. 09.D03.0760, Derinkuyu - Tümosan ETL: The contract (H.377) for the installation of 154 kV, 1272 MCM line, which is 85 km in length, was signed on 13.03.2012. The tender price is 8.045.450,30 . The contractor firm is BARANLAR LTD. ŞTİ. The installation period is 450 days. The installation stopped: Sub Assembly: 100 %, Upper Assembly: 0 %, Wire: 73 %. It is financed by the equity capital.

Project No. 05.D03.0470, Ezine – Altınoluk - Edremit 2 ETL Renewal: The contract (H.371) for the installation of 154 kV, 2x1272 MCM line, which is 82 km in length, was signed on 29.03.2012. The tender price is 16.924.000 . The contractor firm is KAR-PA LTD. ŞTİ. The installation period is 450 days. The installation activities are going on as such: Sub Assembly: 59 %, Upper Assembly: 47 %, Wire: 0 %. It is financed by the equity capital.

Project No. 11.D03.0950, Viranşehir - Çırçıp ETL Renewal:

The contract (H.379) for the installation of 154 kV, 2x1272 MCM line, which is 30 km in length, was signed on 03.04.2012. The tender price is 5.518.224,44 . The contractor firm is ZAFER LTD. ŞTİ. The installation period is 450 days. The facility is com-pleted. The Provisional Acceptance Date is 26.01.2013. It is financed by the equity capital.

Project No. 09.D03.0620, Işıklar - Aslanlar ETL Renewal:The contract (H.383) for the installation of 154 kV, 2x1272 MCM line, which is 34,87 km in length, was signed on 03.05.2012. The ten-der price is 6.467.000 . The contractor firm is UFUK ATAÇ-ELTEM MÜH. The installation period is 180 days. The installati-on activities are going installati-on as such: Sub Assembly: 76 %, Upper Assembly: 48 %, Wire: 45 %. It is financed by the equity capital. • Project No. 05.D03.0560, Akçalar - Karacabey ETL Renewal:

The contract (H.2.Gr.Md.) for the installation of 154 kV, 1272 MCM line, which is 12 km in length, was signed on 04.06.2012. The tender price is 1.311.626 . The contractor firm is MHY+TEKNİKER LTD.ŞTİ. The installation period is 180 days. The facility is completed. 2H studies are going on. It is financed by the equity capital.

Project No. 10.D03.0540, AlOIZi - Bergama ETL Renewal:

The contract (H.383) for the installation of 154 kV, 2x1272 MCM line, which is 36,5 km in length, was signed on 22.06.2012. The tender price is 6.455.401,95 . The contractor firm is ZAFER LTD.ŞTİ. The installation period is 180 days. The installation activities are going on as such: Sub Assembly: 0 %, Upper

(22)

20

Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 06.D03.0640, Ambarlı - Hadımköy ETL Renewal:The contract (H.391) for the installation of 154 kV, 2x1272 MCM line, which is 21,38 km in length, was signed on 30.07.2012. The tender price is 6.455.401,95 . The contractor firm is KEBAN LTD.ŞTİ. The installation period is 180 days. The ins-tallation activities are going on as such: Sub Assembly: 100 %, Upper Assembly: 100 %, Wire: 53 %. It is financed by the equity capital.

Project No. 11.D03.0940, Kızıltepe - Çırçıp ETL Renewal:The contract (H.381) for the installation of 154 kV, 2x1272 MCM line, which is 59 km in length, was signed on 31.07.2012. The tender price is 10.665.000 . The contractor firm is VAM LTD.ŞTİ. The installation period is 240 days. The installation activiti-es are going on as such: Sub Assembly: 10 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 07.D03.0550, Mersin 380 Tie Lines:The contract (H.395) for the installation of 154 kV, 2x1272 MCM 2,8+2,8 km+2x1272 line, which is 2,8+2,8 km in

length, was signed on 01.08.2012. The tender price is 1.245.732 . The contractor firm is KAR-PA LTD.ŞTİ. The installation period is 180 days. The installation activities are going on. It is financed by the equity capi-tal.

Project No. 10.D03.0420, Germencik - Aydın ETL Renewal:The contract (H. 395) for the installation of 154 kV, 2x1272 MCM line, which is 26 km in length, was signed on 31.07.2012. The tender price is 5.943.768 . The contractor firm is KAR-PA LTD.ŞTİ. The installation period is 180 days. The installation activities are going on as such: Sub Assembly: 67 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 09.D03.0900, Uzundere - Urla - Urla 2 Transformer Substation ETL Renewal:The contract (H. 395) for the installation of 154 kV, 2x1272+1272 MCM line, which is 31,5+1,34 km in length, was signed on 07.08.2012. The tender price is 7.121.000 . The contractor firm is VAM LTD.ŞTİ. The installation period is 150 days. The installation activities are going on as such: Sub Assembly: 13 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

(23)

21

Project No. 11.D03.0930, Viranşehir 3 - Kırlık ETL:

The contract (H. 401) for the installation of 154 kV, 1272 MCM line, which is 23,5 km in length, was signed on 02.10.2012. The tender price is 2.860.672,11 . The contractor firm is MET A.Ş. The installation period is 150 days. The installation activities are going on. It is financed by the equity capital.

Project No. 09.D03.0700, Konya 2 - Konya 3 ETL Renewal:The contract (H. 399) for the installation of 154 kV, 2x1272 33 km + (18 km New Route) +4x1272 MCM line, which is 35 km in length, was signed on 07.08.2012. The tender price is 9.384.243,32 . The contractor firm is MET A.Ş. The installation period is 240 days. The installation activities are going on as such: Sub Assembly: 35 %, Upper Assembly: 23 %, Wire: 0 %. It is financed by the equity capital.

Project No. 09.D03.0700, New Çates - Karabük Organized Industrial Zone ETL Renewal:The con-tract (H. 403) for the installation of 154 kV, 1272 MCM line, which is 80,3 km in length, was signed on 09.10.2012. The tender price is 10.845.000 . The contractor firm is KAR-PA LTD.ŞTİ. The installation period is 360 days. The installation activities are going on as such: Sub Assembly: 10 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital. • Project No. 09.D03.0700, New Çates - Zonguldak 2

- Ereğli ETL Renewal: The contract (H. 387) for the installation of 154 kV, 1272 MCM line, which is 52 km in length, was signed on 09.10.2012. The tender price is 11.449.000 . The contractor firm is KAR-PA LTD.ŞTİ. The installation period is 270 days. The ins-tallation activities are going on as such: Sub Assembly: 13 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 11.D03.0870, Bursa NGCCPP -Orhangazi ETL:The contract (H. 407) for the installa-tion of 154 kV, 4x1272 MCM 3,8 km, 2x1272 MCM line, which is 32 km in length, was signed on 23.10.2012. The tender price is 11.293.586,50 . The contractor firm is KAR-PA LTD.ŞTİ. The installation period is 270 days. The installation activities are going on as such: Sub Assembly: 8 %, Upper Assembly: 0 %, Wire: 0 %. It is financed by the equity capital.

Project No. 11.D03.0700, Mardin 2 Transformer Substation Tie Lines ETL:The contract (H. 405) for the installation of 154 kV 2x1272 MCM 2,5+2,5km +2x1272 MCM line, which is 8,2 km in length, was signed on 30.10.2012. The tender price is 3.580.545,80 . The contractor firm is VAM LTD.ŞTİ. The installation period is 210 days. The installation activities are going on. It is financed by the equity capital.

Project No. 11.D03.0710, Dikmen 2 Transformer Substation Tie Lines ETL:The contract (H. 405) for

the installation of 154 kV 2x1272 MCM, which is 0,5 km in length, was signed on 30.10.2012. The tender price is 217.054,80 . The contractor firm is VAM LTD.ŞTİ. The installation period is 90 days. The instal-lation activities are going on. It is financed by the equity capital.

Project No. 09.D03.0460, (Otosansit - Yenişehir) Branch.N - Turanköy ETL:The contract (H.2.Gr.Md.) for the installation of 154 kV 2x1272 MCM, which is 0,5 km in length, was signed on 13.11.2012. The tender price is 238.617,50 . The contractor firm is KURTMA-KAS LTD.ŞTİ. The installation period is 90 days. The installation activities are going on. It is financed by the equity capital.

12.D03.0330 Proje No.lu Çorlu-B.Karıştıran ETL Renewal: The contract (H.415) for the line 154 kV, 2x1272 MCM which is 24km (renewal)+ 2km (new line) in length, was signed on 20.11.2012. The tender price is 5.844.000 . The contractor firm is ÖZAŞ LTD.ŞTİ.. The installation period is 180 days. The installation acti-vities are going on. It is financed by the equity capital • Project No. 12.D03.0760, Varsak - Serik ETL

Renewal: The contract (H. 411) for the installation of 154 kV 1272 MCM+ 2x1272 MCM, which is 26,58 km in length, was signed on 04.12.2012. The tender price is 3.286.991,79 . The contractor firm is MET ENERJİ. The installation period is 180 days. The installation acti-vities are going on. It is financed by the equity capital. • Project No. 09.D03.0690, (Konya 1-Konya 4)

Branch Point - Alakova ETL: The contract (H.9.Gr.Md.) for the installation of 154 kV, 2x1272 MCM line, which is 4,5 km in length, was signed on 15.11.2012. The tender price is 1.079.000 . The con-tractor firm is ÇETİNKAYA LTD.ŞTİ. The installation period is 150 days. The installation activities are going on. It is financed by the equity capital.

Project No. 11.D03.0880, (Alpaslan - Adilcevaz) Branch Point - Bulanık Transformer Substation ETL: The contract (H.413) for the installation of 154 kV, 2x1272 MCM line, which is 9 km in length, was sig-ned on 20.12.2012. The tender price is 1.079.000 . The contractor firm is ERİŞİM LTD.ŞTİ-MHY LTD.ŞTİ.ORT. The installation period is 120 days. The installation activities are going on. It is financed by the equity capital.

Project No. 12.D03.1150, Akköprü - Fethiye ETL:The contract (H. 409) for 154 kV, 1272 MCM+ 2x1272 MCM line, which is 23 km (new) + 12 km (renewal) in length, was signed on 26.12.2012. The tender price is 6.822.000 . The contractor firm is UFUK ATAÇ-ELTEM MÜH. The installation period is 180 days. The installation activities are going on. It is financed by the equity capital.

(24)

Project No. 11.D03.0630, Viranşehir 380 - Dikmen ETL:The contract (H. 417) for 154 kV, 2x1272 MCM line, which is 36 km in length, was signed on 26.12.2012. The tender price is 7.146.000 . The con-tractor firm is ÖZAŞ LTD.ŞTİ. The installation period is 300 days. The installation activities are going on. It is financed by the equity capital.

Project No. 12.D03.1270, Bodrum - Yeniköy ETL Renewal: The contract (H. 417) for 154 kV, 2x1272 MCM line, which is 45 km (renewal) + 5 km (new line) in length, was signed on 28.12.2012. The tender price is 12.320.000 . The contractor firm is KAR-PA LTD.ŞTİ. The installation period is 210 days. The ins-tallation activities are going on. It is financed by the equity capital.

Project No. 09.D03.0430, Söke - Akbük ETL: The contract (H. 421) for 154 kV, 1272 MCM line, which is 36,57 km in length, was signed on 02.01.2013. The tender price is 4.612.000 . The contractor firm is KEBAN LTD.ŞTİ. The installation period is 240 days. The installation activities are going on. It is financed by the equity capital.

2.3. Transformer Substation

Projects in 2012

2.3.1 Transmission Facility Projects Taking Place in 2012 Investment Program and Awarded

380 kV Transformer Substation (TS) :

Tepeören 380 TS Extension: 380 kV, 1 unit of Feeder (Transformer), 380/33 kV 2x125 MVA Transformer and 33 kV Metal Clad Power Switch Addition were tendered on 29.08.2012, and the contract was signed on 28.09.2012. The tender price is 7.389 thousand and the contractor firm is ANADOLU ELK. A.Ş. According to its

contract, the completion date is 01.06.2013 and the pro-ject is financed by the equity capital. Time extension is reported to the center and the completion date is postpo-ned to 16.07.2013.

Altınkaya 380 TS Extension:380 kV, 1 unit of Feeder was tendered on 13.07.2012, and the contract was signed on 22.08.2012. The tender price is 993 thousand and the contractor firm is GÜNGÖR LTD.ŞTİ. According to its contract, the completion date is 27.04.2013 and the pro-ject is financed by the equity capital.

Ereğli 380 TS Extension:380/154 kV, Bank Feeder, 154 kV, 4 units of Feeder were tendered on 28.09.2012, and the contract was signed on 31.10.2012. The tender price is 3.748 thousand . and the contractor firm is MET ENERJİ A.Ş. According to its contract, the completion date is 03.11.2013 and the project is financed by the equity capital.

Gelibolu 380 TS:380/154 kV, 2x250 MVA , 380 kV 150 MVAR Reactor,154/33 kV Power Switch were tendered on 29.11.2012, and the contract was signed on 04.01.2013. The tender price is 31.467 thousand and the contractor is AVNİ ULUTAŞ. According to its contract, the completion date is 06.06.2014 and the project is financed by the equity capital.

Ordu 380 TS:380/154 kV 2x250 MVA was tendered on 29.11.2012, and the contract was signed on 04.01.2013. The tender price is 25.078 thousand and the contractor is AVNİ ULUTAŞ. According to its contract, the installation period is 510 days and the project is financed by the equity capital.

154 kV Transformer Substation (TS) :

Kayabaşı TOKİ TS:154/33 kV 2x100 MVA was tendered on 29.03.2012, and the contract was signed on 27.04.2012. The tender price is 7.230 thousand and the contractor firm is ANADOLU ELK. A.Ş. According to its contract, the installation period is 360 days and the project is financed by the equity capital.

Kuzeytepe TS:154/33 kV 2x100 MVA was tendered on 29.03.2012, and the contract was signed on 27.04.2012. The tender price is 7.177 thousand and the contractor firm is GÜNGÖR LTD.ŞTİ. According to its contract, the completion date is 08.05.2013 and the project is financed by the equity capital.

Gercüş TS: 154 kV, 1st and 2nd Transformer Feeder were tendered on 29.08.2012, and the contract was signed on 01.10.2012. The tender price is 3.453 thousand and the contractor firm is MET ENERJİ A.Ş. According to its con-tract, the completion date is 01.12.2013 and the project is financed by the equity capital.

Edremit 2 TS Extension:154 kV, 2 units Feeder were tendered on 29.08.2012, and the contract was signed on 27.09.2012. The tender price is 419 thousand and the contractor firm is BEST A.Ş. According to its contract, the completion date is 01.06.2013 and the project is financed by the equity capital.

Pınarbaşı TS Extension: 154 kV, 4 units Feeder were tendered on 29.08.2012, and the contract was signed on 01.10.2012. The tender price is 1.290 thousand and the

(25)

contractor firm is MET ENERJİ A.Ş. According to its con-tract, the completion date is 04.06.2013 and the project is financed by the equity capital.

Şarkışla TS Extension:154 kV, 4 units Feeder were ten-dered on 29.08.2012, and the contract was signed on 01.10.2012. The tender price is 1.242 thousand and the contractor firm is MET ENERJİ A.Ş. According to its con-tract, the completion date is 03.08.2013 and the project is financed by the equity capital.

Arslanbey TS: 154/33 kV,100 MVA and 2nd Transformer Feeder were tendered on 29.08.2012, and the contract was signed on 28.09.2012. The tender price is 5.463 thousand and the contractor firm is ANADOLU ELK. A.Ş. According to its contract, the completion date is 28.11.2013 and the project is financed by the equity capital.

Artvin - 2 TS:154/33 kV,1stand 2ndTransformer Feeder were tendered on 29.08.2012, and the contract was sig-ned on 28.09.2012. The tender price is 5.419 thousand and the contractor is AVNİ ULUTAŞ. According to its con-tract, the completion date is 30.03.2014 and the project is financed by the equity capital.

Alibeyhöyüğü TS Renewal:154/33 kV,100 MVA and 2nd Transformer Feeder were tendered on 29.08.2012, and the contract was signed on 01.10.2012. The tender price is 5.255 thousand and the contractor firm is MET ENERJİ A.Ş. According to its contract, the completion date is 03.12.2013 and the project is financed by the equity capital.

Mardin - 2 TS:154/33 kV 2x100 MVA was tendered on 29.08.2012, and the contract was signed on 27.09.2012. The tender price is 7.500 thousand and the contractor is BEST A.Ş.. According to its contract, the completion date is 29.11.2013 and the project is financed by the equity capital

Yukarımanahoz TS Extension: 154 kV, 2nd Transformer Feeder and MV Power Switch Addition were tendered on 29.08.2012, and the contract was signed on 01.10.2012. The tender price is 565 thousand and the contractor firm is MET ENERJİ A.Ş. According to its contract, the comple-tion date is 02.04.2013 and the project is financed by the equity capital.

Avanos - 2 TS:154/33 kV, 100 MVA and 2ndTransformer Feeder were tendered on 13.07.2012, and the contract was signed on 16.08.2012. The tender price is 6.435 thou-sand and the contractor is AVNİ ULUTAŞ. According to its contract, the completion date is 18.10.2013 and the project is financed by the equity capital.

Tirebolu TS Extension: 380/154 kV, 2nd Bank Feeder, Serial Capacitor Center was tendered on 13.07.2012, and the contract was signed on 16.08.2012. The tender price is 2.815 thousand and the contractor is AVNİ ULUTAŞ. According to its contract, the completion date is 20.06.2013 and the project is financed by the equity capital.

Refahiye TS Extension:154 kV, 2ndTransformer Feeder and Busbar Reactor Feeder were tendered on 13.07.2012, and the contract was signed on 15.08.2012. The tender price is 912 thousand and the contractor is ÖMSA LTD.ŞTİ./AND LTD.ŞTİ. JOINT VENTURE. According to its contract, the completion date is 18.06.2013 and the project

is financed by the equity capital.

Maslak TS Extension: 154/33 kV, 3rd Transformer Feeder and MV Power Switch were tendered on 13.07.2012, and the contract was signed on 14.08.2012. The tender price is 980 thousand and the contractor firm is ÇAĞ-SER LTD.ŞTİ. According to its contract, the completion date is 19.04.2013 and the project is financed by the equity capital.

Yeniçates TS Extension: 154 kV, 3 units Feeder were tendered on 13.07.2012, and the contract was signed on 14.08.2012. The tender price is 1.072 thousand and the contractor firm is ÇAĞ-SER LTD.ŞTİ. According to its con-tract, the completion date is 19.04.2013 and the project is financed by the equity capital.

Siverek TS Extension: 154 kV, 1 unit of Feeder (3rd Transformer), MV Metal Clad and Control Building Addition were tendered on 30.07.2012, and the contract was signed on 03.09.2012. The tender price is 2.942 thou-sand and the contractor firm is ALF LTD.ŞTİ. According to its contract, the completion date is 08.07.2013 and the project is financed by the equity capital.

Dikmen - 2 TS:154/33 kV, 2x100 MVA was tendered on 30.07.2012, and the contract was signed on 03.09.2012. The tender price is 7.002 thousand and the contractor firm is BEST A.Ş. According to its contract, the completi-on date is 06.09.2013 and the project is financed by the equity capital.

Kızıltepe TS Extension:154 kV, 2 units Feeder were ten-dered on 30.07.2012, and the contract was signed on 03.09.2012. The tender price is 595 thousand and the contractor firm is BEST A.Ş.. According to its contract, the completion date is 09.05.2013 and the project is financed by the equity capital.

Çırçıp TS Extension:154 kV, 3 units Feeder (Viranşehir, Kızıltepe, 3.Transformer Feeder), MV Power Switch and Control Building were tendered on 30.07.2012, and the contract was signed on 03.09.2012. The tender price is 3.834 thousand and the contractor firm is ALF LTD.ŞTİ.. According to its contract, the completion date is 06.09.2013 and the project is financed by the equity capi-tal.

Köklüce TS Extension: 154 kV, 1 units Feeder (Tokat Organized Industrial Zone), Metal Clad and Control Building, 2nd Transformer Feeder were tendered on 28.09.2012, and the contract was signed on 12.11.2012. The tender price is 2.963 thousand and the contractor firm is AYDURAN LTD.ŞTİ.. According to its contract, the completion date is 16.09.2013 and the project is financed by the equity capital.

Sızır TS Extension:154 kV, 2ndTransformer Feeder was tendered on 28.09.2012, and the contract was signed on 12.11.2012. The tender price is 989 thousand and the contractor firm is ANADOLU ELK.A.Ş.. According to its contract, the completion date is 18.07.2013 and the pro-ject is financed by the equity capital.

Karabük OIZ TS:154 kV Renewal (154/33 kV, 100 MVA), was tendered on 28.09.2012 and the contract was signed on 31.10.2012. The tender price is 6.773 thousand the contractor company is ANADOLU ELK. A.Ş.. According

(26)

to its contract the completion date is 02.11.2013, it is financed by the equity capital.

Kadıköy GIS TS:154/33 kV, 2x100+50 MVA was tendered on 05.10.2012, and the contract was signed on 17.10.2012. The tender price is 18.422 thousand and the contractor firm is ALSTOM GRİD ENERJİ END. A.Ş. According to its contract, the completion date is 20.09.2013 and the project is financed by the equity capital.

Edirne TS Renewal: 154/33 kV, 100 MVA and 2nd Transformer Feeder were tendered on 29.11.2012, and the contract was signed on 04.01.2013. The tender price is 5.979 thousand and the contractor is AVNİ ULUTAŞ. According to its contract, the completion date is 08.03.2014 and the project is financed by the equity capital.

CABLES : 380 kV CABLES:

Lapseki - Sütlüce Submarine Cable (with Fiber Optic):

380 kV, 2x1600 mm2, 4.5 km cable was tendered on 29.08.2012, and the contract was signed on 19.09.2012. The tender price is 66.737 thousand and the contractor is TURK PRYSMIAN A.Ş./PRYSMIAN POWERLINK S.R.L. According to its contract, the completion date is 10.11.2014 and the project is financed by World Bank.

Maltepe 380 - Kartal 380 Cable:380 kV, 2000 mm2, 8.04 km cable was tendered on 29.11.2012, and the contract was signed on 21.12.2012. The tender price is 28.040 thousand and the contractor is DEMİRER KABLO A.Ş. According to its contract, the completion date is 21.05.2014 and the project is financed by the equity capital.

154 kV CABLES:

Gebze Organized Industrial Zone - Tuzla Cable: 154 kV, 1600 mm211.1 km cable was tendered on 29.11.2012, and the contract was signed on 20.12.2012. The tender price is 20.400 thousand and the contractor is TÜRK PRYSMIAN KABLO A.Ş. According to its contract, the completion date is 20.02.2014 and the project is financed by the equity capital.

Kalkandere TS Cable connection: 154 kV, 1000 mm2 300 m cable was tendered on 07.12.2012, and the con-tract was signed on 27.12.2012. The tender price is 787 thousand and the contractor is TÜRK PRYSMIAN KABLO A.Ş. According to its contract, the completion date is 02.06.2013 and the project is financed by the equity capital.

Adapazarı TS Cable connection:154 kV, 1000 mm2300 m cable was tendered on 07.12.2012, and the contract was signed on 27.12.2012. The tender price is 1.021 thousand and the contractor is TÜRK PRYSMIAN KABLO A.Ş. According to its contract, the completion date is 31.05.2013 and the project is financed by the equity capital.

Yıldıztepe - Şişli Cable: 154 kV, 1600 mm2 4,995 km cable was tendered on 29.11.2012, and the contract was signed on 12.02.2013. The tender price is 12.393 thou-sand and the contractor is DEMİRER KABLO A.Ş. According to its contract, the installation period is 420 days and the project is financed by the equity capital.

2.3.2 Facility Projects Awarded in Previous Years and Completed in 2012

380 kV Transformer Substation (TS) :

Diyarbakır 3 TS:Extension of 380 TM, 380/33 kV, 125 MVA was tendered on 27.10.2010, and the contract was signed on 07.12.2010. The tender price is 6.711 thousand and the contractor is GÜNGÖR LTD.ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is perfor-med on 15.01.2012 and then it is set into operation.

Hamitabat 380 TS Extension: 380/154kV, Auto Transformer Substation, 250 MVA Autotransformer was tendered on 27.10.2010, and the contract was signed on 07.12.2010. The tender price is 4.866 thousand and the contractor firm is GÜNGÖR LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 06.03.2012 and then it is set into operation.

Transformer and Transformer Feeder Addition to Yıldıztepe 380 TS:380/33 kV, 2 x 125 MVA Transformer Substation was tendered on 17.08.2011, and the contract was signed on 22.09.2011. The tender price is 2.701 thou-sand and the contractor firm is BEST A.Ş. It is financed by the equity capital. Its Provisional Acceptance is perfor-med on 31.10.2012 and then it is set into operation.

Batman 380 TS Extension:380 kV, 1 unit of Feeder, 154 kV 3 units feeder were tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 1.719 thousand and the contractor firm is GÜNGÖR LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 24.08.2012 and then it is set into operation.

Ağrı TS Extension:380 kV 2 units Feeder (Van Feeder, Van Line + Busbar Reactor Feeder) and 154 kV 1 unit of Feeder (Horasan Feeder) were tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 2.085 thousand and the contractor firm is GÜNGÖR LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 16.08.2012 and then it is set into operation.

Manisa 380 TS Extension: 380 kV, 1 unit of Feeder (Soma), 154 kV, 2 units Fider (Kemalpaşa, Üniversite), were tendered on 17.08.2011, and the contract was sig-ned on 21.09.2011. The tender price is 1.667 thousand and the contractor firm is ANADOLU ELK. A.Ş. It is finan-ced by the equity capital. Its Provisional Acceptance is performed on 24.08.2012 and then it is set into operation.

Bursa San TS:380 kV, 1 units Feeder was tendered on 17.11.2011, and the contract was signed on 19.12.2011. The tender price is 342 thousand and the contractor firm is GÜNGÖR LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 16.07.2012 and then it is set into operation.

Erzurum 380 TS:380 kV, 2 units Feeder (İspir, Yusufeli Line + Busbar Reactor Feeder), were tendered on 28.11.2011, and the contract was signed on 19.12.2011. The tender price is 1.670 thousand and the contractor firm is GÜNGÖR LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 09.11.2012 and then it is set into operation.

(27)

Soma 380 TS Extension: 380 kV, 2 units Feeder (Manisa, K.Biga, Line + Busbar Reactor Feeder), were tendered on 10.11.2011, and the contract was signed on 19.12.2011. The tender price is 1.890 thousand and the contractor firm is GÜNGÖR LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 28.09.2012 and then it is set into operation.

Hatay 380 TS: 380/154 kV, 2x250 MVA and 154/33 kV 100 MVA Transformer Substation was tendered on 30.09.2010 and the contract was signed on 09.11.2010. The tender price is EURO 9.819 thousand, and the con-tractor firm is GES LTD. A.Ş. / GES İMAL.MONT. A.Ş. / BAŞÖZ A.Ş. CONSORTIUM. The project is financed by the World Bank. Its Provisional Acceptance is performed on 12.12.2012 and then it is set into operation.

Maltepe 380 GIS: 380/33 kV, 2 x 125 MVA Transformer Substation was tendered on 14.07.2011, and the contract was signed on 04.08.2011. The tender price is 8.792 thou-sand and the contractor firm is SIEMENS AG & SIE-MENS INC. The project is financed by the World Bank. The completion certificate is published on 28.01.2013.

154 kV TS :

Elazığ - 2 TS Renewal:154 kV and 33 kV Power Switch were tendered on 25.10.2010, and the contract was sig-ned on 05.11.2010. The tender price is 4.368 thousand and the contractor firm is UFUK ATAÇ - ELTEM ENGI-NEERING. It is financed by the equity capital. Its Provisional Acceptance is performed on 07.11.2012 and then it is set into operation.

Gölcük (Yeniköy) TS: 154/33 kV 100 MVA and 2nd Transformer Substation was tendered on 17.08.2011 and the contract was signed on 21.09.2011. The tender price is 4.570 thousand and the contractor firm is ANADOLU ELK. LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 28.12.2012 and then it is set into operation.

Yeni Gediz TS Extension: 154 kV Transformer Feeder was tendered on 17.08.2011, and the contract was signed on 22.09.2011. The tender price is 668 thousand and the contractor firm is ÇAĞ-SER ELK. LTD. ŞTİ. It is finan-ced by the equity capital. Its Provisional Acceptance is performed on 19.07.2012 and then it is set into operation.

Bulanık TS:154/33 kV, 1st and 2nd Transformer Feeder were tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 3.755 thousand and the contractor firm is GÜNGÖR ELK. LTD. ŞTİ.. It is finan-ced by the equity capital. Its Provisional Acceptance is per-formed on 22.11.2012 and then it is set into operation.

Tokat Organized Industrial Zone TS Extension:154 kV 1 unit of Feeder was tendered on 17.08.2011 and the contract was signed on 21.09.2011. The tender price is 567 thousand and the contractor firm is GÜNGÖR ELK. LTD. ŞTİ.. It is financed by the equity capital. Its Provisional Acceptance is performed on 12.06.2012 and then it is set into operation.

Feeder Addition to Tümosan TS (Derinkuyu):154 kV 1 unit of Feeder was tendered on 17.08.2011 and the con-tract was signed on 21.09.2011. The tender price is 659 thousand and the contractor firm is INEMKO ELK.

LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 12.07.2012 and then it is set into operation.

3rd Transformer Feeder and 33 kV Indoor Power

Switch Addition to Ümitköy TS:154 kV 1 unit of Feeder and 33 kV Power Switch were tendered on 17.08.2011 and the contract was signed on 21.09.2011. The tender price is 568 thousand and the contractor firm is GÜNGÖR ELK. LTD. ŞTİ. It is financed by the equity capi-tal. Its Provisional Acceptance is performed on 25.06.2012 and then it is set into operation.

Tuzla TS Extension: 154 kV, 3rd and 4thFeeder and MV Power Switch Addition, 2x100 MVA Transformer Substation was tendered on 17.08.2011 and the contract were signed on 22.09.2011. The tender price is 4.026 thousand and the contractor firm is BEST A.Ş. It is finan-ced by the equity capital. Its Provisional Acceptance is per-formed on 05.11.2012 and then it is set into operation.

Karasu TS Extension (Kaynarca TS): 154 kV, 1 unit of Feeder was tendered on 17.08.2011, and the contract was signed on 22.09.2011. The tender price is 457 thou-sand and the contractor firm is ÇAĞ-SER ELK. LTD. A.Ş. It is financed by the equity capital. Its Provisional Acceptance is performed on 24.07.2012 and then it is set into operation.

Kaynarca TS Extension (Karasu TS): 154 kV, 1 unit of Feeder was tendered on 17.08.2011, and the contract was signed on 22.09.2011. The tender price is 387 thou-sand and the contractor firm is ÇAĞ-SER ELK. LTD. A.Ş. It is financed by the equity capital. Its Provisional Acceptance is performed on 24.07.2012 and then it is set into operation.

Marmaris TS Extension (Marmaris - 2):154 kV, 1 unit of Feeder was tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 620 thousand and the contractor firm is İNEMKO ELK. LTD. CO. It is finan-ced by the equity capital. Its Provisional Acceptance is per-formed on 24.07.2012 and then it is set into operation.

(28)

26

Urla TS Extension (Alaçatı):154 kV, 1 unit of Feeder was tendered on 17.08.2011, and the contract was signed on 22.09.2011. The tender price is 312 thousand and the contractor firm is AEG BEST A.Ş. It is financed by the equity capital. Its Provisional Acceptance is performed on 19.07.2012 and then it is set into operation.

Feeder Transformation to Keçiborlu TS (2nd Transformer, Afyon 2):154 kV, 2 units of Feeder was tendered on 17.11.2011 and the contract was signed on 22.12.2011. The tender price is 718 thousand and the contractor firm is MET ENERGY A.Ş. It is financed by the equity capital. Its Provisional Acceptance is performed on 26.09.2012 and then it is set into operation.

Alara TS: 154/33 kV, 100 MVA and 2nd Transformer Feeder was tendered on 17.11.2011, and the contract was signed on 16.12.2011. The tender price is 5.028 thou-sand and the contractor is AVNİ ULUTAŞ. It is financed by the equity capital. Its Provisional Acceptance is perfor-med on 27.12.2012 and then it is set into operation.

Feeder Addition to Derinkuyu TS (Tümosan):154 kV 1 unit of Feeder was tendered on 17.11.2011 and the con-tract was signed on 19.12.2011. The tender price is 428 thousand and the contractor firm is G Ü N G Ö R ELK. LTD. ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 27.12.2012 and then it is set into operation.

Datça TS Extension (Marmaris - 2): 154 kV, 1 unit of Feeder was tendered on 17.08.2011, and the contract was signed on 22.09.2011. The tender price is 510 thou-sand and the contractor firm is ÇAĞ-SER ELK. LTD.

ŞTİ. It is financed by the equity capital. Its Provisional Acceptance is performed on 30.09.2012 and then it is set into operation.

Kuleönü TS Renewal: 154/33 kV 100 MVA and 2nd Transformer Feeder was tendered on 17.08.2011 and the contract was signed on 21.09.2011. The tender price is 4.849 thousand and the contractor is AVNİ ULUTAŞ. It is financed by the equity capital. Its Provisional Acceptance is performed on 06.01.2013 and then it is set into operation.

Altınekin TS:154/33 kV 100 MVA and 2nd Transformer Feeder were tendered on 28.11.2011, and the contract was signed on 16.12.2011. The tender price is 5.150 thou-sand and the contractor is AVNİ ULUTAŞ. It is financed by the equity capital. Its Provisional Acceptance is perfor-med on 30.01.2013 and then it is set into operation.

Nazilli TS Renewal: 154/33 kV 100 MVA and 2nd Transformer Feeder, MV Power Switch Renewal were ten-dered on 28.11.2011 and the contract was signed on 19.12.2011. The tender price is 5.423 thousand and the contractor firm is UFUK ATAÇ ELTEM MÜHENDİSLİK. It is financed by the equity capital. Its Provisional Acceptance is performed on 14.10.2012 and then it is set into operation.

Kırıkkale TS Extension: The contract for 33 kV Metal Clad and Control Building Addition was signed on 28.03.2011. The tender price is 2.438 thousand , the contractor company is İNEMKO. It is financed by the equity capital. The provisional acceptance was performed on 29.08.2012 and it has been taken into service.

(29)

Finike TS Renewal: 154 kV 1st and 2nd Transformer Feeder, MV Power Switch were signed on 08.07.2011. The tender price is 4.649 thousand and the contractor firm is AVNİ ULUTAŞ. It is financed by the equity capital. Its Provisional Acceptance is performed on 08.12.2012 and then it is set into operation.

Altıntaş TS Extension:154 kV 2ndTransformer Feeder, is financed by the equity capital. Its Provisional Acceptance is performed on 27.07.2012 and then it is set into operation.

MV Power Switch in Samsun - 1 TS: 33 kV, Power Switch Transformer Substation was tendered on 25.10.2010 and the contract was signed on 05.11.2010. The tender price is 2.085 thousand and the contractor firm is UFUK ATAÇ - ELTEM MÜHENDİSLİK. It is financed by the equity capital. Its Provisional Acceptance is perfor-med on 04.05.2012 and then it is set into operation.

Erciş TS MV Power Switch Renewal (DAP): 33 kV Indoor Switch Transformer Substation was tendered on 27.10.2010, and the contract was signed on 03.12.2010. The tender price is 2.086 thousand and the contractor is SELÇUK ALBAYRAK. It is financed by the equity capi-tal. Its Provisional Acceptance is performed on 27.02.2012 and then it is set into operation.

2ndIndoor Power Switch Addition to Denizli 2 TS:33 kV, Indoor Switch Transformer Substation was tendered on 25.10.2010 and the contract was signed on 04.11.2010. The tender price is 2.439 thousand and the contractor firm is ŞA-RA A.Ş. It is financed by the equity capital. Its Provisional Acceptance is performed on

11.03.2012 and then it is set into operation.

2ndTransformer Feeder Addition to Toroslar TS:154 kV (154 kV / 33 kV 16 MVA), 1 unit of Feeder Transformer Substation was tendered on 27.10.2010, and the contract was signed on 06.12.2010. The tender price is 592 thou-sand and the contractor firm is FEYZ-TÜRKKABLO JOINT VENTURE. It is financed by the equity capital. Its Provisional Acceptance is performed on 26.07.2012 and then it is set into operation

MV Power Switch Renewal in Bafra TS MV: 33 kV Indoor Switch Transformer Substation was tendered on 25.10.2010, and the contract was signed on 05.11.2010. The tender price is 1.998 thousand and the contractor firm is UFUK ATAÇ - ELTEM MÜHENDİSLİK. It is financed by the equity capital. Its Provisional Acceptance is perfor-med on 20.04.2012 and then it is set into operation.

Reyhanlı TS: 154/33 kV 100 MVA was tendered on 10.02.2011 and the contract was signed on 15.03.2011. The tender price is 4.460 thousand and the contractor firm is BEST A.Ş.. It is financed by the equity capital. Its Provisional Acceptance is performed on 04.12.2012 and then it is set into operation.

Aksaray TS:154/33 kV, 2 x 100 MVA Transformer Feeder was tendered on 28.11.2011, and the contract was signed on 16.12.2011. The tender price is 7.157 thousand and the contractor firm is AVNİ ULUTAŞ. Its Provisional Acceptance is performed on 12.02.2013 and then it is set into operation.

Torul TS Feeder Addition: 154 kV, 2 units of Feeder were tendered on 28.11.2011, and the contract was sig-ned on 19.12.2011. The tender price is 887 thousand and the contractor firm is GÜNGÖR ELK. LTD.ŞTİ. Its Provisional Acceptance is performed on 30.01.2013 and then it is set into operation.

CABLES : 380 kV CABLES :

Ambarlı NGCCPP - New Ambarlı NGCCPP: 380 kV, 2000 mm2, 0.6 km cable was tendered on 21.06.2011, and the contract was signed on 14.07.2011. The tender price is 3.695 thousand and the contractor firm is ARK YAPI A.Ş. Its Provisional Acceptance is performed on 08.02.2012 and then it is set into operation.

154 kV CABLES :

Bursa San.- Bursa Merinos Cable:154 kV, 1600 mm2 , 10,50 km cable was tendered on 01.12.2010 and the con-tract was signed on 17.12.2010. The tender price is 25.334 thousand and the contractor is TÜRK PRYSMI-AN A.Ş. Its Provisional Acceptance is performed on 14.02.2012 and then it is set into operation.

Ümraniye - Vaniköy ETL Renewal: 154 kV, 1600 mm2, 6,13 km Cable was tendered on 01.12.2010 and the con-tract was signed on 17.12.2010. The tender price is 15.650 thousand and the contractor is TÜRK PRYSMI-AN A.Ş. Its Provisional Acceptance is performed on 10.02.2012 and then it is set into operation.

(30)

2.3.3. Facility Projects Awarded in Previous Years and Continued in 2012

380 kV Transformer Substation (TS) :

Mersin 380 TS:380/154 kV, 2 x 250 MVA and 154/33 kV 2 x 100 MVA Transformer Substation were tendered on 10.02.2011, and the contract was signed on 15.03.2011. The tender price is 19.856 thousand and the contractor firm is BEST A.Ş. The installation is going on with delay and the project is financed by the equity capital.

Eskişehir 380 TS:380/154 kV, 2 x 250 MVA Transformer Substation was tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 14.717 thousand and the contractor firm is GÜNGÖR LTD.ŞTİ. According to its contract, the completion date is 20.02.2013 and the project is financed by the equity capital.

Viranşehir 380 TS:380/154 kV, 2 x 250 MVA + 380/154 kV, 2 x 125 MVA and 154 /33 kV, 2 x 100 MVA Transformer Substation were tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 26.379 thousand and the contractor firm is GÜNGÖR LTD.ŞTİ.. According to its contract, the completion date is 20.02.2013 and the project is financed by the equity capital.

Cizre 380 TS: 380/154 kV, 2 x 250 MVA Transformer Substation was tendered on 17.11.2011, and the contract was signed on 16.12.2011. The tender price is 15.230 thou-sand and the contractor firm is AVNİ ULUTAŞ. According to its contract, the completion date is 13.05.2013, and the project is financed by the equity capital.

Çeşme 380 TS: 380/33 kV, 2 x 125 MVA Transformer Substation was tendered on 17.11.2011, and the contract was signed on 16.12.2011. The tender price is 14.302 thou-sand and the contractor firm is AVNİ ULUTAŞ. According to its contract, the completion date is 14.05.2013, and the project is financed by the equity capital.

Borçka TS Extension: 380 kV 3 units of Feeder

(Gürcistan, Arkun, Bank), 154 kV 1 unit of Feeder (2nd Transformer Feeder) and Metal Clad Power Switch Addition were tendered on 17.11.2011 and the contract was signed on 19.12.2011. The tender price is 4.683 thousand and the contractor firm is UFUK ATAÇ ELTEM MÜHENDİSLİK. The installation is going on with delay and the project is financed by the equity capital.

Karaburun GIS 380 TS: 380/33 kV, 125 MVA Transformer Substation was tendered on 17.11.2011, and the contract was signed on 19.12.2011. The tender price is 6.489 thousand 3.657 thousand USD, 1.547 EURO and the contractor firm is ŞA-RA ENERJİ. According to its contract, the completion date is 20.05.2013, and the project is financed by the equity capital.

Adapazarı 380 TS Extension:380/33 kV, 125 MVA, 154 kV Bank Feeder was tendered on 28.11.2011, and the contract was signed on 15.12.2011. The tender price is 4.227 thousand and the contractor firm is ANADOLU ELK. A.Ş. According to time extension, the completion date is 21.01.2013, and the project is financed by the equity capital.

Ambarlı NGCCPP:380 kV Extension was tendered on 27.10.2010, and the contracts were signed on 06.12.2010. The tender price is 2.837 thousand and the contractor firm is FEYZ-TÜRKKABLO JOINT VENTURE. The installation is going on with delay and the project is financed by the equity capital.

Auto-transformer, Bank and Feeder Addition to Kalkandere (İyidere) 380 TS: Construction of 380/154 kV, 2x250 MVA,154/33 kV 50 MVA and the 2ndTransformer Feeder was tendered on 27.10.2010, and the contract was signed on 07.12.2010. The tender price is 18.949 thousand and the contractor firm is SIEMENS A.Ş. The installation is going on with delay and the project is finan-ced by the equity capital.

154 kV Transformer Substation (TS) :

İncek TS:154/33 kV, 2 x 100 MVA Transformer Substation was tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 6.668 thousand and the contractor firm is ANADOLU ELK. A.Ş. The installati-on is going installati-on with delay and the project is financed by the equity capital.

MV Power Switch Renewal in İkitelli TS:33 kV, Indoor Power Switch was tendered on 17.08.2011 and the con-tract was signed on 22.09.2011. The tender price is 1.557 thousand and the contractor firm is DALKIRANLAR A.Ş. It is in the acceptance phase and the project is financed by the equity capital.

Dinar TS: 154/33 kV 50 MVA and 2ndTransformer Feeder was tendered on 17.08.2011 and the contract was signed on 21.09.2011. The tender price is 4.966 thousandand the contractor firm is ANADOLU ELK. A.Ş. The installation is going on with delay and the project is financed by the equity capital.

Bozöyük Organized Industrial Zone TS:154/33 kV, 50 MVA and 2nd Transformer Feeder was tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 5.133 thousand and the contractor

(31)

29

firm is ANADOLU ELK. A.Ş. The installation is going on with delay and the project is financed by the equity capital.

Kurşunlu TS Extension (2ndTransformer and Karabük

Organized Industrial Zone): 154 kV 2 units of Feeder were tendered on 17.08.2011 and the contract was signed on 22.09.2011. The tender price is 1.621 thousand and the contractor firm is AEG GENEL ELK. TÜRK. A.Ş.. The installation is going on with delay and the project is finan-ced by the equity capital.

Çağlayan Havza TS: 154/33 kV, 50 MVA and 2nd Transformer Feeder were tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 5.624 thousand and the contractor firm is ANADOLU ELK. A.Ş. Due to the expropriation problem the completi-on of the installaticompleti-on is postpcompleti-oned to the year 2013. The project is financed by the equity capital.

Urla - 2 TS:154/33 kV, 3 x 50 MVA Transformer Feeder was tendered on 17.08.2011, and the contract was signed on 21.09.2011. The tender price is 6.826 thousand and the contractor firm is ANADOLU ELK. A.Ş. The installati-on is going installati-on with delay and the project is financed by the equity capital.

Tercan TS MV Power Switch Renewal:33 kV was ten-dered on 17.08.2011, and the contract was signed on 22.09.2011. The tender price is 2.718 thousand and the contractor firm is ÇAĞ-SER ELK. LTD ŞTİ. The installati-on is going installati-on with delay and the project is financed by the equity capital.

Sivrihisar TS: 154 kV, 2 units of Transformer Feeders were tendered on 17.08.2011, and the contract was sig-ned on 21.09.2011. The tender price is 3.477 thousand and the contractor firm is ANADOLU ELK. A.Ş. The instal-lation is going on with delay and the project is financed by the equity capital.

Gaziemir GIS TS:154/33 kV, 100 MVA and 2ndTransformer Feeder were tendered on 28.11.2011, and the contract was signed on 15.12.2011. The tender price is 3.000 thousan

References

Related documents

In May 2003, the Supervisory Board of Directors approved amendments to the terms of outstanding options held by members of the management board, which include the Company’s

Loans to members of executive bodies The members of the Board of Directors or of management and persons close- ly related to them are, or were, in the current or preceding

The Annual General Meeting, the Board of Directors and the Managing Director of Julius Tallberg Real Estate Corporation are responsible for corporate governance.. Annual

As described in the section “Events after the End of the Accounting Year”, on 12 March 2015, the Board of Directors of Rella Holding A/S and the Chairmanship and the

As mentioned in company’s articles of association, Çimsa’s Board of Directors consists of five members selected from among its shareholders at its annual General Assembly..

The Board of Directors currently comprises 15 members, including 13 non-executive directors and 2 executive directors (the CEO and the Chairman). The number and powers of

TDS has a Directors and Officers Insurance (D&O insurance) for Executive Board members and Supervisory Board members that cov- ers personal liability for a defined group of

However, my talents and passion for land preservation would never have preserved a single acre without the structure of our organization being formed by a few dedicated board members,