SELECTION
DA
DATTA A TO BE COLLECTO BE COLLECTED TO TED TO STSTART ART DESDESIGNIGN
1.
1. A A complete complete set set of of piping piping general general arrangementarrangement
drawings.
drawings.
2.
2. A A complete complete set set of of steel steel and and structural structural drawingsdrawings
including the equipment foundation .
including the equipment foundation .
3.
3. A A complete complete set set of of drawing drawing showing showing the the locationlocation
of ventilating ducts, electrical trays, instrument
of ventilating ducts, electrical trays, instrument
tray etc.
tray etc.
4.
4. A A complete complete set set of of piping piping specification specification and and lineline
list which includes pipe sizes,
list which includes pipe sizes, material of material of
construction, thickness of insulation, operating
DA
DATTA A TO BE COLLECTO BE COLLECTED TO TED TO STSTART ART DESDESIGNIGN
1.
1. A A complete complete set set of of piping piping general general arrangementarrangement
drawings.
drawings.
2.
2. A A complete complete set set of of steel steel and and structural structural drawingsdrawings
including the equipment foundation .
including the equipment foundation .
3.
3. A A complete complete set set of of drawing drawing showing showing the the locationlocation
of ventilating ducts, electrical trays, instrument
of ventilating ducts, electrical trays, instrument
tray etc.
tray etc.
4.
4. A A complete complete set set of of piping piping specification specification and and lineline
list which includes pipe sizes,
list which includes pipe sizes, material of material of
construction, thickness of insulation, operating
temperatures etc.
temperatures etc.
5.
5. A A copy copy of of insulation insulation specification specification with with densities.densities.
6.
6. A A copy copy of of valve valve and and specialty specialty list list indicating indicating weights.weights.
7.
7. The The movement movement of of all all critical critical equipment equipment connectionsconnections
such
On collection of the above data, the steps in which the engineer will apply this basic information are as follows.
1. The determination of support location.
2. The determination of thermal movement of the piping at each support location.
3. The calculation of load at each support location.
4. The selection of the type of support i.e. Anchor Guide, Rest, Constant or Variable spring etc. 5. Checking the physical interference of the
support with structures, tray, ducts equipment‟s etc.
Anchors are provided to secure the desired points of piping whereas guides are provided to direct or absorb the
same. They shall permit the piping to expand and contract freely away from the fixed points. Sliding or Rest supports permit free movement of piping and shall be designed to include friction resistance along with the dead weight of the piping. Resilient supports are those which support the dead weight throughout the expansion / contraction of the piping.
The „primary support‟ is the supporting element which is
attached or in contact with the piping “secondary support” is the supplementary steel provided to carry the load on the
Fig. 1.1 Fig.1.2
Fig.1.4 Fig.1.5
Fig.1.6
Fig. 1.10
Fig 1.8
2.0 THE DETERMINATION OF SUPPORT LOCATIONS The support location is dependent on the pipe size, piping configuration, the location of heavy valves and specialties and the structure available for support. The simplest method of estimating the support load and pipe stress due to weight is to model the pipe as a beam loaded uniformly along the length, the length of the beam equal to distance between supports.
There are two possible ways to model the pipe, depending upon the end conditions – the simply supported (pinned end) beam or the fixed end beam.
For a simply supported beam , the maximum stress and support loads are.
Mmax = wl2 8 s = wl2 8Z F = wl 2 where,
Mmax = maximum bending moment, ft-lb (N-m)
s = Bending stress, psi (N/mm2)
w = weight per unit length, lb/in (N/mm) l = length of pipe, in (mm)
F = force on support, lb (N) Z = section modulus in3 (mm3)
For fixed end beam
wl2 Mmax = 12 wl2 s = 12 Z wl F = 2For either model, the support load remains the same. However, depending upon the model chosen the stress in pipe varies. In actual practice the pipe at the point of support is not free to support fully, since it is partially restrained through its
attachment to piping segment beyond the support. If the pipe runs between supports are equally loaded and of equal length, segment end rotation could cancel each other causing the pipe to behave as fixed-end beam. Therefore, the true case lies
somewhere between the two beam models. Hence, as a compromise case, the stress is calculated as
wl2
smax =
Hence, support spacing is decided by the formula 10 Z S
L =
w where
The suggested maximum spans between the supports as
recommended by ASMEB 31.1 in Table 121.5 are as follows:
Nominal Suggested Maximum
Span
Pipe Size Water Service Steam, Gas or
Air Service NB Inch M (ft) M (ft) 1 2.1 (7) 2.7 (9) 2 3.0 (10) 4.0 (13) 3 3.7 (12) 4.6 (15) 4 4.3 (14) 5.2 (17) 6 5.2 (17) 6.4 (21) 8 5.8 (19) 7.3 (30) 12 7.0 (23) 9.1 (30) 16 8.2 (27) 10.7 (35) 20 9.1 (30) 11.9 (39) 24 9.8 (32) 12.8 (42)
The above spacing is based on fixed bean support with a bending stress not to exceed 2300 psi and insulated pipe filled with water or the equivalent weight of steel pipe for steam, gas or air service and 2.5mm (0.1 inch) sag is permitted between supports.
The selection of supports should consider the following guidelines
i) The support should be located as near as possible to concentrated load such as valves, flanges etc. to keep the bending stress to the minimum.
ii) When changes of direction in a horizontal plane occur, it is suggested that the spacing be limited to 75% of the tabulated values to promote stability and reduce eccentric loadings. Note that the supports located directly on elbows are not recommended since that will stiffen the elbow and no flexibility will be available.
iii)The standard span does not apply to vertical run pipes (risers) since no moment and no stress will develop due to gravity load in the riser. The support should be located on the
a riser (above the center of gravity) to prevent instability in overturning of pipe under its own weight. Guides may be placed on long vertical risers to reduce pipe sag resulting in excessive pipe deflection. These guides are usually placed in span intervals
of twice the normal horizontal span and do not carry any dead weight.
iv) Support location should be selected near the existing building steel to minimize the use of supplementary steel.
In case of pipeline running in Multiplan, the support load is determined by applying a method called „weight
balancing‟. This method involves breaking the larger piping system into smaller segments of pipe with supports, which are modeled as free bodies in equilibrium and solved
PIPE SUPPORT DESIGN AND
ENGINEERING
In case of concentrated loads, the support should be placed as close as possible. When change in direction occurs, it is considered a good practice to keep the span to 75% of the tabulated values.
For the illustrated problem, the following vertical movements are known,
Point A – 50 mm up, Cold to Hot Point B – 35 mm up, Cold to Hot
The above data is as furnished by the manufactures of equipment.
STEP 1
Calculate the expansion at point C and D by multiplying the Coefficient of expansion by the vertical distance of each point from the position of zero movement on the riser CD.
3.0 x 7.62 = 22.86 mm up at point C 6.1 x 7.62 = 46.48 mm down at point D
The calculation of the loads for hangers involves dividing the system into convenient sections. A free body diagram of each section should be drawn to facilitate the calculation with simple arithmetic solution to the problem.
DISTRIBUTION OF VERTICAL MOVEMENT TO INTERMEDIATE POINTS ON HORIZONTAL LEG
Step II
Make a simple sketch between two adjacent points of known movement
(Refer Case3 of ‘Distribution of movements’)
The vertical movement at hanger location can be calculated by proportioning the same.
03
.
24
7850
14
.
27
6950
1
X
Vertical movement of H1 = 22.86 + 24.03 = 46.89
Say 47 mm i.e. 47 mm up
Vertical movement of H2 = 22.86 + 6.74 = 29.60 Say 30 mm
mm
X
74
.
6
7850
14
.
27
1950
1
Step III
Make the sketch of piping between the points B and D,
extending the piping to a single plane as shown.
15350
48
.
46
15350
)
25
48
.
46
(
750
4
X
= -42.99 mm say – 43 mm
Vertical movement at H4 =43 mm down
= -19.70 mm say – 20 mm
Vertical movement at H5 = 20 mm down
15350
48
.
46
15350
)
25
48
.
46
(
5750
5
X
= -3.41 mm say – 3 mm
Vertical movement at H6 = 3 mm down
= -20.81 mm say 21 mm
Vertical movement at H7 = 21 mm up
15350
48
.
46
15350
)
25
48
.
46
(
9250
6
X
15350
48
.
46
15350
)
25
48
.
46
(
14450
7
X
For easy reference, when selecting the appropriate
hanger, let us make a simple table of hanger movement. Hanger Number Movement (mm)
H1 47 up H2 30 up H3 0 H4 43 down H5 20 down H6 3 down H7 21 up
The first step in the solution is to prepare a table of weights
Description Weight Weight of Total Weight Weight Insln (Ca Si) Used in
calculation 150NB Sch 67.5 Kg/m 17.0 Kg/m 84.5Kg/m 84.5 Kg/m 160 pipe 150 NB Sch 24.0 kg 8.0 Kg 32 Kg 32 Kg 160 900BW LR Elbow 150 NB BW 725.0 kg 37.0 Kg 762 Kg 762 Kg 1500 Ib class Gate Value
Taking moments about H1, m x kg. = kg.m 0.15 x 25.4 = 3.81 0.60 x 762.0 = 457.20 787.4 461.01 461.01 Reaction at the point A =
0.9
= 512.23kg
Reaction at the hanger H1 = 787.4 - 512.2 = 275.17 kg.
422.5 Reaction at the point H1 & H2 =
2
= 211.25 kg Fig. 4.2: DISTRIBUTION OF LOAD
Taking moments about H3 M x Kg. = Kg-M 0.00 x 234.15 = 0.00 0.0832 x 32.00 = 2.66 1.0895 x 145.42 = 58.44 411.57 161.10 161.10 Reaction at H2 = 1.95 = 82.62 kg Reaction at H3 = 411.57 - 82.62 = 328.95 kg.
The various distances to the center of gravity of the
bend can be calculated using the formula as below
2R Sin /2
A
=
R ( 1- Cos )
B
=
R Sin
C
=
Applying the above formula for the distance of CG from the center of the arc for 150 NB LR elbow
C
C
=
=
R
R
Sin
Sin
= =229.0 x 1
229.0 x 1
p
p
/ 2
/ 2
=
145.8mm
=
145.8mm
Distance of the CG form the center line of the straight
Distance of the CG form the center line of the straight
pipe = 229.0 - 145.8
pipe = 229.0 - 145.8
= 83.2 mm
Taking moments about H4
Taking moments about H4
M M x x Kg. Kg. = = Kg_MKg_M 0.2605 0.2605 x x 44.0 44.0 = = 11.4611.46 0.6668 0.6668 x x 32.0 32.0 = = 21.3421.34 0.750 0.750 x x 496.1 496.1 = = 372.08372.08 572.1 404.88 572.1 404.88 404.88 404.88 Reaction Reaction at at H3 H3 == 0.750 0.750 = = 539.84 539.84 kgkg Reaction Reaction at at H4 H4 = = 572.1 572.1 - - 539.84539.84 = = 32.26 32.26 kg.kg.
Fig. 4.4: DISTRIBUTION OF LOAD BETWEEN H3 & H4
422.5 Reaction at the point H4 & H5 =
2
= 211.25 kg.
Taking moment about H6 M x Kg. = Kg-M 0.5 x 105.6 = 52.8 1.60 x 126.75 = 202.80 2.275 x 63.4 = 144.2 268.5 356.2 356.2 Reaction at H5 = 2.5 = 142.48 kg Reaction at H6 = 268.5 - 142.48 = 126.02 kg
Taking moment about H6 M x Kg = Kg-M 2.60 x 439.4 = 1142.44 5.35 x 25.4 = 135.89 5.80 x 762.0 = 4419.60 1226.8 5697.93 As the nozzle B is relieved of load
5697.93 Reaction at H7 = 5.2 = 1095.76 kg Reaction at H6 = 1226.8 - 1095.76 = 131.04 kg.
•When vertical displacement occurs as a result of
thermal expansion it is necessary to provide a
flexible support which apply supporting force
throughout the contraction and expansion cycle of
the system.
•Flexible hangers are two types :
•
Constant Spring
b f a
a b
Y Z
= =
Sina Sinf Sinb
Considering, Y Z = Sina Sinb YSinb Sina = Z Since Y Sinb X X Sina Z Y Substituting in Eqn. = Sina Sinf Y i.e. = X/Z Sinf YZ X Sinf YZ Sinf or X =
The Load „L‟ is suspended from the lever at point „A‟ and at any point within the load travel range the moment of the load about the main lever- pivot „P‟ is equal to the load times its moment arm.
Thus load moment =L (WSinf), where WSinf is the load moment arm.
The spring is attached to one of its ends to the fixed pivot “B”. The free end of the spring is attached by means of a rod to the lever- pivot „D”. This spring
arrangement provides a spring moment about the main lever- pivot “P” which opposes the load moment and is equal to the spring force, “F‟ times its moment arm. Thus spring moment
Where X is the spring moment arm
The spring force “F‟ is equal to the spring constant “K” times to the spring deflection “E”
Thus F = KE
To obtain PERFECT constant spring, the load moment must always equal to spring moment.
KE
(
YZ
Sin
f
)
Moment
Spring
f
KEYZ
Sin
Sin
LW
By proper design f and are made equal
The spring and the rod are so designed that
the spring deflection “E” always equals the distance
“”
Between pivots “B” and “D”
Therefore LW = KYZ
KEYZ
LW
Therefore
W KEYZ L or This equation holds true for all position of load within its travel range and “K”, “Y”, “Z” and “W” remain constant. It is therefore true that perfect constant support is obtained.
But due to spring hysteresis, bearing friction, sliding friction of moving parts and manufacturing tolerances, it is not normally possible to keep constant effort throughout the travel range. The deviation is kept very minimum by using PTFE washers and bushes at all pivot points and life time lubricated antifriction bearings.
But due to spring hysteresis, bearing friction, sliding friction of moving parts and manufacturing tolerances, it is not normally possible to keep constant effort throughout the travel range. The deviation is kept very minimum by using PTFE washers and bushes at all pivot points and life time lubricated antifriction bearings.
There are different models of constant springs available based on the type of supporting arrangement. These are
manufacturer specific and generally as below.
a) Spring located horizontally with the supporting structure above and the supported pipe line below the spring called model “H” by the manufacturers.
b) Spring located horizontally with the supporting structure below and the supported pipe line also below the spring called model “E” by M/s Sarathy and Model “M” by M/s Myricks.
c) Spring located horizontally with the supporting structure below and the supported pipe line above the spring called model
“F” by M/s Sarathy and Model “S” by M/s Myricks.
d) Spring located vertically with the supporting structure above and the supported pipe line below the spring called model “V” by the manufacturers.
e) Spring located vertically with supporting structure above and the supported pipe line below the spring called model “P” by M/s Myricks.
1. First select the basic model best suited for piping layout and the physical structure available for mounting.
2. Establish the total travel by giving a positive allowance of about 20% to the calculated actual travel and in no case less than 25 mm in order to allow for a possible discrepancy between calculated and actual piping movement.
i.e. Total travel = actual travel + Over travel
3. Use the selection table supplied by manufacturer and locate the total travel required at the corresponding table.
4. Move along the line until load nearest to the operating load to be supported is located such that the load fits within a reserve range of ± 10% of the average of the maximum and minimum loads
specified.
5. If the total travel lies between the two indicated figures, the loads between the successive travels can be incorporated.
6. The corresponding hanger size can be read from the respective column.
The following data is required to be specified while inquiring/ordering for a constant spring,
i. The exact Hot or Operating load required to be ii. supported during the working condition.
iii. Hydrostatic test load.
iv. The total travel and its erection.
v. The direction of travel, either upwards or downwards from the erected position.
vi. The set pin locking position (Top, Middle, Bottom or as required).
vii. The basic model.
viii. Requirement of bottom accessory components such as rods, clamps etc.
• Any hazardous environmental conditions.
• any special finish on the body such as galvanizing etc.
5.2.1 How to select the series?
5.2.2 How to determine the type? 5.2.3 How to determine size?
5.2.2 How to determine the type
The type of variable spring hanger to be used depends upon the physical characteristics required by the suspension problem I.e. available head room, pipe to be supported above the
spring or below the spring etc. The type should be selected from the seven standard types available. (See sketch for types A through G)
5.2.1 How to select the series
The selection of the hanger series shall be done to limit the supporting force within the allowable range. In choosing between the series VS1, VS2 and VS3 it must be ensured that the calculated movement will fall within the working load range. The series VS1 has the maximum variation in supporting force and hence is not a competitive selection but an invention of necessity where head room is not sufficient to use VS2.
Good engineering sense combined with available space and reasonable economic considerations should ultimately determine which series of variable spring hangers should be used.
5.2.3 How to determine size
For determining the size of the hanger the load deflection table shall be referred. In order to choose the proper hanger size the data required is the actual load or the working load (also called the hot load) and the amount and direction of the pipe line movement from cold to hot .
Locate the hot load in the table. To determine the cold load, read the spring scale up or down for the amount of expected movement. The chart must be read opposite from the direction of pipe movement. The load arrived is cold load.
If the cold load falls outside the working load range of hanger selected, relocate the hot load to the adjacent
column and find the cold load. When both the hot and cold loads are within the working range of a hanger, the size of the hanger is the number found at the top of the column.
Should it be impossible to select a hanger in any series such that both loads fall within the working range, consideration should be given for a constant spring hanger. Once selected, the percentage load variation shall be checked as follows:
Travel x Spring Rate x 100 Load Variation Percentage =
Hot load
SPECIFICATION FOR ORDER
The following data is required to be specified while inquiring/ordering for a variable spring:
I.
II. The exact hot or operating load required to be supported during the working condition.
III. Hydrostatic test load.
IV. The calculated vertical movement and
V. The direction of travel, either upwards or downwards from the erected position.
VI. The hanger series, type and size.
VII. The allowable percentage variation of load from cold to hot. VIII. Requirement of accessory components such as rods, clamps
etc.
IX. Any hazardous environmental conditions.
X. Any special finish on the body such as galvanizing etc. XI. Tag or Identification number.
COMMISSIONING OF SPRING SUPPORTS
2.5.1 Securely attach the spring to the building structure by identifying and locating at each support point in
accordance with hanger installation drawing. The location should be such that the hanger should be perpendicular in the hot or operating position/the
load should act vertical.
2.5.2 Make sure the moving parts are unobstructed. 2.5.3 The locking should not be disturbed till complete
erection is over. The lock that makes the support work as a rigid support during erection, hydrostatic
testing or chemical clearing etc.
2.5.4 The locking pins must be removed after the hanger is fully loaded to put the piping systems into
removed by the hand after adjusting the distance between the hangers and pipe by rotating the turn buckle.In case of foot mounted supports the load flange is rotated till it touches equipment/pipe being supported. Then the threaded bush with hexagonal sides is rotated so that it moves up and the load is gradually transferred on to the support. The preset pin becomes loose when the pipe load becomes the preset or factory
calibrated load. The support is then ready for use.
2.5.5 Once the preset pin is removed the support allows movement up or down by the specified amount of travel in accordance with the expected pipe
movement.
2.5.6 When the line is in operation, carefully check the support for its free movement. Generally no further