Infrastructure Plans & Trends

National Fuel Gas Supply Corporation

National Fuel Gas Supply Corporation

Empire Pipeline, Inc.

M ay  2014 Pinehurst  – M 1

(2)

NFG PL&S/Midstream Focus

Niagara Niagara Chippawa Hopewell Corning Jackson Ellisburg

WDA GAS Leidy DRY GAS

M ay  2014 Holbrook WET GAS WET GAS WET GAS Pinehurst  – M 2

(3)
(4)
(5)

1990

(6)

Niagara

(7)

ROCHESTER

SYRACUSE

Chippawa

2003

(8)

2008

(9)

Tioga

Tioga

Extension

(10)

Northern Access

Northern Access

(11)

Supply Corporation

East Aurora

East Aurora

Station

(12)

Supply Corporation

Ellisburg Station

2 New 4,740 HP Units

(13)

Line N 2011,

2012 & 2013

Bristoria

Holbrook

(14)

Supply Corporation

Buffalo Station

2011

2011

2 New 2,370 HP Units

20 2

2012 

2 New 10,310 HP Units 

(15)
(16)

Recent Expansions Have Transformed the System

Project

Project

Northern Access 320,000 Dth/d Tioga County Extension 350,000 Dth/d ( ) h/d

Northern 

Access

Tioga County 

Extension

Line N (2011, 2012 & 2013) 353,000 Dth/d Total New Capacity 1,023,000 Dth/d Northern Access $72 million Tioga County Extension $58 million Line N (2011, 2012 & 2013) $58 million

Line N Projects

M ay  2014 Total Capital Expenditures * $188 million Pinehurst  – M 16 * Capital Cost is for Expansion Only – Excludes Modernization Cost

(17)

Predominant Flows ‐ 2008

M ay  2014 Pinehurst  – M 17

Predominant Flows ‐ 2008

(18)

Predominant Flows ‐ Current

M ay  2014 Pinehurst  – M 18

Predominant Flows ‐ Current

(19)

Directly Connected Production Continues to Increase

1 000 30 00 800  900  1,000  25.00 30.00 23.69 MMDth (846 MDth/d) n th) D ay )   600  700  20.00 M Dth p er  Mo n (MDth  per  D 400  500  15.00 (M M 2.74  MMDth (88 MDth/d) 200  300  5.00 10.00 M ay  2014 ( / ) ‐ 100  0.00 n ‐09 ar ‐09 y‐09 u l‐ 09 p ‐09 v‐09 n‐10 ar ‐10 y‐10 u l‐ 10 p ‐10 v‐10 n‐11 ar ‐11 y‐11 u l‐ 11 p ‐11 v‐11 n‐12 ar ‐12 y‐12 u l‐ 12 p ‐12 v‐12 n‐13 ar ‐13 y‐13 u l‐ 13 p ‐13 v‐13 n‐14 Pinehurst  – M 19 Ja n M a Ma y Ju Sep No Jan M a Ma y Ju Sep No Jan M a Ma y Ju Sep No Jan M a Ma y Ju Sep No Jan M a Ma y Ju Sep No Jan

(20)

National Fuel is a Major SW PA Transporter

800 900 600 700 p er  Da y) 400 500 hput  (MDth p 200 300 Daily  Thr o ug M ay  2014 0 100 2009 2010 2011 2012 2013 2014 Pinehurst  – M 20 2009 2010 2011 2012 2013 2014

TCP  DTI  Equitrans Other TGP NFGSC

(21)

Shale Production Driving Throughput Growth

2 663

3,000

Average Daily System Throughput

264 394 548

2,174

2,468

2,663

2 000 thp e Da y) 1 381 1,452 1,540 137 264

1,315

1,140

1,301

1,419

2,000 o ughput  (MD t 1,074 948 1,047 929 1,381

1,140

1,000 Syste m  Thr o M ay  2014 241 173 170 353 529 622 575 0 2009 2010 2011 2012 2013 2014       (Est ) 2015       (Est ) Pinehurst  – M 21 (Est.) (Est.) Fiscal Year Empire NFGSC NFGMC

(22)

h

h

Niagara is Now a Net Export Point to Canada

500  600 

NFGSC Throughput at Niagara

300  400  100  200  D th/day (100) M D M ay  2014 (300) (200) Northern Access project was placed in‐service  November 2012 Pinehurst  – M 22 (400)

(23)

Delivering Into the Premium Eastern Canadian Market

$3 50 $4.00

Dawn to Dominion South PointDifferential Winter 13/14 Premiums in Excess of $25

$3.00 $3.50 u $2.00 $2.50 $  per  MMB tu $1.00 $1.50 M ay  2014 $0.00 $0.50 Pinehurst  – M 23 $0.00 Source: ICE Daily Cash Prices

(24)

Midstream Businesses

Delivering Into the Premium Eastern Canadian Market

g

$3 50 $4.00 Dawn to Dominion South Point Dawn to TGP 300 Zone 4 Differential Differential Winter 13/14 Premiums in  Excess of $25 $3.00 $3.50 u

Dawn to TGP 300 ‐ Zone 4 Differential

$2.00 $2.50 $  per  MMB tu $1.00 $1.50 M ay  2014 $0.00 $0.50 Pinehurst  – M 24 $0.00 Source: ICE Daily Cash Prices

(25)

Recent Extreme Winter Conditions Send Throughput Soaring

Winter Throughput on NFGSC

80,000 90,000

g p

60,000 70,000 (MDth) 40,000 50,000 o nthly  Throughput  ( 20,000 30,000 M o M ay  2014 0 10,000

Nov Dec Jan Feb Mar Nov Dec Jan Feb Mar Nov Dec Jan Feb Mar

Pinehurst

 –

M

25

(26)

Winter 13‐14: Top Gas Inventory Ends at 11.6 Bcf

NFGSC Storage Inventory

70 80

NFGSC Storage Inventory

50 60

22.1 Bcf

35.1 Bcf

March 15, 2012

40 50 Bcf

April 8, 2013

Low of 11.6 Bcf on 

April 2, 2014

20 30

April 2, 2014

M ay  2014 0 10 Pinehurst  – M 26

Nov‐11 Feb‐12 May‐12 Aug‐12 Nov‐12 Feb‐13 May‐13 Aug‐13 Nov‐13 Feb‐14

Winter 

2011‐2012

Winter 

2012‐2013

Winter 

2013‐2014

(27)

Line N Expansion to TGP 219 Pool

 I S

i

N

b

2014

Mercer Expansion

 In‐Service: November 2014

 System: NFGSC

 Capacity: 105,000 Dth/day

 Market: Range Resources

 Executed PA; 10 Yrs 

 Interconnect

( )

Mercer 

Expansion

 Mercer (TGP Station 219)

 Capital Cost: $33.6 Million

 Expansion: $29.6 million  System Modernization: $4 million Mercer (TGP Station  219) M ay  2014

 Facilities

 3,550 HP Compressor  2.08 miles – 24” Replacement Pipeline Pinehurst  – M 27

(28)

Continued Expansion to TGP 219 Pool & TETCO M2

 In‐Service: November 2015

Westside Expansion & Modernization

 In Service: November 2015

 System: NFGSC

 Capacity: 175,000 Dth/day

 Market:

 Executed PA with Range Resources;  145,000 Dth per day; 10 Yrs  Executed PA with Seneca Resources;  30,000 Dth per day; 10/15 Yrs

 Interconnect

Mercer (TGP Station  219)

 Interconnect

 Mercer (TGP Station 219)  Holbrook (TETCO)

 Capital Cost: $76.2 million

 Expansion: $39 6 million

Westside 

Expansion & 

Modernization

M ay  2014  Expansion: $39.6 million  System Modernization: $36.6 million

 Facilities

 3,550 HP Compressor

 23 3 miles – 24” Replacement Pipeline

Holbrook  (TETCO) Pinehurst  – M 28 23.3 miles  24  Replacement Pipeline

(29)

Deliveries into Eastern Canada

 In‐Service: November 2015

Northern Access 2015

Canada &

 In Service: November 2015

 System: NFGSC

 Capacity: 140,000 Dth/day

N th

Canada &  Eastern U.S. Niagara (TCPL)

 Market: Executed PA – Lease 

arrangement with TGP 

 Overall Path

Northern 

Access 2015

Niagara (TCPL)

 Producing area to Niagara

 Capital Cost: $66 million

 Facilities

Clermont M ay  2014

 Facilities

 15,400 HP Hinsdale CS

 7,700 HP Concord CS

 East Eden M&R Upgrades

Delivery Point Pinehurst  – M 29 y

(30)

Unique Solutions for On‐System LDC’s

 In‐Service: November 2015

Tuscarora Lateral

 System: NFGSC & Empire

 New No‐Notice Services (FTNN/FSNN)

 Market: RG&E NYSEG

NFGDC RG&E Market:  RG&E, NYSEG  Combination of Contract Renewals and  New Business  Includes 3.3 Bcf of Storage Service

 Interconnect

 Interconnect

 Tuscarora (NFGSC /Empire)

 Capital Cost: 

 Empire $34.1 million

Tuscarora 

Lateral

M ay  2014  Supply $11.1 million

 Facilities

 1,500 HP Compressor  17 miles – 12/16” Pipeline Pinehurst  – M 30

(31)

Additional Projects into Eastern Canada

 Status:  Working with Foundation 

Northern Access 2016

Northern 

A

2016

Chippawa (TCPL)

Shipper

 Open Season planned

 Proposed In‐Service: Nov 2016

TGP 200  Line

Access 2016

 Proposed In Service: Nov 2016

 Systems: NFGSC to Empire @ 

Pendleton, with Deliveries to 

Chippawa

pp

 Capacity:  ~350,000 Dth/day     

 Proposed Facilities Include:

 100+ miles of 24”/30” Pipeline

M ay  2014

100  miles of 24 /30  Pipeline

 Empire Compressor Station for 

Pendleton deliveries

 Empire Dehydration

 M&R Facilities

Pinehurst  – M 31 Delivery Point

(32)

Significant Post 2016 Expansion Opportunities

To Iroquois

To Iroquois

IGT

To Chippawa

Line N to 

Nexus

Central 

Tioga 

Extension

Line N to 

REX

M ay  2014 Pinehurst  – M 32

(33)

Thank You

M ay  2014 Pinehurst  – M 33

References

Related documents

Indeed, the Web survey of 411 risk managers— conducted by the Flaspöhler Research Group, in partnership with National Underwriter—found that 45.8 percent are “very

Even though Business New Zealand recommends that secret ballots for strikes be restricted to strikes related to collective bargaining (in which only union members can participate)

Contacts with federal partners and policy-makers in the context of Annual Policy Research Symposia; National and International Conferences; Research Domain Meetings; Priority Leader

The objective of duct design is to size the duct so as to minimize the pressure drop through the duct , while keeping the size (and cost) of the ductwork to a minimum.. Proper

If you only specify one formatting command, all elements of an array will be printed on a single row (even multidimensional arrays).. For multidimensional arrays, elements will

Minimal residual disease prior to allogeneic hematopoietic cell transplantation has been associated with increased risk of relapse and death in patients with acute myeloid

Factors that contribute to the most reliable high purity pH measurements include a sealed, low volume stainless steel flow chamber, a low, constant sample flowrate, a flowing

Utilize a dog model in anestrus to measure plasma progesterone concentrations in the bitch after single administration of vaginally (Crinone ® ) and oral (Prometrium ® )