(1)

GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE)

TIS-HSE-JSA-016

Basic Job

Sequence

Potential Hazard

Control Measure

Responsible Person

1

1. Obtain PTW

 Injury / damage as a result of incorrect information

 Unauthorized personal

 Obtain correct Permit to Work from eTEC

 Only authorized person allowed

 All personals must be TAMIMI-ISD and ETEC inducted Supervisor/ Engineer

2. Tool box talk

 Unauthorized access/egress, working platform, Unsafe conditions

 All personnel to be project and zone inducted

 Ensure all approved controls and prevention measures are discussed and JSA discussed with all persons involved in the work.

 All personnel to attend daily toolbox talk prior to the commencement of work.

 All personnel should be wear proper PPE under TAMIMI-ISD PPE requirement

Supervisor/ Engineer

3. Identify work Area

 Risk of injury due to low awareness of work activities and area condition

 Unsafe Access

 Safety induction to new employees, specialized training to craftsmen

 job pre start meeting, tool box meeting

 Mandatory use Of PPE’s

 Work area pre inspection

 Provide proper access.

Supervisor/ Engineer

3. Overhead powerlines

 Risk of Electrical injury due to electrical shock.

 Electrocution (death due to electrical shock)

 Burns due to electrical shock  Falls due to electrical shock

 Safety induction to all area employees  Job pre start meeting, tool box meeting  Required to maintain proper work distances  Provide proper access

 Area should not be wet because Electric hazards can be made worse if the worker, location or equipment is wet

(2)

GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE)

TIS-HSE-JSA-016

Basic Job

Sequence

Potential Hazard

Control Measure

Responsible Person

2

4 .Lifting area preparation

 Improper access

 Personal injury

 Uneven ground pavement

 Bad housekeeping

 Scattered materials

 Slip, trip

 Un authorized entry

 Excavations and trenches

 Area should be clear from any debris

 Material must be segregate

 Housekeeping must be done prior to start the job and finished the job

 Adequate access.

 Ensure area is properly prepared for job

 Ground pavement must be leveled properly

 Provide proper barricades

 Provide signage

 Provided spill tray for flammable oils

 Provide adequate fire extinguisher

 Follow the monthly color code

 Maintain safe distance from Excavation and trenches.

(3)

GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE)

TIS-HSE-JSA-016

Basic Job

Sequence

Potential Hazard

Control Measure

Responsible Person

3

5. Material preparation  Personal injury  Improper access  Sharp edges  Hand injury  Pinch point

 Hit by/hit by objects

 Rolling over of stack pipes

 Slip, trip hazard

 Improper stacking of pipes

 Property damage

 Falling objects

 Scattered pipe materials

 Fire

 Fall of height

 Mechanical failure

 Lifting tackle failure

 Caught in between

 Vision blocked

 Pre inspection of crane equipment prior to start the job.

 Ensure crane is third party certified

 Follow safe operating procedures

 Proper supervision from immediate supervisor

 Prepare proper signage and barricade prior to lifting job

 Use PPE’s as per TAMIMI-ISD requirements

 Ensure that over head object has properly place and tied off

 Material should be properly stacked

 Pipes must be in proper place ,and must be in pipe racks

 Good house keeping

 If working at height must be undergo training of working at heights

 Use fall protection gear

 Proper segregation of pipes as per sizes

 Ensure proper fire extinguisher is available in the area

 Don’t put the hands in between two pipes/objects

 Ensure sling is third party certified

 Inspect the sling thoroughly prior to use

 Ensure lifting gear has third party certified and valid

 Ensure lifting gear has no signed of damage, if damage found don’t use it or replace immediately

 Ensure out rigging pad available and no defects

 Follow monthly color code

 Operation vision must be clear

 Proper communication between operator and Rigger.

Supervisor/ Engineer

6. Lifting work (by means of crane)

 Uneven ground pavement

 Falling objects/pipes

 Struck by/hit by

 Crane overload

 Inadequate access

 Crane overturning

 Ensure crane must third party certified

 Only competent rigger allowed to performed the job

 Only qualified crane operator can performed the job

 Ensure the ground pavement level properly

 Provide proper barricade

 Provide proper signage

 Ensure clear visibility between rigger and crane operator

(4)

GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE)

TIS-HSE-JSA-016

Basic Job

Sequence

Potential Hazard

Control Measure

Responsible Person

4

 Property damage

 Mechanical failure

 Uncontrolled movements of lifted pipes/objects

 Improper communication bet. Crane operator and rigger

 Oil spill

 Slip, trip

 Pinch point

 Personal injury

 Failure of lifting equipment

 Collision of objects/pipes

 Vision blocked

 Caught in between

 EOT crane movement

 Live DSL cable

 Load hit structure

 Provide oil spill tray

 Ensure outrigger pad is free of damage

 Ensure proper sling position

 Inspect lifting gear prior to use

 Lifting gear must third party certified

 Regular inspection of lifting equipments prior to use

 Lifting tackles must have a third party certified and valid

 Use PPE’s as per TAMIMI-ISD requirements

 Don’t put hands in between two objects/pipes

 Ensure proper access

 Use two tag lines

 No people should stand beneath the lifted object/pipes

 Maintain safe distance from lifted objects/pipes

 Be sure no overhead objects within boom range

 Crane load chart must strictly followed

 Ensure lifted pipes must be in proper and secured to avoid rolling of pipes

 Use wooden wedge block

 No person should stay within boom range

 Never sit, stand, walk, work under suspended load

 Ensure no hydraulic leakage of crane

 Maintain safe distance from DSL cables box bar

7. chain block and

rigging gear

Irregular inspection on all

lifting tackles

Shackle improperly

maintained and inspected

Wear and tear of wire

ropes

Mechanical failure

Chain block failure

Wire rope shall be provided properly identified for SWL

and manufacturer.

Inspections shall be done by authorized personnel and

by the safety dep’t. Shall keep the records.

Safe working load stamp shall provide by the

manufacturer

Only trained persons may use electric or pneumatic

tools.

(5)

GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE)

TIS-HSE-JSA-016

Basic Job

Sequence

Potential Hazard

Control Measure

Responsible Person

5

Over loading of chain

block

Improper coordination

Falling of lifted pipes

Collapse of loads

Collapse of rigid mounting

Personal injury

Inadequate access

Property damages

Fall from height

Defective tools or equipment shall not allowed to use

Ensure proper rigid mounting

Ensure to use PPE

Stay away from lifted loads

Lift the pipes slowly

Provide sufficient access as possible

Be sure not to over load the capacity of chain block

Be sure not to over load the maximum strength of wire

ropes

Inspect chain blocks before use

All chain blocks should be 3

rd

party certified

Use two tag lines to control load movements

Use fall protection if working at height

Only qualified personnel allowed to do the job

Barricade the area

Provide proper signage

(6)

GAS Supply PROJECT TO SADARA

JSA FOR LIFTING(CRANE)

TIS-HSE-JSA-016

Basic Job

Sequence

Potential Hazard

Control Measure

Responsible Person

6

8. Housekeeping

 Tripping Hazards

 Arrange/ stage all the material in neat orderly manner.

 Remove damage, banding, crate material, nails etc. and dispose of properly

Supervisor/ Engineer

 Waste disposal

 Fire

 Slip,Trip,Fall

 Crushed by EOT crane

 Provide trash for work areas means for maintaining.

 All containers should be labeled

 Clean the spill area immediately, and reporting of incident and spillage.

 Stay away from EOT crane.

 Maintain safe distance from live box bar

Prepared by: Reviewed by: Approved by: Date

HSE Manager

Muhammad Raza Khan.

Project Manager AMJAD PERVAIZ

eTEC Safety Head Jinhan Baek

References

Related documents

• This paper reports the development and refinement of a comprehensive caregiver-reported measure to support assess- ment of symptoms and problems for long-term care residents

According to the American College of Sports Medicine and the American Dietetic Association, they recommend chocolate milk for athletes to help aid in muscle recovery due to a study

(ii) A bistable valve flexure and seat design that incorporates a ‘thick tip’ and additional magnetic flux channelling components can meet the necessary performance criteria

The design, construction, experimental testing and theoretical modelling of a night-sky radiation sys- tem, comprising of night cooling of water and day time cooling of a room

A comparison between the plant efficiency of three types of coal fuels: Colombian, Russian and US coal have been made with the white wood pellets combustion plant in

Continuity testing is used to establish the existence of a current-carrying path. BS 7671 recommends that continuity testing is carried out using a test instrument with an open

Por isso, o objetivo deste estudo foi avaliar o potencial larvicida do extrato da folha e do óleo do fruto de Ricinus communis sobre as larvas de Aedes aegypti.. Os

“ALS Standards” mean the Advanced Life Support Patient Care Standards of the Emergency Health Services Branch of the Ministry, version 3.0 dated November 2011, as may be amended